Power plant construction and handover · 10. Published Dataset Profile
- Lifecycle status
- Candidate
- Content maturity
- Authored methodology
- Current version
- 0.1.0Last updated
- Readiness
- Review required
Methodology and translation states come from the source record; publishing this website does not change their review status.
Content languages
zh-CN · Aligned
Status, classification and source details
Readiness
- Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.
Classification mapping
CPC 3.0:53262 · exact
Source
10. Published Dataset Profile
| Field | Value |
|---|---|
| dataset_role | foreground_construction_dataset |
| downstream_use | Explicit construction contribution to a plant infrastructure model with separately matched upstream components and separately assessed operation/end of life |
| allowed_use | The measured actual plant/site/configuration/acceptance period and compatible comparisons with the same functional/coverage definitions |
| excluded_use | Generic mass-based power-plant material, unqualified per-kWh operation, default lifetime/capacity/recipe, whole lifecycle or licensing/approval claim |
| required_metadata | All reference qualifiers; actual work packages, initial state and scope; original unit/gate/identity bindings; measured geometries and capacity; asset/shared interface ledger; cold/hot and fuel-load status; signed handover dates |
| required_quality_disclosure | Performed/skipped checks, unmetered and unsupported scope, unresolved identity/allocation/conversion, uncertainty, supplier links and excluded operating/maintenance/demolition stages |
| update_trigger | Actual configuration, site, component/supply gate, method evidence, measurement, acceptance stage or attributable work changes |
11. Data Sources
| Source id | Type | Reference | Used for |
|---|---|---|---|
| un-cpc-power-plants-2025 | official_guidance | United Nations Statistics Division, CPC Version 3.0 Explanatory Notes (30 June 2025), printed/PDF p281, 53262. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdf | Heavy electrical generating plants including nuclear; adjacent category context only, not methodology approval |
| iaea-nuclear-construction-2011 | official_guidance | IAEA, NP-T-2.5 Construction Technologies for Nuclear Power Plants (2011), printed p23/PDF37 §4.1; printed pp48–50/PDF62–64 §4.2; printed pp99–104/PDF113–118 §5.1; printed pp112–114/PDF126–128 §6. https://www-pub.iaea.org/mtcd/publications/pdf/p1526_web.pdf | Qualitative nuclear civil/containment/turbine-island construction and installation; no adoption of historical case dimensions, recipes, duration or licence |
| ifc-thermal-power-2008 | official_guidance | IFC, EHS Guidelines for Thermal Power Plants (19 December 2008), pp1–2 Applicability; Annex A pp26–29; p8 cooling. https://www.ifc.org/content/dam/ifc/doc/2000/2008-thermal-power-ehs-guidelines-en.pdf | Historical non-nuclear combustion-route/component distinctions; guideline applicability >50 MWth HHV, not a PCR capacity default or construction emission factor. Operational cooling/emissions are not mandatory construction releases |
| ifc-biomass-construction-2017 | official_guidance | IFC, Converting Biomass to Energy: A Guide for Developers and Investors (June 2017), printed pp91–94/PDF109–112 §8.1; printed pp95–100/PDF113–118 §8.2. https://www.ifc.org/content/dam/ifc/doc/mgrt-pub/biomass-report-06-2017.pdf | Biomass steam/biogas examples: erection, civil/mechanical/electrical records and cold/hot/function/performance acceptance distinctions; no universal thermal-plant recipes or trial quantities |
| ifc-hydropower-2018 | official_guidance | IFC, Environmental, Health, and Safety Approaches for Hydropower Projects (March 2018), printed pp13–14/PDF23–24 §1.1.7; printed pp48–50/PDF58–60 Annex A. https://www.ifc.org/content/dam/ifc/doc/mgrt/gpn-ehshydropower.pdf | Site-specific hydro civil/waterways/powerhouse and electromechanical interfaces; conditional excavation, spoil and drainage; no default dimensions, life, reservoir emissions or numerical factors |
| doe-wind-siting-2021 | official_guidance | US DOE/NREL, Land-Based Wind Energy Siting: A Foundational and Technical Resource (August 2021), §2.1 Construction, printed pp9–11/PDF19–21, Figures 6–7. https://www.energy.gov/sites/default/files/2025-10/land-based-wind-energy-siting-guide.pdf | Historical land-based preparation, foundation concrete/rebar and crane/tower/nacelle/rotor erection; not offshore construction evidence or default quantities |
| ifc-mocuba-solar-2016 | official_guidance | IFC ESRS project 36787 Mocuba Solar, disclosed 21 January 2016, Project Description and PS3 Water consumption. https://disclosures.ifc.org/project-detail/ESRS/36787/mocuba-solar | One Mozambique polycrystalline PV case: steel substructure, array electrical configuration and construction/O&M separation; no case capacity, module count, area or date is a PCR default, and no transfer of case geography to CN identities |
| epa-concrete-washout-2012 | official_guidance | US EPA, Stormwater Best Management Practice: Concrete Washout, EPA-833-F-11-006 (February 2012), pp1–3. https://www.epa.gov/sites/default/files/2015-11/documents/concretewashout_0.pdf | Historical ready-mix chute/pump washing and separate captured liquid/solid handling; no default pH, density, mandatory leakage or treatment credit |
Raw downloads
These files are byte-identical to the canonical files for this revision in the repository.
Complete field inspector
Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.