TianGong PCR产品类别规则

Pneumatic and other continuous action elevators and conveyors, for goods or materials

Pneumatic and other continuous action elevators and conveyors, for goods or materials: This PCR applies to cradle-to-gate manufacture of complete general-purpose…

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published version
Readiness
Review required
Last updated

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:43550 · exact

Source

1. Scope and Applicability

This PCR applies to cradle-to-gate manufacture of complete general-purpose pneumatic and other continuous-action elevators and conveyors that move bulk materials or unit loads. It covers material preparation, fabrication, route-specific surface finishing, assembly and controls integration, factory acceptance testing, and supplied packing through the manufacturer's factory gate.

The category includes pneumatic conveying systems and continuously operating belt, chain, screw, apron, vibrating, bucket-elevator, overhead, or functionally comparable conveying equipment when sold as complete equipment. Purchased motors, gearboxes, belts, controls, housings, piping, and structural members are inputs to the equipment system, not alternative reference products.

This PCR excludes passenger lifts, escalators and moving walkways; intermittent cranes, hoists, forklifts, and industrial robots; pumps and liquid elevators; conveyor belting sold separately; underground-use conveying equipment designed as a distinct special-purpose product; installation at the customer site; distribution after the factory gate; operation, maintenance, replacement parts, and end-of-life. A study that adds any excluded stage shall report it as a separate module and shall not merge it into the cradle-to-gate result.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.general-purpose-machinery.pneumatic-and-other-continuous-action-elevators-and-conveyors-for-goods-or-materials
classification_refsCPC 3.0: 43550, exact
covered_productsComplete general-purpose pneumatic conveying systems and continuous-action belt, chain, screw, apron, vibrating, bucket-elevator, overhead, or comparable conveyors for bulk materials or unit loads
excluded_productsPassenger lifts, escalators, moving walkways, intermittent lifting or handling machinery, pumps and liquid elevators, separately sold components, and underground-use special-purpose conveyors
representative_productA complete powered conveyor system supplied with its structural frame, conveying mechanism, drives, guards, controls, and declared factory-supplied accessories
production_routePurchased material and component receipt; cutting and fabrication; conditional surface finishing; mechanical and electrical assembly; factory acceptance testing; conditional packing
market_stateComplete new equipment at the manufacturer's factory gate, ready for shipment and identified by model and configuration

3. Reference Flow

FieldValue
WhatProvision of new complete equipment that continuously conveys the declared goods or material between declared inlet and discharge points
How much1,000 kg of finished, saleable equipment at the manufacturer's factory gate
How wellThe declared equipment configuration meets its specified conveying capacity, conveying route, lift or horizontal distance, material or unit-load characteristics, power supply, controls, and applicable factory acceptance criteria
How long or cycleOne factory-gate equipment product; design service life and duty class are declared but do not change the cradle-to-gate mass normalization
reference_flow_linkThe functional unit is realized by 1,000 kg of the reference product flow
FieldValue
Reference amount1,000 kg
Reference product flowPneumatic and other continuous action elevators and conveyors, for goods or materials f7693db3-d2af-46be-88aa-8d3a4a4aa276
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifiersconveyor technology; handled material or unit-load type and relevant properties; rated capacity; conveying length; lift height or route profile; duty class and operating mode; drive and power supply; control scope; equipment mass; included accessories and guards; surface-protection system; factory acceptance criteria; design service life; factory location and reporting period

When constructing a foreground data package, the items listed in Required qualifiers must be declared in dataset metadata, process notes, reference flow comment, product description, or an equivalent data package field. Missing required qualifiers make the reference flow definition incomplete for that data package.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
mu_reference_massReference product and all mass-normalized inventory rowsMass 93a60a56-a3c8-11da-a746-0800200b9a66kgDetermine finished equipment mass for the declared saleable configuration, including factory-supplied guards, controls, accessories, lubricants, and packing only where the packing remains with the delivered product; normalize all rows to 1,000 kg of unpacked equipment and report packing separately.
mu_energy_conversionElectricity rowsNet calorific value 93a60a56-a3c8-11da-a746-0800200b9a66MJPreserve metered electricity in its source unit and convert kWh to MJ using 1 kWh = 3.6 MJ; do not combine electricity with fuel or compressed-air consumption.
mu_gas_reference_conditionsNatural gas, industrial oxygen, and compressed air rowsVolume 93a60a56-a3c8-22da-a746-0800200c9a66m3Report volume at the supplier or meter reference temperature and pressure, disclose those conditions, and convert only with documented composition, density, temperature, and pressure data.
mu_bom_massPurchased materials and componentsMass 93a60a56-a3c8-11da-a746-0800200b9a66kgUse received mass assigned to the declared model or a documented bill-of-materials mass; reconcile reusable or returned items separately and avoid assigning a catalogue mass without configuration evidence.

5. System Boundary

The foreground boundary starts when purchased materials, components, fuels, utilities, and packing materials cross the reporting manufacturing site's gate. It ends when the complete tested product and its separately reported supplied packing leave the factory gate. Upstream production is represented by supplier-specific or otherwise representative upstream datasets linked to each product input.

Boundary Abstraction

FieldValue
declared_starting_conditionPurchased materials and components at the manufacturing-site gate, with supplier, grade or model, product state, mass, and upstream dataset identity recorded
starting_condition_roleForeground receipt boundary for cradle-to-gate equipment manufacture
product_classification_scopeComplete general-purpose pneumatic and other continuous-action elevators and conveyors for bulk materials or unit loads
recursive_input_ruleIf a purchased input is itself complete equipment within this PCR boundary, record it once as a product input with a separate upstream dataset and do not recursively apply this PCR inside the same foreground process
upstream_dataset_requirementEach purchased product, fuel, electricity supply, and packing material shall link to a geographically and technologically representative upstream dataset; proxies shall be identified and justified
disclosureDeclare factory location, reporting period, model and configuration, make-versus-buy boundary, included accessories, equipment mass, technology route, surface treatment, test scope, packing scope, cut-offs, proxy datasets, and excluded life-cycle stages
rule_idApplies toRulesource_ids
sb_cradle_to_gateforeground_systemInclude all on-site material preparation, fabrication, finishing, assembly, testing, rework, and packing attributable to saleable equipment through the factory gate; separately identify outsourced operations and link their upstream datasets.
sb_route_conditionconditional_processesInclude only route-specific processes and exchanges that occurred for the declared equipment configuration; mark a conditional row not applicable only with production records showing the route was absent.
sb_safety_test_boundaryfactory_acceptance_testingInclude energy and test media used for factory functional and safety tests and retain the risk assessment, acceptance procedure, and results for the declared product.eu-machinery-regulation-2023-1230
sb_cutoffall_foreground_exchangesDo not omit a listed exchange. Other exchanges may be excluded only when the data package reports their identity, estimated mass or energy relevance, environmental relevance, and reason for exclusion; hazardous and legally controlled releases shall not be cut off solely by mass.eu-machinery-regulation-2023-1230

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
material_fabricationMaterial preparation and fabricationrequiredAlways included for the declared manufactured equipmentForeground manufacture of frames, housings, chutes, piping, supports, and other fabricated members1,000 kg finished equipment
surface_finishingSurface preparation and finishingconditionalIncluded when coating, washing, curing, plating, or another surface-protection operation is performed by the reporting site or an attributable subcontractorForeground or linked outsourced surface protection1,000 kg finished equipment
assembly_controlsMechanical assembly and controls integrationrequiredAlways included; individual drive and conveying components apply only when present in the saleable configurationForeground assembly of the complete equipment system1,000 kg finished equipment
testing_packingFactory acceptance testing and packingrequiredAlways include factory acceptance testing; include each packing input only when supplied with the productForeground test, release, and preparation for shipment1,000 kg finished equipment

Process: Material preparation and fabrication (material_fabrication)

Inputs

Product flows
Carbon-steel plate input (carbon_steel_plate)

Carbon-steel plate crosses the site boundary for frames, housings, chutes, supports, or other fabricated members. Record the grade-specific received or bill-of-materials mass; the exact Tiangong flow UUID remains unresolved.

  • Selected flow: Carbon steel plate
  • Flow property / unit: Mass / kg
  • Amount rule: Measured received mass assigned to the declared equipment configuration, adjusted for documented opening and closing stock
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_fabrication_materials
  • Sources:
Fabrication electricity (fabrication_electricity)

Electricity powers cutting, forming, welding, machining, extraction, and supporting fabrication operations within the reporting boundary.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Metered electricity attributable to fabrication, converted from kWh where necessary
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_fabrication_energy
  • Sources:
Industrial oxygen for cutting (cutting_oxygen)

Industrial oxygen crosses the boundary when oxy-fuel cutting or another documented fabrication operation consumes it. Mark the row not applicable only when the declared fabrication route uses no oxygen.

  • Selected flow: Industrial oxygen bd4b0f96-2090-4806-a648-335ab20ff401
  • Flow property / unit: Volume / m3
  • Amount rule: Supplier delivery or flow-meter volume attributable to applicable fabrication operations at declared reference conditions
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_fabrication_materials
  • Sources:
Fabrication process water (fabrication_process_water)

Process water crosses the boundary when water-based cutting, cleaning, leak testing, or another fabrication operation consumes it. Do not use this row for once-through cooling water with a separately metered return.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass / kg
  • Amount rule: Metered or invoiced process-water mass attributable to fabrication, using a documented density conversion when the source record is volumetric
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_fabrication_materials
  • Sources:
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Ferrous fabrication scrap (steel_scrap)

Steel scrap leaves fabrication for internal recovery, external recycling, or treatment. Record the measured outgoing mass and destination without crediting avoided primary steel in the foreground process.

  • Selected flow: Steel scrap 8658611f-0588-4eb7-9490-46bcd02b3c2f
  • Flow property / unit: Mass / kg
  • Amount rule: Weighed or documented ferrous scrap leaving the fabrication process, net of internally reused offcuts
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_fabrication_scrap
  • Sources:
Elementary flows

Process: Surface preparation and finishing (surface_finishing)

Inputs

Product flows
Powder-coating input (powder_coating)

Powder coating crosses the boundary when it is applied to the declared equipment. Record formulation, supplier, colour, reclaimed overspray treatment, and applied-route applicability.

  • Selected flow: Powder Coating 0c581697-0eed-4b86-a070-b94966eb7344
  • Flow property / unit: Mass / kg
  • Amount rule: Issued powder mass less documented returned reusable powder, assigned to the declared equipment configuration
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_finishing_inputs
  • Sources:
Surface-finishing electricity (finishing_electricity)

Electricity powers pretreatment, extraction, coating application, curing auxiliaries, and other included finishing operations.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Metered electricity attributable to included surface-finishing operations
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_finishing_energy
  • Sources:
Natural gas for curing (curing_natural_gas)

Gaseous natural gas crosses the boundary when an on-site curing or drying oven burns it. Record fuel composition, supplier, reference conditions, and metered volume; mark not applicable for non-gas routes.

  • Selected flow: natural gas in the gaseous state 4f19ca0e-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: Volume / m3
  • Amount rule: Metered natural-gas volume attributable to included curing or drying operations at declared reference conditions
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_curing_gas
  • Sources:
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows
Direct fossil carbon dioxide from curing (curing_fossil_co2)

Direct fossil carbon dioxide crosses the elementary boundary when gaseous natural gas is burned on site for curing or drying. Do not include upstream electricity or fuel-supply emissions in this row.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Calculated from metered natural gas and documented fuel carbon composition using complete carbon-to-carbon-dioxide mass balance, adjusted for measured unburned carbon where applicable
  • Value mode: Calculated value (calculated_value)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_curing_gas
  • Sources:

Process: Mechanical assembly and controls integration (assembly_controls)

Inputs

Product flows
Installed electric motor (electric_motor)

The electric motor crosses the assembly boundary when it is supplied as part of the saleable equipment. Record manufacturer, model, rated output, efficiency class, motor type, and installed mass.

  • Selected flow: Electric motor 014f80a3-c257-425b-9b75-3e5a18573695
  • Flow property / unit: Mass / kg
  • Amount rule: Bill-of-materials or weighed installed motor mass in the declared equipment configuration
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assembly_bom
  • Sources:
Installed industrial gearbox (industrial_gearbox)

An industrial gearbox crosses the assembly boundary when the mechanical conveying route includes a gearbox. Record gearbox model, ratio, rated torque, lubricant inclusion, and installed mass; the exact Tiangong flow UUID remains unresolved.

  • Selected flow: Industrial gearbox
  • Flow property / unit: Mass / kg
  • Amount rule: Bill-of-materials or weighed installed gearbox mass in the declared equipment configuration
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assembly_bom
  • Sources:
Installed rubber conveyor belt (rubber_conveyor_belt)

Vulcanized-rubber conveyor belting crosses the assembly boundary only for belt-based configurations. Record carcass, cover compound, width, length, thickness, supplier, and installed mass.

  • Selected flow: Conveyor or transmission belts or belting, of vulcanized rubber 1e587e97-03a2-4c50-8226-f8446a1dd1d9
  • Flow property / unit: Mass / kg
  • Amount rule: Bill-of-materials or weighed installed conveyor-belt mass in the declared belt-conveyor configuration
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assembly_bom
  • Sources:
Assembly electricity (assembly_electricity)

Electricity powers mechanical assembly, electrical integration, fastening, local lifting, and assembly-area tools attributable to the declared equipment.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Metered or allocated assembly electricity supported by equipment hours or production records
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assembly_energy
  • Sources:
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Factory acceptance testing and packing (testing_packing)

Inputs

Product flows
Compressed air for testing (test_compressed_air)

Compressed air crosses the test boundary when pneumatic conveying performance, actuation, leakage, or cleaning is tested. Record pressure, air quality, reference conditions, test duration, and metered volume.

  • Selected flow: Compressed air 46e2b1e4-5a4e-4579-b6a2-65b03f9ce825
  • Flow property / unit: Volume / m3
  • Amount rule: Metered compressed-air volume attributable to the declared equipment's factory tests at declared reference conditions
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_test_media
  • Sources:
Factory-test electricity (testing_electricity)

Electricity powers unloaded and loaded functional tests, control verification, safety-function tests, and documented re-tests before release.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Metered electricity for factory acceptance tests and attributable re-tests
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_test_energy
  • Sources:
Supplied wooden packing crate (wooden_packing_crate)

A wooden packing case or crate crosses the boundary only when it is supplied with the equipment. Record wood product type, treatment, reusable-return status, and supplied mass.

  • Selected flow: Packing cases, boxes, crates, drums and similar packings, of wood, cable-drums of wood 39feb4f9-43da-4106-aa3c-f52afb654078
  • Flow property / unit: Mass / kg
  • Amount rule: Weighed or supplier-documented mass of wooden packing cases or crates supplied with the declared equipment
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1,000 kg finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_packing_materials
  • Sources:
Waste flows
Elementary flows

Outputs

Product flows
Finished conveyor equipment (reference_product)

The complete tested and released equipment is the reference product. Record unpacked saleable mass; supplied packing remains a separate input row.

  • Selected flow: Pneumatic and other continuous action elevators and conveyors, for goods or materials f7693db3-d2af-46be-88aa-8d3a4a4aa276
  • Flow property / unit: Mass / kg
  • Amount rule: 1,000 kg unpacked finished equipment after normalization from the measured saleable configuration mass
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: 1,000 kg reference product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_product_mass
  • Sources:
Waste flows
Elementary flows

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
al_subdividemulti_product_manufacturingPrefer direct metering, work-order records, and process subdivision to assign materials, energy, test media, scrap, and outsourced operations to the declared equipment configuration.
al_physicalresidual_shared_inputsWhen subdivision is not feasible, allocate shared material-processing and energy inputs using a documented physical driver such as machine time, processed mass, weld length, coating area, or test duration that causally represents consumption.
al_economic_last_resortresidual_shared_overheadsUse economic allocation only when no defensible physical driver exists; disclose the value basis, currency year, product mix, sensitivity result, and fraction assigned to the reference product.
al_scrapferrous_scrap_and_recyclingReport scrap at the point it leaves the foreground process with its measured mass and destination. Do not subtract an avoided-primary-material credit from the foreground inventory; any recycling benefit belongs to a separately declared downstream modelling convention.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_fabrication_materialsmaterial_fabricationcarbon-steel plate, industrial oxygen, and process water inputsGoods receipts, issue records, flow meters, and stock recordsflow identity; grade or purity; supplier; quantity; unit; reference conditions for gases; opening stock; closing stock; work orderReconcile receipts plus opening stock minus closing stock and documented transfers to the declared work orderkg or m3 as required by the rowPer receipt or meter interval, aggregated per work orderRepresentative production period covering the declared modelAll fabrication areas and attributable subcontractorsSum attributable quantities, convert under section 4, then normalize to 1,000 kg finished equipmentSupplier documents, calibrated meter records, stock reconciliation, and work-order traceability
cp_fabrication_energymaterial_fabricationfabrication electricitySubmeter or facility electricity records and machine-hour allocationmeter start; meter end; kWh; machine; work order; operating hours; allocation driverPrefer dedicated metering; otherwise allocate documented area or machine consumption using operating hourskWh retained and converted to MJMeter interval not longer than one monthAt least one representative continuous production year or the full campaignReporting site's fabrication operationsSubtract excluded loads, assign by causal driver, convert to MJ, and normalize to 1,000 kg finished equipmentMeter calibration, invoice reconciliation, and allocation worksheet
cp_fabrication_scrapmaterial_fabricationferrous fabrication scrapScales, scrap tickets, and internal reuse recordsscrap identity; mass; date; work order; destination; internally reused offcutsWeigh outgoing scrap and subtract documented internal reuse without avoided-production creditkgPer shipment or production lotSame period as material inputsAll fabrication scrap collection pointsSum attributable outgoing ferrous scrap and normalize to 1,000 kg finished equipmentCalibrated scale record, recycler ticket, and mass-balance reconciliation
cp_finishing_inputssurface_finishingpowder-coating inputStores issue and return recordsproduct identity; formulation; issued mass; returned reusable mass; work order; dateNet issued mass assigned to the declared work orderkgPer batch or work orderFull finishing campaign for the declared modelOn-site and attributable outsourced finishingIssued mass minus documented reusable return, normalized to 1,000 kg finished equipmentSupplier specification, batch record, and stock reconciliation
cp_finishing_energysurface_finishingfinishing electricitySubmeter and equipment-run recordskWh; line; work order; operating time; standby timeDedicated meter or causal allocation by line operating timekWh retained and converted to MJPer meter interval or batchFull finishing campaign for the declared modelIncluded on-site finishing lineSubtract unrelated loads, convert to MJ, and normalize to 1,000 kg finished equipmentMeter calibration and batch-to-work-order traceability
cp_curing_gassurface_finishingcuring natural gas and direct fossil carbon dioxideGas meter, supplier composition, and oven run recordsm3; reference temperature; reference pressure; fuel composition; fossil carbon fraction; work order; operating timeMeter fuel attributable to curing and retain supplier composition needed for carbon balancem3 for gas and kg for calculated carbon dioxidePer meter interval or batchFull applicable curing campaignIncluded on-site gas-fired curing equipmentNormalize metered gas; calculate fossil carbon dioxide by carbon balance; normalize both to 1,000 kg finished equipmentMeter calibration, supplier fuel certificate, run log, and calculation worksheet
cp_assembly_bomassembly_controlsinstalled motor, gearbox, and conveyor beltReleased bill of materials, supplier records, and as-built configurationcomponent identity; model; specification; quantity; unit mass; installed mass; serial or lot; work orderReconcile released bill of materials to as-built records and weigh when catalogue mass is configuration-dependentkgPer equipment configurationAll declared equipment units in the reporting sampleReporting site and attributable preassemblySum installed mass by atomic component flow and normalize to 1,000 kg finished equipmentApproved bill of materials, as-built release, and supplier specification
cp_assembly_energyassembly_controlsassembly electricitySubmeter and tool or work-centre recordskWh; work centre; work order; operating hours; allocation driverDedicated meter or causal allocation by work-centre operating hourskWh retained and converted to MJMeter interval not longer than one monthRepresentative production periodAll included assembly and controls-integration areasAssign attributable electricity, convert to MJ, and normalize to 1,000 kg finished equipmentMeter calibration, invoice reconciliation, and work-centre log
cp_test_mediatesting_packingcompressed air for testingFlow meter and test recordm3; pressure; temperature; air quality; test id; equipment id; durationMeter test air at the point of use and document reference-condition conversionm3Per testAll acceptance tests and attributable re-tests in the reporting sampleFactory acceptance test areaSum attributable volume at declared conditions and normalize to 1,000 kg finished equipmentMeter calibration and signed test record
cp_test_energytesting_packingfactory-test electricityTest-bay submeter and test recordkWh; test id; equipment id; operating mode; duration; re-test reasonRead dedicated test-bay meter for each test or allocate by documented test duration and powerkWh retained and converted to MJPer testAll acceptance tests and attributable re-tests in the reporting sampleFactory acceptance test areaSum attributable electricity, convert to MJ, and normalize to 1,000 kg finished equipmentMeter calibration and signed acceptance record
cp_packing_materialstesting_packingwooden packing cratePacking list, supplier record, and scalepacking identity; material; treatment; reuse status; mass; equipment idWeigh supplied packing or use supplier mass verified against packing configurationkgPer packed equipment unitAll supplied packing in the reporting sampleFinal packing area and supplier-packed modulesSum supplied crate mass and normalize to 1,000 kg finished equipmentPacking list, supplier specification, and scale record
cp_product_masstesting_packingfinished reference productFinal scale, shipping record, and released configurationequipment id; model; configuration; unpacked mass; packing mass; release status; dateWeigh released equipment without supplied packing or reconcile verified component masses when direct weighing is impracticablekgPer saleable equipment unitAll declared units or a justified representative sampleFinal release point at the reporting factorySum unpacked saleable mass and normalize all inventory to exactly 1,000 kg reference productCalibrated scale certificate, release record, and packing-mass reconciliation

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calc_normalize_massall_inventory_rowsnormalized amount = attributable period or work-order amount / unpacked saleable equipment mass × 1,000 kgattributable row amount; unpacked saleable equipment massamount per 1,000 kg reference product
calc_electricity_mjelectricity_rowselectricity MJ = metered kWh × 3.6 MJ/kWhmetered electricity in kWhelectricity in MJ
calc_gas_conditionsvolumetric_gas_rowsConvert volume only when source and target temperature, pressure, and compressibility treatment are documented; otherwise retain and disclose meter reference conditionsmetered volume; temperature; pressure; gas identity; conversion methodm3 at declared conditions
calc_fossil_co2curing_fossil_co2direct fossil CO2 mass = combusted fossil carbon mass × 44/12, adjusted for measured fossil carbon leaving unoxidizedmetered natural gas; gas composition; fossil carbon fraction; measured unburned carbon where applicablekg fossil CO2 per 1,000 kg finished equipment

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_identityreference product and purchased componentsRetain model, configuration, supplier, grade or specification, product state, UUID where resolved, and the exact bill-of-materials or receipt link; document unresolved UUIDs without substituting a proxy.Released configuration, supplier document, bill of materials, and UUID audit
dq_temporalall foreground recordsUse a representative continuous 12-month period when production is continuous, or the complete declared campaign for project manufacture; disclose shutdowns, atypical rework, and sample coverage.Meter intervals, work orders, production calendar, and coverage calculation
dq_mass_balancematerials, scrap, packing, and reference productReconcile input material mass to product, outgoing scrap, returned stock, documented inventory change, and other identified outputs at the finest practical work-order or period level.Signed mass-balance worksheet and stock reconciliation
dq_meteringelectricity, gases, water, and test mediaRetain meter identity, calibration status, reading interval, allocation basis, unit conversion, and reference conditions where volumetric.Calibration certificate, raw meter readings, invoices, and conversion worksheet
dq_performancefactory acceptance testingRetain declared capacity, route, lift or distance, load or conveyed material, power and control settings, acceptance limits, safety-function checks, deviations, and signed results; for applicable idler belt conveyors, document the capacity and power calculation method.Signed test procedure and report; ISO 5048:1989 where applicable; ISO 12100:2010 and applicable legal conformity documentation
dq_completenessall foreground exchangesCheck purchase, waste, environmental, maintenance, and incident records for additional atomic exchanges; quantify or explicitly justify every exclusion and do not use a generic utility, waste, or emission collection label as an inventory row.Completeness checklist, record reconciliation, and exclusion log

9. Validation Rules

rule_idApplies toRulesource_ids
vr_referencereference_flowConfirm the reference product UUID, mass property, mass unit group, exact 1,000 kg normalization, and all required qualifiers; reject packed mass substituted for unpacked equipment mass.un-cpc-3-0-structure-2025
vr_inventoryprocess_inventoryConfirm every row is one atomic exchange, each UUID-bearing row matches the declared flow type, property, unit group, and official Chinese name, and every unresolved row appears in manifest review metadata.
vr_mass_balancematerial_fabrication_and_packingConfirm carbon-steel plate, steel scrap, returned stock, installed mass, supplied packing, and reference product are reconciled without an unreported recycling credit.
vr_energy_separationenergy_and_test_mediaConfirm electricity, natural gas, and compressed air are separately metered or causally allocated, use their declared properties and units, and are not combined into one utility row.
vr_routeconditional_rowsConfirm each conditional exchange is supported by the declared technology route and production records; do not apply belt, gas-curing, oxygen-cutting, compressed-air, or wooden-crate rows to an absent route.
vr_performance_safetyfactory_acceptance_testingConfirm functional and safety acceptance evidence covers the declared configuration, reasonably foreseeable use, control and stopping functions, safe blockage handling, and declared conveying performance; document deviations and re-tests.eu-machinery-regulation-2023-1230
vr_disclosurepublished_datasetConfirm required metadata, temporal and site coverage, allocation drivers, upstream dataset links, proxies, cut-offs, outsourced operations, noise and hazardous-substance emission information where applicable, and excluded stages are disclosed.eu-machinery-regulation-2023-1230

10. Published Dataset Profile

FieldValue
dataset_rolesecondary_dataset; may serve as background_dataset after methodology review and publication
downstream_useForeground process and lifecycle-model projections for cradle-to-gate manufacture of the declared complete conveying equipment configuration
allowed_useComparison or modelling of equipment configurations with equivalent reference mass, factory-gate boundary, functional qualifiers, technology route, geography, time period, data quality, and allocation basis
excluded_useDirect comparison of conveying service efficiency without matched capacity, route, duty cycle, service life, use-phase energy, maintenance, and end-of-life; passenger lifting, intermittent lifting machinery, pumps, separately sold parts, or underground-only equipment
required_metadataPCR id and version; equipment model and configuration; conveyor technology; handled material or unit-load specification; rated capacity; conveying length and lift or route profile; duty class; drive, power and controls; included accessories; unpacked mass; surface finish; test scope; design service life; factory geography; reporting period; make-versus-buy boundary; packing; allocation; cut-offs; upstream datasets; unresolved UUIDs
required_quality_disclosurePrimary-data share; meter and scale calibration; temporal and site coverage; sampling; mass-balance closure; causal allocation drivers; supplier-data age; proxy datasets; test conditions and results; rework; exclusions; uncertainty and unresolved evidence needs
update_triggerMaterial change in equipment boundary, dominant material or component design, drive or conveying technology, factory route, energy supply, surface treatment, test protocol, packing, geography, allocation method, upstream dataset, or evidence that changes a material inventory result

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-3-0-structure-2025official_guidanceUnited Nations Statistics Division, CPC Version 3.0 Structure, 30 June 2025, https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Structure_30Jun2025.csv (retrieved 2026-06-23; SHA-256 5cd2c1c4890dd6be16af48e9bb940fed48efff9865f39ff15edaa921da25fb7c)CPC 43550 classification identity and separation from adjacent lifting, other handling, and parts categories
eu-machinery-regulation-2023-1230official_guidanceRegulation (EU) 2023/1230 of the European Parliament and of the Council on machinery, https://eur-lex.europa.eu/eli/reg/2023/1230/oj (accessed 2026-09-05)Safety integration, functional testing, technical instructions, blockage handling, control safety, and applicable noise and hazardous-substance emission disclosure

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 5
Rule IDApplies toRuleSource IDs
system_boundary_rule_1foreground_system_boundaryThe foreground boundary starts when purchased materials, components, fuels, utilities, and packing materials cross the reporting manufacturing site's gate. It ends when the complete tested product and its separately reported supplied packing leave the factory gate. Upstream production is represented by supplier-specific or otherwise representative upstream datasets linked to each product input.
sb_cradle_to_gateforeground_systemInclude all on-site material preparation, fabrication, finishing, assembly, testing, rework, and packing attributable to saleable equipment through the factory gate; separately identify outsourced operations and link their upstream datasets.
sb_route_conditionconditional_processesInclude only route-specific processes and exchanges that occurred for the declared equipment configuration; mark a conditional row not applicable only with production records showing the route was absent.
sb_safety_test_boundaryfactory_acceptance_testingInclude energy and test media used for factory functional and safety tests and retain the risk assessment, acceptance procedure, and results for the declared product.eu-machinery-regulation-2023-1230
sb_cutoffall_foreground_exchangesDo not omit a listed exchange. Other exchanges may be excluded only when the data package reports their identity, estimated mass or energy relevance, environmental relevance, and reason for exclusion; hazardous and legally controlled releases shall not be cut off solely by mass.eu-machinery-regulation-2023-1230
Allocation rules · 4
Rule IDApplies toRuleSource IDs
al_subdividemulti_product_manufacturingPrefer direct metering, work-order records, and process subdivision to assign materials, energy, test media, scrap, and outsourced operations to the declared equipment configuration.
al_physicalresidual_shared_inputsWhen subdivision is not feasible, allocate shared material-processing and energy inputs using a documented physical driver such as machine time, processed mass, weld length, coating area, or test duration that causally represents consumption.
al_economic_last_resortresidual_shared_overheadsUse economic allocation only when no defensible physical driver exists; disclose the value basis, currency year, product mix, sensitivity result, and fraction assigned to the reference product.
al_scrapferrous_scrap_and_recyclingReport scrap at the point it leaves the foreground process with its measured mass and destination. Do not subtract an avoided-primary-material credit from the foreground inventory; any recycling benefit belongs to a separately declared downstream modelling convention.
Validation rules · 7
Rule IDApplies toRuleSource IDs
vr_referencereference_flowConfirm the reference product UUID, mass property, mass unit group, exact 1,000 kg normalization, and all required qualifiers; reject packed mass substituted for unpacked equipment mass.un-cpc-3-0-structure-2025
vr_inventoryprocess_inventoryConfirm every row is one atomic exchange, each UUID-bearing row matches the declared flow type, property, unit group, and official Chinese name, and every unresolved row appears in manifest review metadata.
vr_mass_balancematerial_fabrication_and_packingConfirm carbon-steel plate, steel scrap, returned stock, installed mass, supplied packing, and reference product are reconciled without an unreported recycling credit.
vr_energy_separationenergy_and_test_mediaConfirm electricity, natural gas, and compressed air are separately metered or causally allocated, use their declared properties and units, and are not combined into one utility row.
vr_routeconditional_rowsConfirm each conditional exchange is supported by the declared technology route and production records; do not apply belt, gas-curing, oxygen-cutting, compressed-air, or wooden-crate rows to an absent route.
vr_performance_safetyfactory_acceptance_testingConfirm functional and safety acceptance evidence covers the declared configuration, reasonably foreseeable use, control and stopping functions, safe blockage handling, and declared conveying performance; document deviations and re-tests.eu-machinery-regulation-2023-1230
vr_disclosurepublished_datasetConfirm required metadata, temporal and site coverage, allocation drivers, upstream dataset links, proxies, cut-offs, outsourced operations, noise and hazardous-substance emission information where applicable, and excluded stages are disclosed.eu-machinery-regulation-2023-1230
Processes and inputs/outputs · 4
Process IDProcess nameInput flowsOutput flows
material_fabricationMaterial preparation and fabrication41
surface_finishingSurface preparation and finishing31
assembly_controlsMechanical assembly and controls integration40
testing_packingFactory acceptance testing and packing31

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page

1. Scope and Applicability2. Product Category Identity3. Reference Flow4. Measurement and Unit Rules5. System BoundaryBoundary Abstraction6. Process Inventory StructureProcess MapProcess: Material preparation and fabrication (material_fabrication)InputsProduct flowsCarbon-steel plate input (carbon_steel_plate)Fabrication electricity (fabrication_electricity)Industrial oxygen for cutting (cutting_oxygen)Fabrication process water (fabrication_process_water)Waste flowsElementary flowsOutputsProduct flowsWaste flowsFerrous fabrication scrap (steel_scrap)Elementary flowsProcess: Surface preparation and finishing (surface_finishing)InputsProduct flowsPowder-coating input (powder_coating)Surface-finishing electricity (finishing_electricity)Natural gas for curing (curing_natural_gas)Waste flowsElementary flowsOutputsProduct flowsWaste flowsElementary flowsDirect fossil carbon dioxide from curing (curing_fossil_co2)Process: Mechanical assembly and controls integration (assembly_controls)InputsProduct flowsInstalled electric motor (electric_motor)Installed industrial gearbox (industrial_gearbox)Installed rubber conveyor belt (rubber_conveyor_belt)Assembly electricity (assembly_electricity)Waste flowsElementary flowsOutputsProduct flowsWaste flowsElementary flowsProcess: Factory acceptance testing and packing (testing_packing)InputsProduct flowsCompressed air for testing (test_compressed_air)Factory-test electricity (testing_electricity)Supplied wooden packing crate (wooden_packing_crate)Waste flowsElementary flowsOutputsProduct flowsFinished conveyor equipment (reference_product)Waste flowsElementary flows7. Allocation and Co-product Handling8. Foreground Data Collection, Calculation, and Quality RulesData Collection ProtocolsCalculation RulesData Quality Requirements9. Validation Rules10. Published Dataset Profile11. Data Sources