TianGong PCR

Industrial and agricultural building delivery

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53121 · exact

Source

1. Scope and Applicability

This PCR covers the actually constructed and accepted building entity used for industrial production/assembly (factories, plants, workshops) and agricultural buildings including silos and storage facilities. A delivered site-specific entity, including its declared foundations, frame/shell, industrial floor where applicable, enclosure and fixed building services, is the reference product. Steel portal, reinforced/precast concrete, masonry, timber and agricultural storage routes remain within scope when evidenced by the actual project. A steel example does not redefine the class.

Exclude mining facilities, power plants, chemical/related facilities and specialized manufacturing facilities such as iron foundries (CPC 53261/53262/53269); exclude residential/commercial buildings outside the category, upstream construction products sold alone, construction services and production machinery. Integrated office/ancillary space within the accepted building is included and disclosed. Standalone machinery, conveyors, grain drying/aeration process equipment and process-crane equipment are outside the building product unless a separately justified integrated scope is declared; structural supports actually part of the building remain included. Construction to handover is the foreground boundary; the delivered entity is not a claim of full lifetime performance.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.constructions-and-construction-services.constructions.industrial-and-agricultural-building-delivery
classification_refsCPC 3.0 53121 — Industrial buildings
covered_productsAccepted industrial-production/assembly buildings and agricultural buildings including storage silos, with project-specific complete delivery scope
excluded_productsCPC excluded specialized facilities; building-service contracts; material kits; production equipment; other occupancy classes
representative_productOne accepted factory/workshop building or one accepted agricultural building/silo of an explicitly surveyed configuration
production_routeActual site preparation, foundations, load-bearing erection or shell assembly, enclosure, fixed services, commissioning and handover; route-specific atomic rows
market_stateCompleted on its declared site and signed over in the specified construction/fit-out condition, without an assumed production operation period

3. Reference Flow

FieldValue
WhatDeliver the building enclosure/structure and declared fixed services for the documented industrial or agricultural function
How muchOne complete accepted entity; report surveyed gross/internal/useful areas with explicit definitions, number of levels, clear height and actual dimensions; for silo declare usable storage volume/capacity and contents basis without default bulk density
How wellAs-built structural system, actual design/performance records, enclosure, industrial floor requirements and installed service/acceptance scope; no generic design loads or compliance approval
How long or cycleOne actual construction-to-handover event with start/end dates; operational service life is outside this reference and must be source-supported in later scenarios
reference_flow_linkreference_building
FieldValue
Reference amount1
Reference product flowCompleted industrial or agricultural building
Reference flow propertyNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345
Reference unit groupUnits of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159
Reference unititem
Required qualifiersentity/site id; industrial/agricultural function and exclusions; delivery date/state; full installed scope; actual area definition and geometry; clear height; structural system; floor/performance evidence; actual silo contents and capacity basis if applicable; route; upstream gates; unmeasured/excluded stages

The unit item is a display alias for public Item(s), not kg or m2. The reference output and every inventory/protocol denominator are the same declared whole entity. Required qualifiers must be present in the foreground package. Do not convert buildings to mass, area or annual service using assumed averages; comparisons require matched actual function, size, performance and scope.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_countreference productNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345itemOne accepted complete entity with cp_acceptance. Keep the same declared reference flow for all records. No numeric mass M is imposed.
actual_geometryreference productArea 93a60a56-a3c8-19da-a746-0800200c9a66m2Survey areas with stated measurement convention and as-built dimensions; retain silo usable volume in m3 separately. Geometry describes function/configuration and is not an automatic output conversion.
energy_identitylv_electricity; mv_electricity; dieselNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJPreserve public net calorific value reference and energy group. Electricity kWh uses 3.6 MJ/kWh; diesel kg to MJ needs actual LHV and litres to kg actual density at declared state. Retain raw records and uncertainty.
transport_basisroad_freightGoods transport (mass*distance) 838aaa20-0117-11db-92e3-0800200c9a66t*kmRetain actual cargo mass and each route distance in cp_transport; documented tonne-kilometres are an input service numerator per the same entity.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionActual documented site condition plus supplied construction products/equipment at explicitly named supplier or site gates before installation
starting_condition_roleforeground_starting_point
product_classification_scopeIndustrial/agricultural delivered building entity within the stated inclusions/exclusions
recursive_input_ruleA reused same-category building or shell is recorded once at its actual received state/gate; expose residual inherited burdens and refurbishment work, do not recursively recreate its full construction inventory
upstream_dataset_requirementCompatible A1–A3 material/component manufacture and actual A4 delivery links must be supplied separately and checked for included transport/site processes; missing links preclude complete cradle-to-handover claim
disclosureSite preparation and pre-existing demolition; product/manufacture gates; construction phases and temporary works; actual transport, fixed services, commissioning; later use, maintenance/replacement, final demolition, treatment and module D excluded
rule_idapplies_torulesource_ids
construction_gatedatasetCollect each actual foreground work package through accepted handover; the inventory is construction-focused, not automatically complete cradle-to-gate. Upstream products carry their own manufacturing burden rather than copied manufacture into site work.rics-wlca-2024
route_completenessall inventory rowsProcess and flow examples are conditional, not a universal bill. Add every actually used atomic cement, aggregate, additive, panel, joint/grout, fixing, membrane, service component and waste for the real design. Do not drop industrial/agricultural routes because their identities are unresolved.jrc-levels-boq-2021; un-cpc-3-53121
environment_gateutilities; wasteDistinguish supplied water, direct resource intake, dewatering, contained washwater, treated discharge and each measured emission constituent. Construction noise/vibration/land and unmeasured constituents require explicit assessment/disclosure, not invented mandatory exchanges. Direct combustion and generator supply must not double count.epa-concrete-washout-2012; epa-construction-dust-2010

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
groundSite preparation and earthworksrequiredActual ground investigation, clearance, excavation, fill and drainage required by the delivered design; pre-existing demolition separately disclosedforegroundper declared reference flow
concreteFoundations and structural concrete including industrial ground slabconditionalActual cast-in-place foundations, slab or frame; measure concrete placement, reinforcement, finishing, curing, pumps and formworkforegroundper declared reference flow
frameLoad-bearing frame and masonry erectionconditionalActual steel, precast, timber or masonry route with separate row applicability; cranes/MEWPs and temporary bracing, bolting or welding, alignment and inspectionforegroundper declared reference flow
envelopeRoof, wall enclosure and industrial openingsconditionalActual covered building: cladding, insulation, roof drainage and doors as delivered; open agricultural structures disclose absent enclosureforegroundper declared reference flow
siloAgricultural storage-silo assemblyconditionalActual agricultural silo: foundation interface, shell/roof, anchors, seals and access; steel example is not universal for concrete silosforegroundper declared reference flow
servicesIndustrial floor finishes and fixed building servicesconditionalOnly actually delivered fixed lighting, power distribution, drainage, ventilation and fire protection; integral offices included within declared building; process machinery excludedforegroundper declared reference flow
utilitiesSite equipment operation and temporary facilitiesrequiredActual construction utilities and measured releases across all work packages; stages and equipment retainedforegroundper declared reference flow
wasteConstruction waste collection and exportconditionalEvery occurring waste segregated by material and state, with actual destination; add atomic exchanges not represented by examplesforegroundper declared reference flow
transportDeliveries and exported waste transportconditionalActual transport legs not already in linked datasets; preserve different gates and modesforegroundper declared reference flow
handoverInspection, commissioning and accepted handoverrequiredWhole delivered entity with documented geometry, structural/enclosure/services scope and signed acceptance; test exchanges retainedreference_productper declared reference flow

Process: Site preparation and earthworks (ground)

Inputs

Product flows
Crushed stone for foundation subbase (subbase)

If used: record actual grading, moisture, delivered and retained quantities; no universal layer thickness.

  • Selected flow: Crushed stone for foundation subbase
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_ground; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_ground
  • Sources: jrc-levels-boq-2021

Outputs

Waste flows
Non-contaminated excavated mineral soil sent for disposal (soil_export)

Only if exported as waste: distinguish bank/loose volume, contamination and destination; reused soil is not disposal.

  • Selected flow: Non-contaminated excavated mineral soil sent for disposal
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measured attributable exchange total from cp_ground; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_ground
  • Sources: rics-wlca-2024

Process: Foundations and structural concrete including industrial ground slab (concrete)

Inputs

Product flows
Ready-mixed concrete delivered before placing (ready_mix)

For supplied concrete in foundations, ground slab or frame: retain actual mix designation, strength/exposure specification, tickets, pump/placing, curing and returns. Site batching instead requires cement, each aggregate, water and additive rows; do not count both routes.

  • Selected flow: Ready-mixed concrete delivered before placing
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measured attributable exchange total from cp_concrete; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_concrete
  • Sources: jrc-levels-boq-2021
Steel rebar (rebar)

Only for actual non-alloy steel supplied in irregularly wound coils, matching the public Chinese identity. Record supplier gate, coil grade/shape and weighed receipts; on-site straightening, cutting and bending are separate actual foreground operations with losses and utilities. Straight bars, already cut/bent bars, alloy reinforcement and prefabricated cages require separately verified identities; the generic English name does not broaden applicability.

  • Selected flow: steel rebar 4f1a1837-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_concrete; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_concrete
  • Sources: jrc-levels-boq-2021
Plywood formwork panel (formwork)

Only if used: record actual panel thickness, composition, area, reuse and remaining service under cp_asset; installed contact area is not the whole new panel charge.

  • Selected flow: Plywood formwork panel
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: Measured attributable exchange total from cp_concrete; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_concrete
  • Sources: rics-wlca-2024

Outputs

Process: Load-bearing frame and masonry erection (frame)

Inputs

Product flows
Precast concrete structural column (precast)

Only for a precast frame: include actual embedded reinforcement/connection scope and delivered column mass; lifting, grouting and joints are site processes.

  • Selected flow: Precast concrete structural column
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_frame; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_frame
  • Sources: jrc-levels-boq-2021
Fabricated structural steel beam (steel_beam)

Only for steel frame members: record section, grade, coating/fire protection and supplier gate. Shop cutting/welding/coating is upstream unless actually performed on site.

  • Selected flow: Fabricated structural steel beam
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_frame; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_frame
  • Sources: bcsa-steel-buildings-2003
Fabricated structural steel column (steel_column)

Only for actual steel columns; distinguish base plates, anchors and included coatings to avoid duplication; record alignment and connection inspection.

  • Selected flow: Fabricated structural steel column
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_frame; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_frame
  • Sources: bcsa-steel-buildings-2003
Kiln-dried sawn coniferous timber (timber)

Only for a timber building route using this state: record species, strength grading, moisture and treatment; laminated or treated members require separate identities.

  • Selected flow: Kiln-dried sawn coniferous timber, at mill 50904047-e5b0-4110-990a-53751d250267
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_frame; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_frame
  • Sources: jrc-levels-boq-2021
Fired brick (brick)

Only for actual sintered clay masonry: record unit type/voids and installation evidence; refractory and unsintered units do not match.

  • Selected flow: Fired brick aedc2027-2154-4b0e-95fd-9baeb46d4153
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_frame; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_frame
  • Sources: jrc-levels-boq-2021
Cement-sand masonry mortar (mortar)

If supplied for masonry: retain real composition and water state; if mixed on site split constituent exchanges and mixing utilities, do not assume a sand fraction.

  • Selected flow: Cement-sand masonry mortar
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_frame; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_frame
  • Sources: jrc-levels-boq-2021
Structural steel bolt (steel_bolt)

If installed: record grade, dimensions, coating and weighed quantity; nuts and washers not included by supplier must be separate atomic rows.

  • Selected flow: Structural steel bolt
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_frame; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_frame
  • Sources: bcsa-steel-buildings-2003
Flux Cored Wire (welding_wire)

Only for actual site flux-cored arc welding: record wire designation, composition, consumed mass, remaining stock and welding procedure. Not a universal erection requirement.

  • Selected flow: Flux Cored Wire 1b74a576-06e0-4764-97ce-11a73f8a4752
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_frame; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_frame
  • Sources: bcsa-steel-buildings-2003
Argon welding shielding gas (argon)

Only if pure argon is actually supplied for the documented site weld; mixtures and CO2 shielding are separate flows. Measure cylinder net mass or supported state-specific conversion.

  • Selected flow: Argon welding shielding gas
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_frame; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_frame
  • Sources: bcsa-steel-buildings-2003

Outputs

Process: Roof, wall enclosure and industrial openings (envelope)

Inputs

Product flows
galvanized corrugated iron (sheet)

Only for installed hot-dip galvanized corrugated sheet of the public thickness range 0.25–2.5 mm. Verify actual thickness/coating/grade and measured receipts; sandwich panels and silo-specific sheets are separate products.

  • Selected flow: galvanized corrugated iron b302e292-860a-430a-9dc0-b95e89d4a63e
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_envelope; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_envelope
  • Sources: bcsa-steel-buildings-2003
Rock Wool (rock_wool)

Only for separately supplied installed rock wool: measure actual density/thickness/facing and design specification. Do not also count insulation embedded in a purchased sandwich panel.

  • Selected flow: Rock Wool 3a298360-f298-4a11-999e-11943f142cec
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_envelope; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_envelope
  • Sources: jrc-levels-boq-2021
Finished steel industrial roller door (industrial_door)

Only if this door is installed: record opening size, leaf/mechanism/frame and supplied accessories. Other door types require distinct rows.

  • Selected flow: Finished steel industrial roller door
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Measured attributable exchange total from cp_envelope; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_envelope
  • Sources: bcsa-steel-buildings-2003

Outputs

Process: Agricultural storage-silo assembly (silo)

Inputs

Product flows
Galvanized steel grain-silo wall panel (silo_wall)

Only for assembled steel agricultural storage silos: record panel geometry, thickness, coating, included stiffeners, bolts, measured mass and supplier erection drawings. Not general industrial cladding.

  • Selected flow: Galvanized steel grain-silo wall panel
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_silo; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_silo
  • Sources: sukup-grain-bins-2026
Galvanized steel grain-silo roof panel (silo_roof)

If installed: retain actual roof/rib assembly and aperture/seal scope; supporting members and access platform not included in supply are separate.

  • Selected flow: Galvanized steel grain-silo roof panel
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_silo; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_silo
  • Sources: sukup-grain-bins-2026
Polyethylene grain-bin bolt sealing washer (silo_washer)

Only when this actual manufacturer-type sealing washer is used; weigh or use documented supplier part mass and installed count, not a generic polyethylene-resin input.

  • Selected flow: Polyethylene grain-bin bolt sealing washer
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_silo; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_silo
  • Sources: sukup-grain-bins-2026
Galvanized steel grain-silo wall stiffener (silo_stiffener)

Only separately supplied stiffeners on the actual silo design: record section, coating, installed mass and connection to foundation; do not repeat stiffeners embedded in panel supply.

  • Selected flow: Galvanized steel grain-silo wall stiffener
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_silo; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_silo
  • Sources: sukup-grain-bins-2026
Steel grain-silo foundation anchor bolt (silo_anchor)

Only actual foundation anchoring: record bolt type, dimensions, coating, weighed quantity and inspected anchorage. No universal wind load or embedment is prescribed.

  • Selected flow: Steel grain-silo foundation anchor bolt
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_silo; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_silo
  • Sources: sukup-grain-bins-2026

Outputs

Process: Industrial floor finishes and fixed building services (services)

Inputs

Product flows
Two-component epoxy industrial floor coating (floor_epoxy)

Only if installed: record actual formulated resin/hardener supply scope, coverage, mixed/unused mass and curing; do not infer VOC composition or emissions. If purchased separately list resin and hardener separately.

  • Selected flow: Two-component epoxy industrial floor coating
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_services; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_services
  • Sources: jrc-levels-boq-2021
Insulated copper low-voltage building cable (cable)

If part of fixed building services: collect conductor area, insulation, voltage, length and actual product mass; exclude process-machine wiring outside delivery.

  • Selected flow: Insulated copper low-voltage building cable
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_services; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_services
  • Sources: jrc-levels-boq-2021
Unplasticized polyvinyl chloride pipe (drain_pipe)

Only for installed unplasticized PVC pipe with documented CN production-origin supply compatible with the public at-plant identity: record dimensions, pipe mass and actual drainage/water role; fittings are separate when not included.

  • Selected flow: UPVC tube a343bef6-8d18-4594-b1aa-99bc47172684
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_services; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_services
  • Sources: jrc-levels-boq-2021
Complete LED building luminaire (led)

If installed as fixed lighting: declare fixture, driver, mounting and actual tested configuration. A diode module or driver alone is not a complete luminaire.

  • Selected flow: Complete LED building luminaire
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Measured attributable exchange total from cp_services; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_services
  • Sources: jrc-levels-boq-2021
Fire sprinkler head (sprinkler)

Only if delivered fire-protection design includes this head: record type/rating, installed count and test evidence; piping, pumps and test water are separate.

  • Selected flow: Fire sprinkler head
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Measured attributable exchange total from cp_services; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_services
  • Sources: jrc-levels-boq-2021

Outputs

Process: Site equipment operation and temporary facilities (utilities)

Inputs

Product flows
Electricity (lv_electricity)

Only for CN user-side supply below 1 kV matching the public identity. Attribute meters to excavation, pumping, lifting, welding, enclosure, site accommodation and commissioning; other geography/voltage needs another verified row.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Measured attributable exchange total from cp_utilities; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_utilities
  • Sources: rics-wlca-2024
Electricity (mv_electricity)

Only for CN user-side 1–35 kV supply, with actual metering point/transformer losses and no overlap with low-voltage readings.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Measured attributable exchange total from cp_utilities; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_utilities
  • Sources: rics-wlca-2024
Diesel (diesel)

For actual distillate diesel consumed in site excavators, compactors, cranes or generators: preserve net calorific value, collect fuel receipts/tank reconciliation and measured LHV with density if converting litres. Disclose fossil/bio share; site combustion is separate from refinery supply.

  • Selected flow: Diesel fbd79004-188c-47a4-900b-96005d994690
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Measured attributable exchange total from cp_utilities; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_utilities
  • Sources: rics-wlca-2024
Treated mains water supplied to construction site (mains_water)

If purchased: meter actual curing, cleaning, dust suppression and system testing water; supply is a technosphere input, not direct natural-resource abstraction.

  • Selected flow: Treated mains water supplied to construction site
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measured attributable exchange total from cp_utilities; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_utilities
  • Sources: rics-wlca-2024
Elementary flows
Water, groundwater (groundwater)

Only for actual direct groundwater abstraction with source, date and volume; do not count purchased water or pumped excavation drainage as resource consumption without demonstrated routing.

  • Selected flow: ground water 4f462198-40cd-4184-8733-86648a20dc3f
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measured attributable exchange total from cp_environment; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: rics-wlca-2024
Water, river (riverwater)

Only for actual direct river intake with identified source; not lake water, wastewater or groundwater.

  • Selected flow: river water 805a7346-1664-4483-afe3-4b224be5e361
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measured attributable exchange total from cp_environment; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: rics-wlca-2024

Outputs

Elementary flows
carbon dioxide (fossil) (fossil_co2)

Only quantified immediate fossil CO2 emitted to unspecified air by documented site combustion. Retain fossil fraction and actual fuel carbon/oxidation basis; do not duplicate generator background combustion.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_environment; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: rics-wlca-2024
nitrogen monoxide (nitric_oxide)

Only if NO to unspecified air is separately measured or supported by equipment/fuel-specific evidence. Do not allocate total NOx expressed as NO2 mass to NO without justified speciation.

  • Selected flow: nitrogen monoxide 08a91e70-3ddc-11dd-96ee-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_environment; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: rics-wlca-2024
nitrogen dioxide (nitrogen_dioxide)

Only for separately established NO2 release to unspecified air; not N2O, nitrogen or nitrite, and not an assumed fraction of total NOx.

  • Selected flow: nitrogen dioxide 08a91e70-3ddc-11dd-96e5-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_environment; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: rics-wlca-2024
particles (PM10) (pm10)

Only for quantified PM10 release to unspecified air from evidenced earthworks/material handling or combustion; retain particle-size definition and avoid overlapping PM fractions. No fixed dust factor from historical guidance is prescribed.

  • Selected flow: particles (PM10) 08a91e70-3ddc-11dd-91be-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_environment; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: epa-construction-dust-2010

Process: Construction waste collection and export (waste)

Inputs

Outputs

Waste flows
Hardened concrete construction offcut (concrete_waste)

Only actual separated hardened concrete sent off site; fresh returned mix and mixed demolition rubble have different states and routes.

  • Selected flow: Hardened concrete construction offcut
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_waste; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
  • Sources: rics-wlca-2024
Steel construction offcut sent for recycling (steel_waste)

Only separated steel offcuts from documented site cutting; track coating, contamination, destination and recovery. Reused whole members remain product transfers.

  • Selected flow: Steel construction offcut sent for recycling
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_waste; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
  • Sources: rics-wlca-2024
Polyethylene packaging film waste (film_waste)

Only received packaging removed at site: measure actual polymer-specific quantity and disposal route; not virgin film provision.

  • Selected flow: Polyethylene packaging film waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable exchange total from cp_waste; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
  • Sources: rics-wlca-2024
Contained concrete-chute washwater for off-site treatment (washwater)

If concrete equipment is washed: collect retained liquid volume, solids, chemistry and destination; list separated solids separately. Export is waste, not automatic emission to water.

  • Selected flow: Contained concrete-chute washwater for off-site treatment
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measured attributable exchange total from cp_waste; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012

Process: Deliveries and exported waste transport (transport)

Inputs

Product flows
Freight Truck (road_freight)

Only actual generic road freight compatible with this service identity: retain leg, load, mass, distance and empty-return allocation. Stage-tag delivered goods separately from exported waste; avoid transport embedded in supplier datasets.

  • Selected flow: Freight Truck d55f1329-cd61-44c0-8000-9367d38d5634
  • Flow property / unit: Goods transport (massdistance) 838aaa20-0117-11db-92e3-0800200c9a66 / tkm
  • Amount rule: Measured attributable exchange total from cp_transport; preserve the row unit and documented route; no default amount
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_transport
  • Sources: rics-wlca-2024

Outputs

Process: Inspection, commissioning and accepted handover (handover)

Inputs

Outputs

Product flows
Completed industrial or agricultural building (reference_building)

1 item

  • Selected flow: Completed industrial or agricultural building
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: 1 item
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_acceptance
  • Sources: un-cpc-3-53121

7. Allocation and Co-product Handling

rule_idapplies_torulesource_ids
avoid_allocationall inventory rowsSeparate directly attributable records by building, stage and contractor first. For genuinely shared site utilities use measured causal activity, time or another justified physical driver; retain denominator, covered projects and uncertainty. Economic allocation needs explicit review when no physical relation can be evidenced.ghg-allocation-2011
asset_conservationutilities; concrete; frameEquipment manufacture, scaffolds, bracing and reusable formwork are charged only by the justified share in cp_asset. Across all projects, periods and reuses cumulative manufacture-burden shares must not exceed one; retain residual and reconcile forecast service. Unknown lifetime/cumulative service requires review and disclosure; no full manufacture reset for each building.rics-wlca-2024
waste_no_creditwasteKeep actual exported waste and treatment/recovery burdens distinct from the accepted building output. Do not credit future avoided steel/concrete production by default; reuse/recycling substitutions require separately evidenced routes and consistent boundary without duplicate credit.rics-wlca-2024

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_groundgroundIndividual actual exchange or reference acceptanceforeground_recordsSite id; excavation boundaries; geology/contamination; bank/loose volumes; grading; moisture; weighbridge tickets; reuse and export destinationsSurvey actual excavated geometry and weigh imports/exports; trace drainage separately and reconcile retained/reused fillrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_concreteconcreteIndividual actual exchange or reference acceptanceforeground_recordsMix/specification; batch/delivery tickets; actual placed volumes; reinforcement weights; pump power; curing water; formwork id and reuse ledger; returns/wasteReconcile actual deliveries, returns, installed geometry, reinforcement schedules and supplier quantities; meter placement/finishing/curing utilities. Site-batched materials collected separatelyrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_frameframeIndividual actual exchange or reference acceptanceforeground_recordsMember id; material/grade; fabrication and coating gate; component masses; bolts; weld wire/gas; lifting equipment hours; connection/alignment inspection; temporary supportsMatch as-built member list to delivery weighing and installed state; retain actual lift/assembly method, connection records and partition factory/site operationsrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_envelopeenvelopeIndividual actual exchange or reference acceptanceforeground_recordsPanel type/coating/thickness; measured roof/wall/opening geometry; delivered and installed masses; insulation density; drainage and doors; returns and wasteSurvey and reconcile actual assembly by product; separate embedded and separately supplied insulation, fixings, glazing and weather sealsrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_silosiloIndividual actual exchange or reference acceptanceforeground_recordsSilo id; stored material; diameter/height; usable capacity definition and actual geometry; foundation interface; shell/roof/stiffeners/anchors; washers/seals; access; separate machineryMatch actual manufacturer erection drawings and as-built survey to weighed supplied parts, shell/roof connections, anchoring and acceptance; no generic bulk density/capacity conversionrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_servicesservicesIndividual actual exchange or reference acceptanceforeground_recordsFixed service component ids and supplied scope; cable/pipe lengths and real mass; floor coating formulation; test energy/water; commissioning records; excluded machinery listTrace every delivered fixed service to schedules, supplier tickets and commissioning; separate product identities and measured test consumption, identify all additional atomic flowsrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_utilitiesutilitiesIndividual actual exchange or reference acceptanceforeground_recordsDate; stage/equipment; supply geography/voltage; meters; fuel tank receipts/returns; diesel density/LHV/fossil fraction; generator output and combustion scopeUse calibrated site and subcontractor meters; reconcile stock, hours and actual equipment logs. Convert measured fuel mass using actual LHV and liquids using actual density; preserve energy propertyrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_environmentutilitiesIndividual actual exchange or reference acceptanceforeground_recordsEmission species/CAS; fossil or biogenic share; actual equipment fuel/load; measured concentration/flow/time or specific factor provenance; medium/submedium; abstraction/discharge route; PM cutQuantify only evidenced releases/abstractions through calibrated measurements or explicit applicable factors and actual activity; retain speciation and uncertainty. Assess noise, vibration, land and drainage explicitly, never substitute unrelated flowsrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_wastewasteIndividual actual exchange or reference acceptanceforeground_recordsMaterial identity/state; weighed or metered amount; contamination; segregation; collection container; destination; treatment gate; liquid/solid separation; recoveryReconcile waste transfer notes with actual site separation and receipts. Record concrete washwater as retained liquid plus separately identified solids; direct discharge requires constituent-specific measured rowsrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_transporttransportIndividual actual exchange or reference acceptanceforeground_recordsConsignment; supplier and recipient gates; actual load mass; each origin/destination and distance; mode; load factor; empty-return and shared-load allocationCalculate actual leg-specific transport service from weighed cargo and documented route distance with explicit allocation; avoid transport already in product or treatment datasetrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_acceptancehandoverIndividual actual exchange or reference acceptanceforeground_recordsEntity/site id; industrial/agricultural function; actual area definition/geometry; usable height; structural design record; silo capacity and material definition where applicable; complete delivery schedule; inspections/acceptance signaturesInspect one complete accepted entity against as-built drawings and signed handover. Verify actual dimensions and functional requirements, installed fixed systems and excluded process machinery. No default service life or product massitem; m2; m3Each delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance
cp_assetutilitiesIndividual actual exchange or reference acceptanceforeground_recordsShared asset/formwork id; manufacture boundary; current attributable activity; cumulative actual service or evidenced forecast; all projects/periods; assigned shares and residual balanceMeter operation separately. Charge manufacture only by an evidenced lifetime/cumulative activity denominator; maintain immutable cross-project/period allocation ledger and reconcile forecasts. Unknown denominator requires review; never reset full burden per projectrow-specific kg, m3, m2, MJ, item, t*kmEach delivery/work event and meter interval; each final handoverFull actual construction period with start/end dates and all unmetered intervalsDeclared entity/site and all subcontracted attributable workper declared reference flowOriginal drawings/tickets; calibration; signed inspection; mass/volume reconciliation; uncertainty and provenance

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
project_reconciliationall inventory rowsRetain actual attributable totals in each row unit per declared reference flow. Reconcile receipts, returns, stock changes, installed quantities and exported waste by physical identity. Internal recirculation is not a new external input. No default recipe, loss factor, mass per building or service life.cp_ground; cp_concrete; cp_frame; cp_envelope; cp_silo; cp_services; cp_utilities; cp_waste; cp_acceptanceActual exchange totals per declared reference flowjrc-levels-boq-2021
unit_preservationdiesel; lv_electricity; mv_electricity; road_freightApply energy_identity and transport_basis only to input numerator units while preserving the declared reference flow. Keep measured density/LHV and actual transport legs with the dataset; geometry is reported as configuration, not an unproved output conversion.cp_utilities; cp_transportMJ or t*km per declared reference flow

Data Quality Requirements

requirement_idApplies toRequirementEvidence
complete_entitydatasetAcceptance scope, function, actual geometry, structural system, industrial floor and fixed service schedule must agree; assess agricultural storage-specific shell/capacity requirements. All absent/missing work packages are explicit; example rows do not prove complete inventory.cp_acceptance; cp_silo
measurementall inventory rowsOriginal readings, tickets and subcontractor records cover the whole project and actual states. Report uncertainty and estimates separately; missing measurements never become zero.all collection protocols
identityall inventory rowsVerify public identity, main reference property, unit group, route, geography and official bilingual flow display; mass/volume/energy are distinct. Blank identities retain exact rows and block unsupported linkage.supplier/state records; identity evidence
environmentutilities; wasteDocument actual fossil/biogenic share, CAS, medium/submedium, immediate/long-term and particle fraction. Assess actual noise, land use, dewatering and washwater/discharge routes; disclose unmeasured coverage and add specific measured exchanges when required.cp_environment; cp_waste

9. Validation Rules

rule_idapplies_torulesource_ids
validate_scopedatasetRequire a whole accepted industrial/agricultural building or silo within the official exclusions, actual site/function/geometry and delivery state. Reject substitution by a building service, material bundle or specialized excluded facility.un-cpc-3-53121
validate_basisall inventory rowsReference table, reference_building output and every row/protocol denominator must agree with one declared entity. Check physically compatible numerator property/unit and supported measured conversions; no false kg building mass or assumed capacity relation.
validate_completedatasetCheck every actually occurring material, process, temporary work, utility, waste and release, including contractor work and commissioning. Missing identities, quantities or stages are declared gaps, not zero; no full cradle-to-gate/full-lifetime claim with missing upstream or later stages.rics-wlca-2024
validate_assetutilities; concrete; frameReconcile shared-equipment/formwork manufacture shares across all projects and periods, cumulative total at most one; review unknown service denominator and ensure direct operation is not charged twice.ghg-allocation-2011
validate_environmentutilities; wasteRequire quantified evidence and compatible CAS, source, medium and submedium; distinguish NO and NO2 and retain waste-vs-discharge routing. Never claim methodology or legal approval from a projection/check result.epa-concrete-washout-2012; epa-construction-dust-2010

10. Published Dataset Profile

FieldValue
dataset_roleforeground_dataset
downstream_usesecondary_dataset; background_dataset
allowed_useConstruction-to-handover inventory of the declared complete industrial/agricultural building; compatible linked upstream scenarios; comparisons only with matched actual function, geometry, delivery scope and performance
excluded_useFull lifetime, default annual industrial operation, process-plant equipment inventory, generic kg/m2 building conversion, default capacity/density/life or legal/scientific approval
required_metadataAll reference qualifiers, construction dates, actual route, work-package coverage, installed and excluded machinery scope, supplier/stage gates, measured geometry/capacity basis, allocations and property/unit evidence
required_quality_disclosureMeasurement/estimate uncertainty, site/time/technology representativeness, missing upstream/background links, identity gaps, unmetered stages, environmental coverage and later-stage exclusions
update_triggerChanged function, structure, geometry, storage basis, fixed-services/delivery scope, site/supplier route, measured inventory or evidence/identity

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-3-53121official_guidanceUN Statistics Division, CPC Version 3.0, subclass 53121 explanatory note. https://unstats.un.org/unsd/classifications/Econ/Structure/Detail/EN/2100/53121Category inclusions/exclusions only; not a construction recipe.
bcsa-steel-buildings-2003handbookBCSA, Steel Buildings, publication 35/03 (2003), chapter 3, printed pp.37–41 / PDF pp.49–53. https://www.steelconstruction.info/images/0/03/BCSA_35-03.pdfHistorical UK steel building anatomy, erection and dimensional interpretation only; no default rates, loads, dimensions or contemporary code conformity. Not universal across industrial buildings.
sukup-grain-bins-2026handbookSukup Manufacturing Co., Grain Bins, L1132-042026Su ©2026, PDF pp.3 and 9. https://www.sukup.com/assets/brochures/Grain-Bins.pdfManufacturer-specific steel agricultural silo connection/sealing and foundation interface; no universal capacities, grades or design loads.
jrc-levels-boq-2021official_guidanceEuropean Commission JRC, Level(s) indicator 2.1 v1.1, January 2021, PDF/printed pp.16 and 23–24, Table 2. https://susproc.jrc.ec.europa.eu/product-bureau/sites/default/files/2021-01/UM3_Indicator_2.1_v1.1_34pp.pdfSource framework covers office and residential buildings; adapt only its as-built quantity/reconciliation method, not category coverage or a material recipe, to actual industrial/agricultural work. Industrial special elements require project evidence; no claim of Level(s) conformity.
rics-wlca-2024standardRICS, Whole life carbon assessment for the built environment, 2nd edition version 3 August 2024, section 5.1.4 printed pp.80–84 / PDF pp.88–92. https://www.rics.org/content/dam/ricsglobal/documents/standards/Whole_life_carbon_assessment_PS_Sept23.pdf.Construction-stage separation and project-specific evidence; no default factors or full WLCA compliance claim.
epa-construction-dust-2010official_guidanceUS EPA AP-42 13.2.3 Heavy Construction Operations, January 1995 corrected February 2010, p.13.2.3-1. https://www.epa.gov/sites/default/files/2020-10/documents/13.2.3_heavy_construction_operations.pdfHistorical qualitative dust/operation/moisture relationship only; no generic emissions or fixed emission factor.
epa-concrete-washout-2012official_guidanceUS EPA, Stormwater Best Management Practice Concrete Washout, EPA-833-F-11-006 February 2012, PDF pp.1–2. https://www.epa.gov/sites/default/files/2015-11/documents/concretewashout_0.pdfSeparate captured washwater and solids from environmental release; no local legal approval or automatic discharge assumption.
ghg-allocation-2011official_guidanceWRI/WBCSD Product Life Cycle Accounting and Reporting Standard 2011, chapter 9 printed p.63 / PDF p.65, Tables 9.1–9.2. https://ghgprotocol.org/sites/default/files/standards/Product-Life-Cycle-Accounting-Reporting-Standard_041613.pdfHistorical allocation hierarchy only; actual causal drivers and complete shared-asset burden ledger required.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 3
Rule IDApplies toRuleSource IDs
construction_gatedatasetCollect each actual foreground work package through accepted handover; the inventory is construction-focused, not automatically complete cradle-to-gate. Upstream products carry their own manufacturing burden rather than copied manufacture into site work.rics-wlca-2024
route_completenessall inventory rowsProcess and flow examples are conditional, not a universal bill. Add every actually used atomic cement, aggregate, additive, panel, joint/grout, fixing, membrane, service component and waste for the real design. Do not drop industrial/agricultural routes because their identities are unresolved.jrc-levels-boq-2021, un-cpc-3-53121
environment_gateutilities; wasteDistinguish supplied water, direct resource intake, dewatering, contained washwater, treated discharge and each measured emission constituent. Construction noise/vibration/land and unmeasured constituents require explicit assessment/disclosure, not invented mandatory exchanges. Direct combustion and generator supply must not double count.epa-concrete-washout-2012, epa-construction-dust-2010
Allocation rules · 3
Rule IDApplies toRuleSource IDs
avoid_allocationall inventory rowsSeparate directly attributable records by building, stage and contractor first. For genuinely shared site utilities use measured causal activity, time or another justified physical driver; retain denominator, covered projects and uncertainty. Economic allocation needs explicit review when no physical relation can be evidenced.ghg-allocation-2011
asset_conservationutilities; concrete; frameEquipment manufacture, scaffolds, bracing and reusable formwork are charged only by the justified share in cp_asset. Across all projects, periods and reuses cumulative manufacture-burden shares must not exceed one; retain residual and reconcile forecast service. Unknown lifetime/cumulative service requires review and disclosure; no full manufacture reset for each building.rics-wlca-2024
waste_no_creditwasteKeep actual exported waste and treatment/recovery burdens distinct from the accepted building output. Do not credit future avoided steel/concrete production by default; reuse/recycling substitutions require separately evidenced routes and consistent boundary without duplicate credit.rics-wlca-2024
Validation rules · 5
Rule IDApplies toRuleSource IDs
validate_scopedatasetRequire a whole accepted industrial/agricultural building or silo within the official exclusions, actual site/function/geometry and delivery state. Reject substitution by a building service, material bundle or specialized excluded facility.un-cpc-3-53121
validate_basisall inventory rowsReference table, reference_building output and every row/protocol denominator must agree with one declared entity. Check physically compatible numerator property/unit and supported measured conversions; no false kg building mass or assumed capacity relation.
validate_completedatasetCheck every actually occurring material, process, temporary work, utility, waste and release, including contractor work and commissioning. Missing identities, quantities or stages are declared gaps, not zero; no full cradle-to-gate/full-lifetime claim with missing upstream or later stages.rics-wlca-2024
validate_assetutilities; concrete; frameReconcile shared-equipment/formwork manufacture shares across all projects and periods, cumulative total at most one; review unknown service denominator and ensure direct operation is not charged twice.ghg-allocation-2011
validate_environmentutilities; wasteRequire quantified evidence and compatible CAS, source, medium and submedium; distinguish NO and NO2 and retain waste-vs-discharge routing. Never claim methodology or legal approval from a projection/check result.epa-concrete-washout-2012, epa-construction-dust-2010
Processes and inputs/outputs · 10
Process IDProcess nameInput flowsOutput flows
groundSite preparation and earthworks11
concreteFoundations and structural concrete including industrial ground slab30
frameLoad-bearing frame and masonry erection90
envelopeRoof, wall enclosure and industrial openings30
siloAgricultural storage-silo assembly50
servicesIndustrial floor finishes and fixed building services50
utilitiesSite equipment operation and temporary facilities64
wasteConstruction waste collection and export04
transportDeliveries and exported waste transport10
handoverInspection, commissioning and accepted handover01

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.