Mine facility construction and physical delivery

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53261 · exact

Source

1. Scope and Applicability

This PCR governs the construction and accepted physical delivery of non-building mining facilities: winding shafts and towers/headframes, mine tunnels, drifts and declines, and mine loading/discharging stations with their integral civil, support and permanent installation interfaces. An actual engineered open-pit access/initial mine-working facility is also in scope when its separately accepted physical extent and mining function are demonstrated. These are facilities associated with mining, not a construction service or a tonne of ore. Sources: unsd-cpc-3-2025; wa-ground-control-2019.

A dataset defines one complete facility or integrated mine-access/materials-handling delivery unit from actual design, as-built survey and acceptance records. Underground access, headframe and loading-station routes must not be replaced by a simpler unrelated structure. A contract section is a reference entity only if its complete functional interfaces and independently accepted extent are documented; do not choose an arbitrary metre of shaft, construction shift or minor component to bypass missing work.

Exclude buildings, public transport tunnels, independent power plants and manufacturing/chemical plants, independently delivered roads/pipelines, machinery/material manufacture sold separately, routine ore extraction/processing and mining services. Include genuinely integral mine-access and loading interfaces, with an asset/interface schedule preventing overlap. For rehabilitation, disclose retained assets, condition, removal and new work; do not charge their original manufacture again without an explicit attributed prior-asset boundary.

The principal boundary is actual construction-to-accepted-handover. Bought-material/equipment production, external transport, site construction, subsequent mine operation/maintenance/renewal, and closure/demolition/disposition are distinct stages. Upstream burden is linked only from verified compatible datasets; the foreground alone establishes neither complete cradle-to-gate nor whole life. Literature supplies route context, not universal recipes, dimensions, equipment necessity, quantities, lifespan, loads, emissions or compliance approval.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.constructions-and-construction-services.constructions.mine-facility-construction-delivery
classification_refsCPC 3.0 53261; Mining constructions
covered_productsAccepted non-building mine shafts/headframes, mining tunnels/drifts/declines and loading/discharging facilities, or a documented integral combination; actual engineered initial open-pit facilities with established mining scope and handover.
excluded_productsExclude buildings, public transport tunnels, independent power plants and manufacturing/chemical plants, independently delivered roads/pipelines, machinery/material manufacture sold separately, routine ore extraction/processing and mining services. Include genuinely integral mine-access and loading interfaces, with an asset/interface schedule preventing overlap. For rehabilitation, disclose retained assets, condition, removal and new work; do not charge their original manufacture again without an explicit attributed prior-asset boundary.
representative_productOne actual independently accepted mine-access or materials-handling facility at its stated site, geology, geometry, configuration and completion status; no numeric exemplar is presumed.
production_routeActual site enabling; selected underground/open-pit opening and muck route; actual batching/support/lining; relevant collar/headframe/station civil structures; permanent equipment installation; construction utilities/wastes; testing and handover.
market_stateComplete accepted mining civil facility at the documented site and interfaces, with permanent equipment inclusions and remaining dependencies stated.

3. Reference Flow

FieldValue
WhatProvide the defined physical mine-access/winding/loading facility ready for its documented function at handover.
How muchOne complete accepted delivery unit; surveyed shaft depth/diameter, drift length and cross-section, decline gradient, initial pit extent, tower height/geometry, station extent and actual handling interface/capacity are required where relevant, never defaults.
How wellActual geotechnical, structural, hydraulic, ventilation and mechanical/electrical acceptance criteria and test conditions under cp_acceptance; retain ground/water conditions and installed support. Do not infer mining licence, production performance or universal safety approval.
How long or cycleOne actual construction/commissioning-to-handover cycle with start/end/test dates. Later service life and operating period require separately evidenced scenarios and are not prescribed.
reference_flow_linkreference_mine_facility
FieldValue
Reference amount1
Reference product flowAccepted complete mine facility delivery unit
Reference flow propertyNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345
Reference unit groupUnits of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159
Reference unititem
Required qualifierssite/project and facility identity; mine type and actual geology/hydrogeology; actual construction route; complete spatial and functional extent; shaft/drift/pit/tower/station geometry where applicable; support/lining and permanent equipment configuration; material/fuel/water states; measured handling/access/ventilation/water-control function and test criteria; as-built survey and acceptance state/dates; retained/removed assets; construction/upstream/transport/later-phase interfaces; shared asset/ore-development attribution; omitted/unresolved environmental and identity coverage

All required qualifiers belong in dataset metadata, reference-flow description or equivalent records. Here item is a display alias for the public Item(s) counting unit. Measured length/area/volume/capacity characterizes the same complete facility; a different facility or route is not interchangeable solely because its count is one. No mass or service duration is implied.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_countreference productNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345itemUse cp_acceptance to confirm one complete accepted facility with the same documented configuration and extent. Every row is per declared reference flow; measured geometry and capacity are qualifiers, not alternative denominators. No whole-facility or per-metre mass is invented.
material_stateimported_fill; emulsion_explosive; anfo; non_electric_detonator; inert_excavation_rock; sulfide_excavation_rock; excavated_soil; portland_cement; natural_sand; crushed_stone; pce_admixture; rock_bolt; steel_mesh; reinforcing_bar; structural_steel; formwork_plywood; steel_loading_hopper; diesel; treated_process_water; mineral_lubricant; excavator_asset; drill_asset; crane_asset; fossil_co2; nitrogen_monoxide; nitrogen_dioxide; pm25; pm_2_5_10; pm_unspecified; washout_solids; concrete_waste; steel_offcut; used_lubricating_oilMass 93a60a56-a3c8-11da-a746-0800200b9a66kgRetain actual lot state, composition, moisture and inclusion boundary. Count/volume/area/length to mass requires actual same-lot unit mass, density, areal mass or geometry and associated material density. No generic 1 kg machine or default density/recipe is used.
fresh_volumepurchased_concrete; purchased_shotcrete; purchased_grout; site_concrete; site_shotcrete; site_groutVolume 93a60a56-a3c8-22da-a746-0800200c9a66m3Use actual measured fresh received/batched/placed volumes, preserving batch formulation, entrained air, returns, rebound and hydration state. Mass conversion requires corresponding fresh density; do not substitute hardened volume, dry powder mass or a whole-works mass.
treated_water_masstreated_process_waterMass 93a60a56-a3c8-11da-a746-0800200b9a66kgPreserve the public treated-water Mass/kg identity and obtain actual same-water measured density at the documented temperature and composition when raw records are volumetric. Keep the raw volume balance; no default density.
water_stateuntreated_supplied_water; groundwater_abstraction; freshwater_release; seawater_release; dewatering_transfer; washout_liquidVolume 93a60a56-a3c8-22da-a746-0800200c9a66m3Meter each liquid stream at its actual source/destination and retain raw volume balance. treated_process_water has a public Mass property: preserve it using independently measured same-water density, not a rewritten Volume identity. Resource withdrawal, supplied water, internal reuse, waste transfer and direct release remain distinct.
energy_propertyelectricity_lv_cn; electricity_mv_cn; electricity_otherNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJPreserve the Net calorific value reference property and energy unit group. Convert kWh to MJ with 3.6 MJ/kWh; this does not assign a fuel heating value. Raw fuel litre-to-kg or kg-to-MJ conversions need actual fuel density/heating value and state.
component_lengthhdpe_drain_pipe; low_voltage_cableLength 838aaa23-0117-11db-92e3-0800200c9a66mRetain actually received/installed length and actual cross-section, cores, wall thickness, joints and offcuts. Public cable Length is not rewritten as Mass; any supplemental mass needs the actual matching measured/certified unit mass.
freight_workroad_freightGoods transport (mass*distance) 838aaa20-0117-11db-92e3-0800200c9a66t*kmUse actual payload in tonnes multiplied by actual leg distance in km, retaining empty-return and allocation conditions under cp_transport; 1000 kg = 1 t, with no default haul distance.

Flow-property and unit-group support relations

Flow propertyUnit groupPublic reference unit
Mass 93a60a56-a3c8-11da-a746-0800200b9a66Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66kg
Volume 93a60a56-a3c8-22da-a746-0800200c9a66Units of volume 93a60a57-a3c8-12da-a746-0800200c9a66m3
Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66Units of energy 93a60a57-a3c8-11da-a746-0800200c9a66MJ
Number of items 01846770-4cfe-4a25-8ad9-919d8d378345Units of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159Item(s)
Length 838aaa23-0117-11db-92e3-0800200c9a66Units of length 838aaa22-0117-11db-92e3-0800200c9a66m
Goods transport (mass*distance) 838aaa20-0117-11db-92e3-0800200c9a66Units of goods transport 838aaa21-0117-11db-92e3-0800200c9a66t*km

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionActual surveyed site, geology, groundwater and prior/retained mine assets; defined supplier material/equipment gates and temporary access/dewatering/ventilation interfaces before construction.
starting_condition_roleforeground construction starting interface; upstream manufacture and prior assets are separate
product_classification_scopeNon-building mining facilities, CPC 3.0 53261 context; integral structures require a non-overlapping applicability decision, not automatic inheritance of all mine assets.
recursive_input_ruleIncoming same-category facility or retained mining component is recorded at its actual interface with attributed prior burden and compatible dataset; do not recursively reproduce its construction or convert a whole mining operation into a new construction input.
upstream_dataset_requirementLink actual material/component/plant production, external freight and waste treatment only where supplier, geography/time, product state, configuration, property and boundary match. Report unlinked burdens and check overlap explicitly.
disclosureDisclose construction phases and route, all starting/ending gates, prior assets, subcontract interfaces, upstream coverage, temporary plant attribution, ore-development separation and later phases excluded or separately modelled.
rule_idApplies toRulesource_ids
construction_deliverydatasetCollect actual enabling, opening/excavation, support/lining, civil structures, permanent installation and all testing/rework to the documented handover. Mechanical/raise-bore/blast routes and open-pit geometry are conditional on real works. The Platreef case is route context, not a required shaft size or timetable.unsd-cpc-3-2025; wa-ground-control-2019; platreef-shaft-case-2025
stage_interfacesall inventory rowsSeparate purchased mixtures from their site-batched alternatives and keep internal batching-to-installation links. Do not count powder/aggregate manufacture twice through both ingredients and a purchased complete mix. Preserve external transport and site operation overlap checks for complete subcontract services.epa-concrete-washout-2012
mining_transitionmine_excavation; handoverSeparate facility construction/development from routine mineral extraction, processing and later mine ventilation/dewatering. Where construction exposes recoverable ore, preserve actual assay, mass, destination and contemporaneous construction/production activities; add each real ore output separately and review allocation. Do not treat saleable development rock automatically as waste or all production as construction.platreef-shaft-case-2025; ifc-mining-2007
later_lifedatasetOperation/maintenance, support renewal, later mine expansion, closure, demolition, long-term drainage and final disposition are outside the core handover result. If requested, model them as distinct evidenced stages with real service periods, quantities and destinations; never assume a universal life or declare whole life from this core.ifc-mining-2007
environmental_routessite_utilities; construction_wasteIdentify actual abstraction, pumped inflow, rainfall, process water, reuse, evaporation, liquid transfer and recipient-specific release. Add significant real gas, dissolved substance and size-specific particulate exchanges separately using matching public identities where verified. Land transformation, noise, vibration and occupational dust metrics require actual location/time and appropriate methods; absence of a row is not zero impact.ifc-mining-2007; epa-concrete-washout-2012

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
site_enablingSite definition and enabling worksrequiredDefine the actual site/retained assets and perform the real survey, access, clearing, stripping and temporary arrangements; do not assume that every earthwork is needed.foreground_productionper declared reference flow
mine_excavationMine opening excavation, drilling, blasting and muck removalconditionalWhen new shafts, mine tunnels/drifts, declines or engineered open-pit access/initial workings form part of the delivery; record mechanical, raise-bore, drill-and-blast or combined route actually used.foreground_productionper declared reference flow
site_batchingActual on-site cementitious batchingconditionalOnly when concrete, shotcrete or cement grout is actually mixed inside the boundary; each actual formulation is separately reconciled.foreground_productionper declared reference flow
ground_supportGeotechnical support, shaft lining and drainage installationconditionalWhere actual ground-control design requires support, reinforcement, shaft lining, grouting or drainage; no universal support pattern is prescribed.foreground_productionper declared reference flow
civil_structuresHeadframes, foundations and loading/discharging civil structuresconditionalWhen headframes/winding towers, shaft collars, foundations or non-building loading/discharging structures belong to the accepted mine facility.foreground_productionper declared reference flow
permanent_installationPermanent winding and materials-handling installationconditionalInclude the actual permanent winding, loading, unloading, conveyor and power interfaces in the delivery schedule; do not assume all facilities have all devices.foreground_productionper declared reference flow
site_utilitiesStage-tagged utilities, temporary plant and environmental exchangesrequiredInspect actual energy, supply water, abstraction/dewatering, temporary ventilation/pumping/hoisting and construction plant for every included stage; rows occur only when evidenced.foreground_productionper declared reference flow
construction_wasteConstruction waste characterization and transferrequiredInspect each actual construction and commissioning waste stream, including waste status, composition, hazardous character and destination.foreground_productionper declared reference flow
handoverTesting, reinstatement and accepted physical handoverrequiredVerify the complete delivered facility, surveyed extent, functionality, defects, test consumption and handover documentation.deliveryper declared reference flow

These blocks are accounting responsibilities, not a mandatory recipe. Utilities and waste are stage-tagged once for their originating work; field readings remain process-specific. Complete subcontract services require overlap checks before separate material/fuel/plant inputs are added. Extend the map and atomic rows for every significant actual unlisted operation or stream before claiming dataset completeness.

Process: Site definition and enabling works (site_enabling)

Define the actual site/retained assets and perform the real survey, access, clearing, stripping and temporary arrangements; do not assume that every earthwork is needed.

Inputs

Product flows
Uncontaminated natural soil fill (imported_fill)

Only actual imported fill for integral access, collars or station foundations; retain soil class, moisture and compaction records. Internal cut/fill is not a purchased input.

  • Selected flow: Uncontaminated natural soil fill
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_earth, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_earth
  • Sources: wa-ground-control-2019
Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Outputs

Product flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Process: Mine opening excavation, drilling, blasting and muck removal (mine_excavation)

When new shafts, mine tunnels/drifts, declines or engineered open-pit access/initial workings form part of the delivery; record mechanical, raise-bore, drill-and-blast or combined route actually used.

Inputs

Product flows
Emulsion Explosive (emulsion_explosive)

Only the actually used sensitized ammonium-nitrate water-in-oil emulsion explosive matching this public identity; retain product lot, actual formulation, charge mass and detonation record. This is not an assumed blasting requirement, nor an authorization to blast.

  • Selected flow: Emulsion Explosive eb58ee82-ee46-4306-baef-51dfef1d1ccc
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_blast, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_blast
  • Sources: platreef-shaft-case-2025; ifc-mining-2007
Ammonium nitrate and fuel oil blasting explosive (anfo)

Only actual ordinary ANFO, with measured formulation and charge records. Do not use the expanded-ammonium-nitrate candidate containing nitromethane or aluminium as its identity. Other explosives need their own rows.

  • Selected flow: Ammonium nitrate and fuel oil blasting explosive
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_blast, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_blast
  • Sources: platreef-shaft-case-2025
Non-electric shock-tube blasting detonator (non_electric_detonator)

When this exact initiation device is used; record actual number and lot-specific unit mass, not the mass of its bulk explosive.

  • Selected flow: Non-electric shock-tube blasting detonator
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_blast, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_blast
  • Sources: platreef-shaft-case-2025
Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Outputs

Product flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Waste flows
Non-acid-generating excavated rock (inert_excavation_rock)

Actual exported excavation rock demonstrated non-acid-generating by project geology and characterization; internal reuse is reconciled separately. No ore, gangue or tailings identity is assumed.

  • Selected flow: Non-acid-generating excavated rock
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_earth, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_earth
  • Sources: ifc-mining-2007; platreef-shaft-case-2025
Potentially acid-generating sulfide excavation rock (sulfide_excavation_rock)

Only physically separate sulfide-bearing excavation rock evidenced as potentially acid-generating; track containment and destination. Acid and dissolved-metal releases need actual chemistry and release evidence, not automatic emissions.

  • Selected flow: Potentially acid-generating sulfide excavation rock
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_earth, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_earth
  • Sources: ifc-mining-2007
Uncontaminated excavated soil sent off site (excavated_soil)

Only actual exported soil, with contamination test, moisture and waste/product status. Segregate removed topsoil retained for reinstatement.

  • Selected flow: Uncontaminated excavated soil sent off site
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_earth, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_earth
  • Sources: ifc-mining-2007
Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Process: Actual on-site cementitious batching (site_batching)

Only when concrete, shotcrete or cement grout is actually mixed inside the boundary; each actual formulation is separately reconciled.

Inputs

Product flows
Cement, portland cement (portland_cement)

Use only actual grey powdered Portland cement at its factory production gate. Record binder grade and supplier; separately add real transport and on-site mixing. Do not use this identity for grout, fresh concrete, slag binder or a cementitious basket. Its public CPC label describes concrete articles and conflicts with the explicit powder name/route/comment: retain that discrepancy for review and require actual supplier powder identity, rather than relying on the classification label.

  • Selected flow: Cement, portland cement 3c9e98a5-0a1e-4a18-9545-1475a87fcab7
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_batch, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_batch
  • Sources: wa-ground-control-2019; epa-concrete-washout-2012
Washed natural silica sand (natural_sand)

Only this actual sand used in the recorded mix; preserve grading, source and moisture, including water carried by the sand.

  • Selected flow: Washed natural silica sand
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_batch, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_batch
  • Sources: wa-ground-control-2019; epa-concrete-washout-2012
Graded crushed natural stone aggregate (crushed_stone)

Record actual crushed-stone aggregate by geology, size, moisture and supplier; alternative recycled aggregate is a separate flow, never this identity.

  • Selected flow: Graded crushed natural stone aggregate
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_batch, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_batch
  • Sources: epa-concrete-washout-2012
Aqueous polycarboxylate concrete superplasticizer (pce_admixture)

Only if the actual concrete/shotcrete recipe uses this formulation; record concentration, supplier and wet mass. Do not infer a dosage or substitute accelerator, resin or dry active mass.

  • Selected flow: Aqueous polycarboxylate concrete superplasticizer
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_batch, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_batch
  • Sources: epa-concrete-washout-2012
Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Outputs

Product flows
Fresh site-batched Portland cement concrete (site_concrete)

An internal output only when this exact material is made on site. Reconcile measured fresh batch volume and actual formulation to installation; do not add a second upstream fresh-mixture dataset or count the internal transfer as an external delivery.

  • Selected flow: Fresh site-batched Portland cement concrete
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_batch, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_batch
  • Sources: wa-ground-control-2019; epa-concrete-washout-2012
Fresh site-batched wet-mix shotcrete (site_shotcrete)

An internal output only when this exact material is made on site. Reconcile measured fresh batch volume and actual formulation to installation; do not add a second upstream fresh-mixture dataset or count the internal transfer as an external delivery.

  • Selected flow: Fresh site-batched wet-mix shotcrete
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_batch, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_batch
  • Sources: wa-ground-control-2019; epa-concrete-washout-2012
Fresh site-batched Portland cement grout (site_grout)

An internal output only when this exact material is made on site. Reconcile measured fresh batch volume and actual formulation to installation; do not add a second upstream fresh-mixture dataset or count the internal transfer as an external delivery.

  • Selected flow: Fresh site-batched Portland cement grout
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_batch, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_batch
  • Sources: wa-ground-control-2019; epa-concrete-washout-2012
Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Process: Geotechnical support, shaft lining and drainage installation (ground_support)

Where actual ground-control design requires support, reinforcement, shaft lining, grouting or drainage; no universal support pattern is prescribed.

Inputs

Product flows
Steel mechanical expansion rock bolt (rock_bolt)

Only actual mechanical-expansion steel rock bolts required by the geotechnical design, with installed number, alloy, diameter, length and lot-specific mass. Resin/grouted anchors require separate resin/grout and appropriate bolt identities.

  • Selected flow: Steel mechanical expansion rock bolt
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_support, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_support
  • Sources: wa-ground-control-2019
Welded carbon-steel ground-support mesh (steel_mesh)

Only the installed mesh of the actual steel grade, wire diameter, opening, coating and mass; recovered temporary mesh follows the asset ledger.

  • Selected flow: Welded carbon-steel ground-support mesh
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_support, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_support
  • Sources: wa-ground-control-2019
Fresh delivered wet-mix shotcrete (purchased_shotcrete)

Only supplier-mixed wet shotcrete crossing the site gate. Keep actual recipe, fibre/admixture content and rebound; site-batched shotcrete is instead linked internally to site_batching.

  • Selected flow: Fresh delivered wet-mix shotcrete
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_support, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_support
  • Sources: wa-ground-control-2019
Fresh delivered Portland cement grout (purchased_grout)

Only actual delivered fresh grout, with cement/water/additive recipe and placed quantity. Site-prepared grout uses the internal site_batching balance. Other chemical injection routes need separate substances.

  • Selected flow: Fresh delivered Portland cement grout
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_support, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_support
  • Sources: wa-ground-control-2019
Perforated HDPE mine drainage pipe (hdpe_drain_pipe)

Only actual installed drainage pipe with resin, perforation pattern, diameter, wall thickness and length; record fittings separately if material.

  • Selected flow: Perforated HDPE mine drainage pipe
  • Flow property / unit: Length 838aaa23-0117-11db-92e3-0800200c9a66 / m
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_support, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_support
  • Sources: wa-ground-control-2019
Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Outputs

Product flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Process: Headframes, foundations and loading/discharging civil structures (civil_structures)

When headframes/winding towers, shaft collars, foundations or non-building loading/discharging structures belong to the accepted mine facility.

Inputs

Product flows
Fresh delivered ready-mixed structural concrete (purchased_concrete)

Only external fresh structural mix for collars, foundations, shaft linings or non-building station structures; actual strength/exposure recipe, delivered volume, placement, curing and waste are recorded. Site batching is accounted separately.

  • Selected flow: Fresh delivered ready-mixed structural concrete
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_civil, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_civil
  • Sources: platreef-shaft-case-2025; epa-concrete-washout-2012
Non-alloy reinforcing steel bar (reinforcing_bar)

Only actual reinforcing bar of the documented grade and delivered form; reconcile mill certificates, measured bar mass, cut schedules and offcuts.

  • Selected flow: Non-alloy reinforcing steel bar
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_civil, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_civil
  • Sources: platreef-shaft-case-2025
Fabricated low-alloy structural steel headframe member (structural_steel)

Only actual fabricated headframe/station member, with grade, coating, geometry, joints and inclusion of fabrication declared; upstream tube-feedstock steel is not this finished member.

  • Selected flow: Fabricated low-alloy structural steel headframe member
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_civil, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_civil
  • Sources: platreef-shaft-case-2025
Film-faced construction formwork plywood (formwork_plywood)

Only actual plywood formwork, with coating, panel size, mass, reuse and losses. Manufacture is attributed from one persistent asset ledger; consumptive damage/replacement and final destination are separate.

  • Selected flow: Film-faced construction formwork plywood
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_assets, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_assets
  • Sources: platreef-shaft-case-2025; epa-concrete-washout-2012
Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Outputs

Product flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Process: Permanent winding and materials-handling installation (permanent_installation)

Include the actual permanent winding, loading, unloading, conveyor and power interfaces in the delivery schedule; do not assume all facilities have all devices.

Inputs

Product flows
Complete electric mine winding machine (mine_winder)

Include the actual permanent winder of stated drum/drive/braking/control configuration when handed over with the shaft. Record supplier manufacturing interface and installation/testing separately; temporary sinking winders follow the asset ledger.

  • Selected flow: Complete electric mine winding machine
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_install, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_install
  • Sources: platreef-shaft-case-2025
Fabricated steel mine loading hopper (steel_loading_hopper)

Only actual delivered loading/discharging hopper, with wear lining, steel specification, dimensions and complete supply boundary. No assumed capacity or per-station mass.

  • Selected flow: Fabricated steel mine loading hopper
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_install, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_install
  • Sources: unsd-cpc-3-2025; ifc-mining-2007
Complete electrically driven mine belt conveyor (belt_conveyor)

Only an actually installed complete conveyor in the station or mine access works; record belt, drive, support and controls included by supplier and actual dust-control interfaces. A rubber belt or transportation service alone is not the complete machine.

  • Selected flow: Complete electrically driven mine belt conveyor
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_install, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_install
  • Sources: unsd-cpc-3-2025; ifc-mining-2007
Low-voltage cable (low_voltage_cable)

Only actual CN factory-gate low-voltage cable matching GB/T 12706.1-2020 identity and documented voltage not exceeding 1000 V. Retain actual conductor, insulation, sheath, cores, cross-section and length; installation, operating losses and retirement are excluded from the cable identity. Other geography/specification needs another identity.

  • Selected flow: Low-voltage cable 49101b44-20cc-46a0-adfb-af07e4cc8908
  • Flow property / unit: Length 838aaa23-0117-11db-92e3-0800200c9a66 / m
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_install, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_install
  • Sources: platreef-shaft-case-2025
Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Outputs

Product flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Process: Stage-tagged utilities, temporary plant and environmental exchanges (site_utilities)

Inspect actual energy, supply water, abstraction/dewatering, temporary ventilation/pumping/hoisting and construction plant for every included stage; rows occur only when evidenced.

Inputs

Product flows
Diesel fuel (diesel)

Actual diesel supplied and consumed by construction machinery, trucks, temporary pumps or hoisting; retain blend, grade, supplier and receiving/consumption stocks. This mass-based foreground identity specifies no provider, refinery, density or heating value. It establishes no upstream inventory or emission factor; measured density is required for volumetric receipts and fossil fraction is measured separately.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: ifc-mining-2007
Alternating current (electricity_lv_cn)

Only CN grid-average consumption mix delivered to the actual site user below 1 kV. Preserve its Net calorific value property and energy unit group. Tag ventilation, drilling, pumping, lifting, batching, joining and test meters by stage; prevent duplication with complete subcontract services or the medium-voltage supply.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: ifc-mining-2007
Alternating current (electricity_mv_cn)

Only actual CN user-side grid consumption at 1–35 kV, preserving its Net calorific value property. If transformed within the foreground, reconcile incoming electricity, actual transformation losses and internal low-voltage use without counting both incoming supplies.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: ifc-mining-2007
User-side alternating-current electricity at the declared non-CN supply (electricity_other)

Only actual supply outside the confirmed CN identities; retain country, voltage, generation/grid route and supply boundary. On-site diesel generation is modelled from fuel, plant and measured outputs, without adding another purchased-grid burden.

  • Selected flow: User-side alternating-current electricity at the declared non-CN supply
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: ifc-mining-2007
Process Water (treated_process_water)

Only genuinely treated liquid industrial process water at its verified actual supply interface; document supplier, source, treatment, quality and transport/link to site. Preserve Mass/kg. If meters report volume, use same-water measured density at its temperature/composition; no default 1000 kg/m3. Untreated natural water and groundwater pumping are separate.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: ifc-mining-2007; epa-concrete-washout-2012
Supplied untreated liquid freshwater (untreated_supplied_water)

Only actual untreated freshwater transferred from a technosphere supplier; declare source, quality and site delivery. A natural resource is counted at the abstraction process, not automatically repeated at this purchase interface.

  • Selected flow: Supplied untreated liquid freshwater
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: ifc-mining-2007
Mineral hydraulic lubricating oil (mineral_lubricant)

Only actual mineral oil used for construction plant with documented grade, formulation, additions and changes. Synthetic PAO or insulation oil candidates are not this fluid.

  • Selected flow: Mineral hydraulic lubricating oil
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: ifc-mining-2007
Complete hydraulic construction excavator (excavator_asset)

Include only the actual identified temporary machine manufacturing contribution. Record its same-configuration measured/certified net mass and evidenced dimensionless current service share across its full supported activity basis. Keep manufacture distinct from operating fuel/electricity and maintenance. Unknown total service remains review; cumulative attribution across projects/periods cannot exceed one.

  • Selected flow: Complete hydraulic construction excavator
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_assets, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_assets
  • Sources: ifc-mining-2007
Complete rock drilling rig (drill_asset)

Include only the actual identified temporary machine manufacturing contribution. Record its same-configuration measured/certified net mass and evidenced dimensionless current service share across its full supported activity basis. Keep manufacture distinct from operating fuel/electricity and maintenance. Unknown total service remains review; cumulative attribution across projects/periods cannot exceed one.

  • Selected flow: Complete rock drilling rig
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_assets, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_assets
  • Sources: ifc-mining-2007
Complete mobile construction crane (crane_asset)

Include only the actual identified temporary machine manufacturing contribution. Record its same-configuration measured/certified net mass and evidenced dimensionless current service share across its full supported activity basis. Keep manufacture distinct from operating fuel/electricity and maintenance. Unknown total service remains review; cumulative attribution across projects/periods cannot exceed one.

  • Selected flow: Complete mobile construction crane
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_assets, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_assets
  • Sources: ifc-mining-2007
Road freight transport of mine construction cargo by truck (road_freight)

Only real external supplier-to-site and outgoing transport legs not already contained in a complete supplier/subcontract inventory; retain measured payload, distance, vehicle, load/return and origin/destination. Internal mucking energy belongs to its actual equipment, not a duplicate external freight leg.

  • Selected flow: Road freight transport of mine construction cargo by truck
  • Flow property / unit: Goods transport (massdistance) 838aaa20-0117-11db-92e3-0800200c9a66 / tkm
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_transport, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_transport
  • Sources: ifc-mining-2007
Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows
ground water (groundwater_abstraction)

Only actual liquid groundwater crossing from the natural resource into construction abstraction/dewatering, CAS 7732-18-5, Resources from water / Renewable material resources from water. Record country/aquifer, purpose, actual pumped volume, reuse and destination. No seawater, supplier water, wastewater, vapour or scarcity-class substitution; dewatering is not assumed consumptive use.

  • Selected flow: ground water 4f462198-40cd-4184-8733-86648a20dc3f
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: ifc-mining-2007; wa-ground-control-2019

Outputs

Product flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows
carbon dioxide (fossil) (fossil_co2)

Only actual externally released fossil CO2, CAS 124-38-9, immediate air/unspecified from evidenced construction fuel combustion or an independently evidenced geological release. Retain fossil carbon, oxidation and measured release/activity evidence; fuel presence supplies no universal emission quantity.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_air, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
  • Sources: ifc-mining-2007
nitrogen monoxide (nitrogen_monoxide)

Only measured or independently supported molecular NO release to immediate air/unspecified, CAS 10102-43-9, from actual construction exhaust or blasting. Internal mine workplace concentration is not external released mass; no NO2, N2O or NOx-equivalent substitution.

  • Selected flow: nitrogen monoxide 08a91e70-3ddc-11dd-96ee-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_air, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
  • Sources: ifc-mining-2007
nitrogen dioxide (nitrogen_dioxide)

Only evidenced molecular NO2 immediate air/unspecified release, CAS 10102-44-0, after actual ventilation/control. NOx-as-NO2 is not this molecule, and a misleading N2O4 synonym does not change the definition.

  • Selected flow: nitrogen dioxide 08a91e70-3ddc-11dd-96e5-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_air, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
  • Sources: ifc-mining-2007
particles (PM2.5) (pm25)

Only evidenced external-air release of the PM2.5 fraction from actual excavation, handling, exhaust or blasting, air/unspecified. Exclude captured dust and workplace exposure; retain size definition and measurement/factor basis.

  • Selected flow: particles (PM2.5) 08a91e70-3ddc-11dd-9293-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_air, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
  • Sources: ifc-mining-2007
particles (PM2.5 - PM10) (pm_2_5_10)

Only evidenced external-air release of the disjoint PM2.5–PM10 fraction to air/unspecified; do not add total PM10 or total suspended dust without removing overlap and proving the fraction.

  • Selected flow: particles (PM2.5 - PM10) 08a91e70-3ddc-11dd-9501-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_air, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
  • Sources: ifc-mining-2007
Particulate matter, particle size unspecified (pm_unspecified)

Only actual external particulate release with genuinely unresolved size; this remains an explicit coverage limitation and must not duplicate the quantified PM fractions. Do not label internal dust or a water-borne solids stream as this air release.

  • Selected flow: Particulate matter, particle size unspecified 0ce3dedb-caca-407b-a856-a90470eb8ec0
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_air, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
  • Sources: ifc-mining-2007
Water (freshwater_release)

Only actual liquid H2O discharged directly to a freshwater receptor, CAS 7732-18-5, Emissions to fresh water. Record recipient, discharge point/time, volume, treatment and measured chemistry; dissolved species/solids need separate atomic releases. This is not water supply, abstraction, water vapour, saline receptor discharge or liquid sent to treatment.

  • Selected flow: Water 5e50fc01-19c6-4377-a1cc-bc65a12498ea
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: ifc-mining-2007
Water (seawater_release)

Only actual liquid water discharged directly to a marine receptor, CAS 7732-18-5, Emissions to sea water. Record original water source, receiving sea/point/time, volume, salinity and separately monitored pollutant composition. Do not assume clean water or zero pollution. This is not freshwater release, water resource withdrawal, vapour or liquid transferred to treatment.

  • Selected flow: Water 631ecf13-0e51-4e35-8235-c6f80c60d72c
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: ifc-mining-2007

Process: Construction waste characterization and transfer (construction_waste)

Inspect each actual construction and commissioning waste stream, including waste status, composition, hazardous character and destination.

Inputs

Product flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Outputs

Product flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Waste flows
Construction dewatering liquid sent for treatment (dewatering_transfer)

Only actual characterized dewatering liquid transferred into treatment; retain suspended/dissolved chemistry and destination. Do not also record the same transfer as direct freshwater discharge; subsequent treatment releases belong to its linked process.

  • Selected flow: Construction dewatering liquid sent for treatment
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: ifc-mining-2007
Alkaline concrete washout liquid (washout_liquid)

Only actual separated washout liquid from site batching, pouring or grout work; record measured chemistry and collection/treatment. Historical EPA description provides no default pH, concentration or recycling rate.

  • Selected flow: Alkaline concrete washout liquid
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012
Settled cementitious concrete washout solids (washout_solids)

Actual separated wet/dry solids, with moisture, composition and destination; no double counting of the same slurry as both full liquid and full solid mass.

  • Selected flow: Settled cementitious concrete washout solids
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012
Hardened Portland cement concrete construction waste (concrete_waste)

Only actual hardened waste, including separately weighed shotcrete rebound after hardening if it matches the composition; retain fibre, admixture and contamination. Fresh returns are supplier returns, not automatically hardened waste.

  • Selected flow: Hardened Portland cement concrete construction waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012
Low-alloy structural steel offcut (steel_offcut)

Only actually separated structural-member offcut with recorded alloy/coating and export status; rebar and stainless scrap are separate if present. No avoided-virgin credit is assumed.

  • Selected flow: Low-alloy structural steel offcut
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: platreef-shaft-case-2025
Used lubricating oil (used_lubricating_oil)

Actual separately collected used lubricating oil at the generation point, with composition/contamination and destination documented; preserve treatment-unspecified identity and add the real treatment process separately. This does not identify every hydraulic fluid or solvent.

  • Selected flow: Used lubricating oil 55d93375-7f04-4166-b2a2-88ce929051a5
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; preserve its actual physical state, configuration and inclusion conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: ifc-mining-2007
Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Process: Testing, reinstatement and accepted physical handover (handover)

Verify the complete delivered facility, surveyed extent, functionality, defects, test consumption and handover documentation.

Inputs

Product flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Outputs

Product flows
Accepted complete mine facility delivery unit (reference_mine_facility)

One complete accepted non-building mine facility or integrated mine access/materials-handling works, with actual functional extent, geometry, interfaces and commissioned configuration. No arbitrary unfinished section, material basket, service or ore output substitutes for this physical entity.

  • Selected flow: Accepted complete mine facility delivery unit
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: 1 item
  • Value mode: fixed_value
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_acceptance
  • Sources: unsd-cpc-3-2025; platreef-shaft-case-2025
Waste flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

Elementary flows

No universal crossing exchange is prescribed here. Record each actual significant exchange separately; retained/internal movements remain in the project balance.

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
direct_subdivisiondatasetFirst trace each receipt, meter, machine log and work package to its actual facility and stage. Subdivide joint construction/ore production and adjacent power/manufacturing/building functions before allocation. For inseparable activities, justify an evidenced physical causal driver and complete beneficiary denominator using cp_allocation; cost, facility count or forecast throughput alone is not causal evidence.
asset_share_conservationexcavator_asset; drill_asset; crane_asset; formwork_plywood; steel_meshRetain one persistent identified asset and manufacture boundary. An actual same-configuration mass/count multiplied by its evidenced dimensionless current service share attributes the included manufacture burden. All projects, periods and repeated uses share one supported total-activity denominator; cumulative shares must not exceed one. Forecast versus realized service is explicit and reconciled. Unknown lifetime/activity remains review; never reset the full burden per project. Permanent new delivered support/equipment instead carries its included full supply burden once.
recovery_and_ore_interfacesmine_excavation; construction_wasteInternal rock/fill/water reuse is an internal balance, not an automatic co-product credit. Exported ore, useful rock and scrap retain real status, quantities and recipients; no default avoided-production credit. Later mineral models consume the actual allocated construction dataset burden once rather than adding its ingredients/plant again. Shared downstream attribution requires actual supported production/service evidence, with unknown denominators disclosed for review.

Direct attribution and cumulative-conservation controls are supported by the actual cp_assets/cp_allocation records; this PCR specifies no asset lifespan, mine output or allocation factor. Unproven relations remain explicit review needs for the actual dataset.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_acceptancehandoverReference entity and acceptanceforeground_recordproject/site; mine function; delivery limits/interfaces; route; as-built shaft/drift/pit/tower/station dimensions; support/plant configuration; criteria; test results; retained/new assets; start/end/test/handover dates; complete accepted countUse signed actual acceptance and as-built survey records, with stage-specific geotechnical/structural/mechanical and actual ventilation/drainage/handling tests. Reconcile the same complete facility and configuration; document defects and remaining interfaces, not presumed approvals.item; m; m2; m3; actual capacity unitsat each acceptance and relevant testactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowsigned acceptance, calibrated survey/test records and complete asset schedule
cp_earthsite_enabling; mine_excavationEarthworks and separated excavation outputsforeground_recordsurvey before/after; geology; opening dimensions; mechanical/blast route; imported fill; moisture; weighbridge records; rock/soil assay and acid-generation tests; internal reuse; disposition; construction versus production tagSurvey actual delivered openings and movements; use calibrated mass records or actual same-material surveyed volume and measured bulk density at its moisture/state. Reconcile excavation, internal reuse, exported streams and separately recovered ore.kg; m; m3each work shift/haul and survey milestoneactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowsurvey control, calibrated scales, geological tests and destination receipts
cp_blastmine_excavationActual blasting inputsforeground_recordhole pattern and dimensions; product/lot/formulation; charged and returned mass; detonator type/count/unit mass; misfires; date/location; ventilation/control; emissions evidenceReconcile real approved project blasting logs, charge weighings and stock/returns for each physically distinct formulation and initiation device. Match actual route and chemical species; a safety log is not an external-release measurement.kg; item; meach blast and stock reconciliationactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowlot certificates, actual charge logs and checked inventory balance
cp_batchsite_batchingActual on-site mixture and internal transfersforeground_recordactual recipe/lot; cement; sand; stone; every real additive; water; moisture; fresh density; batch/placed/returned volumes; transport internal links; rebound/washout; electricityMeasure each actual ingredient and fresh batch volume; retain recipe and water carried in wet constituents. Link separate concrete/shotcrete/grout transfers to their actual installation stage without adding an external purchased mixture burden.kg; m3; MJeach actual batch and work shiftactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowcalibrated batch scales/meters, actual recipe and placed/returned balance
cp_supportground_supportSupport, lining, grout and drainageforeground_recordground-control drawing; actual bolt/mesh/drain/lining specification; installed number/length/mass; fresh delivered mix/grout volume; actual strength/curing; rebound; reclaimed temporary supportUse actual installation and supplier records with surveyed same-state geometry and measured/certified unit masses/densities; inspect route necessity and permanent/temporary inclusion, retaining geotechnical and acceptance evidence.kg; m; m3; itemeach installed lot/section and inspectionactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowinstallation drawings, lot certificates and accepted inspection records
cp_civilcivil_structuresActual civil structure material quantitiesforeground_recordfoundation/collar/headframe/station geometry; purchased concrete fresh volume/recipe; rebar/structural steel grade and mass; joints; supplier inclusion; curing; returns; offcutsReconcile actual delivery tickets, drawings, fresh volumes, steel weighing/certified unit mass and installation schedules. Record all site handling, pumping, joining and curing consumption in stage-tagged utility logs.kg; m3; m; itemeach received/installed lot and acceptance milestoneactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowsupplier certificates, calibrated measurement and as-built quantities
cp_installpermanent_installationPermanent winding and loading equipment/interfacesforeground_recordsupplier equipment boundary; model/configuration; quantity or mass/length; included component schedule; delivery; installed layout; commissioning tests; cable country/voltage/conductor/insulation; losses/offcutsUse actual procurement, manufacturer drawings and accepted installed records; weigh/certify same-configuration components when mass is used, preserve actual Count/Length properties, and separately account installation/testing activity and waste.item; kg; meach equipment/cable delivery, installation and testactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowcomplete supplier inclusion list and signed commissioning evidence
cp_utilitiessite_utilitiesEnergy, plant operation and fluid useforeground_recordstage/date; meter start/end; grid country/voltage; fuel grade/blend/density/heating value if conversion; supply/stock/returns; machine hours/load/control; lubricant additions; complete subcontract inclusionsUse calibrated submeters, actual fuel receipts/tank balances and equipment duty logs. Separate construction/test operation from later mine operation. Trace any common utility total with direct subdivision or documented allocation; no assumed per-machine consumption.MJ; kWh; kg; L; heach shift, metering interval and tank reconciliationactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowmeter calibration, tank reconciliation, supplier and duty records
cp_watersite_utilitiesSupply, abstraction, dewatering and destination balanceforeground_recordsource/aquifer/country; treatment; supplier interface; incoming pumped/metered volume; actual density if Mass reporting; temperature/composition; rainfall; recirculation; consumption; recipient; liquid transfers; concentration testsMeter actual liquid volumes by source and destination. Keep pumped groundwater and purchased treated water distinct, with actual same-water density for the Mass identity; reconcile reuse, discharged liquid, treatment transfer and measured residual balance with uncertainties.m3; kg; actual concentration unitseach meter interval and discharge/sample eventactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowcalibrated meters, density/chemistry tests and receptor/treatment records
cp_assetssite_utilities; civil_structures; ground_supportReusable equipment, formwork and support attributionforeground_recordpersistent asset id; manufacture boundary; same-configuration actual net mass/count; service activity unit; current actual service; evidenced total supported service denominator; all beneficiaries/projects/periods; prior shares; forecasts/revisions; consumptive replacements and dispositionMeasure/certify actual asset quantities and trace one cross-project asset/activity ledger. Derive current share only with a supported compatible activity denominator; reconcile all past/current/planned shares without reset. Unknown total service and revised forecasts require review and sensitivity, never an invented life.kg; item; actual service activity units; dimensionless shareeach asset use/project and denominator revisionactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowtraceable manufacture/quantity evidence, full asset ledger and share reconciliation
cp_transportsite_utilitiesActual external freight legsforeground_recordcargo identity/state; actual payload mass; origin/destination; real distance; vehicle/load; return; inclusion/overlap; allocationUse dispatch/weighbridge and actual route records, distinguishing external supplier/site/waste legs from internal muck movement; check inclusion in upstream or subcontract inventories.t; km; t*kmeach shipment/legactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowweighbridge/dispatch and route evidence
cp_airsite_utilitiesSpecies, size and external releaseforeground_recordactual stage/activity; engine/fuel/blast/dust source; exhaust/control/ventilation; CAS/species; fossil origin; fraction; medium/submedium; sample/calibration; concentration and matching flow/time or independently supported factor/activity; uncertaintyUse actual outward release monitoring, compatible concentration/flow/time measurement or independently sourced activity/engine/control-specific factor with conditions and units. Retain raw data and conversions; no workplace concentration, NOx equivalent or total-dust number is silently assigned to molecular NO/NO2 or a PM fraction.kg; actual concentration/flow/time unitsrepresentative actual activity/control periods and each release campaignactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowsampling calibration, original factor applicability and complete raw activity/release basis
cp_wasteconstruction_wasteSegregated solid and liquid wasteforeground_recordoriginating stage; stream identity; actual mass/volume; moisture/chemistry; contamination/acid potential; status; collection; treatment/recovery/disposal destination; transport; internal reuseWeigh/meter each physically separated actual waste with representative characterization and signed destination records; preserve liquid/solid split, waste-to-product status and treatment interface.kg; m3each collection/load and characteristic changeactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowcalibrated scales/meters, characterization and chain-of-custody receipts
cp_allocationmine_excavation; handoverJoint works/ore and beneficiary subdivisionforeground_recordactual joint activities; separable work/meter records; facility/ore recipients; ore assay/mass; driver/activity units; complete denominator; attribution shares; overlap and sensitivityTrace real causal work packages and subdivide first. Where inseparable, document driver selection and complete measured/supported beneficiary basis; disclose uncertainty and unresolved actual/forecast relationships for independent review.actual activity units; kg; dimensionless shareeach joint campaign and boundary changeactual complete construction and test campaigndefined mine facility and actual supply/destination interfacesper declared reference flowreal activity records and full allocation reconciliation

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 5
Rule IDApplies toRuleSource IDs
construction_deliverydatasetCollect actual enabling, opening/excavation, support/lining, civil structures, permanent installation and all testing/rework to the documented handover. Mechanical/raise-bore/blast routes and open-pit geometry are conditional on real works. The Platreef case is route context, not a required shaft size or timetable.unsd-cpc-3-2025, wa-ground-control-2019, platreef-shaft-case-2025
stage_interfacesall inventory rowsSeparate purchased mixtures from their site-batched alternatives and keep internal batching-to-installation links. Do not count powder/aggregate manufacture twice through both ingredients and a purchased complete mix. Preserve external transport and site operation overlap checks for complete subcontract services.epa-concrete-washout-2012
mining_transitionmine_excavation; handoverSeparate facility construction/development from routine mineral extraction, processing and later mine ventilation/dewatering. Where construction exposes recoverable ore, preserve actual assay, mass, destination and contemporaneous construction/production activities; add each real ore output separately and review allocation. Do not treat saleable development rock automatically as waste or all production as construction.platreef-shaft-case-2025, ifc-mining-2007
later_lifedatasetOperation/maintenance, support renewal, later mine expansion, closure, demolition, long-term drainage and final disposition are outside the core handover result. If requested, model them as distinct evidenced stages with real service periods, quantities and destinations; never assume a universal life or declare whole life from this core.ifc-mining-2007
environmental_routessite_utilities; construction_wasteIdentify actual abstraction, pumped inflow, rainfall, process water, reuse, evaporation, liquid transfer and recipient-specific release. Add significant real gas, dissolved substance and size-specific particulate exchanges separately using matching public identities where verified. Land transformation, noise, vibration and occupational dust metrics require actual location/time and appropriate methods; absence of a row is not zero impact.ifc-mining-2007, epa-concrete-washout-2012
Allocation rules · 4
Rule IDApplies toRuleSource IDs
direct_subdivisiondatasetFirst trace each receipt, meter, machine log and work package to its actual facility and stage. Subdivide joint construction/ore production and adjacent power/manufacturing/building functions before allocation. For inseparable activities, justify an evidenced physical causal driver and complete beneficiary denominator using cp_allocation; cost, facility count or forecast throughput alone is not causal evidence.
asset_share_conservationexcavator_asset; drill_asset; crane_asset; formwork_plywood; steel_meshRetain one persistent identified asset and manufacture boundary. An actual same-configuration mass/count multiplied by its evidenced dimensionless current service share attributes the included manufacture burden. All projects, periods and repeated uses share one supported total-activity denominator; cumulative shares must not exceed one. Forecast versus realized service is explicit and reconciled. Unknown lifetime/activity remains review; never reset the full burden per project. Permanent new delivered support/equipment instead carries its included full supply burden once.
recovery_and_ore_interfacesmine_excavation; construction_wasteInternal rock/fill/water reuse is an internal balance, not an automatic co-product credit. Exported ore, useful rock and scrap retain real status, quantities and recipients; no default avoided-production credit. Later mineral models consume the actual allocated construction dataset burden once rather than adding its ingredients/plant again. Shared downstream attribution requires actual supported production/service evidence, with unknown denominators disclosed for review.
allocation_rule_4foreground_burden_allocationDirect attribution and cumulative-conservation controls are supported by the actual cp_assets/cp_allocation records; this PCR specifies no asset lifespan, mine output or allocation factor. Unproven relations remain explicit review needs for the actual dataset.
Validation rules · 6
Rule IDApplies toRuleSource IDs
v_referencereference_mine_facilityRequire one complete physically accepted facility and all relevant qualifiers; reference name and output-row name match exactly, output is 1 item and every collection/inventory denominator is per declared reference flow. A count basis alone does not demonstrate applicability or interchangeable performance.
v_routeall inventory rowsCheck the actual shaft/drift/pit/headframe/station route and all significant materials, mixtures, permanent devices, plant and tests. Mark a conditional exchange absent only with evidence. Actual unlisted chemistry/components get separate atomic rows; mixture alternatives and internal transfers are not duplicate purchases.
v_units_identityall inventory rowsCheck actual supply gates, country/voltage, substance/CAS/origin, medium/submedium, particle size and reference property/unit relations. No false conversion from Volume/Length/Count to Mass, unresolved reference product UUID remains a declared candidate gap, and public official Chinese names remain aligned.
v_balancesmine_excavation; site_batching; site_utilities; construction_wasteReconcile actual excavation/reuse/export, each fresh mixture, fuel/stock, liquid inputs/outputs and waste disposition. Distinguish natural withdrawal, consumption, treatment transfer and direct recipient release; PM fractions and molecular NO/NO2 cannot be replaced by totals/equivalents or workplace concentrations.
v_allocationdatasetVerify one persistent cross-project asset ledger and supported share denominator; cumulative manufacture attribution at most one. Review facility/ore-production joint activities and prevent mineral models counting the same development burden again. Unproved mathematical/causal relationships remain review.
v_coveragedatasetReport performed/skipped checks, source-bound measurement/identity gaps, uncertainty and stage coverage. Neither accepted construction nor a passed structural check grants methodology/scientific approval. Do not label foreground as complete cradle-to-gate, whole life or total environmental coverage without independent complete evidence.
Processes and inputs/outputs · 9
Process IDProcess nameInput flowsOutput flows
site_enablingSite definition and enabling works10
mine_excavationMine opening excavation, drilling, blasting and muck removal33
site_batchingActual on-site cementitious batching43
ground_supportGeotechnical support, shaft lining and drainage installation50
civil_structuresHeadframes, foundations and loading/discharging civil structures40
permanent_installationPermanent winding and materials-handling installation40
site_utilitiesStage-tagged utilities, temporary plant and environmental exchanges128
construction_wasteConstruction waste characterization and transfer06
handoverTesting, reinstatement and accepted physical handover01