TianGong PCR

Power plant construction and handover

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53262 · exact

Source

1. Scope and Applicability

This PCR addresses the physical construction and agreed acceptance handover of complete heavy electrical generating plants, including nuclear plants, as identified by UN CPC 3.0 53262. Select the actual thermal, nuclear, hydro, wind or solar configuration and declare plant/site interfaces; a code alone does not define construction technology. The reference is the delivered construction entity, not a construction service, manufactured material, generator alone or electricity generation. (un-cpc-power-plants-2025)

Factory manufacture of supplied materials/equipment is linked upstream. Standalone industrial buildings, dams, water-treatment works and external long-distance/local grid networks have their own boundaries; integrate an actual component once without duplicating its standalone dataset. The core covers actual civil/mechanical/electrical completion and cold testing, with hot/fuelled acceptance and all later operating/maintenance/demolition stages explicitly outside or separately extended. Handover before fuel loading is not commercial readiness.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.constructions-and-construction-services.constructions.power-plant-construction-delivery
classification_refsCPC 3.0 53262 — Power plants
covered_productsComplete constructed heavy generating plant at declared construction/cold-test handover; actual thermal, nuclear, hydro, wind/PV and evidenced generating configurations
excluded_productsLoose generators; upstream materials alone; stand-alone buildings/dams/networks; construction services; electricity production or whole operating lifetime
representative_productOne actual site-identified plant with as-built installed units, integral works and a signed declared acceptance stage; no default technology or capacity
production_routeSurveyed site → ground/civil works → route-specific generating and auxiliary installation → electrical/control interfaces → inspection/cold testing → declared construction handover
market_stateComplete physically installed construction at the evidenced handover stage, with unfinished/hot tests and operating authorisations disclosed

3. Reference Flow

FieldValue
WhatDeliver the actual constructed plant capable by its installed design of the declared generating function, at the specified construction acceptance stage
How muchOne complete actual plant; declare installed unit count, actual capacity per unit and total, electrical AC/DC/net/gross convention and documented test conditions. Capacity is a qualifier, not energy output
How wellAs-built geometry, route-specific configuration, interfaces and signed structural/mechanical/electrical completion criteria; actual site, operational restrictions and unfinished scope declared
How long or cycleOne actual construction-to-handover event with recorded dates; no assumed life, capacity factor or lifetime electricity yield
reference_flow_linkreference_product_power_plant
FieldValue
Reference amount1
Reference product flowComplete power plant at construction handover
Reference flow propertyNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345
Reference unit groupUnits of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159
Reference unititem
Required qualifiersPlant/site/entity id; geographic location and initial land/site state; generating route and reactor/cycle/cell technology; actual unit number and rated capacity with AC/DC/net/gross and test conditions; surveyed plot and powerhouse/foundation dimensions and structure; route-specific headworks/penstock/tailrace geometry or containment or turbine/module configuration; complete supplied/installed BOM and package interfaces; shared dam/grid/access attribution; construction and handover dates, signed tests and outstanding work; cold/hot/fuel-load stage; upstream gates and links; all excluded/unmeasured lifecycle stages

item is the display alias for public Item(s); 件 denotes the same count. All rows and protocols are per declared reference flow. Capacity (MW), surveyed area (m2), conduit length (m) and measured materials describe this same plant and are not arbitrary replacement denominators. Comparison requires compatible function, capacity convention, site, configuration, acceptance stage and lifecycle scope; no universal plant mass M is assigned.

Selected-flow property and unit bindings

roleflow_typetiangong_flowflow_propertyunit_grouppreferred_unit
rebarproductHot rolled rebar steel 43050e3b-42be-465c-a021-17f606484151Mass 93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
structural_sectionproductHot-rolled large section cbeefeb8-2dfc-48f5-b643-f35aed0d52a1Mass 93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
francis_turbineproductVertical Francis hydraulic turbine f762dd15-89d4-4b91-abc3-38ba6d4539eaNumber of items 01846770-4cfe-4a25-8ad9-919d8d3783455beb6eed-33a9-47b8-9ede-1dfe8f679159item
hydro_generatorproductHydro generator 46310235-eeca-4dee-84fb-50da9b4a99dcNumber of items 01846770-4cfe-4a25-8ad9-919d8d3783455beb6eed-33a9-47b8-9ede-1dfe8f679159item
wind_turbineproductwind turbine e4ae4246-b93d-44ab-bb73-58671139c50bNumber of items 01846770-4cfe-4a25-8ad9-919d8d3783455beb6eed-33a9-47b8-9ede-1dfe8f679159item
poly_moduleproductPolycrystalline Silicon Solar Module 5bdcaef5-1689-4ad5-8ce2-c1543b0ff811Area 93a60a56-a3c8-19da-a746-0800200c9a6693a60a57-a3c8-18da-a746-0800200c9a66m2
mono_moduleproductMonocrystalline Silicon Solar Module fbfc81aa-aefd-49ec-aaf6-81b9416a7b78Area 93a60a56-a3c8-19da-a746-0800200c9a6693a60a57-a3c8-18da-a746-0800200c9a66m2
transformerproductTransformer 734249ea-34e6-471b-a05a-f5b26b818167Number of items 01846770-4cfe-4a25-8ad9-919d8d3783455beb6eed-33a9-47b8-9ede-1dfe8f679159item
lv_cableproductLow-voltage cable 49101b44-20cc-46a0-adfb-af07e4cc8908Length 838aaa23-0117-11db-92e3-0800200c9a66838aaa22-0117-11db-92e3-0800200c9a66m
dieselproductDiesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816Mass 93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
lv_powerproductAlternating current 50657322-939c-4829-a87b-47c093bfa6a7Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a6693a60a57-a3c8-11da-a746-0800200c9a66MJ
mv_powerproductAlternating current 3d76981f-964a-4865-b588-0e067a2a1163Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a6693a60a57-a3c8-11da-a746-0800200c9a66MJ
river_intakeelementaryriver water 805a7346-1664-4483-afe3-4b224be5e361Volume 93a60a56-a3c8-22da-a746-0800200c9a6693a60a57-a3c8-12da-a746-0800200c9a66m3
groundwater_intakeelementaryground water 4f462198-40cd-4184-8733-86648a20dc3fVolume 93a60a56-a3c8-22da-a746-0800200c9a6693a60a57-a3c8-12da-a746-0800200c9a66m3
sea_intakeelementarysea water 172a3db9-6556-11dd-ad8b-0800200c9a66Mass 93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
fossil_co2elementarycarbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048Mass 93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
nitrogen_monoxideelementarynitrogen monoxide 08a91e70-3ddc-11dd-96ee-0050c2490048Mass 93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
nitrogen_dioxideelementarynitrogen dioxide 08a91e70-3ddc-11dd-96e5-0050c2490048Mass 93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
pm_fineelementaryparticles (PM2.5) 08a91e70-3ddc-11dd-9293-0050c2490048Mass 93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
pm_coarseelementaryparticles (PM2.5 - PM10) 08a91e70-3ddc-11dd-9501-0050c2490048Mass 93a60a56-a3c8-11da-a746-0800200b9a6693a60a57-a4c8-11da-a746-0800200c9a66kg
freshwater_dischargeelementaryWater 5e50fc01-19c6-4377-a1cc-bc65a12498eaVolume 93a60a56-a3c8-22da-a746-0800200c9a6693a60a57-a3c8-12da-a746-0800200c9a66m3
sea_returnelementaryWater 631ecf13-0e51-4e35-8235-c6f80c60d72cVolume 93a60a56-a3c8-22da-a746-0800200c9a6693a60a57-a3c8-12da-a746-0800200c9a66m3
road_freightproductfreight transport 4f1a3f30-7b3b-11dd-ad8b-0800200c9a66mass*distance 118f2a40-50ec-457c-aa60-9bc6b6af99313620148f-c5db-48ce-9065-a10092089acat*km

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_countreference productNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345itemcp_handover records one accepted complete plant with consistent identity, actual configuration and declared stage; all quantities retain the same declared reference flow.
geometry_capacityreference configurationArea 93a60a56-a3c8-19da-a746-0800200c9a66m2Survey footprint/building/foundation and route-specific waterway geometry from as-built records in cp_handover; capacity, AC/DC basis, head, discharge and dimensions remain separate actual qualifiers. No assumed kg per plant, area or MW conversion.
material_massfresh_concrete; rebar; structural_section; hydraulic_grout; diesel; sea_intakeMass 93a60a56-a3c8-11da-a746-0800200b9a66kgUse actual mass; convert a measured volume only with independently supported density for the exact material, temperature, salinity/moisture and state. Sea intake retains primary Mass and a parallel volume balance. cp_civil, cp_utilities and cp_environment preserve original measurements.
electricity_energylv_power; mv_powerNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJRetain Net calorific value and exact 3.6 MJ/kWh conversion, actual CN supply and specified voltage; actual on-site generation does not inherit this grid identity.
water_volumesupplied_water; river_intake; groundwater_intake; freshwater_discharge; sea_return; washout_liquidVolume 93a60a56-a3c8-22da-a746-0800200c9a66m3Measure actual volume and preserve source/destination, physical state, internal transfers and pollution sampling. Resource, supplied product, liquid waste and discharge are not interchangeable.
module_areapoly_module; mono_moduleArea 93a60a56-a3c8-19da-a746-0800200c9a66m2Preserve module Area/m2, with actual gross-area definition, dimensions/count and rating. The linked upstream dataset must use the same module-area convention or an independently evidenced conversion; unknown gross/aperture/cell-area relationship requires review. Secondary property meanValue=1 does not imply one module equals 1 m2. Area does not identify station area or permit rewriting the public property to Mass.
cable_lengthlv_cableLength 838aaa23-0117-11db-92e3-0800200c9a66mPreserve measured cable Length/m and actual supplied specification; do not use a generic copper mass conversion.
freight_quantityroad_freightmass*distance 118f2a40-50ec-457c-aa60-9bc6b6af9931t*kmActual cargo tonnes times actual route kilometres using cp_transport; preserve the public massdistance group reference kgkm and its documented tkm unit, 1 tkm = 1000 kg*km. Road freight is not the reference product mass.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionActual surveyed site before attributable construction, with received materials and components at explicit supplier/site interfaces and original condition documented
starting_condition_roleforeground_starting_point
product_classification_scopeComplete constructed power-plant entity with integral actual generating works; CPC provides category context only
recursive_input_ruleExisting plant or reused component enters once in its actual inherited state; record inherited burdens and new measured work without recursively reconstructing the same plant category
upstream_dataset_requirementSeparate compatible manufacture, supplied-state and transport links; disclose every gap and included gate
disclosureActual construction and cold-test handover foreground; upstream full coverage not presumed; hot/fuelled tests, routine generation, maintenance and later demolition excluded unless separately defined
rule_idapplies_torulesource_ids
construction_scopedataset; inventoryInclude the actual complete agreed plant construction from surveyed starting site through signed civil/mechanical/electrical handover, with integral foundation and generating equipment. Record delivery gate and cold-test stage; this is a construction entity, not a building service or bag of materials.un-cpc-power-plants-2025; iaea-nuclear-construction-2011
route_completenessdataset; inventoryUse the installed design branch, not every example row. Complete its work-package BOM: foundation and material state, generating unit, auxiliary cooling/water/fuel handling, pollution-control hardware, electrical/control/safety, connections, tests and temporary removal. Add every missing specific atomic exchange and supplier link before claiming complete inventory; unsupported branches remain a review gap.iaea-nuclear-construction-2011; ifc-thermal-power-2008; ifc-hydropower-2018; doe-wind-siting-2021
upstream_interfacesdataset; inventorySeparate supplier manufacturing, attributable supply transport and measured site construction. Received components carry their actual delivered state; raw metal is not added again when a purchased fabricated assembly includes it. Upstream datasets are separately linked with actual formulation, geography, technology and gate; missing links prohibit a complete cradle-to-gate claim.ifc-biomass-construction-2017
handover_and_operationdataset; inventoryThe core endpoint is the actual agreed construction-completion/cold-commissioning handover, with stage and unfinished tests disclosed. It does not establish commercial generating readiness or nuclear licensing. Fuel loading, nuclear startup, hot performance operation and trial electricity/heat exports require a separate fully specified extension with each actual fuel, water, chemical, emission and output; never silently omit included hot tests or blend routine operation.ifc-biomass-construction-2017; iaea-nuclear-construction-2011
later_stagesdataset; inventoryRoutine generation, maintenance/renewal, reservoirs operational emissions, later decommissioning/demolition, downstream waste treatment and future recovery credits are outside the core. Existing-site demolition/remediation and removal of temporary construction works, if actually undertaken, are separate included work packages with measured flows. Declare land/ecology disturbance, noise/vibration, sediment and thermal releases and their unmeasured coverage; they are not fabricated mass emissions.ifc-hydropower-2018; doe-wind-siting-2021
water_identitydataset; inventoryKeep supplied water, direct river/ground/sea resource intake, internal reuse, captured liquid waste and direct recipient discharge separate. Actual pollutant species/medium and physicochemical state require their own atomic rows. No default density, emission factor, dilution credit or zero for missing measurements.ifc-hydropower-2018; epa-concrete-washout-2012

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
groundSite preparation, excavation and ground treatmentrequiredActual site, geology, earth/rock balances, access, drainage and slope stabilization; add route-specific excavation/blasting/reinstatement flows when actually used.foregroundper declared reference flow
civilFoundations and permanent civil structuresrequiredActual foundations, generator bases, powerhouse, containment, headworks/waterways and ancillary structures within the plant boundary; define each as-built work package.foregroundper declared reference flow
temporaryTemporary works and erection equipmentconditionalActual formwork, access/crane pads, lifting, shoring or dewatering installations, their repeated use and removal.foregroundper declared reference flow
thermalThermal prime mover and heat-cycle installationconditionalActual boiler-steam, simple gas-turbine, combined cycle or reciprocating-engine route; nuclear steam turbine island uses its compatible actual subset.foregroundper declared reference flow
nuclearNuclear island and safety-system installationconditionalActual nuclear configuration, qualified concrete/liner/primary components, supports, piping and safety/control systems. Handover stage must state whether fuel loading and nuclear startup are excluded.foregroundper declared reference flow
hydroHydraulic generation and water-conduit installationconditionalActual hydro plant; include headworks, pressure waterway, powerhouse, turbine-generator and tailrace interfaces. Shared/multipurpose dam construction receives conserved attribution once.foregroundper declared reference flow
renewableWind and solar generating-equipment installationconditionalActual utility-scale wind or PV station, foundation/racking and generator/module configuration, access and installation. Offshore/floating works and other renewable technologies require corresponding primary design and complete additional rows.foregroundper declared reference flow
electricalPlant electrical and control installationrequiredActual generator output, plant auxiliaries, transformer, switchgear, cables, earthing, protection and control interfaces; explicitly assign external grid works.foregroundper declared reference flow
utilitiesConstruction utilities and environment exchangesrequiredAttributable construction, erection, flushing, cold testing and actual included acceptance activities by stage/equipment; no routine operating inventory.foregroundper declared reference flow
wasteConstruction waste containment and exportconditionalActual segregated waste generation, temporary containment and export before handover; treatment links/gaps disclosed.foregroundper declared reference flow
transportSupply and construction-waste transportconditionalEach actual plant delivery/export leg outside already included supplier gates.foregroundper declared reference flow
handoverInspection, cold commissioning and construction handoverrequiredActual configuration inspection and agreed civil/mechanical/electrical completion tests with dated signed handover. Hot/fuelled generation is a separately disclosed extension.foregroundper declared reference flow

All cards below are individually conditional on actual configuration/activity. Required processes must account for their complete actual design, even where the example card is absent or an identity is unresolved. Retain specific additional rows before a dataset claims completeness. Each shared utility amount is allocated by measured process/equipment logs once.

Process: Site preparation, excavation and ground treatment (ground)

Inputs

Product flows
Crushed rock for engineered fill (crushed_rock)

Only actual imported graded crushed rock used in platforms, crane pads or backfill; native excavated rock retained on site is an internal transfer, not another purchased input.

  • Selected flow: Crushed rock for engineered fill
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect attributable measured mass from delivery, return, stock and installation records; keep losses and destination separately.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_ground
  • Sources: iaea-nuclear-construction-2011; ifc-hydropower-2018

Process: Foundations and permanent civil structures (civil)

Inputs

Product flows
Fresh ready-mixed hydraulic-cement concrete (fresh_concrete)

Use only supplied fresh ready-mixed concrete at its batching/delivery gate for actual foundations and plant structures. Record strength, exposure, composition, delivery state, placement, vibration, curing and accepted geometry. Site batching is a separate branch requiring individual cement, aggregate, admixture and water rows and mixing inputs; never count both constituents and purchased concrete.

  • Selected flow: Fresh ready-mixed hydraulic-cement concrete
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured batch-ticket mass; when tickets are in m3, multiply actual delivered volume by independently supported batch/state density. Retain volume, moisture, returns, rejects and tests; no default density or mix.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_civil
  • Sources: iaea-nuclear-construction-2011; epa-concrete-washout-2012
Hot rolled rebar steel (rebar)

Conditional on actual hot-rolled low-alloy reinforcing bar with carbon C≤0.2% and matching factory output; keep grade, diameter and inspection. Other reinforcement grades need their own specific identity.

  • Selected flow: Hot rolled rebar steel 43050e3b-42be-465c-a021-17f606484151
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect attributable measured mass from delivery, return, stock and installation records; keep losses and destination separately.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_civil
  • Sources: iaea-nuclear-construction-2011; doe-wind-siting-2021
Hot-rolled large section (structural_section)

Only actual large hot-rolled iron/non-alloy steel sections before further fabrication. Record section and grade; on-site cutting, welds and erection are foreground. Purchased fabricated frames must use a separate supplied assembly row and exclude their already included raw section.

  • Selected flow: Hot-rolled large section cbeefeb8-2dfc-48f5-b643-f35aed0d52a1
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect attributable measured mass from delivery, return, stock and installation records; keep losses and destination separately.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_civil
  • Sources: iaea-nuclear-construction-2011; ifc-mocuba-solar-2016
Non-shrink hydraulic-cement grout (hydraulic_grout)

Include only actual supplied grout for anchor pockets, machine bases or waterway/ground treatment; declared formulation and cured acceptance required. It is not plain Portland cement.

  • Selected flow: Non-shrink hydraulic-cement grout
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect attributable measured mass from delivery, return, stock and installation records; keep losses and destination separately.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_civil
  • Sources: iaea-nuclear-construction-2011; ifc-hydropower-2018

Process: Temporary works and erection equipment (temporary)

Inputs

Product flows
Reusable plywood formwork panel (plywood_form)

Only plywood panels actually used; record panel area, cycles, loss and transfer to next project. Steel forms, scaffolds, cofferdams and shores, when used, each require separate component rows.

  • Selected flow: Reusable plywood formwork panel
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: Measured panel area times evidenced manufacture attribution fraction; reconcile all uses in cp_assets. Unknown denominator requires review; physical panel movements remain a separate ledger.
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_assets
  • Sources: iaea-nuclear-construction-2011
Hydraulic crawler excavator (excavator)

Only the actual complete excavator deployed for excavation; operation fuel is separately metered. Preserve equipment identity and configuration; do not select a crane subassembly as the excavator.

  • Selected flow: Hydraulic crawler excavator
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Actual equipment count times documented manufacture attribution fraction from cp_assets; retain cross-project total at most one per asset.
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_assets
  • Sources: iaea-nuclear-construction-2011; ifc-hydropower-2018
Mobile crawler crane (mobile_crane)

Only actual erection crane; foundation/crane-pad construction and energy remain separate. Its asset manufacture is shared across real deployments.

  • Selected flow: Mobile crawler crane
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Actual crane count times evidenced manufacture share from cp_assets; never reset full manufacture burden for each project.
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_assets
  • Sources: ifc-biomass-construction-2017; doe-wind-siting-2021

Process: Thermal prime mover and heat-cycle installation (thermal)

Inputs

Product flows
Power-generation steam boiler (steam_boiler)

Only boiler-based thermal route. Define furnace, boiler supplied package and auxiliaries by actual contract; cold installation is separate from fuel burning. Simple-cycle gas turbines do not require this boiler.

  • Selected flow: Power-generation steam boiler
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_thermal
  • Sources: ifc-thermal-power-2008; ifc-biomass-construction-2017
Steam turbine assembly (steam_turbine)

Use for actual steam cycle, including thermal, combined-cycle or nuclear turbine island. Installed unit has documented steam parameters and supplied boundary; it is not a hydraulic turbine.

  • Selected flow: Steam turbine assembly
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_thermal
  • Sources: ifc-thermal-power-2008; iaea-nuclear-construction-2011
Industrial gas turbine assembly (gas_turbine)

Only actual combustion turbine with identified compressor/combustor/turbine package; generator and HRSG are separate unless explicitly supplied within that package and not counted twice.

  • Selected flow: Industrial gas turbine assembly
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_thermal
  • Sources: ifc-thermal-power-2008
Heat-recovery boiler assembly (HRSG) (hrsg)

Only actual combined-cycle heat-recovery equipment; record pressure circuit, supplied module and field welds. Omit for a genuine simple-cycle gas plant.

  • Selected flow: Heat-recovery boiler assembly (HRSG)
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_thermal
  • Sources: ifc-thermal-power-2008
Stationary reciprocating generating engine (engine)

Only an actual reciprocating-engine generating route; specify engine and whether generator is included, and its mounting/auxiliaries. This is not mobile construction diesel machinery.

  • Selected flow: Stationary reciprocating generating engine
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_thermal
  • Sources: ifc-thermal-power-2008
Synchronous electrical generator (synchronous_generator)

Only actual standalone generator of the thermal/nuclear package; reconcile ratings, voltage, cooling and shaft interface. Exclude if already included in purchased generating set.

  • Selected flow: Synchronous electrical generator
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_thermal
  • Sources: ifc-thermal-power-2008; iaea-nuclear-construction-2011
Steam surface condenser (condenser)

Only condensing steam cycle with actual heat-exchange equipment; identify cooling circuit and tube specification. No universal condenser for simple-cycle gas generation.

  • Selected flow: Steam surface condenser
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_thermal
  • Sources: ifc-thermal-power-2008
Wet recirculating cooling tower (cooling_tower)

Only actual wet recirculating cooling configuration and supplied tower boundary. Dry cooling and once-through water require their own specified equipment; no default water demand or evaporation.

  • Selected flow: Wet recirculating cooling tower
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_thermal
  • Sources: ifc-thermal-power-2008

Process: Nuclear island and safety-system installation (nuclear)

Inputs

Product flows
Reactor pressure vessel (reactor_vessel)

Only a nuclear configuration using this vessel; identify reactor design and delivered internals boundary, weld/test records and installation acceptance. Other reactor designs require their actual components.

  • Selected flow: Reactor pressure vessel
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_nuclear
  • Sources: iaea-nuclear-construction-2011
Nuclear steam generator (nuclear_steam_generator)

Only actual indirect steam-cycle nuclear configuration using separate steam generator; reactor type and material/pressure specification are required. Do not impose it on direct-cycle reactors.

  • Selected flow: Nuclear steam generator
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_nuclear
  • Sources: iaea-nuclear-construction-2011
Fabricated steel containment liner (containment_liner)

Only the actual lined containment design; record liner material, fabrication gate, embedded interfaces, installation welds and leak-test acceptance. Other containment systems need corresponding rows.

  • Selected flow: Fabricated steel containment liner
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect attributable measured mass from delivery, return, stock and installation records; keep losses and destination separately.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_nuclear
  • Sources: iaea-nuclear-construction-2011
Nuclear safety injection pump (safety_pump)

Only actual safety-injection configuration; identify qualified pump, drive and supply scope. Complete safety instrumentation, valves and cables must each be added from the actual nuclear BOM; this row does not represent the whole safety system.

  • Selected flow: Nuclear safety injection pump
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_nuclear
  • Sources: iaea-nuclear-construction-2011

Process: Hydraulic generation and water-conduit installation (hydro)

Inputs

Product flows
Fabricated steel penstock (penstock)

Only actual pressure-water conduit; preserve diameter, length, thickness, steel grade, supports, weld tests and liner/coating scope. Waterway and headworks geometry are measured separately.

  • Selected flow: Fabricated steel penstock
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Collect attributable measured mass from delivery, return, stock and installation records; keep losses and destination separately.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_hydro
  • Sources: ifc-hydropower-2018
Vertical Francis hydraulic turbine (francis_turbine)

Only complete vertical Francis hydraulic turbine at factory gate, with actual head, discharge, runner configuration and acceptance. Kaplan, Pelton and reversible pump-turbines must have separate exact rows and identities.

  • Selected flow: Vertical Francis hydraulic turbine f762dd15-89d4-4b91-abc3-38ba6d4539ea
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_hydro
  • Sources: ifc-hydropower-2018
Hydro generator (hydro_generator)

Only actual hydroelectric generator supplied at its manufacturing/factory gate; record rated output, voltage, shaft configuration and included excitation/cooling. Exclude components already included in a purchased complete turbine-generator unit.

  • Selected flow: Hydro generator 46310235-eeca-4dee-84fb-50da9b4a99dc
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_hydro
  • Sources: ifc-hydropower-2018

Process: Wind and solar generating-equipment installation (renewable)

Inputs

Product flows
wind turbine (wind_turbine)

Only actual factory-supplied onshore wind turbine of rated power below 2 MW. Record model, tower/rotor/nacelle included boundary, foundations and erection separately. Larger and offshore turbines require independent exact rows; this restriction does not narrow the plant category to small turbines.

  • Selected flow: wind turbine e4ae4246-b93d-44ab-bb73-58671139c50b
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_renewable
  • Sources: doe-wind-siting-2021
Polycrystalline Silicon Solar Module (poly_module)

Only actual CN polycrystalline silicon module supplied at photovoltaic station interface. Preserve measured module gross-area convention, module count/rating and included transport gate; it is a module, not a whole station or generated electricity.

  • Selected flow: Polycrystalline Silicon Solar Module 5bdcaef5-1689-4ad5-8ce2-c1543b0ff811
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: Sum measured actual module area from dimensions and installed/returned counts using the same gross-area convention; retain m2, never replace its primary Area property with Mass or energy.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_renewable
  • Sources: ifc-mocuba-solar-2016
Monocrystalline Silicon Solar Module (mono_module)

Only actual CN monocrystalline silicon module at the photovoltaic-station supply interface; identify technology, gross area and included supply scope. Site design must independently support this branch; the Mocuba case is polycrystalline and gives no monocrystalline defaults.

  • Selected flow: Monocrystalline Silicon Solar Module fbfc81aa-aefd-49ec-aaf6-81b9416a7b78
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: Measure actual module area and reconcile configuration/count/rating with acceptance records; preserve Area/m2.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_renewable
  • Sources: un-cpc-power-plants-2025

Process: Plant electrical and control installation (electrical)

Inputs

Product flows
Transformer (transformer)

Only actual factory-supplied 400 kVA, 10/0.4 kV transformer used for transmission/distribution within the declared plant interface; retain matched type and included oil/accessory scope. Other capacities or voltage ratios need their own atomic row and identity. External network/substation delivery is separately assigned.

  • Selected flow: Transformer 734249ea-34e6-471b-a05a-f5b26b818167
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_electrical
  • Sources: ifc-biomass-construction-2017; ifc-hydropower-2018
Low-voltage cable (lv_cable)

Only actual CN factory-gate low-voltage cable conforming to the original GB/T 12706.1-2020 route and matched conductor, insulation, rated voltage and cross-section. Verify supplied cable and included packaging; it is not generic copper metal or HV cable.

  • Selected flow: Low-voltage cable 49101b44-20cc-46a0-adfb-af07e4cc8908
  • Flow property / unit: Length 838aaa23-0117-11db-92e3-0800200c9a66 / m
  • Amount rule: Measure reel delivery lengths minus returns; reconcile installed circuits and separately documented offcuts. Retain primary Length/m, not assumed cable kg per metre.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_electrical
  • Sources: ifc-biomass-construction-2017
Metal-enclosed AC switchgear (switchgear)

Only actual plant switchgear at the specified voltage/current and supplied configuration; gas-insulated variants must add each actual gas charge and actual release as separate chemical rows. No assumed SF6 emission.

  • Selected flow: Metal-enclosed AC switchgear
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_electrical
  • Sources: ifc-biomass-construction-2017
Photovoltaic DC-to-AC inverter (pv_inverter)

Only actual PV plant DC-to-AC conversion unit; retain rating, topology, quantity and whether transformer/switchgear is included.

  • Selected flow: Photovoltaic DC-to-AC inverter
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Count the actual accepted units of the same specified configuration within this plant; reconcile serial numbers and included subassemblies.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_electrical
  • Sources: ifc-mocuba-solar-2016

Process: Construction utilities and environment exchanges (utilities)

Inputs

Product flows
Diesel fuel (diesel)

Only supplied diesel fuel as a technosphere material; grade, formulation, supplier, fossil/biogenic fraction, density and heating value remain site records because the identity leaves them unspecified. Meter equipment combustion separately; do not double count fuel plus a fully linked fuel-burn service.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use fuel stock/delivery/return balance and equipment records in kg; convert measured litres only with evidenced density at the same temperature/state. No fixed consumption or LHV.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_utilities
  • Sources: iaea-nuclear-construction-2011; ifc-hydropower-2018
Alternating current (lv_power)

Only actual CN grid-average customer-side supply below 1 kV; verify meter voltage/country, delivery interface and temporal mix. Other locations, voltage or on-site generation require separately verified identities.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Meter and sum attributable purchased energy; exact conversion 1 kWh = 3.6 MJ. Preserve primary Net calorific value/MJ; segregate internal construction generation and trial exports.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_utilities
  • Sources: ifc-biomass-construction-2017
Alternating current (mv_power)

Only actual CN grid-average customer-side supply 1–35 kV; verify meter voltage/country, delivery interface and temporal mix. Other locations, voltage or on-site generation require separately verified identities.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Meter and sum attributable purchased energy; exact conversion 1 kWh = 3.6 MJ. Preserve primary Net calorific value/MJ; segregate internal construction generation and trial exports.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_utilities
  • Sources: ifc-biomass-construction-2017
Delivered fresh construction water (supplied_water)

Only actual technosphere freshwater delivered for curing, washing, flushing or tests, with supplier/gate and delivery network identified; recycled internal water is an internal transfer. The Hong Kong plant-gate treated-water identity cannot identify unrestricted site supply.

  • Selected flow: Delivered fresh construction water
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Meter actual delivered volume in m3 by use and date; reconcile storage, internal reuse, consumption and exported water without invented density.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012; ifc-biomass-construction-2017
Elementary flows
river water (river_intake)

Only actual direct river-water abstraction crossing environment into construction/test use; identify river and extraction country. It is a renewable material resource from water, not purchased water, a discharge, or routine operational turbine throughput.

  • Selected flow: river water 805a7346-1664-4483-afe3-4b224be5e361
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measure abstraction volume at intake in m3 during the included works; separately retain return and consumptive use.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011
ground water (groundwater_intake)

Only actual groundwater extraction/dewatering from the identified aquifer into site handling; distinguish rainfall, river diversion and recirculation. Retain aquifer/extraction geography and later destination.

  • Selected flow: ground water 4f462198-40cd-4184-8733-86648a20dc3f
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Meter actual pumped groundwater volume in m3, with time, abstraction point and water balance.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011
sea water (sea_intake)

Only actual direct sea-water abstraction for included construction or cold-test activity. Preserve resource-from-water classification and primary Mass; it is not sea-water discharge or normal operating cooling water.

  • Selected flow: sea water 172a3db9-6556-11dd-ad8b-0800200c9a66
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measure sea-water mass in kg, or measured m3 times evidenced kg/m3 density at the same salinity/temperature; keep a separate volume ledger. Unknown density requires review.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011

Outputs

Elementary flows
carbon dioxide (fossil) (fossil_co2)

Only evidenced immediate fossil CO2 emission into external air, unspecified subcompartment, from included site engines or other actual works. Exclude biogenic CO2, upstream emissions, indoor concentrations and soil/long-term release.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Retain measured emitted species mass or a documented site fuel-carbon balance/model with fossil share, oxidized carbon, activity and uncertainty; no emission solely inferred from a fuel row.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011
nitrogen monoxide (nitrogen_monoxide)

Only evidenced immediate molecular NO, CAS 10102-43-9, emission to external air/unspecified from included activity. NOx expressed as NO2-equivalent does not establish this molecular species; do not use inconsistent synonyms or N2O.

  • Selected flow: nitrogen monoxide 08a91e70-3ddc-11dd-96ee-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measure or use independently supported species-specific site model mass in kg; unknown speciation remains unmeasured, not invented or zero.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011
nitrogen dioxide (nitrogen_dioxide)

Only evidenced immediate molecular NO2, CAS 10102-44-0, emission to external air/unspecified from included activity. NOx expressed as NO2-equivalent does not establish this molecular species; do not use inconsistent synonyms or N2O.

  • Selected flow: nitrogen dioxide 08a91e70-3ddc-11dd-96e5-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measure or use independently supported species-specific site model mass in kg; unknown speciation remains unmeasured, not invented or zero.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011
particles (PM2.5) (pm_fine)

Only evidenced external airborne PM2.5 particulate release from actual excavation/handling/combustion, immediate air/unspecified. Captured dust is a waste; measured ambient concentration alone is not released mass.

  • Selected flow: particles (PM2.5) 08a91e70-3ddc-11dd-9293-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Determine non-overlapping size-fraction emitted kg from supported source/activity measurements or an independently validated project-specific model; total PM10 must not be added to its fractions.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011
particles (PM2.5 - PM10) (pm_coarse)

Only evidenced external airborne above PM2.5 through PM10 particulate release from actual excavation/handling/combustion, immediate air/unspecified. Captured dust is a waste; measured ambient concentration alone is not released mass.

  • Selected flow: particles (PM2.5 - PM10) 08a91e70-3ddc-11dd-9501-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Determine non-overlapping size-fraction emitted kg from supported source/activity measurements or an independently validated project-specific model; total PM10 must not be added to its fractions.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011
Water (freshwater_discharge)

Only actual liquid water directly crossing the site environment boundary into an identified freshwater receptor, CAS7732-18-5. It is not abstraction, sea return, vapour or liquid sent to treatment; every actual dissolved/suspended pollutant is separately quantified.

  • Selected flow: Water 5e50fc01-19c6-4377-a1cc-bc65a12498ea
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Meter direct discharge m3 and receptor/date; reconcile source, treatment, storage and water balance without subtracting it from abstraction as a negative resource.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011
Water (sea_return)

Only evidenced liquid-water return to an identified marine receptor during included construction/testing, CAS7732-18-5, Emissions to sea water. Retain actual source, receiving marine area, salinity and individually monitored pollutant constituents; neither clean water nor zero pollution is assumed. It is not freshwater discharge, sea-water abstraction, vapour or liquid sent to treatment.

  • Selected flow: Water 631ecf13-0e51-4e35-8235-c6f80c60d72c
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measure actual m3 at marine outfall and document temperature/salinity/constituents; distinguish water volume from thermal and chemical emissions.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_environment
  • Sources: ifc-hydropower-2018; iaea-nuclear-construction-2011

Process: Construction waste containment and export (waste)

Outputs

Waste flows
Uncontaminated excavated mineral soil for disposal (mineral_spoil)

Only actual exported spoil classified as waste by its destination and tests; reused soil on the same site is an internal transfer. Separately identify rock, topsoil and contaminated soil when present.

  • Selected flow: Uncontaminated excavated mineral soil for disposal
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Weigh segregated stream in kg with wet/dry convention and composition; retain actual receiving treatment, transport and transfer evidence.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
  • Sources: ifc-hydropower-2018; epa-concrete-washout-2012
Hardened concrete rubble (concrete_rubble)

Only actual rejected hardened concrete or construction breakage sent off site; returned fresh mix and later demolition are distinct streams/stages.

  • Selected flow: Hardened concrete rubble
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Weigh segregated stream in kg with wet/dry convention and composition; retain actual receiving treatment, transport and transfer evidence.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
  • Sources: ifc-hydropower-2018; epa-concrete-washout-2012
Carbon-steel reinforcement offcuts (steel_offcuts)

Only actual segregated reinforcement cutting scrap; separate reusable bars and other metal streams. No automatic avoided-primary-steel credit.

  • Selected flow: Carbon-steel reinforcement offcuts
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Weigh segregated stream in kg with wet/dry convention and composition; retain actual receiving treatment, transport and transfer evidence.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
  • Sources: ifc-hydropower-2018; epa-concrete-washout-2012
Cementitious concrete washout liquid (washout_liquid)

Only captured concrete chute/pump washout liquid exported for treatment, separate from settled hardened solids. No assumed release to water or soil; independent actual pollutant measurements are required if leakage occurred.

  • Selected flow: Cementitious concrete washout liquid
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measure segregated wet stream m3 and actual treatment destination; retain solids content, sampling and water balance.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
  • Sources: ifc-hydropower-2018; epa-concrete-washout-2012

Process: Supply and construction-waste transport (transport)

Inputs

Product flows
freight transport (road_freight)

Only actual non-refrigerated delivery/export legs using the public road-freight production-at-plant identity and a separately compatible service dataset; retain vehicle class, load, route, empty-return method and real origin/delivery gates. The flow identity supplies no carrier fuel/emission factors. Heavy-lift sea/rail transport requires its own atomic service and evidence; upstream included freight is not counted twice.

  • Selected flow: freight transport 4f1a3f30-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: massdistance 118f2a40-50ec-457c-aa60-9bc6b6af9931 / tkm
  • Amount rule: Sum actual cargo tonnes times actual leg km using manifests and route records; reconcile shared loads, payload convention and origin/destination.
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_transport
  • Sources: ifc-biomass-construction-2017; doe-wind-siting-2021

Process: Inspection, cold commissioning and construction handover (handover)

Outputs

Product flows
Complete power plant at construction handover (reference_product_power_plant)

The same identified complete constructed entity with actual installed route/configuration and declared acceptance stage. A civil-only building, loose generator or electricity output cannot substitute.

  • Selected flow: Complete power plant at construction handover
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: 1 item
  • Value mode: Fixed value (fixed_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_handover
  • Sources: un-cpc-power-plants-2025

7. Allocation and Co-product Handling

rule_idapplies_torulesource_ids
direct_activitydataset; inventoryFirst assign materials, metered energy and work packages directly to the actual plant. For shared batching, workforce equipment or deliveries use recorded beneficiary activities/loads and explain the physical relationship; neither plant cost nor assumed annual generation supplies the denominator. Missing relationship requires review.
shared_assetsdataset; inventoryFor each equipment or reusable form/component retain a persistent manufacture-burden ledger across every project and period. Attribute measured asset amount times evidenced use share; the cumulative shares must be ≤1 and operating energy is separate. Record actual hours/cycles or supported whole-asset denominator and beneficiaries; unknown future life/capacity remains an explicit review, not a fresh full burden at every project.
multipurpose_worksdataset; inventoryShared dam, reservoir civil works, access and grid interfaces must be assigned once with project-specific causal/service evidence among actual beneficiaries; shares conserve the entire included construction burden. State unallocated/missing scope. Independently imported component datasets must not duplicate plant foreground works.
residualsdataset; inventorySeparate reusable material/product transfers from segregated waste and actual disposal. Do not net avoided virgin manufacture or future recovery into core construction. A hot-test electricity/heat extension records actual useful outputs and its independent allocation basis; trial export does not turn construction reference quantity into kWh.

These attribution rules require the explicit foreground measurement and cross-project evidence of cp_assets and the relevant work-package protocols; they supply no external default share, lifetime or substitution factor.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_groundgroundEach actual atomic exchange and same declared plantforeground_recordsSite survey, starting state, geology, bank/loose earth/rock volumes, fill grading, transport/export destinations and remediation flagsUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_civilcivilEach actual atomic exchange and same declared plantforeground_recordsWork-package/drawing ids, concrete batch/grade/density/moisture, reinforcement tickets, geometry, placement/vibration/curing, structural and leak testsUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_thermalthermalEach actual atomic exchange and same declared plantforeground_recordsCycle type, unit/serial/rating, supplied assembly boundaries, foundations/alignment, piping, welds, cooling/fuel-handling and installation testsUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_nuclearnuclearEach actual atomic exchange and same declared plantforeground_recordsReactor design, nuclear-island configuration, qualified materials, liner and primary components, safety BOM, weld/test and construction stage; fuel-load statusUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_hydrohydroEach actual atomic exchange and same declared plantforeground_recordsIntake/waterway/penstock/powerhouse/tailrace as-built geometry, head/discharge, turbine-generator configuration and shared dam attributionUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_renewablerenewableEach actual atomic exchange and same declared plantforeground_recordsWind turbine rating/onshore/offshore and included tower/rotor/nacelle; PV cell technology, module area/count, mounts and inverter; construction scopeUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_electricalelectricalEach actual atomic exchange and same declared plantforeground_recordsCircuit ids, supply voltage/country, transformer ratings, supplied package boundary, cable lengths/specifications, protection/earthing and cold acceptanceUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_utilitiesutilitiesEach actual atomic exchange and same declared plantforeground_recordsEquipment/activity/stage ids, diesel stock/grade/density/carbon/LHV, power meters and voltage, water end use and internal generationUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_wastewasteEach actual atomic exchange and same declared plantforeground_recordsSegregated stream, material/state, wet/dry mass, washout volume/solids, tests, transfer and actual receiver/treatment/gateUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_transporttransportEach actual atomic exchange and same declared plantforeground_recordsCargo mass/dimensions, origin/destination, real leg distance/mode/load, equipment mobilisation, return/load attribution and included upstream freightUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_handoverhandoverEach actual atomic exchange and same declared plantforeground_recordsEntity/site id, generating route, actual unit capacity and capacity convention, plant geometry and interfaces, accepted components/tests, dates/signatures and incomplete workUse signed drawings/tests, original supplier tickets, calibrated weighing/meters, equipment logs and configuration evidence; reconcile field work packages and subcontractorsRow-specific kg, m3, m2, m, MJ, item, t*km; raw capacity MW and geometry retained separatelyEvery delivery/return, activity/meter interval, installation test and final handoverEntire actual included construction period, rework and subcontracted stages; each gap explicitSame defined plant/site, actual interfaces and attributable off-site workper declared reference flowOriginal records, calibration/density/state checks, geometry/BOM reconciliation, identity/gate matches, uncertainty and signed acceptance
cp_assetstemporaryEquipment and reusable-component manufacture attributionforeground_recordsAsset id/configuration; measured count/area/mass; actual project use; previous cumulative share; supported full-asset denominator; beneficiary ledgerReconcile one persistent ledger across all users/projects/periods with actual hours/cycles or supported denominator; unknown denominator requires reviewitem; m2; kg; fraction; hours/cyclesEvery deployment/reuse/transfer and allocation updateAll relevant asset projects and service periodsAsset and all beneficiariesper declared reference flowMeasured asset amount, manufacture provenance, conserved cumulative shares ≤1 and separately metered operating energy
cp_environmentutilitiesEach actual resource intake and external releaseforeground_recordsStage/equipment, species/CAS, fossil fraction, resource/receptor/compartment, mass/volume, time, salinity/temperature/density, measured source rate/activity, control capture, model provenance and uncertaintyCalibrated intake/outfall meters and source-specific chemical/size-fraction monitoring or independently supported site model; reconcile water/carbon balances. Record noise, vibration, ecological disturbance and thermal effects separately; do not infer emitted mass from concentration alonekg; m3Every intake/release interval, documented activity and sampleAll included site construction/testing intervals; unobserved intervals disclosedActual source and environment boundary/receptorper declared reference flowCalibration, chemistry/speciation, disjoint size fractions, medium/state and independent model checks, mass/volume balance and uncertainty

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calc_referenceall inventory rowsAggregate each attributable atomic quantity for this same accepted entity. q = Q / N, where N = 1 complete delivered plant; q is per declared reference flow. Do not divide by assumed plant mass, lifetime, cost or generated electricity.cp_handoverper declared reference flow
calc_electricitylv_power; mv_powerE_MJ = E_kWh * 3.6; preserve actual meter/gate and allocate construction energy once.cp_utilitiesMJ per declared reference flow
calc_densityfresh_concrete; diesel; sea_intakeMass in kg = measured volume times independently evidenced same-material/state density in compatible units; retain raw volume and density provenance. Unknown density is review, not a guessed factor.cp_civil; cp_utilities; cp_environmentkg per declared reference flow
calc_freightroad_freightSum actual cargo tonnes * actual route kilometres by leg, with supported shared-load and return convention; distinguish raw vehicle-km from t*km and included supply freight.cp_transportt*km per declared reference flow
calc_modulespoly_module; mono_moduleSum measured module gross areas using the same area convention and accepted installed counts; reconcile rejected/returned modules. Rated capacity and electricity are distinct qualifiers/outputs.cp_renewablem2 per declared reference flow
calc_attributionplywood_form; excavator; mobile_craneAttributable asset manufacture = measured asset amount * evidenced share; cumulative shares across every beneficiary and period ≤1. Keep physical transfer ledger and operating fuel separate; unsupported use/lifetime denominator is review.cp_assetsattributed asset amount per declared reference flow
calc_releasesfossil_co2; nitrogen_monoxide; nitrogen_dioxide; pm_fine; pm_coarseUse measured emitted species mass or an independently supported source-specific site model. Fossil CO2 may use measured oxidized fossil carbon * 44/12 with composition/oxidation evidence; molecular NO and NO2 require independent speciation, and PM fractions are disjoint. No universal engine/plant emission factors are given.cp_environmentkg per declared reference flow

Data Quality Requirements

requirement_idApplies toRequirementEvidence
configurationreference productActual generating route, complete installed BOM, geography, capacity/geometry and delivery stage must describe the same identified plant.cp_handover; cp_civil; cp_thermal; cp_nuclear; cp_hydro; cp_renewable
coverageall inventory rowsCover every actual work package, subcontracted interval and relevant route; disclose missing measurements, components, unsupported identities and all excluded stages without claiming complete lifecycle.cp_handover; construction records; supplier gates
metrologyall inventory rowsRetain calibration, raw basis/state, density/composition provenance, dimensional consistency and uncertainty; no default mix, site consumption, plant mass or life.cp_civil; cp_utilities; cp_environment; cp_transport
attributiontemporary; hydro; electricalPersistent asset and multipurpose civil/interface allocations conserve burdens across all beneficiaries; unresolved denominator or scope stays review.cp_assets; original project allocation ledger
source_limitsdatasetHistorical technical sources support qualitative construction/route facts only, not current permission, default recipe, lifetime or emission factor. Nuclear, biomass, hydro, wind and solar case scopes must not be silently extended.un-cpc-power-plants-2025; iaea-nuclear-construction-2011; ifc-thermal-power-2008; ifc-biomass-construction-2017; ifc-hydropower-2018; doe-wind-siting-2021; ifc-mocuba-solar-2016; epa-concrete-washout-2012

9. Validation Rules

rule_idapplies_torulesource_ids
identity_gatedataset; inventoryRequire one actual constructed power-plant entity, its generating route and all mandatory qualifiers. Verify every adopted identity against material/specification, geography, state, route, primary property and unit group; unresolved identity is not a substitution licence.
measurement_gatedataset; inventoryThe final output is exactly 1 item/件 and every inventory/protocol basis is the same declared reference flow. Reconcile measured geometry, capacity, count and delivery state; never infer mass per plant, life, energy yield or a universal mix. Preserve Mass, Area, Length, Volume and energy identities and evidence for any conversion.
completeness_gatedataset; inventoryMatch every actual required/conditional design work package to its atomic rows, original records and upstream/transport interfaces. Missing components, unmetered work, hot tests within the accepted scope, unknown allocations or conversions and unsupported routes remain review gaps and prohibit a complete result; genuine absence requires design evidence.
environment_gatedataset; inventoryCheck independent source/species/medium evidence before direct elementary exchanges, including fossil share, molecular NO/NO2, disjoint PM fractions and water receptor. Captured sludge/liquid is waste, internal recirculation is not intake, and noise/concentration is not assumed emitted mass. Missing observation is not zero.
attribution_gatedataset; inventoryReconcile each persistent asset and shared dam/connection ledger across all users, projects and periods; cumulative manufacture shares ≤1 and complete attribution sums to the whole declared burden. Retain actual gates and eliminate duplicate raw materials, equipment packages, fuel services and freight.
handover_gatedataset; inventoryRequire dated signed construction acceptance, geometry/configuration and outstanding-tests list. Independent structural, electrical, nuclear, environmental or regulatory acceptance must be evidenced where claimed; PCR inspection establishes none of these approvals. Report performed/skipped checks, findings, uncertainty and covered/excluded stages.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 6
Rule IDApplies toRuleSource IDs
construction_scopedataset; inventoryInclude the actual complete agreed plant construction from surveyed starting site through signed civil/mechanical/electrical handover, with integral foundation and generating equipment. Record delivery gate and cold-test stage; this is a construction entity, not a building service or bag of materials.un-cpc-power-plants-2025, iaea-nuclear-construction-2011
route_completenessdataset; inventoryUse the installed design branch, not every example row. Complete its work-package BOM: foundation and material state, generating unit, auxiliary cooling/water/fuel handling, pollution-control hardware, electrical/control/safety, connections, tests and temporary removal. Add every missing specific atomic exchange and supplier link before claiming complete inventory; unsupported branches remain a review gap.iaea-nuclear-construction-2011, ifc-thermal-power-2008, ifc-hydropower-2018, doe-wind-siting-2021
upstream_interfacesdataset; inventorySeparate supplier manufacturing, attributable supply transport and measured site construction. Received components carry their actual delivered state; raw metal is not added again when a purchased fabricated assembly includes it. Upstream datasets are separately linked with actual formulation, geography, technology and gate; missing links prohibit a complete cradle-to-gate claim.ifc-biomass-construction-2017
handover_and_operationdataset; inventoryThe core endpoint is the actual agreed construction-completion/cold-commissioning handover, with stage and unfinished tests disclosed. It does not establish commercial generating readiness or nuclear licensing. Fuel loading, nuclear startup, hot performance operation and trial electricity/heat exports require a separate fully specified extension with each actual fuel, water, chemical, emission and output; never silently omit included hot tests or blend routine operation.ifc-biomass-construction-2017, iaea-nuclear-construction-2011
later_stagesdataset; inventoryRoutine generation, maintenance/renewal, reservoirs operational emissions, later decommissioning/demolition, downstream waste treatment and future recovery credits are outside the core. Existing-site demolition/remediation and removal of temporary construction works, if actually undertaken, are separate included work packages with measured flows. Declare land/ecology disturbance, noise/vibration, sediment and thermal releases and their unmeasured coverage; they are not fabricated mass emissions.ifc-hydropower-2018, doe-wind-siting-2021
water_identitydataset; inventoryKeep supplied water, direct river/ground/sea resource intake, internal reuse, captured liquid waste and direct recipient discharge separate. Actual pollutant species/medium and physicochemical state require their own atomic rows. No default density, emission factor, dilution credit or zero for missing measurements.ifc-hydropower-2018, epa-concrete-washout-2012
Allocation rules · 5
Rule IDApplies toRuleSource IDs
direct_activitydataset; inventoryFirst assign materials, metered energy and work packages directly to the actual plant. For shared batching, workforce equipment or deliveries use recorded beneficiary activities/loads and explain the physical relationship; neither plant cost nor assumed annual generation supplies the denominator. Missing relationship requires review.
shared_assetsdataset; inventoryFor each equipment or reusable form/component retain a persistent manufacture-burden ledger across every project and period. Attribute measured asset amount times evidenced use share; the cumulative shares must be ≤1 and operating energy is separate. Record actual hours/cycles or supported whole-asset denominator and beneficiaries; unknown future life/capacity remains an explicit review, not a fresh full burden at every project.
multipurpose_worksdataset; inventoryShared dam, reservoir civil works, access and grid interfaces must be assigned once with project-specific causal/service evidence among actual beneficiaries; shares conserve the entire included construction burden. State unallocated/missing scope. Independently imported component datasets must not duplicate plant foreground works.
residualsdataset; inventorySeparate reusable material/product transfers from segregated waste and actual disposal. Do not net avoided virgin manufacture or future recovery into core construction. A hot-test electricity/heat extension records actual useful outputs and its independent allocation basis; trial export does not turn construction reference quantity into kWh.
allocation_rule_5foreground_burden_allocationThese attribution rules require the explicit foreground measurement and cross-project evidence of cp_assets and the relevant work-package protocols; they supply no external default share, lifetime or substitution factor.
Validation rules · 6
Rule IDApplies toRuleSource IDs
identity_gatedataset; inventoryRequire one actual constructed power-plant entity, its generating route and all mandatory qualifiers. Verify every adopted identity against material/specification, geography, state, route, primary property and unit group; unresolved identity is not a substitution licence.
measurement_gatedataset; inventoryThe final output is exactly 1 item/件 and every inventory/protocol basis is the same declared reference flow. Reconcile measured geometry, capacity, count and delivery state; never infer mass per plant, life, energy yield or a universal mix. Preserve Mass, Area, Length, Volume and energy identities and evidence for any conversion.
completeness_gatedataset; inventoryMatch every actual required/conditional design work package to its atomic rows, original records and upstream/transport interfaces. Missing components, unmetered work, hot tests within the accepted scope, unknown allocations or conversions and unsupported routes remain review gaps and prohibit a complete result; genuine absence requires design evidence.
environment_gatedataset; inventoryCheck independent source/species/medium evidence before direct elementary exchanges, including fossil share, molecular NO/NO2, disjoint PM fractions and water receptor. Captured sludge/liquid is waste, internal recirculation is not intake, and noise/concentration is not assumed emitted mass. Missing observation is not zero.
attribution_gatedataset; inventoryReconcile each persistent asset and shared dam/connection ledger across all users, projects and periods; cumulative manufacture shares ≤1 and complete attribution sums to the whole declared burden. Retain actual gates and eliminate duplicate raw materials, equipment packages, fuel services and freight.
handover_gatedataset; inventoryRequire dated signed construction acceptance, geometry/configuration and outstanding-tests list. Independent structural, electrical, nuclear, environmental or regulatory acceptance must be evidenced where claimed; PCR inspection establishes none of these approvals. Report performed/skipped checks, findings, uncertainty and covered/excluded stages.
Processes and inputs/outputs · 12
Process IDProcess nameInput flowsOutput flows
groundSite preparation, excavation and ground treatment10
civilFoundations and permanent civil structures40
temporaryTemporary works and erection equipment30
thermalThermal prime mover and heat-cycle installation80
nuclearNuclear island and safety-system installation40
hydroHydraulic generation and water-conduit installation30
renewableWind and solar generating-equipment installation30
electricalPlant electrical and control installation40
utilitiesConstruction utilities and environment exchanges77
wasteConstruction waste containment and export04
transportSupply and construction-waste transport10
handoverInspection, cold commissioning and construction handover01

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.