TianGong PCR产品类别规则

Parts of portable electric lamps designed to function by their own source of energy (except those of cycles or motor vehicles); parts n.e.c. of lamps and lighting fittings; parts n.e.c. of illuminated signs, illuminated name-plates and the like

Parts of portable electric lamps designed to function by their own source of energy (except those of cycles or motor vehicles); parts n.e.c. of lamps and lighting……

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published version
Readiness
Review required
Last updated

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:46542 · exact

Source

1. Scope and Applicability

This PCR covers factory-gate production of discrete metal or metal-and-minor-component parts whose dedicated function is incorporation into portable self-powered electric lamps, lamps and lighting fittings, illuminated signs, illuminated name-plates, or similar illuminated articles within the boundary represented by CPC 46542. It applies to finished replacement parts and production parts supplied as saleable parts, including formed housings, brackets, reflectors, covers, frames, contact-supporting metal pieces, and comparable non-light-source parts when their product identity is documented.

The representative route is an aluminium-sheet part formed or machined, conditionally alkaline-cleaned and powder-coated, inspected, and released at the factory gate. A concrete data package shall declare the actual part number, host product, material and alloy, forming technology, surface treatment, coating, electrical content, dimensions, saleable condition, geography, and production period. Alternative metal stocks or finishing systems shall be instantiated as separate atomic flows and technology-specific processes; they are not to be combined with the representative flows.

Complete lamps and lighting fittings, lamps for cycles or motor vehicles, electric filament or discharge lamps, arc lamps, LED light sources or modules sold as such, glass-only parts, plastics-only parts, upstream production of purchased materials, distribution, installation, use, maintenance, and end-of-life are outside this foreground gate-to-gate rule. These may be linked as separate datasets when required by the study goal. un-cpc-3-0-structure-2025 establishes the classification identity; us-epa-mpm-development-document-2003 and eu-jrc-stm-bref-2006 support the representative operation sequence and conditional surface-treatment boundary.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.electrical-machinery-and-apparatus.parts-of-portable-electric-lamps-designed-to-function-by-their-own-source-of-energy-exc-21bad56b
classification_refsCPC 3.0: 46542 (exact)
covered_productsSaleable metal or metal-and-minor-component parts dedicated to portable self-powered electric lamps, lamps and lighting fittings, illuminated signs, illuminated name-plates, and like illuminated articles, when not classified as a complete lamp, light source, glass-only part, or plastics-only part
excluded_productsComplete lamps and fittings; cycle or motor-vehicle lighting parts; filament, discharge, arc, or LED light sources sold as such; glass-only parts; plastics-only parts; generic metal articles without a documented lighting-equipment function
representative_productPowder-coated fabricated aluminium housing, bracket, reflector, frame, or comparable metal part for a lighting fitting, supplied as one saleable part
production_routeReceipt of aluminium sheet; cutting, stamping and/or machining; optional cutting-fluid use; conditional alkaline cleaning and rinsing; conditional powder coating and electric curing; inspection and factory-gate release
market_stateFinished, dry, inspected saleable part at the manufacturing factory gate; not installed in a complete lamp or sign

3. Reference Flow

FieldValue
WhatSupply a finished part that performs its declared mechanical, optical-support, protective, mounting, contact-support, or enclosure function in the specified lighting or illuminated-sign product
How much1 kg net mass of saleable parts, excluding transport packaging
How wellConforms to the declared drawing, material/alloy, dimensions and tolerances, finish/coating, host-product interface, electrical-content declaration, and release inspection criteria
How long or cycleOne factory-gate delivery; no use-stage service duration is credited at part level, and any required durability or cycle rating shall be declared as a product qualifier
reference_flow_linkOne kilogram of finished lighting-equipment part output finished_lighting_part
FieldValue
Reference amount1 kg
Reference product flowFinished lighting-equipment part
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifierspart number and function; host lamp, fitting, sign or name-plate type; material and alloy; net mass; dimensions and tolerances; forming and machining route; surface preparation; coating or uncoated state; electrical content; factory-gate geography; production period; recycled-content claim and method if reported; release criteria; transport-packaging exclusion

When constructing a foreground data package, every item in Required qualifiers shall be declared in dataset metadata, process notes, reference-flow comments, product descriptions, or an equivalent field. Missing required qualifiers make the reference flow incomplete for that data package.

Tiangong audit receipt fd0dd520-46b8-49d5-b2e6-427dc6c94d03 directly read five public state-100 candidates and found no exact reference-product flow. Its highest-ranked candidate was rejected with classification_mismatch because: The public flow is aluminium/alloy bars, rods and profiles (CPC 41532), not a finished lighting-equipment part in the assigned category. The other candidates were likewise upstream aluminium materials or unrelated aluminium products, so finished_lighting_part remains explicitly unresolved.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_net_massReference product and all mass-normalized exchangesMass 93a60a56-a3c8-11da-a746-0800200b9a66kgNormalize to the measured net mass of accepted saleable parts at factory-gate release. Exclude pallets, cartons, protective film, and other transport packaging from the reference mass.
batch_to_reference_massBatch recordsMass 93a60a56-a3c8-11da-a746-0800200b9a66kg/kg reference flowDivide each batch exchange by accepted net product mass from the same batch or a documented representative aggregation period. Keep reject and rework mass separate from accepted output.
electricity_energy_conversionElectricity rowsNet calorific value 93a60a56-a3c8-11da-a746-0800200b9a66MJPreserve metered electrical energy and convert kWh to MJ using 1 kWh = 3.6 MJ. Do not convert electricity to a mass basis.
water_mass_conversionProcess-water and cleaning-wastewater rowsMass 93a60a56-a3c8-11da-a746-0800200b9a66kgPrefer direct mass measurement. If volume is metered, record temperature and density source and document the volume-to-mass conversion.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionPurchased aluminium sheet and other declared process inputs received at the part-manufacturing site
starting_condition_roleFactory-gate input to foreground part fabrication; upstream production is represented by linked datasets
product_classification_scopeLighting-equipment parts with the semantic boundary stated in section 1; CPC 46542 is classification context and does not replace the declared product qualifiers
recursive_input_ruleIf an input is itself a saleable part within this PCR boundary, record that concrete part as a purchased product input with its supplier dataset; do not recreate its fabrication inside the consuming process or aggregate it with other parts
upstream_dataset_requirementLink geography-, technology-, material-state-, recycled-content-, and supplier-appropriate upstream datasets for aluminium sheet, electricity, water, chemicals, coating, cutting fluid, and treatment services
disclosureDeclare included operations, omitted conditional operations, outsourced steps, allocation, scrap ownership and destination, wastewater treatment, powder recovery, electricity mix, geography, period, and all substitutions from the representative route
rule_idApplies toRulesource_ids
boundary_factory_gateForeground productionInclude material receipt, cutting/stamping/machining, associated cleaning, conditional surface preparation and coating, inspection, internal transfers, saleable output, aluminium scrap, spent coolant, cleaning wastewater, and powder-coating waste through factory-gate release.us-epa-mpm-development-document-2003; eu-jrc-stm-bref-2006
boundary_conditional_finishSurface preparation and coatingInclude surface_preparation_and_coating only when alkaline cleaning and powder coating are performed for the declared product. If omitted or replaced, identify the actual finish route and author separate atomic inputs and outputs for it.us-epa-mpm-development-document-2003; eu-jrc-stm-bref-2006
boundary_upstream_linkagePurchased inputs and outsourced operationsKeep upstream production and outsourced operations outside the foreground unit process but require traceable linked datasets with consistent geography, technology and product state; no purchased input may disappear under a cut-off solely because its UUID is unresolved.eu-pef-recommendation-2021-2279
boundary_exclusionsDownstream and infrastructureExclude transport packaging from the reference mass and exclude distribution, installation, complete-lamp assembly, use, maintenance, end-of-life, buildings, capital equipment and employee travel unless the study goal explicitly includes and reports them as separate processes.eu-pef-recommendation-2021-2279

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
metal_part_fabricationMetal-part cutting, forming and machiningrequiredAlways include for the representative fabricated aluminium part; adapt the atomic stock input and operations to the declared partForeground material shapingMass of fabricated parts awaiting the next applicable operation
surface_preparation_and_coatingAlkaline surface preparation and powder coatingconditionalInclude only when the declared part is alkaline-cleaned/rinsed and powder-coated; use a separately declared technology-specific process for another finishForeground cleaning and organic coatingMass of coated parts awaiting release inspection
inspection_and_releaseFinal inspection and factory-gate releaserequiredAlways include; identify the applicable fabricated-part input from the preceding routeForeground quality release1 kg accepted saleable part

The detailed rows below describe one representative aluminium-sheet/powder-coating route without multiplying product variants by material and finishing choices. Other product constructions shall replace or extend the representative route with concrete atomic rows while preserving the same reference-flow and data-quality rules.

Process: Metal-part cutting, forming and machining (metal_part_fabrication)

Inputs

Product flows
Aluminium sheet stock (aluminium_sheet_input)

Purchased aluminium sheet crosses the site boundary as the representative metal stock. The state-100 identity is sheet above 0.2 mm; alloy, temper, thickness, recycled content and supplier state remain foreground qualifiers.

  • Selected flow: aluminium sheet 4f197be4-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record delivered sheet mass charged to the production batch, net of stock returned unused to inventory
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material_batch_records
  • Sources: us-epa-mpm-development-document-2003
Forming and machining electricity (forming_electricity)

Metered electricity for cutting, stamping, forming, machining and local extraction crosses the process boundary as electrical energy.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of energy 93a60a57-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Record submetered electricity or allocate a reconciled production-area meter by documented machine time for the declared batch
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy_records
  • Sources: us-epa-mpm-development-document-2003
Cutting fluid (cutting_fluid_input)

Cutting fluid is recorded when machining uses a supplied coolant or lubricant. Formulation, dilution and recirculation shall be disclosed.

  • Selected flow: Cutting Fluid 576d250f-4f36-4385-939d-0f03b8f95a10
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record fresh concentrate plus make-up fluid charged to the batch, excluding internally recirculated fluid
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_cutting_fluid_records
  • Sources: us-epa-mpm-development-document-2003
Waste flows
Elementary flows

Outputs

Product flows
Fabricated part awaiting the next operation (formed_part_release_output)

The shaped part leaves fabrication for the declared next operation. This is a product-specific internal flow and shall receive a foreground flow identity rather than a proxy public UUID.

  • Selected flow: Fabricated lighting part awaiting next operation
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record measured conforming and nonconforming part mass transferred out of fabrication; tag the accepted transfer separately
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_intermediate_transfer_records
  • Sources: us-epa-mpm-development-document-2003
Waste flows
Segregated aluminium fabrication scrap (aluminium_scrap_output)

Aluminium offcuts, punchings and separated chips leaving fabrication as scrap are recorded independently from the finished part and other wastes.

  • Selected flow: Aluminium Scrap 96c5f842-ea53-419b-b1cd-c02c479efb45
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record weighed aluminium scrap leaving the process, net of clean material returned directly to the same batch; disclose contamination and destination
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_fabrication_waste_records
  • Sources: us-epa-mpm-development-document-2003
Spent cutting coolant (spent_coolant_output)

Spent coolant removed from the recirculating system or batch is recorded when it leaves the process for recovery or treatment.

  • Selected flow: Spent coolant 62b6a738-fb6a-4570-a95a-9255ec0dcb2b
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record mass removed from service and transferred off process, excluding coolant retained in active recirculation inventory
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_fabrication_waste_records
  • Sources: us-epa-mpm-development-document-2003
Elementary flows

Process: Alkaline surface preparation and powder coating (surface_preparation_and_coating)

Inputs

Product flows
Fabricated part entering surface treatment (formed_part_surface_input)

The product-specific fabricated part enters the conditional surface process as an internal product flow.

  • Selected flow: Fabricated lighting part awaiting surface treatment
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record measured part mass accepted into the surface-treatment batch
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_intermediate_transfer_records
  • Sources: us-epa-mpm-development-document-2003
Alkaline-cleaning process water (process_water_input)

Water supplied to cleaning baths, rinses and make-up crosses the process boundary as a product input; internally recycled water is not counted again.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record metered fresh and make-up process water entering the surface-treatment process, excluding recirculated internal water
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_surface_material_records
  • Sources: us-epa-mpm-development-document-2003; eu-jrc-stm-bref-2006
Sodium hydroxide cleaner (sodium_hydroxide_input)

Sodium hydroxide is recorded as one concrete alkaline-cleaning chemical when used in the declared bath; concentration and solution mass basis shall be disclosed.

  • Selected flow: Sodium hydroxide e0abcced-0611-4c24-9290-5a2c5a0c4169
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record 100% sodium-hydroxide-equivalent mass added to the bath from purchase and replenishment records; separately retain supplied solution mass and concentration
  • Value mode: Calculated value (calculated_value)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_surface_material_records
  • Sources: us-epa-mpm-development-document-2003; eu-jrc-stm-bref-2006
Powder coating material (powder_coating_input)

Fresh powder coating crossing into the booth is recorded separately from recovered internal overspray.

  • Selected flow: Powder Coating 6e3010f9-fbd3-48f6-95fc-c1b38d2800d2
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record fresh powder charged from inventory, excluding recovered powder recirculated within the same foreground process; disclose resin and pigment system
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_surface_material_records
  • Sources: us-epa-mpm-development-document-2003
Surface-treatment and coating electricity (surface_electricity)

Electricity for pumps, ventilation, drying, powder application, recovery equipment and electric curing is recorded for the conditional process.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of energy 93a60a57-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Record submetered electricity or allocate a reconciled line meter by documented operating time and throughput
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy_records
  • Sources: us-epa-mpm-development-document-2003; eu-jrc-stm-bref-2006
Waste flows
Elementary flows

Outputs

Product flows
Coated part awaiting release inspection (finished_part_surface_output)

The coated product leaves the conditional surface process as a product-specific internal flow.

  • Selected flow: Powder-coated lighting part awaiting release inspection
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record dry part mass transferred from the coating line after cure and cooling
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_intermediate_transfer_records
  • Sources: us-epa-mpm-development-document-2003
Waste flows
Cleaning and rinse wastewater (cleaning_wastewater_output)

Wastewater leaving alkaline cleaning and rinsing is recorded as one concrete process-wastewater flow before on-site or off-site treatment. Bath dumps and rinses may be tracked separately in raw records but are aggregated only when composition and destination are compatible.

  • Selected flow: Wastewater from cleaning f0402393-e82c-47e8-9cd8-a486c97f3e89
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record measured wastewater mass leaving the process after internal reuse, with pH, dissolved-metal information and treatment destination retained
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_surface_output_records
  • Sources: us-epa-mpm-development-document-2003; eu-jrc-stm-bref-2006
Powder-coating waste (powder_coating_waste_output)

Unrecovered overspray and booth clean-out powder leaving the process is recorded separately from internally recovered powder.

  • Selected flow: Powder coating waste 9aa53a82-5462-400e-9096-efab7718201f
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record weighed powder-coating waste transferred for treatment or disposal, net of powder returned to the coating feed
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_surface_output_records
  • Sources: us-epa-mpm-development-document-2003
Elementary flows

Process: Final inspection and factory-gate release (inspection_and_release)

Inputs

Product flows
Fabricated part awaiting release (finished_part_inspection_input)

The last applicable fabrication or finishing step supplies the product-specific part to release inspection.

  • Selected flow: Fabricated lighting part awaiting release inspection
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Record net dry mass entering final inspection and reconcile it to accepted, rework and rejected outcomes
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_release_records
  • Sources: us-epa-mpm-development-document-2003
Inspection electricity (inspection_electricity)

Electricity for dimensional, optical, coating, continuity or other declared release equipment is recorded separately from fabrication electricity.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of energy 93a60a57-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Record submetered inspection electricity or allocate a reconciled test-area meter by documented inspection time
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy_records
  • Sources: us-epa-mpm-development-document-2003
Waste flows
Elementary flows

Outputs

Product flows
Finished lighting-equipment part (finished_lighting_part)

Accepted parts leave the foreground system at factory gate. No exact public state-100 reference-product UUID was confirmed, so the final dataset shall create or resolve the product-specific flow before publication.

  • Selected flow: Finished lighting-equipment part
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 / kg
  • Amount rule: Exactly 1 kg accepted net product mass as the reference-flow normalization output
  • Value mode: Fixed value (fixed_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: 1 kg accepted finished lighting-equipment part
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Method formula (method_formula)
  • Sources: eu-pef-recommendation-2021-2279
Waste flows
Elementary flows

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
allocation_subdivision_firstShared fabrication, finishing and inspection processesFirst subdivide meters, batch records and waste records by process, line, batch or part family so that the declared product receives directly measured burdens wherever technically feasible.eu-pef-recommendation-2021-2279
allocation_physical_driverResidual shared foreground burdensWhen subdivision is not feasible, allocate electricity by machine or line time and rated/measured load, cleaning and coating burdens by treated surface area or bath throughput, and other mass-driven burdens by accepted plus rejected processed mass. Document the causal driver and sensitivity.eu-pef-recommendation-2021-2279
allocation_scrap_and_recoveryAluminium scrap, recovered powder and internally recirculated fluidsRecord quantities, ownership and destinations. Do not count internal recirculation as a new input or assign an avoided-primary-material credit inside this gate-to-gate process. Apply any recycling or substitution credit only in the downstream lifecycle model under its declared method.eu-pef-recommendation-2021-2279
allocation_economic_last_resortMulti-product operations without a defensible physical driverUse economic allocation only when subdivision and a causal physical relationship are demonstrably unavailable; use contemporaneous net prices, report the allocation share, and test sensitivity to price variability.eu-pef-recommendation-2021-2279

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_material_batch_recordsmetal_part_fabricationaluminium sheet inputpurchase receipt plus batch issue/return recordmaterial UUID; alloy; temper; thickness; recycled-content basis; supplier; issued mass; returned mass; batch id; timestampReconcile calibrated receiving or inventory scales with production issue and return recordskgEach receipt and production batchAt least 12 representative months or the full campaign when shorterEach manufacturing site and declared part familySum net issued mass for accepted reference-product batches, then normalize by accepted net output massScale calibration; material certificate; supplier lot; inventory reconciliation; exception log
cp_energy_recordsmetal_part_fabrication; surface_preparation_and_coating; inspection_and_releaseelectricity inputsproduction electricity meter and allocation recordsmeter id; opening and closing reading; multiplier; operating time; line state; batch id; electricity supplier and grid geographyPrefer submetering; otherwise reconcile the site meter and allocate with documented machine/line/test time and loadkWh and MJEach batch or shift; meter reconciliation monthlyAt least 12 representative months or the full campaign when shorterEach site and process areaSubtract idle/non-production loads when measured, allocate only residual shared load, convert kWh to MJ, normalize by accepted massMeter calibration; invoices; meter reconciliation; downtime log; allocation worksheet
cp_cutting_fluid_recordsmetal_part_fabricationcutting-fluid inputpurchase, issue and inventory recordsproduct identity; concentrate mass; make-up mass; dilution water; opening and closing inventory; recirculation status; batch idReconcile purchase, issue and inventory records; exclude fluid still in internal circulationkgEach charge and disposal eventAt least 12 representative months or the full campaign when shorterEach machining systemNet fresh fluid charged divided by accepted reference-product massProduct safety/technical sheet; inventory reconciliation; batch log
cp_intermediate_transfer_recordsmetal_part_fabrication; surface_preparation_and_coatinginternal part outputs and inputstransfer tickets and work-order recordspart id; source process; destination process; accepted mass; rejected mass; rework mass; timestampWeigh or count with a validated count-to-mass conversion at every process transferkgEach batch transferFull production campaignEach foreground process boundaryReconcile source output to destination input and explain timing or inventory differencesScale calibration; transfer ticket; work-order reconciliation; rework log
cp_fabrication_waste_recordsmetal_part_fabricationaluminium scrap and spent coolantdispatch, manifest and storage recordswaste UUID; container tare/gross/net mass; alloy/contamination; coolant type; destination; manifest/receipt; batch linkWeigh each dispatched container and reconcile temporary storage changekgEach container movement and monthly stocktakeAt least 12 representative months or the full campaign when shorterEach site and waste destinationOpening stock plus generation minus closing stock and returns, normalized by accepted product massScale calibration; waste manifest; recycler/treatment receipt; storage reconciliation
cp_surface_material_recordssurface_preparation_and_coatingprocess water, sodium hydroxide, powder coatingmeter, purchase, issue and bath recordsmeter readings; chemical product mass; active concentration; powder issue/return; recovered powder; bath id; batch idMeter water and reconcile chemical/coating purchase, issue, return and bath recordskg and concentration fractionEach batch or bath addition; water meter each shiftAt least 12 representative months or the full campaign when shorterEach treatment and coating lineCount only fresh boundary inputs; calculate active NaOH mass as supplied solution mass times verified mass fraction; normalize by accepted output massMeter/scale calibration; chemical certificate; concentration test; inventory and bath logs
cp_surface_output_recordssurface_preparation_and_coatingcleaning wastewater and powder-coating wastedischarge, waste transfer and recovery recordswastewater mass/volume; density; pH; dissolved-metal indicator; treatment destination; powder waste net mass; recovered powder; batch/dateMeter wastewater or document tank transfer; weigh powder waste; reconcile internal reuse and recoverykgEach discharge or waste transfer; reconcile monthlyAt least 12 representative months or the full campaign when shorterEach line, treatment route and destinationNet external waste output after internal reuse/recovery, normalized by accepted output massMeter/scale calibration; laboratory result; waste manifest; treatment receipt; recovery reconciliation
cp_release_recordsinspection_and_releaseinspection input and accepted reference productproduction and release-inspection recordspart id; input mass/count; inspected count; accepted count/mass; rework; reject; drawing revision; inspection criteria; timestampUse calibrated scales or validated count-to-mass conversion and controlled inspection recordskg and item countEach production batchFull production campaignEach site and part numberReconcile input to accepted, rework and rejected outcomes; normalize all exchanges by accepted net massScale calibration; inspection plan; signed release record; nonconformance and rework log

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calc_reference_normalizationEvery foreground exchangenormalized amount = period- or batch-matched exchange / accepted net mass of finished_lighting_part; preserve the raw amount and common time/batch boundaryExchange record; accepted net product massExchange per 1 kg reference floweu-pef-recommendation-2021-2279
calc_net_material_inputaluminium_sheet_inputnet sheet input = issued sheet mass - unused sheet returned to inventory; do not subtract generated scrapIssued mass; returned unused massNet aluminium sheet inputus-epa-mpm-development-document-2003
calc_active_naohsodium_hydroxide_input100% NaOH-equivalent mass = supplied cleaning-solution mass × verified NaOH mass fractionSupplied solution mass; certificate or measured mass fractionActive sodium hydroxide masseu-jrc-stm-bref-2006
calc_electricity_mjAll electricity rowselectricity (MJ) = metered electricity (kWh) × 3.6Metered or allocated kWhElectricity in MJ
calc_mass_reconciliationFabrication, surface process and inspectioninput part/material mass shall reconcile to accepted output, internal transfer, scrap/waste, retained inventory and documented mass change over the same boundary; investigate rather than force-close unexplained differencesMaterial and intermediate inputs; accepted outputs; wastes; inventory changeMass-balance residual and completeness findingus-epa-mpm-development-document-2003

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_identityReference product and material flowsPreserve part number, host-product function, drawing revision, material/alloy, dimensions, finish, UUID decision, and product state; do not use the representative aluminium route for an undeclared alternative material.Product drawing and bill of materials; material certificate; Tiangong state-100 direct-read audit
dq_measurementMeters and scalesUse calibrated meters/scales or document a validated conversion; retain raw readings, multipliers, density/concentration data, downtime and allocation worksheets.Calibration certificates; meter logs; weigh tickets; laboratory or supplier certificates
dq_temporalForeground annual or campaign dataCover at least 12 representative months unless the production campaign is shorter; disclose campaign dates, shutdowns, abnormal batches and representativeness.Production calendar; batch register; exception log
dq_completenessAll required and applicable conditional processesReconcile inputs, internal transfers, accepted outputs, rejects, wastes and inventory change. Report zero only when the exchange is demonstrably absent, not when the UUID or meter is missing.Mass and energy reconciliation; applicability checklist; unresolved-flow register
dq_geography_technologyForeground and linked upstream datasetsMatch site geography, electricity supply, material state, finishing technology, waste treatment and reference period; document any proxy and its effect.Dataset metadata; supplier records; process specification; data-quality assessment following eu-pef-recommendation-2021-2279

9. Validation Rules

rule_idApplies toRulesource_ids
validate_identity_and_referenceProduct identity and reference flowFail validation if the canonical PCR id, part function, host product, material/alloy, finish, net reference mass, factory-gate state or required qualifiers are missing or internally inconsistent.un-cpc-3-0-structure-2025; eu-pef-recommendation-2021-2279
validate_process_applicabilityProcess mapRequire both required processes and evaluate the conditional surface process against the declared route. If another finishing route is used, require a technology-specific process with concrete atomic flows and disclose the substitution.us-epa-mpm-development-document-2003; eu-jrc-stm-bref-2006
validate_atomic_inventoryInventory rowsRequire one physical, chemical, waste or energy exchange per row; require a verified state-100 UUID or the matching manifest unresolved entry; reject combined utilities, materials, wastes, emissions or route-choice labels.
validate_units_and_normalizationAmounts and unitsRequire mass rows in kg, electricity in MJ, documented conversions, one common accepted-product denominator, and collection protocols for every collected or calculated foreground row.eu-pef-recommendation-2021-2279
validate_reconciliationMaterial, intermediate, waste and energy recordsReport accepted checks, skipped checks and residuals; fail when batch/time boundaries differ without reconciliation or when unexplained material losses, double-counted recirculation, or missing waste destinations make completeness inconclusive.us-epa-mpm-development-document-2003
validate_range_evidenceQuantitative QA rangesTreat all external range needs in the manifest as unresolved until at least two independent original-text sources with compatible boundary, functional unit and product state support a reasoned synthesis. Do not create a range from a single case, repeated value or regulatory limit.
validate_allocationShared burdens and recoveryRequire subdivision first, a documented causal physical driver for residual allocation, separate recovery quantities and destinations, and sensitivity evidence for any last-resort economic allocation.eu-pef-recommendation-2021-2279

10. Published Dataset Profile

FieldValue
dataset_roleForeground factory-gate production dataset for a declared lighting-equipment part
downstream_usesecondary_dataset; background_dataset after review and publication
allowed_useLink into complete lamp, lighting fitting, illuminated-sign, construction-product or other lifecycle models when the part function, material, finish, geography, technology, time and factory-gate boundary are compatible
excluded_useDirect comparison of unlike parts; use as a complete lamp or lighting fitting; substitution for a glass-only, plastics-only, vehicle-lighting or light-source dataset; use when material or finish is unknown; use as a published default while UUID or range-evidence blockers remain unresolved
required_metadataPCR id and version; part number/function; host product; drawing revision; material/alloy; net mass; dimensions; forming and finishing route; coating; electrical content; included/outsourced processes; site/geography; period; electricity supply; recycled content method; allocation; scrap and waste destinations; UUID status
required_quality_disclosurePrimary-data share; measurement and calibration methods; temporal coverage; missing data and proxies; process applicability; material/energy reconciliation; allocation sensitivity; unresolved UUIDs; unresolved external range evidence; representativeness and reviewer status
update_triggerChange in part design or material, mass by more than the study significance threshold, forming or finishing technology, coating chemistry, supplier/recycled-content basis, electricity supply, site/geography, waste treatment, allocation method, or availability of exact Tiangong UUID/range evidence

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-3-0-structure-2025official_guidanceUnited Nations Statistics Division, Central Product Classification Version 3.0 Structure, 30 June 2025, official CSVExact CPC 46542 classification identity and English title; source bytes verified against SHA-256 5cd2c1c4890dd6be16af48e9bb940fed48efff9865f39ff15edaa921da25fb7c
us-epa-mpm-development-document-2003official_guidanceUS Environmental Protection Agency, Development Document for the Final Effluent Limitations Guidelines and Standards for the Metal Products & Machinery Point Source Category, EPA-821-B-03-001, 2003, official PDFOriginal pages 4-12 to 4-14 verified for shaping, machining, cleaning, surface preparation, organic coating, assembly/inspection, process ordering, wastes and wastewater
eu-jrc-stm-bref-2006official_guidanceEuropean Commission Joint Research Centre, Reference Document on Best Available Techniques for the Surface Treatment of Metals and Plastics, adopted August 2006, official BREF pageOriginal official page verified for aqueous electrolytic/chemical surface treatment and associated activities; supports the conditional surface-treatment boundary and collection focus
eu-pef-recommendation-2021-2279official_guidanceEuropean Commission, Commission Recommendation (EU) 2021/2279 of 15 December 2021 on the use of the Environmental Footprint methods, official consolidated textOriginal official text verified for functional unit/reference flow, system boundary, multifunctionality hierarchy, company-specific data, data quality, normalization and validation principles

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 4
Rule IDApplies toRuleSource IDs
boundary_factory_gateForeground productionInclude material receipt, cutting/stamping/machining, associated cleaning, conditional surface preparation and coating, inspection, internal transfers, saleable output, aluminium scrap, spent coolant, cleaning wastewater, and powder-coating waste through factory-gate release.us-epa-mpm-development-document-2003, eu-jrc-stm-bref-2006
boundary_conditional_finishSurface preparation and coatingInclude surface_preparation_and_coating only when alkaline cleaning and powder coating are performed for the declared product. If omitted or replaced, identify the actual finish route and author separate atomic inputs and outputs for it.us-epa-mpm-development-document-2003, eu-jrc-stm-bref-2006
boundary_upstream_linkagePurchased inputs and outsourced operationsKeep upstream production and outsourced operations outside the foreground unit process but require traceable linked datasets with consistent geography, technology and product state; no purchased input may disappear under a cut-off solely because its UUID is unresolved.eu-pef-recommendation-2021-2279
boundary_exclusionsDownstream and infrastructureExclude transport packaging from the reference mass and exclude distribution, installation, complete-lamp assembly, use, maintenance, end-of-life, buildings, capital equipment and employee travel unless the study goal explicitly includes and reports them as separate processes.eu-pef-recommendation-2021-2279
Allocation rules · 4
Rule IDApplies toRuleSource IDs
allocation_subdivision_firstShared fabrication, finishing and inspection processesFirst subdivide meters, batch records and waste records by process, line, batch or part family so that the declared product receives directly measured burdens wherever technically feasible.eu-pef-recommendation-2021-2279
allocation_physical_driverResidual shared foreground burdensWhen subdivision is not feasible, allocate electricity by machine or line time and rated/measured load, cleaning and coating burdens by treated surface area or bath throughput, and other mass-driven burdens by accepted plus rejected processed mass. Document the causal driver and sensitivity.eu-pef-recommendation-2021-2279
allocation_scrap_and_recoveryAluminium scrap, recovered powder and internally recirculated fluidsRecord quantities, ownership and destinations. Do not count internal recirculation as a new input or assign an avoided-primary-material credit inside this gate-to-gate process. Apply any recycling or substitution credit only in the downstream lifecycle model under its declared method.eu-pef-recommendation-2021-2279
allocation_economic_last_resortMulti-product operations without a defensible physical driverUse economic allocation only when subdivision and a causal physical relationship are demonstrably unavailable; use contemporaneous net prices, report the allocation share, and test sensitivity to price variability.eu-pef-recommendation-2021-2279
Validation rules · 7
Rule IDApplies toRuleSource IDs
validate_identity_and_referenceProduct identity and reference flowFail validation if the canonical PCR id, part function, host product, material/alloy, finish, net reference mass, factory-gate state or required qualifiers are missing or internally inconsistent.un-cpc-3-0-structure-2025, eu-pef-recommendation-2021-2279
validate_process_applicabilityProcess mapRequire both required processes and evaluate the conditional surface process against the declared route. If another finishing route is used, require a technology-specific process with concrete atomic flows and disclose the substitution.us-epa-mpm-development-document-2003, eu-jrc-stm-bref-2006
validate_atomic_inventoryInventory rowsRequire one physical, chemical, waste or energy exchange per row; require a verified state-100 UUID or the matching manifest unresolved entry; reject combined utilities, materials, wastes, emissions or route-choice labels.
validate_units_and_normalizationAmounts and unitsRequire mass rows in kg, electricity in MJ, documented conversions, one common accepted-product denominator, and collection protocols for every collected or calculated foreground row.eu-pef-recommendation-2021-2279
validate_reconciliationMaterial, intermediate, waste and energy recordsReport accepted checks, skipped checks and residuals; fail when batch/time boundaries differ without reconciliation or when unexplained material losses, double-counted recirculation, or missing waste destinations make completeness inconclusive.us-epa-mpm-development-document-2003
validate_range_evidenceQuantitative QA rangesTreat all external range needs in the manifest as unresolved until at least two independent original-text sources with compatible boundary, functional unit and product state support a reasoned synthesis. Do not create a range from a single case, repeated value or regulatory limit.
validate_allocationShared burdens and recoveryRequire subdivision first, a documented causal physical driver for residual allocation, separate recovery quantities and destinations, and sensitivity evidence for any last-resort economic allocation.eu-pef-recommendation-2021-2279
Processes and inputs/outputs · 3
Process IDProcess nameInput flowsOutput flows
metal_part_fabricationMetal-part cutting, forming and machining33
surface_preparation_and_coatingAlkaline surface preparation and powder coating53
inspection_and_releaseFinal inspection and factory-gate release21

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page

1. Scope and Applicability2. Product Category Identity3. Reference Flow4. Measurement and Unit Rules5. System BoundaryBoundary Abstraction6. Process Inventory StructureProcess MapProcess: Metal-part cutting, forming and machining (metal_part_fabrication)InputsProduct flowsAluminium sheet stock (aluminium_sheet_input)Forming and machining electricity (forming_electricity)Cutting fluid (cutting_fluid_input)Waste flowsElementary flowsOutputsProduct flowsFabricated part awaiting the next operation (formed_part_release_output)Waste flowsSegregated aluminium fabrication scrap (aluminium_scrap_output)Spent cutting coolant (spent_coolant_output)Elementary flowsProcess: Alkaline surface preparation and powder coating (surface_preparation_and_coating)InputsProduct flowsFabricated part entering surface treatment (formed_part_surface_input)Alkaline-cleaning process water (process_water_input)Sodium hydroxide cleaner (sodium_hydroxide_input)Powder coating material (powder_coating_input)Surface-treatment and coating electricity (surface_electricity)Waste flowsElementary flowsOutputsProduct flowsCoated part awaiting release inspection (finished_part_surface_output)Waste flowsCleaning and rinse wastewater (cleaning_wastewater_output)Powder-coating waste (powder_coating_waste_output)Elementary flowsProcess: Final inspection and factory-gate release (inspection_and_release)InputsProduct flowsFabricated part awaiting release (finished_part_inspection_input)Inspection electricity (inspection_electricity)Waste flowsElementary flowsOutputsProduct flowsFinished lighting-equipment part (finished_lighting_part)Waste flowsElementary flows7. Allocation and Co-product Handling8. Foreground Data Collection, Calculation, and Quality RulesData Collection ProtocolsCalculation RulesData Quality Requirements9. Validation Rules10. Published Dataset Profile11. Data Sources