TianGong PCR

Irrigation and flood control waterworks delivery

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53234 · exact

Source

1. Scope and Applicability

This PCR describes the actual construction and accepted physical delivery of irrigation and flood-control waterworks, not a construction service, annual water delivery or a basket of building materials. A dataset defines one functional, spatially bounded works: an irrigation canal/distribution/drainage system, a flood conveyance/control scheme, a polder/storage/pumping system, or a combined works whose complete delivered configuration is stated. Earth/unlined, concrete/precast/brick/asphalt/membrane-lined, flexible/vegetated and actual underground routes are conditional options. No one structure, material or technology is universal. The intended function and commissioning interfaces determine the entity, not a classification leaf. Sources: unsd-cpc-3-2025; fao-irrigation-system; hk-dsd-stormwater-2018.

Exclude independently delivered supply-only aqueducts/conduits, navigation harbours/waterways, standalone dams and water-retaining structures, coastal/waterside embankments, standalone pipelines, crop production, treatment plants and separately sold equipment/materials. Integral banks/protection, hydraulic crossings, headworks, control/pump chambers and delivered access are retained where they physically belong to the declared irrigation/flood system. A multipurpose or independently classified dam/embankment/component is declared with a non-overlapping interface and separate applicability decision; this PCR must not erase it, automatically absorb it, or double count it. Actual rehabilitation is allowed only with retained/prior assets and all new/removal work explicitly stated.

The main boundary is construction-to-accepted-handover. Manufacture of bought materials/equipment, delivery transport, site work, later operation/maintenance/renewal and final demolition remain separately identifiable. No complete cradle-to-gate or whole-life claim follows from the foreground alone. Real project measurements and acceptance records supply engineering quantities, configurations and criteria; historical descriptive sources supply no default lifespan, mix, mass, design load, efficiency or approval.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.constructions-and-construction-services.constructions.irrigation-and-flood-control-waterworks-delivery
classification_refsCPC 3.0 53234; Irrigation and flood control waterworks
covered_productsAccepted physical irrigation and flood-control works with declared complete functional/spatial configuration and interfaces, including their actual integral channels, drainage, storage, control, pumping and civil components.
excluded_productsSupply-only conduits; navigation facilities; independently delivered dams/embankments/pipelines; materials, machine manufacture and construction services; crop output and operational water service.
representative_productOne configured irrigation or flood-control works accepted at its actual site, extent, function, geometry and commissioned state. No representative numeric recipe is assumed.
production_routeActual enabling/earthworks, integral bank/filter/drainage and selected lining/structure/underground route, control/pumping installation, utilities and waste handling, reinstatement/testing and handover.
market_stateComplete accepted civil works at the defined site and interfaces; delivered components and prior retained assets explicitly listed.

3. Reference Flow

FieldValue
WhatProvide the declared physical hydraulic works ready for its stated irrigation, flood-control or combined function at handover.
How muchOne complete accepted works at the declared project extent; actual canal/drain length and cross-sections, protected/irrigated area, storage volume and pump/conveyance capacity are measured qualifiers, not prescribed defaults.
How wellActual project-specific hydraulic, geotechnical, structural, water-control and commissioning requirements evidenced in cp_acceptance; retain water levels/head, leakage and operating configuration where relevant, rather than claiming universal flood protection.
How long or cycleOne actual construction/commissioning-to-handover cycle, with real start/end and test dates. No future service life is set; any operational assessment period is separately evidenced.
reference_flow_linkreference_waterworks
FieldValue
Reference amount1
Reference product flowDelivered irrigation and flood control waterworks
Reference flow propertyNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345
Reference unit groupUnits of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159
Reference unititem
Required qualifiersproject/site identity; physical delivery limits and inlet/outlet interfaces; irrigation/flood-control/combined purpose; complete delivered and prior-retained asset schedule; actual route/technology; surveyed chainage, cross-section, slope and levels; actual irrigated/protected area with definition; actual flow/head/storage/pump capacity where relevant; structural/material/water-quality conditions; test criteria, conditions and evidence; construction and handover dates; upstream/transport/site/later-phase boundary; shared asset attribution; missing identity and environmental coverage

All required qualifiers must be declared in dataset metadata, reference-flow description or equivalent records. Here item is the display alias for the public unit-group reference Item(s), not a material mass or an arbitrary count of canal sections. A contract-defined independently functioning delivery is allowed only if its complete interfaces and limits are retained; constituent gates, pumps and sections remain internal to the same reference works.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_countreference productNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345itemUse cp_acceptance to confirm one complete accepted physical works of the same declared configuration and extent. Each input/output is per declared reference flow; measured length/area/capacity is supplemental and may not silently replace the denominator. No whole-works mass is invented.
geometry_massimported_earth_fill; filter_sand; riprap_rock; reinforcing_steel; power_cableMass 93a60a56-a3c8-11da-a746-0800200b9a66kgKeep actual geometry and material state. Where quantities are collected by volume, area, length or count but this row reports mass, use actual matching measured/certified density, areal mass, unit mass or cross-section/length; retain moisture, temperature and configuration. No default density, per-project/per-kilometre mass, shrinkage or mixture.
geometry_volumepurchased_concrete; precast_lining_slab; precast_jacking_pipe; tunnel_lining_segmentVolume 93a60a56-a3c8-22da-a746-0800200c9a66m3Keep the actual measured received/installed volume and matching component/material state; retain dimensions and voids. Count/length/area-to-volume needs actual geometry, and mass-to-volume needs actual matching density. Preserve a public Volume identity as Volume; no default dimensions, density, mix or per-project volume.
geometry_areamembrane_hdpe; grass_sodArea 93a60a56-a3c8-19da-a746-0800200c9a66m2Keep actual purchased and installed area with overlaps/offcuts and delivered thickness/specification. Preserve Area for an area-based identity. Any mass conversion requires the same actual lot’s measured/certified areal mass or thickness and density; no universal factor and no silent mass property replacement.
energy_identityelectricity_lv_cn; electricity_mv_cn; electricity_otherNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJPreserve the public Net calorific value reference property and energy unit group. Use 3.6 MJ/kWh for meter units. This does not imply a fuel heating value; fuel mass/volume-to-energy requires the actual fuel value and state.
water_statetap_water_hk; supplied_water_other; groundwater_abstraction; river_abstraction; water_release_freshVolume 93a60a56-a3c8-22da-a746-0800200c9a66m3Measure each actual liquid stream with its source, destination, quality and temperature/state. L to m3 uses 0.001 m3/L; kg conversion needs real density. Keep supply, natural abstraction, liquid waste and direct release separate. No tap-water screening density or boiler/normal-volume assumption.
transport_basisroad_freightGoods transport (mass*distance) 838aaa20-0117-11db-92e3-0800200c9a66t*kmUse actual measured payload and route distance with 1000 kg/t, retaining load, empty-return and supplier-gate evidence under cp_transport. Different modes and included logistics require separate handling, not a default distance.

Flow-property and unit-group support relations

Flow propertyUnit groupPublic reference unit
Mass 93a60a56-a3c8-11da-a746-0800200b9a66Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66kg
Volume 93a60a56-a3c8-22da-a746-0800200c9a66Units of volume 93a60a57-a3c8-12da-a746-0800200c9a66m3
Area 93a60a56-a3c8-19da-a746-0800200c9a66Units of area 93a60a57-a3c8-18da-a746-0800200c9a66m2
Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66Units of energy 93a60a57-a3c8-11da-a746-0800200c9a66MJ
Number of items 01846770-4cfe-4a25-8ad9-919d8d378345Units of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159Item(s)
Goods transport (mass*distance) 838aaa20-0117-11db-92e3-0800200c9a66Units of goods transport 838aaa21-0117-11db-92e3-0800200c9a66t*km

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionActual site/topography, soil/groundwater and retained asset condition; incoming materials/components at explicitly stated gates; temporary diversion and access arrangements declared before construction.
starting_condition_roleforeground construction starting interface, with prior assets and upstream manufacture separate
product_classification_scopeIrrigation/flood-control physical works context, CPC 3.0 53234; component and multipurpose classifications reviewed at explicit interfaces, not automatically inherited.
recursive_input_ruleAn incoming same-category works/component with prior construction burden is recorded at its real interface, with existing/new scope and a compatible upstream dataset. Do not recursively reproduce its construction or create a duplicate final output.
upstream_dataset_requirementActual material/component manufacture, supply water/electricity, transport and actual waste treatment need compatible geography/time/technology, properties and inclusion boundaries. Identity alone does not supply these burdens. Missing upstream data remains a named gap.
disclosureReport actual site, complete delivery/retained configuration, route, temporary works, water/land interfaces, upstream links/gaps, shared manufacture scope, direct emission evidence and excluded later lifecycle.
rule_idApplies toRulesource_ids
construction_deliverydatasetThe core foreground covers actual site preparation through construction, fitting, testing, removal of temporary works, reinstatement and accepted physical handover. Record delivered incoming products at their real interfaces. Cement/steel/aggregate/pump manufacture is upstream; only actual site batching, placement or assembly is foreground. Link compatible upstream manufacturing and delivery datasets to extend coverage, but label this foreground result as construction-to-handover, not a complete cradle-to-gate or whole-life result.usbr-crow-construction
purpose_and_interfacesreference_waterworksPreserve the actual irrigation or flood-control purpose and independently operable extent. Identify canal/drain chainage and cross-sections, protected/irrigated area definition, inlet/outlet and water levels, documented flow/storage/pumping capacity, control and maintenance access delivered. These are project measurements/requirements, not fixed PCR numbers. Exclude standalone water-supply conduits, navigation/port facilities, dams/water-retaining structures and coastal/waterside embankments; for multipurpose or integral components, declare a non-overlapping package/interface and review classification separately rather than removing real construction.unsd-cpc-3-2025; hk-dsd-stormwater-2018
route_completenessall inventory rowsRequired process blocks require an actual activity/completeness assessment, not all listed materials. Conditional routes remain conditional: earth or lined irrigation; rigid, flexible or vegetated flood channels; storage/polder/pumping; open-cut or underground hydraulic connections. Add each actual missing product, chemical, energy carrier, support element, packaging piece, waste and measured environmental species as a separate atomic row with properties, unit, protocol and route evidence. Significant piling, ground treatment, tunnelling, shotcrete, hydraulic transport or other real operations require their own process detail before a dataset can be complete; a sparse example route cannot represent another technology.fao-irrigation-system; usbr-crow-construction; hk-dsd-stormwater-2018
temporary_and_prior_assetsdatasetAccount actual cofferdams, temporary diversion/roads, dewatering/treatment, support works and their removal/recovery once. Distinguish native retained assets, imported assemblies and new work. A rehabilitation delivery must retain prior structure/interface and record actual enabling demolition and replacement; do not charge the retained old asset as a newly manufactured input or erase its history. Shared machinery/formwork manufacture, when included, follows the cumulative share ledger.usbr-crow-construction
later_lifecycledatasetOnly post-handover operational irrigation deliveries, flood events, pumping energy, leakage/seepage, operating-reservoir/soil processes, desilting, maintenance, renewal and final demolition are outside the core construction delivery. Actual pre-acceptance initial filling, commissioning, land disturbance and resulting supported inundation/land-carbon/release pathways stay inside their real construction/test site and period. Record baseline, flooded area, dates and measurements; unsupported pathways remain explicit gaps, not moved into excluded operation. Keep later actual or explicit future scenarios separate with evidenced period, activity, replacements, treatment and fate. No default service life, flood recurrence, saved crop output or avoided flood damage.fao-irrigation-system; hk-dsd-stormwater-2018; ipcc-flooded-land-2019
environmental_boundarysite_utilities; construction_wastesDistinguish supplied technosphere water, direct river/groundwater resource abstraction, contained liquid waste sent for treatment and actual elemental release to a named receiving medium. Separate recirculation from crossing flows and record storage, rainfall/river diversion and return volumes so abstraction is not equated with consumption. Record noise as site/receptor/time/frequency and sound-level evidence outside mass exchanges until a suitable metric and identity are established; do not convert dB to kg or assume a universal noise emission. Actual land clearing/occupation changes and contaminant releases require separate supported environmental exchanges or explicit gaps, not an assumed zero.epa-concrete-washout-2012; epa-construction-dust-1995; usbr-crow-construction

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
site_earthworksSite preparation, earthworks and temporary water controlrequiredInspect actual clearing, excavation, grading, borrow and internal reuse; cofferdam/diversion/dewatering only where performed.foreground_productionper declared reference flow
banks_drainageIntegral banks, filters, protection and subsoil drainageconditionalWhere the selected waterworks includes integral banks/flood protection, filters, revetment or drains; not a separate standalone dam/embankment output.foreground_productionper declared reference flow
lining_structuresLining and hydraulic civil structuresconditionalWhere real lined canals, headworks, storage, walls, culverts or pumping civil structures are delivered; route/materials from actual design.foreground_productionper declared reference flow
underground_conveyanceIntegral underground hydraulic conveyanceconditionalOnly actual hydraulic tunnels, jacking drives or shafts inside the works; preserve excavation, ground-support, face conditioning, lining and water-control route.foreground_productionper declared reference flow
controls_installationFixed water-control and pumping installationconditionalWhen the delivery configuration includes gates, flap valves, pumps, actuators, instruments or fixed electrical systems.foreground_productionper declared reference flow
site_utilitiesConstruction plant, utilities, transport and direct environmental exchangesrequiredAll construction and acceptance stages; each exchange is conditional on actual occurrence and source/interface.foreground_productionper declared reference flow
construction_wastesConstruction waste segregation, recovery and transferrequiredInspect all construction, testing and in-scope replacement stages; record each real stream and destination, including non-applicability evidence.foreground_productionper declared reference flow
handoverVerification, reinstatement and physical acceptancerequiredAlways confirm completeness, functional interfaces, actual geometry, defects and acceptance; testing consumption remains stage-coded under utilities/wastes.deliveryper declared reference flow

Process blocks are accounting responsibilities, not a compulsory material recipe. A row occurs only under its stated physical conditions. Tag shared utility, plant and waste records to the originating work stage; count them once even if a subcontracted complete service supplies the same stage. Extend this map with every real significant unlisted operation and its atomic exchanges before asserting dataset completeness.

Process: Site preparation, earthworks and temporary water control (site_earthworks)

Inspect actual clearing, excavation, grading, borrow and internal reuse; cofferdam/diversion/dewatering only where performed.

Inputs

Product flows
Uncontaminated natural soil fill (imported_earth_fill)

Only imported natural soil actually received for canal banks, foundations or integral flood-protection components. Record soil classification, source, moisture, grading, compaction specification and measured received mass. Reused excavation within the same project is an internal movement, not a second purchased soil input.

  • Selected flow: Uncontaminated natural soil fill
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_earthworks, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_earthworks
  • Sources: usbr-crow-construction; hk-dsd-stormwater-2018
Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Outputs

Product flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Process: Integral banks, filters, protection and subsoil drainage (banks_drainage)

Where the selected waterworks includes integral banks/flood protection, filters, revetment or drains; not a separate standalone dam/embankment output.

Inputs

Product flows
Washed natural silica filter sand (filter_sand)

Only where this specified sand is installed in a real filter or drainage layer. Preserve grain-size distribution, mineral identity, contamination and water content; sand used in a concrete recipe is accounted separately within that recipe.

  • Selected flow: Washed natural silica filter sand
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_materials, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: hk-dsd-stormwater-2018
gravel 2/32 (filter_gravel)

Use this identity only for actual undried 2/32 gravel from a wet/dry quarry production mix at plant, with measured moisture and grading meeting the project filter specification. Verify delivery to the site separately. Other size fractions, processed drainage media and mixtures require separate identities; this row does not mandate a 2/32 filter.

  • Selected flow: gravel 2/32 4f19a2fb-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_materials, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: hk-dsd-stormwater-2018
rock (riprap_rock)

Only natural rock supplied as a production mix at plant and actually installed for riprap, rubble protection or stone masonry. Obtain rock type, piece-size grading, durability specification, placement geometry and actual accepted mass; the general rock identity supplies no armour stability, sizing or density rule. Record quarry processing and transport in compatible upstream data.

  • Selected flow: rock 8e0f2838-6d58-433c-975c-7d2cb5878a2d
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_materials, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: usbr-crow-construction; hk-dsd-stormwater-2018
Galvanized steel gabion mesh (gabion_mesh)

Only when galvanized steel mesh baskets are used for flexible channel protection. Record wire/coating specification and basket dimensions; record rock separately, avoiding duplication with a purchased filled-gabion dataset.

  • Selected flow: Galvanized steel gabion mesh
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_materials, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: hk-dsd-stormwater-2018
Live grass sod for channel stabilization (grass_sod)

Only actual planted sod in a grass-lined or restored channel bank. Record species, area, soil attached to the sod, establishment work and delivered survival/coverage requirements. Seed, fertilizer, irrigation for establishment and other real inputs each need their own row if used; later landscape maintenance is excluded.

  • Selected flow: Live grass sod for channel stabilization
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_materials, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: hk-dsd-stormwater-2018
Polypropylene nonwoven drainage geotextile (geotextile_pp)

Only specified polypropylene nonwoven geotextile used as filter/separator beneath protection or around drainage. Record polymer, areal mass, thickness, overlap and installed area; convert area to purchased mass only using the actual roll certificate or weighing. Polymer fabric names alone do not establish this component.

  • Selected flow: Polypropylene nonwoven drainage geotextile
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_materials, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: usbr-crow-construction
Perforated HDPE subsoil drainage pipe (drain_pipe_hdpe)

Only actual perforated HDPE pipes in a subsoil drain. Record diameter, wall class, perforation geometry, length and measured mass or certified mass per actual length. The pipeline is an integral drain component; standalone water or sewer pipeline projects are a separate scope.

  • Selected flow: Perforated HDPE subsoil drainage pipe
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_materials, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_materials
  • Sources: hk-dsd-stormwater-2018
Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Outputs

Product flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Process: Lining and hydraulic civil structures (lining_structures)

Where real lined canals, headworks, storage, walls, culverts or pumping civil structures are delivered; route/materials from actual design.

Inputs

Product flows
Fresh ready-mixed hydraulic concrete (purchased_concrete)

Only concrete received fresh for in-situ channel lining, headworks, floodwalls, storage structures, pump chambers or culverts. Record approved project mix, delivery tickets, placed volume, reinforcement scope, curing, rejected/returned quantities and site additions. The confirmed Cast-In-Place Concrete record describes site pouring/mixing, not this unplaced purchased mixture. Do not duplicate its constituents when upstream concrete manufacture is linked.

  • Selected flow: Fresh ready-mixed hydraulic concrete
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_concrete, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_concrete
  • Sources: usbr-canal-concrete-2017
Cement, portland cement (portland_cement)

Only actual gray powdered Portland cement supplied as a factory production mix for site batching of concrete, mortar or grout. Check the real binder and grade; blended cements and special binders require their own identities. Record measured recipe and separately supplied sand, coarse aggregate, water and every identified admixture; do not assume a default mix or repeat cement already included in purchased concrete.

  • Selected flow: Cement, portland cement 3c9e98a5-0a1e-4a18-9545-1475a87fcab7
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_concrete, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_concrete
  • Sources: usbr-canal-concrete-2017
Hot rolled rebar steel (reinforcing_steel)

Use only actual hot-rolled low-alloy reinforcement with carbon content no greater than 0.2%, supplied as factory production mix, matching the public identity and the project bar certificate. Other alloy/strength/coating routes require re-selection. Measure receipts, cutting schedules, installed steel and offcuts; precast elements may already include reinforcement.

  • Selected flow: Hot rolled rebar steel 43050e3b-42be-465c-a021-17f606484151
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_concrete, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_concrete
  • Sources: usbr-crow-construction
Precast concrete canal lining slab (precast_lining_slab)

Only delivered precast canal slabs actually fitted into the lining. Preserve geometry, concrete type, reinforcement and upstream component boundary; count/area/volume conversion requires actual dimensions. A floor slab or generic concrete material is not automatically this canal component.

  • Selected flow: Precast concrete canal lining slab
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_concrete, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_concrete
  • Sources: usbr-canal-concrete-2017; hk-dsd-stormwater-2018
Fired clay canal lining brick (brick_lining)

Conditional brick-lined canal route, supported by the historical FAO description. Record actual brick composition, firing/state, dimensions, installed amount and separate mortar. This is one option, not a required lining for all waterworks.

  • Selected flow: Fired clay canal lining brick
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_concrete, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_concrete
  • Sources: fao-irrigation-system
Hydraulic asphalt concrete lining mixture (asphalt_lining)

Only the actual hydraulic asphalt-concrete canal lining route. Record binder grade, aggregate grading, mixture certificate, installed geometry, actual heating/paving activities and losses. Do not use ordinary road paving data without demonstrating waterworks formulation and interface applicability.

  • Selected flow: Hydraulic asphalt concrete lining mixture
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_concrete, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_concrete
  • Sources: fao-irrigation-system
HDPE hydraulic geomembrane (membrane_hdpe)

Only an actual HDPE membrane lining with known thickness, roll identity, installed/overlap area and seam testing. Do not infer density. The inspected 2 mm sheet from a South Korean soil-remediation biopile is not a confirmed hydraulic membrane identity.

  • Selected flow: HDPE hydraulic geomembrane
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_concrete, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_concrete
  • Sources: usbr-crow-construction
Construction formwork plywood (formwork_plywood)

Only actual plywood formwork. Record panel specification, same-panel reuse history, manufacturing attribution, damage and removal; allocate manufacture conservatively across evidenced uses without resetting at each project. Steel forms, liners, release agents and curing materials require their own actual rows if used.

  • Selected flow: Construction formwork plywood
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_shared_assets, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_shared_assets
  • Sources: usbr-crow-construction
EPDM elastomeric joint waterstop (waterstop_epdm)

Only where an actual EPDM waterstop is installed at water-retaining joints. Record polymer, profile, width, length, mass and joint location. PVC waterstops, sealants and coating formulations are different exchanges and must not be merged into this row.

  • Selected flow: EPDM elastomeric joint waterstop
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_concrete, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_concrete
  • Sources: usbr-canal-concrete-2017
Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Outputs

Product flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Process: Integral underground hydraulic conveyance (underground_conveyance)

Only actual hydraulic tunnels, jacking drives or shafts inside the works; preserve excavation, ground-support, face conditioning, lining and water-control route.

Inputs

Product flows
Reinforced concrete hydraulic jacking pipe (precast_jacking_pipe)

Only an integral hydraulic crossing or flood-conveyance drive actually installed by jacking. Record internal/external diameter, wall geometry, pipe count and joints, hydraulic grade and reinforcement inclusions. The DSD route is an example, not permission to assign transport-tunnel criteria or a universal alignment tolerance.

  • Selected flow: Reinforced concrete hydraulic jacking pipe
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_underground, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_underground
  • Sources: hk-dsd-stormwater-2018
Precast reinforced concrete hydraulic tunnel lining segment (tunnel_lining_segment)

Only a segmentally lined hydraulic tunnel route within the delivered works. Record tunnel/shaft extent, excavated section, segment geometry and accepted installed volume, joint/seal details and component manufacture interface. Do not replace the complete waterworks reference with a generic tunnel length.

  • Selected flow: Precast reinforced concrete hydraulic tunnel lining segment
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_underground, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_underground
  • Sources: hk-dsd-stormwater-2018
Low-alloy structural steel tunnel support (steel_support)

Only actual steel support in shafts or hydraulic underground works. Record section, alloy, temporary/permanent status, installed mass and recovered/reused quantity. Permanent delivered support uses its actual full received/installed material quantity; only reusable temporary supports use an evidenced manufacturing share and asset ledger. Additional shotcrete, grout constituents and face-conditioning chemicals are individually recorded for the actual excavation technology.

  • Selected flow: Low-alloy structural steel tunnel support
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_underground, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_underground
  • Sources: hk-dsd-stormwater-2018
Dry sodium bentonite powder (bentonite_powder)

Only if the actual slurry-support or jacking-lubrication formulation uses this specified dry powder. Record real mineral/additive composition and concentration, dry receipts, water separately and spent slurry destination; slurry TBM use does not make bentonite universal. Other conditioning agents each require their own material row.

  • Selected flow: Dry sodium bentonite powder
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_underground, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_underground
  • Sources: hk-dsd-stormwater-2018
Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Outputs

Product flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Process: Fixed water-control and pumping installation (controls_installation)

When the delivery configuration includes gates, flap valves, pumps, actuators, instruments or fixed electrical systems.

Inputs

Product flows
Pump (installed_pump)

Only an actually supplied liquid pump from the public factory production-mix identity, installed as part of irrigation or flood drainage. Verify the supplied model, fluid/duty point, configuration, measured net mass and whether motor/base/control are included. A supplied integral motor must not be counted again. Pump manufacture is upstream; site fitting, wiring and commissioning are foreground.

  • Selected flow: Pump bbd91be4-dc00-44c2-8bc1-f67ee79174a7
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_controls, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_controls
  • Sources: fao-irrigation-system; hk-dsd-stormwater-2018
Fabricated steel hydraulic sluice gate (sluice_gate)

Only actual delivered steel gate leaf/frame of the declared water-control structure. Record opening, head condition, steel/coating, seals, actuator inclusion and accepted mass. The inspected trench gate is an active-media groundwater-remediation component and is not this gate.

  • Selected flow: Fabricated steel hydraulic sluice gate
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_controls, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_controls
  • Sources: usbr-crow-construction
Cast-iron hydraulic drainage flap valve (flap_valve)

Only actual cast-iron flap valve at an integral drainage outlet. Record diameter, material/coating, hinge and seal configuration, backflow function and installed mass; distinguish a purchased complete valve from its metal constituents.

  • Selected flow: Cast-iron hydraulic drainage flap valve
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_controls, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_controls
  • Sources: hk-dsd-stormwater-2018
Electric hydraulic gate actuator (gate_actuator)

Only a separately supplied actual gate actuator. Record rating, travel/load condition and motor/gearbox/control inclusions; a generic small electric motor is not the complete actuator.

  • Selected flow: Electric hydraulic gate actuator
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_controls, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_controls
  • Sources: usbr-crow-construction
Installed electronic water-level sensor (level_sensor)

Only a real separately supplied water-level instrument, including its documented sensor interface. Record instrument technology, range and installation/verification; cabinets, telemetry and batteries each need their own row when separately installed.

  • Selected flow: Installed electronic water-level sensor
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_controls, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_controls
  • Sources: usbr-crow-construction
Copper-conductor XLPE-insulated low-voltage power cable (power_cable)

Only this actual installed cable specification. Record rated voltage, conductor area, sheath/armour, measured length and manufacturer mass per length or weighing; other conductor/insulation constructions require separate rows. No cable manufacturing locality is assumed.

  • Selected flow: Copper-conductor XLPE-insulated low-voltage power cable
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_controls, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_controls
  • Sources: hk-dsd-stormwater-2018
Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Outputs

Product flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Process: Construction plant, utilities, transport and direct environmental exchanges (site_utilities)

All construction and acceptance stages; each exchange is conditional on actual occurrence and source/interface.

Inputs

Product flows
Diesel fuel (site_diesel)

Use the generic foreground diesel material identity only for actual identified diesel, preserving its unspecified fuel grade, formulation, density, heating value, refinery, geographic supply and provider. Collect real fuel certificates and metered consumption by excavator, compactor, haul vehicle, pump, crane or generator and by work stage. Do not copy a fixed fuel rate from an equipment record. Measure density for volume-to-mass conversion; fossil content is separately required for fossil-emission rows.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: usbr-crow-construction
Alternating current (electricity_lv_cn)

Only actual CN user-side grid-average consumption mix supplied below 1 kV. Preserve Net calorific value as the public reference property and MJ energy units. Record real meter interface and dates; electricity at 1–35 kV and other countries, self-generation or dedicated generation mixes are separate. Diesel used by a site generator and its output electricity must not both import the same upstream grid burden.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: usbr-crow-construction
Alternating current (electricity_mv_cn)

Only actual CN user-side grid-average supply at 1–35 kV. Keep Net calorific value/MJ, actual voltage and meter point, including transformers and losses only once according to supply interface. This row and the below-1-kV row cover distinct supplies, not alternative UUIDs for the same meter.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: usbr-crow-construction
User-side alternating-current electricity at the declared supply voltage (electricity_other)

Only actual electricity outside the two confirmed CN supply conditions. Identify country, actual voltage and mix, grid/self-generation interface and measured energy; select the matching public identity before dataset use. Do not replace it with incineration-production electricity.

  • Selected flow: User-side alternating-current electricity at the declared supply voltage
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: usbr-crow-construction
Tap water (tap_water_hk)

Only actual Hong Kong treated tap water supplied as a production mix at the water-treatment plant gate. Verify the real distribution/transport link to the construction meter separately, and include its activities once. Preserve Volume/m3; the record’s secondary 1000 kg/m3 screening property is not a default density. Other locations or supply interfaces use a separately verified identity.

  • Selected flow: Tap water 3a8411b6-e476-4f98-9d77-0d492661a07f
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: usbr-canal-concrete-2017
Supplied liquid construction process water (supplied_water_other)

Only actual externally supplied liquid water for moisture conditioning, batching, curing, dust control or commissioning not satisfying the Hong Kong plant-gate identity. Record quality, geography, supplier, treatment and delivery interface; split source/quality streams. Do not also record its upstream natural-water abstraction as a foreground resource input.

  • Selected flow: Supplied liquid construction process water
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: usbr-canal-concrete-2017
Mineral lubricating oil (mineral_lubricant)

Only actual separately consumed mineral lubricant in construction plant. Record grade, issue/return, replacement and used-oil collection; lubricants already contained in a complete equipment/service dataset are not duplicated.

  • Selected flow: Mineral lubricating oil
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_utilities, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: usbr-crow-construction
Complete hydraulic excavator at manufacture gate (excavator_manufacture_share)

Only when an actual hydraulic excavator manufacturing contribution is inside the declared dataset scope. Inventory kg equals measured same-configuration net excavator mass multiplied by the documented dimensionless manufacturing share attributable to this reference works; record both factors under cp_shared_assets. The service denominator must come from evidenced total lifetime/cumulative activity or a justified forecast, with reconciliation. Across all projects, periods and reuse scenarios the cumulative manufacture shares cannot exceed one. Unknown denominator or included manufacture requires explicit review, never a full new excavator burden per project. Do not adopt a dismantling-use excavator flow or its nominal fuel rate as manufacturing identity.

  • Selected flow: Complete hydraulic excavator at manufacture gate
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_shared_assets, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_shared_assets
  • Sources: usbr-crow-construction
Road freight transport by truck (road_freight)

Only actual inbound or attributable off-site truck transport not already contained in supplier or waste-treatment data. Keep material/vehicle/route separate in raw records, measured payload, loaded distance, empty return treatment and loading. Calculate each real leg in t*km; on-site plant fuel is metered separately, and plant mobilisation is included only once.

  • Selected flow: Road freight transport by truck
  • Flow property / unit: Goods transport (massdistance) 838aaa20-0117-11db-92e3-0800200c9a66 / tkm
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_transport, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_transport
  • Sources: usbr-crow-construction
Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows
ground water (groundwater_abstraction)

Only direct abstraction of freshwater from groundwater inside this foreground boundary for site use or actual construction dewatering. Record aquifer/source, location/country, extraction meter and purpose. This is a renewable material resource from water, not contaminated groundwater waste or water discharged to an aquifer. If an LCIA water-scarcity method is used, preserve the country/location requirement and method compatibility; abstraction is not assumed to equal consumption.

  • Selected flow: ground water 4f462198-40cd-4184-8733-86648a20dc3f
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: usbr-crow-construction
river water (river_abstraction)

Only actual direct freshwater river abstraction crossing the site foreground environmental boundary; preserve source, location/country, intake meter, purpose and any separately measured returns. River diversion that bypasses construction without consumptive site use is disclosed as changed routing, not automatically counted as purchased water or final irrigation supply.

  • Selected flow: river water 805a7346-1664-4483-afe3-4b224be5e361
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: usbr-crow-construction

Outputs

Product flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows
carbon dioxide (fossil) (diesel_co2)

Only supported CO2 from the actual fossil fraction of site fuel combustion. Immediate emission to air with unspecified subcompartment; use a different verified flow if an urban/non-urban/high-stack subcompartment is specified. Include only the measured or route/engine/control-specific supported mass, with its factor and activity evidence retained by cp_environment. Do not import the same emission again from a combustion-inclusive service dataset. Biofuel carbon, soil carbon change and reservoir methane are separate and are not presumed construction emissions.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_environment, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_environment
  • Sources: usbr-crow-construction
carbon monoxide (fossil) (diesel_co)

Only supported fossil CO, CAS 630-08-0, from actual construction combustion. Immediate emission to air with unspecified subcompartment; use a different verified flow if an urban/non-urban/high-stack subcompartment is specified. Include only the measured or route/engine/control-specific supported mass, with its factor and activity evidence retained by cp_environment. Do not import the same emission again from a combustion-inclusive service dataset.

  • Selected flow: carbon monoxide (fossil) 08a91e70-3ddc-11dd-924e-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_environment, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_environment
  • Sources: usbr-crow-construction
nitrogen monoxide (diesel_no)

Only separately supported NO, CAS 10102-43-9. NOx totals or NO2-equivalent reporting cannot be assigned as NO without substantiated speciation. Immediate emission to air with unspecified subcompartment; use a different verified flow if an urban/non-urban/high-stack subcompartment is specified. Include only the measured or route/engine/control-specific supported mass, with its factor and activity evidence retained by cp_environment. Do not import the same emission again from a combustion-inclusive service dataset.

  • Selected flow: nitrogen monoxide 08a91e70-3ddc-11dd-96ee-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_environment, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_environment
  • Sources: usbr-crow-construction
nitrogen dioxide (diesel_no2)

Only separately supported NO2, CAS 10102-44-0; not NO, N2O or a NOx total expressed as NO2 equivalent. Immediate emission to air with unspecified subcompartment; use a different verified flow if an urban/non-urban/high-stack subcompartment is specified. Include only the measured or route/engine/control-specific supported mass, with its factor and activity evidence retained by cp_environment. Do not import the same emission again from a combustion-inclusive service dataset.

  • Selected flow: nitrogen dioxide 08a91e70-3ddc-11dd-96e5-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_environment, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_environment
  • Sources: usbr-crow-construction
sulfur dioxide (diesel_so2)

Only supported SO2, CAS 7446-09-5, with actual fuel sulfur/control conditions. Immediate emission to air with unspecified subcompartment; use a different verified flow if an urban/non-urban/high-stack subcompartment is specified. Include only the measured or route/engine/control-specific supported mass, with its factor and activity evidence retained by cp_environment. Do not import the same emission again from a combustion-inclusive service dataset.

  • Selected flow: sulfur dioxide fe0acd60-3ddc-11dd-ac48-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_environment, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_environment
  • Sources: usbr-crow-construction
particles (PM2.5) (exhaust_pm25)

Only supported size-defined PM2.5 exhaust mass for the actual plant. Immediate emission to air with unspecified subcompartment; use a different verified flow if an urban/non-urban/high-stack subcompartment is specified. Include only the measured or route/engine/control-specific supported mass, with its factor and activity evidence retained by cp_environment. Do not import the same emission again from a combustion-inclusive service dataset. A PM10 measurement already includes PM2.5; use a consistent non-overlapping particle-size representation and never sum nested fractions as separate total emissions.

  • Selected flow: particles (PM2.5) 08a91e70-3ddc-11dd-9293-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_environment, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_environment
  • Sources: usbr-crow-construction
particles (PM10) (earthworks_dust_pm10)

Only supported PM10 from actual excavation, fill placement, exposed stockpiles or site traffic, with immediate air/unspecified-subcompartment identity. Record activity, soil/silt/moisture, traffic, weather and dust-control evidence by operation. EPA AP-42 13.2.3 is used for its component-operation approach and cautions only: its historical area/month TSP factor is not a project PM10 default. Keep exhaust separate and avoid particle-size overlap.

  • Selected flow: particles (PM10) 08a91e70-3ddc-11dd-91be-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_environment, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_environment
  • Sources: epa-construction-dust-1995
Water (water_release_fresh)

Only an actual direct discharge to a documented freshwater receiving body, after any recorded site treatment. Retain source, volume, destination, treatment and water-quality evidence. Do not use a natural-water resource identity, a purchased river-water product or a waste-treatment transfer for this release. Identify any actual pollutant species separately with measured concentrations and correct receiving medium; no default pollutant release is prescribed.

  • Selected flow: Water 5e50fc01-19c6-4377-a1cc-bc65a12498ea
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_water, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water
  • Sources: usbr-crow-construction; epa-concrete-washout-2012
carbon dioxide (biogenic) (initial_filling_biogenic_co2)

Only actual biogenic CO2 attributable to land disturbance or initial filling/testing before acceptance, with the original land/carbon baseline, inundated extent, start/end and measured or specifically supported release. This immediate air/unspecified-subcompartment identity is not fossil combustion or a delayed-emission correction flow. IPCC flooded-land guidance supports pathway review, not automatic application of annual factors to a short construction test; identify actual land conversion and avoid repeating baseline respiration/short-term carbon cycling already counted elsewhere. Missing evidence is a declared gap, not zero.

  • Selected flow: carbon dioxide (biogenic) 08a91e70-3ddc-11dd-9c15-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_environment, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_environment
  • Sources: ipcc-flooded-land-2019
methane (biogenic) (initial_filling_biogenic_ch4)

Only actual attributable biogenic CH4 to air before acceptance from a demonstrated initial-filling, constructed waterbody or soil pathway. Preserve original baseline, waterbody type, inundation/hydrology, oxygen/organic conditions, actual monitoring period and diffusion/ebullition/degassing routes; quantify each supported release without overlap. This is immediate air/unspecified subcompartment, not a long-term or fossil-methane identity. IPCC distinguishes flooded-land types and excludes some seasonal floodplains; its national/annual guidance is not a default construction-test factor, and merely installing a canal does not prove a methane release.

  • Selected flow: methane (biogenic) fe0acd60-3ddc-11dd-a8e8-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_environment, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_environment
  • Sources: ipcc-flooded-land-2019

Process: Construction waste segregation, recovery and transfer (construction_wastes)

Inspect all construction, testing and in-scope replacement stages; record each real stream and destination, including non-applicability evidence.

Inputs

Product flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Outputs

Product flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Waste flows
Uncontaminated excavated soil sent off site (excavated_soil_waste)

Only soil actually crossing the boundary to an identified waste destination after documented contamination characterization. Record native soil, wet/dry basis, recovered internal fill and exported quantity separately. Contaminated soil and excavated rock each require a separate specified row and treatment; a soil resource is not this waste.

  • Selected flow: Uncontaminated excavated soil sent off site
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: usbr-crow-construction
Hardened construction concrete waste (concrete_waste)

Only actually removed hardened concrete from construction loss or in-scope replacement work. Preserve reinforcement contamination, route and destination; segregate recovered steel and distinguish fresh rejected concrete or washout residue. Prior-asset demolition for rehabilitation is explicitly disclosed, not silently merged with new manufacture.

  • Selected flow: Hardened construction concrete waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: usbr-crow-construction
Low-alloy reinforcing steel offcut (steel_offcut_waste)

Only the actual segregated offcut from the specified reinforcement, with coating/contamination and recipient documented. No automatic avoided-primary-steel credit; preserve scrap transfer and actual recovery boundary.

  • Selected flow: Low-alloy reinforcing steel offcut
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: usbr-crow-construction
Alkaline concrete washout liquid (concrete_washout_liquid)

Only actual contained liquid from cleaning concrete delivery/placing equipment or batching. EPA describes separate management of washwater and solids; record contained volume, alkalinity/contaminants, recycling and destination. Its later direct release, if any, belongs under the environmental boundary, not as an assumed discharge.

  • Selected flow: Alkaline concrete washout liquid
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012
Settled concrete washout solids (washout_solids)

Only actual settled/hardened concrete washout solids removed from containment. Record water content and residue composition, mass and reuse/disposal destination; do not count the same water again as both liquid waste and wet-solid moisture.

  • Selected flow: Settled concrete washout solids
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012
Construction dewatering water sent for treatment (dewatering_transfer)

Only actual liquid transferred off site for treatment, with origin, characterization and destination documented. Groundwater abstraction and direct freshwater discharge are distinct flows and quantities. A contaminated-groundwater waste identity is used only if contamination and treatment route actually match; absence of discharge evidence is not a zero-emission assertion.

  • Selected flow: Construction dewatering water sent for treatment
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: usbr-crow-construction
Spent sodium-bentonite excavation slurry (spent_bentonite_slurry)

Only actual bentonite-based slurry removed from the specified underground construction route. Record mineral/additive/water composition, density or measured mass, dewatering, recovered liquid/solid fractions and destination, with a closed balance. Other tunnelling slurries are separate exchanges; no slurry waste is assumed for dry excavation.

  • Selected flow: Spent sodium-bentonite excavation slurry
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: hk-dsd-stormwater-2018
Spent mineral lubricating oil (spent_mineral_oil)

Only actual separately collected used mineral lubricant. Record contamination and handling destination; neither fresh oil nor general oily sludge is equivalent.

  • Selected flow: Spent mineral lubricating oil
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: usbr-crow-construction
Corrugated cardboard packaging waste (carton_waste)

Only actual removed cardboard from supplied components, with supplier packaging inclusions reconciled and destination recorded.

  • Selected flow: Corrugated cardboard packaging waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: usbr-crow-construction
Polyethylene packaging film waste (film_waste)

Only actual removed polyethylene film with polymer and contamination known. Other polymers, timber crates and other real wastes each need their own atomic row.

  • Selected flow: Polyethylene packaging film waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect the actual attributable quantity in this row unit using cp_waste, per declared reference flow; retain the stated configuration, activity and identity conditions.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: usbr-crow-construction
Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Process: Verification, reinstatement and physical acceptance (handover)

Always confirm completeness, functional interfaces, actual geometry, defects and acceptance; testing consumption remains stage-coded under utilities/wastes.

Inputs

Product flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Outputs

Product flows
Delivered irrigation and flood control waterworks (reference_waterworks)

One completed and accepted physical works at the declared site and project extent, providing its specified irrigation, flood-control or combined function. Its complete configured channel/retention/drainage/control assets and defined interfaces must match the as-built, commissioning and handover records. A work package of materials or a construction service does not fulfil this output.

  • Selected flow: Delivered irrigation and flood control waterworks
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: 1 item
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_acceptance
  • Sources: unsd-cpc-3-2025; fao-irrigation-system; hk-dsd-stormwater-2018
Waste flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Elementary flows

No universal crossing exchange is prescribed in this group. Record any real exchange separately; retained/internal transfers are reconciled within this works.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 6
Rule IDApplies toRuleSource IDs
construction_deliverydatasetThe core foreground covers actual site preparation through construction, fitting, testing, removal of temporary works, reinstatement and accepted physical handover. Record delivered incoming products at their real interfaces. Cement/steel/aggregate/pump manufacture is upstream; only actual site batching, placement or assembly is foreground. Link compatible upstream manufacturing and delivery datasets to extend coverage, but label this foreground result as construction-to-handover, not a complete cradle-to-gate or whole-life result.usbr-crow-construction
purpose_and_interfacesreference_waterworksPreserve the actual irrigation or flood-control purpose and independently operable extent. Identify canal/drain chainage and cross-sections, protected/irrigated area definition, inlet/outlet and water levels, documented flow/storage/pumping capacity, control and maintenance access delivered. These are project measurements/requirements, not fixed PCR numbers. Exclude standalone water-supply conduits, navigation/port facilities, dams/water-retaining structures and coastal/waterside embankments; for multipurpose or integral components, declare a non-overlapping package/interface and review classification separately rather than removing real construction.unsd-cpc-3-2025, hk-dsd-stormwater-2018
route_completenessall inventory rowsRequired process blocks require an actual activity/completeness assessment, not all listed materials. Conditional routes remain conditional: earth or lined irrigation; rigid, flexible or vegetated flood channels; storage/polder/pumping; open-cut or underground hydraulic connections. Add each actual missing product, chemical, energy carrier, support element, packaging piece, waste and measured environmental species as a separate atomic row with properties, unit, protocol and route evidence. Significant piling, ground treatment, tunnelling, shotcrete, hydraulic transport or other real operations require their own process detail before a dataset can be complete; a sparse example route cannot represent another technology.fao-irrigation-system, usbr-crow-construction, hk-dsd-stormwater-2018
temporary_and_prior_assetsdatasetAccount actual cofferdams, temporary diversion/roads, dewatering/treatment, support works and their removal/recovery once. Distinguish native retained assets, imported assemblies and new work. A rehabilitation delivery must retain prior structure/interface and record actual enabling demolition and replacement; do not charge the retained old asset as a newly manufactured input or erase its history. Shared machinery/formwork manufacture, when included, follows the cumulative share ledger.usbr-crow-construction
later_lifecycledatasetOnly post-handover operational irrigation deliveries, flood events, pumping energy, leakage/seepage, operating-reservoir/soil processes, desilting, maintenance, renewal and final demolition are outside the core construction delivery. Actual pre-acceptance initial filling, commissioning, land disturbance and resulting supported inundation/land-carbon/release pathways stay inside their real construction/test site and period. Record baseline, flooded area, dates and measurements; unsupported pathways remain explicit gaps, not moved into excluded operation. Keep later actual or explicit future scenarios separate with evidenced period, activity, replacements, treatment and fate. No default service life, flood recurrence, saved crop output or avoided flood damage.fao-irrigation-system, hk-dsd-stormwater-2018, ipcc-flooded-land-2019
environmental_boundarysite_utilities; construction_wastesDistinguish supplied technosphere water, direct river/groundwater resource abstraction, contained liquid waste sent for treatment and actual elemental release to a named receiving medium. Separate recirculation from crossing flows and record storage, rainfall/river diversion and return volumes so abstraction is not equated with consumption. Record noise as site/receptor/time/frequency and sound-level evidence outside mass exchanges until a suitable metric and identity are established; do not convert dB to kg or assume a universal noise emission. Actual land clearing/occupation changes and contaminant releases require separate supported environmental exchanges or explicit gaps, not an assumed zero.epa-concrete-washout-2012, epa-construction-dust-1995, usbr-crow-construction
Allocation rules · 4
Rule IDApplies toRuleSource IDs
direct_subdivisiondatasetFirst assign receipts, meters, equipment logs and subcontract works directly to this defined delivery and stage. Subdivide joint water-supply, navigation, power or other functions before allocation. If inseparable works serve several beneficiaries/functions, justify an evidenced physical causal driver and denominator, show all recipients and sensitivity; a common area, cost or flow-capacity ratio is not automatically causal.
manufacture_share_conservationexcavator_manufacture_share; formwork_plywood; steel_supportFor each reusable asset retain one persistent same-asset manufacture boundary and documented total service basis. Multiply its real mass/count by the current dimensionless attributed share only when units and configuration match. Across projects, periods, temporary reuse and later reuse, cumulative shares must be no greater than one. Keep forecast versus realized service explicit and reconcile; unknown lifetime/activity denominator remains review, never a per-project reset or an invented lifespan.
recovery_and_internal_reuseconstruction_wastesInternal cut/fill reuse, recirculated water and recovered formwork are reconciled internal transfers, not co-products or automatic environmental credits. Preserve actual exported soil, scrap and waste quantities and the point of waste/product status change. Do not subtract hypothetical recycling, avoided virgin production or avoided flood loss from the construction result; any separately assessed recovery scenario must state allocation and substitution evidence.
allocation_rule_4foreground_burden_allocationThese conservation and direct-attribution rules are modelling controls backed by actual cp_shared_assets/cp records, not prescribed lifetime or allocation factors. Any unresolved beneficiary or lifetime relationship must be reviewed and disclosed in the eventual dataset.
Validation rules · 6
Rule IDApplies toRuleSource IDs
entity_and_acceptancereference_waterworksRequire one physically accepted works with matching project id, site, delivered configuration, as-built geometry, inlet/outlet limits and documented irrigation/flood-control purpose. Declare real irrigated/protected area, flow/head/storage/pump capacity and test conditions where relevant. These qualifiers do not prove future flood performance, crop yield, regulatory approval or a service lifetime.unsd-cpc-3-2025, hk-dsd-stormwater-2018
basis_and_physical_unitsall inventory rowsReference output is 1 item and every exchange/protocol aggregate is per declared reference flow for that same whole delivery. Surveyed lengths, areas, volumes and installed capacities are qualifiers or documented supplemental metrics, not silent denominator changes. Confirm public property, unit group and actual numerator conversions; do not make Mass, Volume, Area, Count or energy interchangeable, and do not invent an overall works mass.
materials_and_waste_balancelining_structures; underground_conveyance; construction_wastesReconcile delivery/returns/stock/installation/removal for each concrete, soil, rock, reinforcement and other specific exchange; record real mix/concentration, density and wet/dry basis where conversions occur. Keep temporary recovery and excavated native material distinct. Validate containment and destinations of washout/dewatering/slurry, and do not duplicate liquid water with wet-residue moisture.epa-concrete-washout-2012, usbr-crow-construction
identity_and_emission_conditionssite_utilitiesCheck each adopted identity against exact substance, fossil/biogenic origin, route/state, country, voltage, supply gate and medium/submedium, with referenceToReferenceFlowProperty and support units. NO is not NO2/N2O; an NOx equivalent is not a species. PM nested fractions are not summed. Only measured or explicitly supported factor-derived releases are admissible. Missing identity, measurement, factors or omitted significant operations remains disclosed review/incomplete data, not proof of database absence or zero burden.epa-construction-dust-1995
hydraulic_civil_completenessdatasetReview the actual channel/bank/retention/culvert/tunnel/pump/control route against drawings and signed checks: alignment/levels/sections, ground conditions, filters/drains, joints/leakage, compaction, lining/structure quality, water-control operation, clearance and reinstatement as applicable. Use current project-specific acceptance evidence; historical guides do not impose universal geometry, strength, mix, water quality, life or legal approval. Missing integral drainage, control, support or treatment cannot be hidden by choosing a smaller easy route.fao-irrigation-system, usbr-canal-concrete-2017, hk-dsd-stormwater-2018
allocation_and_disclosuredatasetCheck full receiving-population and reusable-asset ledgers, no more than one cumulative manufacture share, no duplicated material/service/combustion, and separate later lifecycle scenarios. Scientific review and unresolved identities are explicit prerequisites for reviewed use; a candidate projection/measurement check is a technical consistency result, not methodology approval or publication.
Processes and inputs/outputs · 8
Process IDProcess nameInput flowsOutput flows
site_earthworksSite preparation, earthworks and temporary water control10
banks_drainageIntegral banks, filters, protection and subsoil drainage70
lining_structuresLining and hydraulic civil structures90
underground_conveyanceIntegral underground hydraulic conveyance40
controls_installationFixed water-control and pumping installation60
site_utilitiesConstruction plant, utilities, transport and direct environmental exchanges1110
construction_wastesConstruction waste segregation, recovery and transfer010
handoverVerification, reinstatement and physical acceptance01

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page