TianGong PCR

Local pipeline construction delivery

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published versionLast updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53251 · exact

Source

1. Scope and Applicability

This PCR concerns the actual installed local gas pipelines, local water and sewer mains, and local hot-water and steam pipelines, delivered as complete physical civil entities (un-cpc3-2025, printed/PDF p.280). Local water/sewer mains are distinct from treatment plants (p.281). The method is needed for medium-specific joints, network interfaces, chambers, thermal protection and actual acceptance construction; classification alone does not establish identity. Manufactured pipe methods can supply upstream evidence, but do not replace this installed entity. Long-distance transmission, nonpipeline aqueducts, treatment/generating plants, internal building plumbing and separately purchased construction services are outside this category.

Use the entire owner-defined main/network between surveyed interfaces, including actually delivered junctions, chambers, valves, supports, branch connections, condensate return where applicable and contracted reinstatement. An independently accepted reach is permissible only when its physical scope and complete interfaces are documented; never omit inconvenient crossings or thermal/acceptance work by choosing a smaller material route. A data package for a genuinely partial delivery remains explicitly incomplete.

The foreground is construction from recorded preconstruction site and supplied-material states through actual inspection, tests, corrections and acceptance. Supplier manufacture is separately linked upstream; ordinary conveyance, heating/pumping after handover, maintenance, replacement and eventual dismantling/fates are separate stages. This is neither automatically complete cradle-to-gate nor a full-life method. No default lifetime, capacity, pipe mass per metre, mix ratio, loss or energy rate is supplied. HK mainlaying/civil specifications and the US heat guide/report inform their stated routes, not global compliance or default numeric requirements.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.constructions-and-construction-services.constructions.local-pipeline-delivery
classification_refsCPC 3.0 53251; scope context only
covered_productsComplete accepted local gas pipelines; water/sewer mains; hot-water/steam pipelines with integral declared works
excluded_productsLong-distance lines; aqueducts without pipelines; treatment/generating plants; building plumbing; manufactured pipe/components; services
representative_productAccepted complete local pipeline delivery unit
production_routeActual logistics → surveyed site preparation → open-cut/trenchless installation and route-specific joints/chambers → thermal protection where applicable → backfill/restoration → medium-specific testing/rework → acceptance; retain actual ordering and interleaving
market_stateInstalled complete civil entity at its declared site, actually accepted for the specified duty and interface configuration

3. Reference Flow

FieldValue
WhatDeliver the complete local main/network passage for its specified gas, water, sewage, hot-water or steam duty and actual integral connections
How muchOne complete accepted delivery unit. Survey centreline length of each carrier/branch/return separately, bore/wall, burial/gradient, chamber dimensions, supports and restored area. Record actual hydraulic/thermal capacity, pressure and temperature conditions; lengths/areas/capacities qualify this same entity, not interchangeable reference denominators.
How wellActual certified material/joint/protection configuration, applicable project acceptance criteria and signed inspection/test results; gravity sewer gradient and leakage, pressure-main duty, gas compatibility, and heat expansion/insulation are route-specific
How long or cycleOne actual construction-to-acceptance cycle including rework/retest; service duration for later lifecycle stages requires separate evidence
reference_flow_linkfinished_pipeline
FieldValue
Reference amount1
Reference product flowAccepted complete local pipeline delivery unit
Reference flow propertyNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345
Reference unit groupUnits of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159
Reference unititem
Required qualifiersasset/site/country; main/network interfaces and integral-work scope; conveyed medium; actual as-built carrier/branch/return lengths and bore/wall/burial/gradient; chamber/support/restoration geometry; actual capacity/duty/pressure/temperature; material grade/lining/coating/joint/insulation/casing and factory-assembly boundary; route and preconstruction/retained state; supplier interfaces; acceptance specification/date/tests/corrections; boundary extensions and unresolved coverage

item is the display alias of the public Item(s) count unit for this one complete configured civil entity. It does not imply equal lengths, capacities or performance across entities. Mass, monetary cost and an arbitrary kilometre are not substitutes; no entire-network mass is invented.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_countreference productNumber of itemsitemOutput is 1 item of the same complete accepted configuration, established through cp_delivery. All inventory and protocol aggregation is per declared reference flow.
preserve_physical_unitsinventory rows with native Mass, Volume or Length propertiesMass; Volume; Lengthkg; m3; mPreserve the actual primary property. Weigh net quantities; survey actual lengths; meter liquid/gas volume at declared conditions. Convert using same-lot measured density/linear mass and calibration evidence only; do not rewrite public properties or use screening density. Electricity follows electricity_basis with Net calorific value/MJ and the measured kWh-to-MJ conversion. The complete accepted network reference output follows Number of items/item. These energy and counted output exchanges are excluded from this material-unit rule and retain their own numerator and reference roles.
electricity_basiscn_lv_power; cn_mv_powerNet calorific valueMJKeep the verified energy property/group; measured kWh × 3.6 = MJ. Separate user-voltage interfaces and exclude double counting of transformations/generators.
asset_shareshoring_steel; excavator_share; wood_palletMasskgMeasured same-configuration asset mass multiplied by a supported dimensionless manufacture share is an attributable input, not reference-product mass. Across all beneficiaries/reuses cumulative shares must be <=1; unknown life/activity requires review.
chemical_fractionhypochlorite_solution; no_air; no2_air; pm25_air; pm_coarse_airMasskgKeep solution mass separate from active chlorine; keep molecular species and nonoverlapping particle fractions separate. Total NOx, total dust or a single concentration cannot establish these exchanges without a supported conversion and actual flow/time.
PropertyUUIDUnit groupReference unit
Mass93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
Volume93a60a56-a3c8-22da-a746-0800200c9a6693a60a57-a3c8-12da-a746-0800200c9a66m3
Length838aaa23-0117-11db-92e3-0800200c9a66838aaa22-0117-11db-92e3-0800200c9a66m
Net calorific value93a60a56-a3c8-11da-a746-0800200c9a6693a60a57-a3c8-11da-a746-0800200c9a66MJ

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionSurveyed existing site/retained network state and identified supplier-gate material/assembly interfaces before the construction cycle
starting_condition_roleforeground_start
product_classification_scopeActual installed local gas/water/sewer/hot-water/steam pipelines with integral declared construction, CPC3.0 53251 as scope context
recursive_input_ruleA pre-existing or purchased complete local-pipeline entity is a separately identified retained/input asset with provenance and interface; do not recursively regenerate all earlier construction. New measured work remains distinct and may not re-charge retained manufacture.
upstream_dataset_requirementLink route/geography/year-compatible material/component manufacture, supply energy, actual transport and treatment datasets; disclose unavailable links and included boundaries. Site assembly and field tests stay foreground.
disclosureState supplier interfaces, actual construction/acceptance limits, retained assets, excluded operation/end-of-life and all additional included stages. The site-only inventory is not complete upstream or full life.
rule_idRulesource_ids
b_integralInclude actual integral main/branch connections, chambers, support/thermal/return works, testing/rework and restoration to the declared acceptance interface; do not turn the entity into a pipe-manufacturing or service record.un-cpc3-2025
b_suppliedDocument whether inputs are bare pipe, lined pipe, complete preinsulated assembly, precast chamber or individual products. Embedded materials are counted once; unresolved supplier boundaries prevent completeness.wsd-mainlaying-2023; ufgs-heat-2024
b_stageMeasure construction and actual pre-handover tests separately from later conveyed product, pumping/heating, maintenance/replacement, demolition and disposal. A complete-life claim requires separately evidenced stages and duration.
b_waterSeparate purchased water, actual natural withdrawal, liquid waste to treatment, recovered external condensate and final direct receiver release. Internal recirculation is not repeated withdrawal or external output.

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
logisticsConstruction logisticsrequiredActual material/plant deliveries and exported waste trips within the declared construction account; preserve supplier transport interfaces.foreground_constructionper declared reference flow
earthworksSite preparation, excavation and beddingrequiredAlways assess site/retained-asset survey; apply actual open-cut trenches or trenchless pits, shoring and dewatering only where present.foreground_constructionper declared reference flow
pipe_assemblyMain installation, joints and integral chambersrequiredInstall the actual declared gas/water/sewer main with route-specific materials and components; for a heat-only unit its carrier installation is in heat_protection.foreground_constructionper declared reference flow
trenchlessTrenchless crossing and annular fillingconditionalActual jacking, directional drilling or other evidenced non-open-cut method; record drilling/pit/spoil/water route without assuming one method.foreground_constructionper declared reference flow
heat_protectionHot-water/steam carrier, return, insulation and support installationconditionalActual local hot-water or steam system; retain chosen certified system, actual condensate-return scope and factory-vs-field assembly boundary.foreground_constructionper declared reference flow
restorationBackfill, compaction and surface reinstatementrequiredActual disturbed site and contracted surface restoration through acceptance; internal reusable soil stays in the balance.foreground_constructionper declared reference flow
commissioningInspection, medium-specific testing and acceptance handoverrequiredActual complete delivery interfaces and applicable inspection/test/repair/retest records; medium and criteria follow the real project specification.foreground_constructionper declared reference flow
construction_supportOperation-resolved construction utilities, plant and releasesrequiredAccounts record actual operation/task meters and releases across the site processes; utility rows do not imply every fuel or emission occurs.foreground_constructionper declared reference flow

The stages are physically operation-resolved: survey/utility location → actual surface removal and excavation/pits/shoring/dewatering → bedding/pipe lowering → actual material-specific cutting, mechanical jointing, steel welding, PE fusion or specified solvent bonding → integral chamber/thrust/support/heat-protection works → interleaved inspection, backfill/compaction, testing/corrections → surface reinstatement and signed handover. Record the actual order; testing may precede final backfill. Site_support quantities retain the operation_id, equipment and meter and are allocated once to these actual stages. No card makes its flow mandatory: document evidenced absence for inapplicable routes, and add each actual unlisted chemical/component/waste/release as a separate atomic row before calling the data package complete. Marine transmission, plant treatment and building service routes are not used to fill local-main evidence gaps.

Process: Construction logistics (logistics)

Inputs

Product flows
Diesel fuel (haul_diesel)

Only actual diesel consumed on recorded construction delivery/waste-haul trips. This is a mass-based foreground fuel identity with grade, formulation, refinery and provider unspecified; retain actual supplier, fossil fraction and route separately. A transport service including fuel/emissions replaces this account rather than adding to it.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_logistics
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Site preparation, excavation and bedding (earthworks)

Inputs

Product flows
Reusable steel sheet-pile shoring (shoring_steel)

When actual trench/pit shoring uses steel sheet piles. Record actual installation/removal energy separately; the input is the supported manufacture share of the same measured steel component, with cumulative shares conserved across all projects.

  • Selected flow: Reusable steel sheet-pile shoring
  • Flow property / unit: Mass / kg
  • Amount rule: Measured configured net asset mass multiplied by its supported dimensionless manufacture share, with conservation ledger.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assets
sand 0/2 (bedding_sand)

Only actual undried natural quarry sand of 0/2 grading supplied at plant for the specified bedding. Record moisture and grading certificate; no universal bedding thickness or kg/m is supplied. Other grades need their own atomic row and identity.

  • Selected flow: sand 0/2 4f1a182d-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: cedd-civil-2026; ufgs-heat-2024
crushed stone 16/32 (bedding_stone)

Only the actually specified 16/32 crushed-stone fraction for bedding or drainage. This is not a generic granular backfill, sand or concrete aggregate selector; other actual fractions are separate rows.

  • Selected flow: crushed stone 16/32 4f197bee-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: cedd-civil-2026
Waste flows
Elementary flows
Fresh groundwater withdrawn from the natural groundwater resource (groundwater_intake)

Conditional actual trench/pit dewatering or direct site abstraction from fresh groundwater. Identify aquifer, salinity, location and external intake meter. Purchased treated water is a product input; contaminated groundwater is not silently mapped to fresh water.

  • Selected flow: ground water 4f462198-40cd-4184-8733-86648a20dc3f
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water

Outputs

Product flows
Waste flows
Uncontaminated excavated mineral soil for off-site disposal (soil_export)

Record only soil actually exported as waste after documented contamination screening and destination classification. Soil moved and reused within the declared site boundary is an internal balance, not a second external exchange. Contaminated soil needs its own identified waste row.

  • Selected flow: Uncontaminated excavated mineral soil for off-site disposal
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: cedd-civil-2026
Sediment-bearing trench dewatering water sent to treatment (dewatering_wastewater)

Conditional actual external transfer to treatment. Record suspended-solids state and any measured contamination; this liquid waste is neither natural resource intake nor a direct environmental discharge. Internal settling/reuse remains internal.

  • Selected flow: Sediment-bearing trench dewatering water sent to treatment
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
Elementary flows
Water (dewatering_freshwater_return)

Only actual trench/pit dewatering liquid water, CAS7732-18-5, discharged directly to an identified freshwater receiver after any actual site treatment. Match Emissions to fresh water and Volume/m3, retaining operation-specific metering, chemistry and receiver. This is alternative to transfer of the same water as dewatering_wastewater to external treatment; it is not sea return, resource abstraction or a test-water release. Add each actual measured contaminant as a distinct elemental exchange.

  • Selected flow: Water 5e50fc01-19c6-4377-a1cc-bc65a12498ea
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water

Process: Main installation, joints and integral chambers (pipe_assembly)

Inputs

Product flows
Cement-mortar-lined ductile-iron water-main pipe (di_water_pipe)

Actual DI water-main route only: document grade, bore, wall, lining, coating, joint and actual supplied net mass. Include factory lining/coating within the supplied pipe boundary; do not add its constituents again. Cast-steel and generic iron families do not establish this configured pipe identity.

  • Selected flow: Cement-mortar-lined ductile-iron water-main pipe
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023
PE100 water-pressure pipe (pe_water_pipe)

When the actual accepted water route uses certified PE100 pressure pipe, with diameter, SDR/wall, resin and joint procedure recorded. This water-grade row does not substitute for gas-grade or an unspecified plastic pipe.

  • Selected flow: PE100 water-pressure pipe
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023
Gas-grade polyethylene distribution-main pipe (pe_gas_pipe)

Actual PE gas-main route only, using the specific certified gas grade, dimensions, joining qualification and operating conditions. Do not infer material grade, pressure rating or gas approval from water-pipe identity.

  • Selected flow: Gas-grade polyethylene distribution-main pipe
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: phmsa-distribution-2024
Line pipe of a kind used for oil or gas pipelines, welded, of steel (steel_gas_pipe)

Only actual purchased welded steel gas line pipe at the manufacturing-plant interface. Supplier certificates must establish the same gas duty, grade, dimensions and supplied coating/lining boundary; factory manufacture is upstream, field joints are foreground. This identity is not a water/sewer/steam or installed-network proxy.

  • Selected flow: Line pipe of a kind used for oil or gas pipelines, welded, of steel e505f1de-c307-4319-a6b6-371b34e7b1ed
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: phmsa-distribution-2024
Steel Pipe (steel_water_carrier)

Only actual circular welded steel water carrier supplied at plant and matching the welding route of this identity, with certified water duty, grade/bore/wall and included coating/lining recorded. Hollow structural profiles, seamless pipe and oil/gas-only products require other identities.

  • Selected flow: Steel Pipe 370d14a6-55f3-4fdd-90b2-84751125ff00
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023
Precast reinforced-concrete sewer-main pipe (concrete_sewer_pipe)

Actual precast reinforced-concrete sewer route, including declared reinforcement and factory joint components. Capture net measured mass/geometry and joint method; do not count embedded reinforcement again.

  • Selected flow: Precast reinforced-concrete sewer-main pipe
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: cedd-civil-2026
Vitrified-clay sewer-main pipe (clay_sewer_pipe)

Actual vitrified-clay sewer route, with bore, wall, supplied joint state and measured net quantity; this fired pipe is distinct from loose clay feedstock or concrete pipe.

  • Selected flow: Vitrified-clay sewer-main pipe
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: cedd-civil-2026
UPVC tube (pvc_sewer_pipe)

Only actual CN plant-gate supplied unplasticized PVC construction pipe compatible with this identity; establish sewer use, dimensions, grade and joint configuration from lot certificates. Other countries or unverified formulations need another identity; the manufacturing label alone is not sewer acceptance.

  • Selected flow: UPVC tube a343bef6-8d18-4594-b1aa-99bc47172684
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: cedd-civil-2026
Ductile-iron water-main elbow (di_elbow)

Actual discrete DI elbow with angle, bore, lining/coating and supplied boundary; exclude any elbow already included in a purchased assembly.

  • Selected flow: Ductile-iron water-main elbow
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023
Ductile-iron water-main tee (di_tee)

Actual discrete DI tee; identify each branch diameter and supplied coating/lining.

  • Selected flow: Ductile-iron water-main tee
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023
Ductile-iron water-main gate-valve assembly (gate_valve)

Actual complete gate valve with bore, pressure class, actuator and supplied internal component boundary. Other valve types, gas regulators, steam traps or hydrants require their own discrete rows.

  • Selected flow: Ductile-iron water-main gate-valve assembly
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023
EPDM pipe-joint gasket (epdm_gasket)

Only a separately supplied actual EPDM gasket with confirmed elastomer formulation and fluid/temperature compatibility. Do not default to EPDM for every pipe route or duplicate a gasket included in the supplied pipe/valve.

  • Selected flow: EPDM pipe-joint gasket
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023; cedd-civil-2026
Gas-grade polyethylene electrofusion coupling (pe_coupler)

Actual separately supplied gas-grade PE electrofusion coupling; retain dimensions and joining record. Butt fusion without a supplied coupling does not create this exchange.

  • Selected flow: Gas-grade polyethylene electrofusion coupling
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: phmsa-distribution-2024
Carbon-steel covered welding electrode (welding_electrode)

Actual covered-electrode field welding only; retain classification, coating and issued-minus-returned mass. MIG wire, flux and shielding gases each need separate actual rows.

  • Selected flow: Carbon-steel covered welding electrode
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023; ufgs-heat-2024
Epoxy-resin field-joint coating formulation (epoxy_joint_coating)

Actual prepared epoxy formulation applied to field joints, with composition, mixing state, curing and solvent content declared. Record its constituents separately only if mixed from individual purchased products, replacing the formulated-product row. Actual VOC species require separate supported releases.

  • Selected flow: Epoxy-resin field-joint coating formulation
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023; ufgs-heat-2024
PVC solvent-cement formulation (pvc_solvent_cement)

Actual solvent-cement joint route only, with supplier formulation and issued/returned quantity. Socket-ring routes without solvent adhesive do not use this row.

  • Selected flow: PVC solvent-cement formulation
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: cedd-civil-2026
Fresh ready-mixed concrete for pipeline chamber and thrust block (chamber_concrete)

Only actual separately delivered fresh mix for included chamber/base/thrust works; retain grade, mix certificate, density, placement volume, rejects and curing. Precast chamber assemblies replace their embedded materials; on-site mixing requires separate cement, each aggregate, water and each admixture plus actual mixing energy.

  • Selected flow: Fresh ready-mixed concrete for pipeline chamber and thrust block
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023; cedd-civil-2026; ufgs-heat-2024
Carbon-steel reinforcing bar for pipeline chamber (chamber_rebar)

Actual separately supplied rebar installed in declared civil works; retain grade, cut lengths and weights. Embedded reinforcement of precast components is excluded from this separate row.

  • Selected flow: Carbon-steel reinforcing bar for pipeline chamber
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: cedd-civil-2026; ufgs-heat-2024
Polyethylene pipeline identification tape (warning_tape)

Actual separately installed polyethylene identification tape; retain tape material and measured length/linear mass. Conductive detectable tape with metal content requires its own component identity.

  • Selected flow: Polyethylene pipeline identification tape
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Uncoated carbon-steel pipe offcut waste (steel_offcut)

Only actual uncoated steel offcuts exported as waste; coated/contaminated offcuts and spent electrodes are separate waste identities. No recycling credit is inferred.

  • Selected flow: Uncoated carbon-steel pipe offcut waste
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
Unwashed polyethylene pipe offcut waste (pe_offcut)

Actual PE cut/rejected pipe waste at the site handoff before washing/recycling; cleaned polymer at a recycling plant is a different interface.

  • Selected flow: Unwashed polyethylene pipe offcut waste
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
Unplasticized-PVC pipe offcut waste (pvc_offcut)

Actual uPVC offcuts exported with contamination and destination declared; do not combine with polyethylene scrap.

  • Selected flow: Unplasticized-PVC pipe offcut waste
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
Ductile-iron pipe offcut waste (di_offcut)

Actual DI offcuts with lining/coating state and destination documented. Steel scrap is not automatically this waste.

  • Selected flow: Ductile-iron pipe offcut waste
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
Elementary flows

Process: Trenchless crossing and annular filling (trenchless)

Inputs

Product flows
Dry bentonite powder for water-based drilling fluid (bentonite_powder)

Actual trenchless drilling/lubrication route using separately supplied bentonite. Retain real mud recipe and each separately purchased additive; injection-well bentonite/cellulose mixture is not pure powder. Purchased complete slurry instead replaces its included powder and water rows.

  • Selected flow: Dry bentonite powder for water-based drilling fluid
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023
Prepared Portland-cement grout (grout)

Only actual complete supplied cement grout for annular void filling; record composition and wet state. Site-mixed grout requires each measured constituent and mixing energy instead of double-counting the complete grout.

  • Selected flow: Prepared Portland-cement grout
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: wsd-mainlaying-2023
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Spent bentonite drilling slurry with mineral cuttings (drilling_slurry_waste)

Actual spent slurry transferred out after measured recovery/reuse; retain bentonite concentration, mineral solids, contamination and wet volume. Oilfield-specific drilling waste is not a default local-pipeline waste.

  • Selected flow: Spent bentonite drilling slurry with mineral cuttings
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: wsd-mainlaying-2023
Elementary flows

Process: Hot-water/steam carrier, return, insulation and support installation (heat_protection)

Inputs

Product flows
Steel Pipe (heat_steel_carrier)

Only actual circular welded steel hot-water/steam carrier matching this plant-gate welded identity, with temperature/pressure duty, grade and wall established by supplier certificates. Account separately for the actual condensate-return line geometry and quantities within this same physical material; factory preinsulated assemblies require an assembly identity instead of repeating embedded pipe/insulation/casing.

  • Selected flow: Steel Pipe 370d14a6-55f3-4fdd-90b2-84751125ff00
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: ufgs-heat-2024
High-temperature calcium-silicate pipe insulation section (calcium_silicate)

Actual separately supplied high-temperature calcium-silicate sections in the specified heat system. UFGS WSL steam systems distinguish an inner high-temperature layer from outer foam; do not infer generic thickness, density or suitability from a mineral feedstock.

  • Selected flow: High-temperature calcium-silicate pipe insulation section
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: ufgs-heat-2024
Mineral-rock-wool pipe insulation section (rockwool_section)

When actual certified rock-wool pipe sections suit the recorded operating temperature and system design. A generic loose mineral wool identity does not alone confirm binder/form, temperature duty or thickness.

  • Selected flow: Mineral-rock-wool pipe insulation section
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: ufgs-heat-2024
Rigid polyurethane outer-layer pipe insulation (pu_outer_insulation)

Only an actual separately supplied outer PU layer with composition and thermal duty documented. In the cited WSL steam arrangement this surrounds the calcium-silicate layer; never treat PU directly on every steam carrier as a universal route. Count factory-embedded foam only inside its purchased assembly.

  • Selected flow: Rigid polyurethane outer-layer pipe insulation
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: ufgs-heat-2024
Coated carbon-steel heat-pipeline outer casing (steel_heat_casing)

Actual separately supplied DDT-system steel casing with declared coating, vent/drain and field-connection boundary; it is not the fluid carrier and not a default WSL or HDPE casing.

  • Selected flow: Coated carbon-steel heat-pipeline outer casing
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: ufgs-heat-2024
Glass-fibre-reinforced polyester heat-pipeline outer casing (grp_heat_casing)

Actual separately supplied WSL glass-fibre/polyester casing, with construction and resin documented. Complete supplied casing is one physical component; do not separately add its embedded resin and glass fibres.

  • Selected flow: Glass-fibre-reinforced polyester heat-pipeline outer casing
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: ufgs-heat-2024
Carbon-steel heat-pipeline anchor support (heat_anchor)

Actual separately supplied anchor/support with geometry and load/configuration evidence; concrete block is accounted in its concrete row. Other expansion joints or steam traps require their own specific supplied-component rows.

  • Selected flow: Carbon-steel heat-pipeline anchor support
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: ufgs-heat-2024
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Backfill, compaction and surface reinstatement (restoration)

Inputs

Product flows
Hot-mix asphalt pavement mixture for trench reinstatement (restoration_asphalt)

Actual reinstatement of disturbed asphalt pavement before acceptance, with mix type, binder, reclaimed content, layer dimensions and measured quantity. Do not attribute undisturbed roads or future maintenance to this construction.

  • Selected flow: Hot-mix asphalt pavement mixture for trench reinstatement
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: cedd-civil-2026
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Removed asphalt pavement waste (asphalt_waste)

Only actual removed pavement exported during this construction/restoration; retain tar screening, contamination and destination. Coal-tar waste or concrete rubble need different rows.

  • Selected flow: Removed asphalt pavement waste
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
Elementary flows

Process: Inspection, medium-specific testing and acceptance handover (commissioning)

Inputs

Product flows
Tap water (hk_test_water)

Only actual treated water supplied from the Hong Kong water-treatment-plant gate matching this public identity. Verify the real distribution/transport link separately and retain that link; it is not unrestricted site water. Keep Volume/m3; the secondary screening 1000 kg/m3 is not a default density.

  • Selected flow: Tap water 3a8411b6-e476-4f98-9d77-0d492661a07f
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: wsd-mainlaying-2023
Treated freshwater supplied for pipeline testing and flushing (other_test_water)

Actual supply outside the verified HK interface requires its own provider/geography/treatment identity. Record all fills, flushes, drain-down and repeat tests; use this row instead of, not in addition to, the same hk_test_water quantity. Pneumatic-only tests do not require invented water.

  • Selected flow: Treated freshwater supplied for pipeline testing and flushing
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: wsd-mainlaying-2023; cedd-civil-2026; ufgs-heat-2024
Aqueous sodium-hypochlorite disinfectant formulation (hypochlorite_solution)

Only actual potable-water commissioning that uses this disinfectant, with solution composition, active-chlorine assay, density and issued dose measured. The WSD concentrations/contact times are HK specification context, not global default recipes. Sewer/gas/heat lines do not automatically use disinfection.

  • Selected flow: Aqueous sodium-hypochlorite disinfectant formulation
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: wsd-mainlaying-2023
Nitrogen gas (nitrogen_testing)

Only actual industrial gaseous nitrogen supplied at a CN plant for purging/leak testing, with actual purity, temperature and pressure declared and the plant-to-site link verified. This public property is Volume, not Normal Volume; do not label uncorrected cylinder volume as Nm3 or impose nitrogen purging on all gas lines.

  • Selected flow: Nitrogen gas 96ba4c16-fd7c-424e-b318-d87484d3d7c0
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: wsd-mainlaying-2023; phmsa-distribution-2024
Compressed dry air for pipeline pneumatic testing (compressed_air)

Only actual pneumatic tests; declare moisture, pressure, temperature and supply boundary. Purchased compressed air and on-site compression electricity are alternative production boundaries; avoid counting both as complete supplied utilities.

  • Selected flow: Compressed dry air for pipeline pneumatic testing
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: cedd-civil-2026; ufgs-heat-2024; phmsa-distribution-2024
Natural gas mixture admitted during gas-main commissioning (commissioning_gas)

Conditional actual gas connection/test charge before acceptance, with composition, fossil/biogenic fractions, state and measured mass/volume conversion. Retained line pack at handover is distinguished from consumed/vented gas; subsequent distributed gas and routine operating loss are outside construction.

  • Selected flow: Natural gas mixture admitted during gas-main commissioning
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: phmsa-distribution-2024
Hot water supplied for pre-handover operational testing (test_hot_water)

Only actual external hot-water supply for the specified pre-handover heat-main operational test. Record real inlet/return temperature, pressure, flow/time, water state and supplier interface. A complete purchased heated-water input includes its upstream heating; do not add that same heat again. An internally circulating or on-site heated circuit does not create this external exchange: record actual separately supplied make-up water, each real fuel/electricity and supported releases instead. No universal temperature, duration or heat rate is provided.

  • Selected flow: Hot water supplied for pre-handover operational testing
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: ufgs-heat-2024
Steam supplied for heat-main operational acceptance testing (test_steam)

Only actual pre-handover operational tests: collect supplier pressure, temperature, steam quality and actual supply/condensate interface. Neither 0.45 MPaG nor 11 MPaG is assumed. Boiler production is linked upstream unless actually on site, where each real fuel/water/emission must be inventoried.

  • Selected flow: Steam supplied for heat-main operational acceptance testing
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: ufgs-heat-2024
Waste flows
Elementary flows

Outputs

Product flows
Recovered test-steam condensate returned to supplier (condensate_return)

Actual external return of recovered pre-handover test condensate, with temperature/chemistry/interface and metered quantity. Internal circulation is not an external product output; discarded condensate needs its actual waste/release route instead.

  • Selected flow: Recovered test-steam condensate returned to supplier
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: ufgs-heat-2024
Operational-test hot water returned externally to supplier (test_hot_water_return)

Only actual external return of test hot water to the identified supplier with separately metered quantity and actual temperature, pressure and chemistry. Internal recirculation is an internal balance; discharged test water uses its actual treatment or environmental-release route. Separate this return from steam condensate and from retained water at handover.

  • Selected flow: Operational-test hot water returned externally to supplier
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: ufgs-heat-2024
Accepted complete local pipeline delivery unit (finished_pipeline)

The same entire actually accepted local main/network between the declared interfaces, with integral junctions/chambers/supports, completed applicable tests and contracted reinstatement. Partial or failed delivery cannot be counted as complete output.

  • Selected flow: Accepted complete local pipeline delivery unit
  • Flow property / unit: Number of items / item
  • Amount rule: 1 item
  • Value mode: fixed_value
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: source_rule
  • Collection protocol: cp_delivery
  • Sources: un-cpc3-2025
Waste flows
Sediment-bearing pipeline pressure-test wastewater to treatment (test_wastewater)

Actual collected test/flush water sent to external treatment; retain contact materials, chemistry and treatment route. Do not use a silicon-wafer or manganese-slag washing wastewater merely because its name is Wastewater.

  • Selected flow: Sediment-bearing pipeline pressure-test wastewater to treatment
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: wsd-mainlaying-2023; cedd-civil-2026; ufgs-heat-2024
Residual-chlorine potable-main disinfection wastewater to treatment (chlorinated_wastewater)

Actual disinfection drain-down sent to treatment; retain residual chlorine and dechlorination records. Distinct from uncontaminated pressure-test water and direct analyte discharge; do not count the same volume twice.

  • Selected flow: Residual-chlorine potable-main disinfection wastewater to treatment
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_testing
  • Sources: wsd-mainlaying-2023
Elementary flows
Water (freshwater_discharge)

Actual pre-handover test/flush water only. Only actual liquid water, CAS7732-18-5, finally released directly to an identified freshwater receiver, in the public Emissions to fresh water compartment and Volume/m3 property. Meter the actual liquid volume at its recorded state. Resource abstraction, supplied water, water vapour, seawater return and liquid waste transferred to treatment are different exchanges. Record each actual pollutant separately; unresolved chemistry or receiver prevents completeness.

  • Selected flow: Water 5e50fc01-19c6-4377-a1cc-bc65a12498ea
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
chloride (chloride_freshwater)

Only actual measured chloride ion, CAS16887-00-6, immediately released to the identified freshwater receiver, matching public Emissions to fresh water and Mass/kg. Calculate the ion mass from same-interval concentration and final discharged liquid volume with explicit unit conversion. Free chlorine, hypochlorite, total chlorine, chloride-containing formulations, sea release and long-term/unspecified compartments are different exchanges. Disclose background concentration; neither disinfection nor dechlorination implies a default chloride load.

  • Selected flow: chloride 08a91e70-3ddc-11dd-9508-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water

Process: Operation-resolved construction utilities, plant and releases (construction_support)

Inputs

Product flows
Diesel fuel (site_diesel)

Actual on-site diesel for excavation, lifting, compaction, trenchless work and generators, resolved by operation/equipment; no fixed consumption rate. Preserve this generic mass-based fuel identity and independently verify actual grade, provider, formulation and fossil fraction. Exclude logistics fuel already recorded in haul_diesel.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_energy
Alternating current (cn_lv_power)

Only actual CN grid-average electricity supplied to the user at <1 kV. Allocate real meter readings to welding/fusion, pumping, tests, lighting and actual tasks without overlap; supplier country/year/voltage must match. Generators and other regions require their own boundaries/identities. Preserve Net calorific value and the energy group.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Attributable metered kWh multiplied by 3.6, retaining operation and meter balance in cp_energy.
  • Value mode: calculated_value
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_energy
Alternating current (cn_mv_power)

Only actual CN grid-average user supply at 1–35 kV, on its separate meter/interface; do not add the same energy again at the transformed low-voltage user interface. Other voltage or geography needs a different identity.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Attributable metered kWh multiplied by 3.6, retaining operation and meter balance in cp_energy.
  • Value mode: calculated_value
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_energy
Configured hydraulic crawler excavator manufacture share (excavator_share)

When the actual crawler excavator is used, collect its configured net mass and independently supported dimensionless manufacture share. The broad revolving-machinery family alone does not confirm crawler/hydraulic configuration. Include actual operation fuel separately; never charge complete manufacture anew at each project.

  • Selected flow: Configured hydraulic crawler excavator manufacture share
  • Flow property / unit: Mass / kg
  • Amount rule: Measured configured net asset mass multiplied by its supported dimensionless manufacture share, with conservation ledger.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assets
Treated freshwater supplied for construction and dust suppression (site_water)

Actual separate purchased/supplied site water with provider, location and treatment state declared. Do not use the HK plant-gate UUID outside its geography/interface. All curing, mud preparation and suppression uses are recorded by operation; exclude test water already counted.

  • Selected flow: Treated freshwater supplied for construction and dust suppression
  • Flow property / unit: Volume / m3
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
Polyethylene protective packaging film (wrap_film)

Actual separately delivered protective PE film that crosses the site boundary; include incoming packaging tare separately from installed product.

  • Selected flow: Polyethylene protective packaging film
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
Reusable softwood transport pallet (wood_pallet)

Actual reusable pallet with measured material/state and conservative supported manufacture share; reusable pallets returned externally are recorded in the physical return ledger. Unknown lifetime/reuse denominator remains review.

  • Selected flow: Reusable softwood transport pallet
  • Flow property / unit: Mass / kg
  • Amount rule: Measured configured net asset mass multiplied by its supported dimensionless manufacture share, with conservation ledger.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assets
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Used polyethylene protective packaging film waste (wrap_waste)

Actual discarded film, separate from PE pipe offcuts and with contamination/recycling destination declared.

  • Selected flow: Used polyethylene protective packaging film waste
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
Elementary flows
carbon dioxide (fossil) (fossil_co2)

Only actual measured/supported oxidized fossil-carbon release to air, unspecified subcompartment, during this construction and its separately recorded haul trips. Fuel existence does not establish an amount or complete oxidation; do not repeat tailpipe emissions already included in a linked transport/combustion dataset.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
carbon monoxide (fossil) (co_air)

Only actually quantified molecular CO released immediately to air, unspecified; an applicable measured activity/factor or species monitoring is required, never a default per-litre diesel value.

  • Selected flow: carbon monoxide (fossil) 08a91e70-3ddc-11dd-924e-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
nitrogen monoxide (no_air)

Only molecular NO, CAS 10102-43-9, actual immediate air/unspecified release. NOx as NO2-equivalent does not establish NO, NO2 or N2O separately.

  • Selected flow: nitrogen monoxide 08a91e70-3ddc-11dd-96ee-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
nitrogen dioxide (no2_air)

Only molecular NO2, CAS 10102-44-0, actual immediate air/unspecified release. The incorrect tetroxide synonym does not change the molecular identity; NOx-as-NO2 and N2O are not this exchange.

  • Selected flow: nitrogen dioxide 08a91e70-3ddc-11dd-96e5-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
particles (PM2.5) (pm25_air)

Only quantified externally released PM2.5 during real exhaust/dust activities, immediate air/unspecified. Indoor dust, total dust and PM0.2 do not establish this fraction; do not overlap the coarse fraction.

  • Selected flow: particles (PM2.5) 08a91e70-3ddc-11dd-9293-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
particles (PM2.5 - PM10) (pm_coarse_air)

Only the quantified nonoverlapping PM2.5–PM10 fraction released externally, immediate air/unspecified. PM10 total is not the coarse fraction; other actual subcompartments need their own identities.

  • Selected flow: particles (PM2.5 - PM10) 08a91e70-3ddc-11dd-9501-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air
methane (fossil) (methane_air)

Only actual measured/supported fossil CH4 released immediately to air, unspecified, before acceptance from gas admission/venting/leaks or combustion. Keep actual composition and retained line pack; no default vent or leak fraction, no biogenic or long-term proxy.

  • Selected flow: methane (fossil) 08a91e70-3ddc-11dd-9610-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Measured net attributable exchange quantity in the declared physical state; retain original operation records and reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_air

7. Allocation and Co-product Handling

rule_idRulesource_ids
a_directAssign material, utility, transport, test and waste quantities directly to recorded tasks/interfaces where possible. Shared site meter quantities require actual submeter/task evidence and a conserved ledger over all beneficiaries; do not invent allocation by cost, diameter or an assumed kilometre.
a_assetsFor each reusable plant/shoring/pallet retain same-configuration measured mass, supported total service/activity basis and documented dimensionless manufacture shares. Across projects, periods and reuse cumulative shares <=1. Unknown total activity/life is unresolved review, not full burden per project. Do not also include this manufacture in a rental/service dataset.
a_wasteThe declared pipeline is the single delivery output. Returned usable material/pallet/condensate is separately identified by actual state and receiver; waste is not a co-product by default. Declare actual off-site recycling/treatment boundaries and do not add assumed avoided virgin production.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_deliverycommissioningfinished_pipelineAs-built and acceptance registersite/asset/interfaces; medium; surveyed carrier/branch/return length, bore/wall/burial/gradient; chamber/support/restored-area geometry; actual duty/capacity/pressure/temperature; material/system/BOM; test/repair/retest; date; accepted countSurvey traceable as-built dimensions with calibrated instruments; reconcile complete scope and all integral work with signed handover and applicable test records. Record actual duty from the accepted design/test evidence rather than assuming values.itemeach delivery/correctionentire construction through acceptancesame entire delivery entityper declared reference flowsurvey/calibration; signed scope and test acceptance
cp_materialsearthworks; pipe_assembly; trenchless; heat_protection; restoration; construction_supporteach specific supplied material/componentlot/receipt/issue/return/stock ledgeroperation_id; row_id; supplier/interface/country; lot/grade/formulation; lining/coating/assembly inclusion; net mass/volume/length; moisture/density/linear mass; issued/returned/stocks; installed geometryWeigh net material with calibrated scales/traceable lot weights; meter wet deliveries and survey installed lengths/geometry. Reconcile stocks, returns, installed quantities, rejects and actual rework; exclude packaging tare and embedded components counted in supplied assemblies.kg; m3; meach receipt/issue/returnall construction/rework lotssame entity, assigned actual operationper declared reference flowweigh slips; certificates; actual BOM; stock balance
cp_logisticslogisticshaul_dieseltrip/fuel ledgervehicle; consignment; route; payload; distance; empty returns; fuel meters/stocks; grade/provider/fossil fraction; transport dataset inclusionsUse actual dispatch/vehicle refuelling and fuel-meter records; include evidenced returns and disposal journeys. Fuel volume-to-mass uses same-fuel measured/supplier density at recorded conditions. Remove fuel/emissions already present in a linked complete service.kg; kmeach trip/refuellingall actual construction logisticssame entity actual origin/destinationper declared reference flowmeter and vehicle/dispatch records; supplied boundaries
cp_energyconstruction_supporteach site fuel and voltage-specific electricitymeter/task ledgeroperation_id; equipment; meter/interface; country/provider/year/voltage; readings; working/idle hours; diesel grade/fossil fraction/density; generator fuel/output; attribution beneficiariesRead calibrated user electricity meters and weighed/metered fuel issues; assign actual welding/fusion/pump/compressor/compaction/test/lighting tasks. Reconcile shared meter periods and generator accounts without duplicated utility output.kg; kWh; MJeach shift/read/issuefull construction/retest periodsame entity and explicit shared beneficiariesper declared reference flowcalibration; meter/time logs; fuel certificate; conserved shares
cp_assetsearthworks; construction_supporteach reusable physical plant/componentasset manufacture-attribution ledgerasset id/configuration; measured net mass; weighing evidence; actual task activity; supported total lifetime/cumulative activity; beneficiary list; prior/current sharesUse calibrated same-configuration weighing or traceable manufacturer net-mass records, excluding transport packaging; retain actual task and independently supported total-activity records. Audit cumulative shares across all projects/reuses; missing denominator remains unresolved review.kgeach asset/task/reusewhole attribution history relevant to this sharesame assets across all beneficiary sitesper declared reference flowconfiguration/weighing; total activity evidence; conserved ledger
cp_waterearthworks; commissioning; construction_supporteach supply/resource/waste/direct water exchange and measured analytemeter/chemistry/receiver registeroperation_id; source/provider/aquifer; salinity; meter; volume/temperature/pressure; storage/reuse; waste vs direct route; treatment; receiver; analyte concentration/time; density when neededMeter each actual external intake/return and destination independently; sample actual final discharge using a recorded method and matched flow interval. Distinguish resource abstraction, purchased treatment water, treatment waste and environmental release; preserve internal recirculation balances.m3; kgeach intake/batch/discharge intervalentire actual construction/testing water accountsame entity and identified receiversper declared reference flowmeter calibration; sampling/analysis; receiver and route records
cp_testingcommissioningeach actual test medium/chemical/waste/condensatetest/charge/flush/analysis ledgermain/reach/material/medium; specification/criteria; test type; pressure/temperature/hold; results/repairs; fill/flush/retest volumes; solution concentration/density; nitrogen gas T/P/purity; gas composition/line pack/vent; steam state/condensate fate; hot-water supply/return temperature, pressure, flow/time; actual heating interface; measured delivered heat and state-property evidenceUse signed test/commissioning records and actual medium meters/weighing. Water-pressure, gravity-sewer air/water/infiltration, gas-compatible pressure tests and heat carrier/casing/operational tests follow actual material/system specifications. Collect actual thermal-test supply/return state and flow/time, or on-site heating fuel/water/electricity separately; preserve the actual supplier-vs-site heating boundary. Collect only real potable disinfection and actual dosing; do not infer doses or test media from another route.kg; m3each test/fill/flush/retestall pre-handover tests and correctionssame accepted interfacesper declared reference flowsigned criteria/results; media meters; assay and composition certificates
cp_wasteearthworks; pipe_assembly; trenchless; restoration; construction_supporteach specific external wasteweighbridge/container/transfer ledgerrow_id; operation; chemical/material state; wet/dry basis; contamination; measured mass/volume; reuse/recovery; destination/treatment; manifestWeigh or meter each separately identified exported waste; retain composition and destination evidence, exclude actual internal reuse and document rejected/reworked materials. Never turn an unknown waste mixture into a generic elementary flow.kg; m3each transferall construction/rework transferssame entity, actual receiverper declared reference flowweigh/meter slips; screening; destination manifests
cp_airconstruction_supporteach molecular species or particle fractionemission measurement/activity ledgeroperation_id; source; species/CAS; fossil/biogenic fraction; particle fraction; air subcompartment; release time; matched concentration/gas-flow/time; real fuel/activity; applicable factor/source/uncertainty; included transport boundaryIntegrate actual substance-resolved monitoring at the same dry/wet/temperature/pressure basis, or apply a documented compatible factor to measured actual activity. For dust use evidenced size-specific emission measurement/model and external receiver; occupational or collected indoor dust is not an environmental release. No generic factor or NOx species split is supplied.kgeach source/operating intervalconstruction/actual admission through acceptancesame entity with actual source/receiverper declared reference flowcalibration; concentration/flow/time; factor applicability; raw uncertainty

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 4
Rule IDApplies toRuleSource IDs
b_integralforeground_system_boundaryInclude actual integral main/branch connections, chambers, support/thermal/return works, testing/rework and restoration to the declared acceptance interface; do not turn the entity into a pipe-manufacturing or service record.un-cpc3-2025
b_suppliedforeground_system_boundaryDocument whether inputs are bare pipe, lined pipe, complete preinsulated assembly, precast chamber or individual products. Embedded materials are counted once; unresolved supplier boundaries prevent completeness.wsd-mainlaying-2023, ufgs-heat-2024
b_stageforeground_system_boundaryMeasure construction and actual pre-handover tests separately from later conveyed product, pumping/heating, maintenance/replacement, demolition and disposal. A complete-life claim requires separately evidenced stages and duration.
b_waterforeground_system_boundarySeparate purchased water, actual natural withdrawal, liquid waste to treatment, recovered external condensate and final direct receiver release. Internal recirculation is not repeated withdrawal or external output.
Allocation rules · 3
Rule IDApplies toRuleSource IDs
a_directforeground_burden_allocationAssign material, utility, transport, test and waste quantities directly to recorded tasks/interfaces where possible. Shared site meter quantities require actual submeter/task evidence and a conserved ledger over all beneficiaries; do not invent allocation by cost, diameter or an assumed kilometre.
a_assetsforeground_burden_allocationFor each reusable plant/shoring/pallet retain same-configuration measured mass, supported total service/activity basis and documented dimensionless manufacture shares. Across projects, periods and reuse cumulative shares <=1. Unknown total activity/life is unresolved review, not full burden per project. Do not also include this manufacture in a rental/service dataset.
a_wasteforeground_burden_allocationThe declared pipeline is the single delivery output. Returned usable material/pallet/condensate is separately identified by actual state and receiver; waste is not a co-product by default. Declare actual off-site recycling/treatment boundaries and do not add assumed avoided virgin production.
Validation rules · 6
Rule IDApplies toRuleSource IDs
v_deliveryforeground_dataset_conformanceRequire all reference qualifiers, 1 item of complete actual accepted output, actual geometry/capacity/duty conditions and matching cp_delivery. Failed/partial handover remains incomplete; a classification match is not methodology approval.un-cpc3-2025
v_mediumforeground_dataset_conformanceCheck water/pressure, gravity-sewer, gas and heat test/inspection routes against the actual specification and supplied material state. HK and US source numeric requirements are not default inventory or universal approvals; include actual repair/retest.wsd-mainlaying-2023, cedd-civil-2026, ufgs-heat-2024, phmsa-distribution-2024
v_identityforeground_dataset_conformanceVerify each selected flow against its real primary property, state, route, geography, chemistry, compartment and unit group; unresolved identities keep exact atomic rows and review gaps. CN power voltage, HK water gate, gas pressure/volume and factory-assembly inclusions remain explicit.
v_balanceforeground_dataset_conformanceAll inventory/protocol bases are per declared reference flow. Conserve task/meter/material/water balances, trace actual density/linear-mass conversions and cumulative asset shares. Unproved mathematical relationships require review.
v_releaseforeground_dataset_conformanceReject NO/NO2/N2O, NOx-equivalent, particle-size, fossil/biogenic, immediate/long-term, water-resource/wastewater and receiver mismatches. Missing direct release quantities are explicitly unresolved, never invented from equipment/fuel presence.
v_completenessforeground_dataset_conformanceCheck all required/applicable stages and actual additional atomic exchanges, upstream links, internal assembly exclusions, bilingual row/rule/UUID consistency, noise/land/ecology coverage and lifecycle exclusions. Structural checks do not verify actual engineering acceptance, scientific approval or full-life completeness.
Processes and inputs/outputs · 8
Process IDProcess nameInput flowsOutput flows
logisticsConstruction logistics10
earthworksSite preparation, excavation and bedding43
pipe_assemblyMain installation, joints and integral chambers194
trenchlessTrenchless crossing and annular filling21
heat_protectionHot-water/steam carrier, return, insulation and support installation70
restorationBackfill, compaction and surface reinstatement11
commissioningInspection, medium-specific testing and acceptance handover87
construction_supportOperation-resolved construction utilities, plant and releases78

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page