Power plant construction and handover · Calculation Rules

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53262 · exact

Source

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calc_referenceall inventory rowsAggregate each attributable atomic quantity for this same accepted entity. q = Q / N, where N = 1 complete delivered plant; q is per declared reference flow. Do not divide by assumed plant mass, lifetime, cost or generated electricity.cp_handoverper declared reference flow
calc_electricitylv_power; mv_powerE_MJ = E_kWh * 3.6; preserve actual meter/gate and allocate construction energy once.cp_utilitiesMJ per declared reference flow
calc_densityfresh_concrete; diesel; sea_intakeMass in kg = measured volume times independently evidenced same-material/state density in compatible units; retain raw volume and density provenance. Unknown density is review, not a guessed factor.cp_civil; cp_utilities; cp_environmentkg per declared reference flow
calc_freightroad_freightSum actual cargo tonnes * actual route kilometres by leg, with supported shared-load and return convention; distinguish raw vehicle-km from t*km and included supply freight.cp_transportt*km per declared reference flow
calc_modulespoly_module; mono_moduleFor each same-configuration module lot, multiply measured gross area per module by attributable consumed count = gross attributable receipts + opening stock - verified returns/transfers - closing reusable stock; sum across lots under the same gross-area convention. Include modules consumed by damage, rejection and rework before acceptance. Record accepted installed area and count separately; reconcile discarded modules under cp_waste without subtracting their manufacture burden. Rated capacity and electricity remain distinct qualifiers/outputs.cp_renewablem2 per declared reference flow
calc_attributionplywood_form; excavator; mobile_craneAttributable asset manufacture = measured asset amount * evidenced share; cumulative shares across every beneficiary and period ≤1. Keep physical transfer ledger and operating fuel separate; unsupported use/lifetime denominator is review.cp_assetsattributed asset amount per declared reference flow
calc_releasesfossil_co2; nitrogen_monoxide; nitrogen_dioxide; pm_fine; pm_coarseUse measured emitted species mass or an independently supported source-specific site model. Fossil CO2 may use measured oxidized fossil carbon * 44/12 with composition/oxidation evidence; molecular NO and NO2 require independent speciation, and PM fractions are disjoint. No universal engine/plant emission factors are given.cp_environmentkg per declared reference flow

Data Quality Requirements

requirement_idApplies toRequirementEvidence
configurationreference productActual generating route, complete installed BOM, geography, capacity/geometry and delivery stage must describe the same identified plant.cp_handover; cp_civil; cp_thermal; cp_nuclear; cp_hydro; cp_renewable
coverageall inventory rowsCover every actual work package, subcontracted interval and relevant route; disclose missing measurements, components, unsupported identities and all excluded stages without claiming complete lifecycle.cp_handover; construction records; supplier gates
metrologyall inventory rowsRetain calibration, raw basis/state, density/composition provenance, dimensional consistency and uncertainty; no default mix, site consumption, plant mass or life.cp_civil; cp_utilities; cp_environment; cp_transport
attributiontemporary; hydro; electricalPersistent asset and multipurpose civil/interface allocations conserve burdens across all beneficiaries; unresolved denominator or scope stays review.cp_assets; original project allocation ledger
source_limitsdatasetHistorical technical sources support qualitative construction/route facts only, not current permission, default recipe, lifetime or emission factor. Nuclear, biomass, hydro, wind and solar case scopes must not be silently extended.un-cpc-power-plants-2025; iaea-nuclear-construction-2011; ifc-thermal-power-2008; ifc-biomass-construction-2017; ifc-hydropower-2018; doe-wind-siting-2021; ifc-mocuba-solar-2016; epa-concrete-washout-2012

9. Validation Rules

rule_idapplies_torulesource_ids
identity_gatedataset; inventoryRequire one actual constructed power-plant entity, its generating route and all mandatory qualifiers. Verify every adopted identity against material/specification, geography, state, route, primary property and unit group; unresolved identity is not a substitution licence.
measurement_gatedataset; inventoryThe final output is exactly 1 item/件 and every inventory/protocol basis is the same declared reference flow. Reconcile measured geometry, capacity, count and delivery state; never infer mass per plant, life, energy yield or a universal mix. Preserve Mass, Area, Length, Volume and energy identities and evidence for any conversion.
completeness_gatedataset; inventoryMatch every actual required/conditional design work package to its atomic rows, original records and upstream/transport interfaces. Missing components, unmetered work, hot tests within the accepted scope, unknown allocations or conversions and unsupported routes remain review gaps and prohibit a complete result; genuine absence requires design evidence.
environment_gatedataset; inventoryCheck independent source/species/medium evidence before direct elementary exchanges, including fossil share, molecular NO/NO2, disjoint PM fractions and water receptor. Captured sludge/liquid is waste, internal recirculation is not intake, and noise/concentration is not assumed emitted mass. Missing observation is not zero.
attribution_gatedataset; inventoryReconcile each persistent asset and shared dam/connection ledger across all users, projects and periods; cumulative manufacture shares ≤1 and complete attribution sums to the whole declared burden. Retain actual gates and eliminate duplicate raw materials, equipment packages, fuel services and freight.
handover_gatedataset; inventoryRequire dated signed construction acceptance, geometry/configuration and outstanding-tests list. Independent structural, electrical, nuclear, environmental or regulatory acceptance must be evidenced where claimed; PCR inspection establishes none of these approvals. Report performed/skipped checks, findings, uncertainty and covered/excluded stages.

10. Published Dataset Profile

FieldValue
dataset_roleforeground_construction_dataset
downstream_useExplicit construction contribution to a plant infrastructure model with separately matched upstream components and separately assessed operation/end of life
allowed_useThe measured actual plant/site/configuration/acceptance period and compatible comparisons with the same functional/coverage definitions
excluded_useGeneric mass-based power-plant material, unqualified per-kWh operation, default lifetime/capacity/recipe, whole lifecycle or licensing/approval claim
required_metadataAll reference qualifiers; actual work packages, initial state and scope; original unit/gate/identity bindings; measured geometries and capacity; asset/shared interface ledger; cold/hot and fuel-load status; signed handover dates
required_quality_disclosurePerformed/skipped checks, unmetered and unsupported scope, unresolved identity/allocation/conversion, uncertainty, supplier links and excluded operating/maintenance/demolition stages
update_triggerActual configuration, site, component/supply gate, method evidence, measurement, acceptance stage or attributable work changes

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-power-plants-2025official_guidanceUnited Nations Statistics Division, CPC Version 3.0 Explanatory Notes (30 June 2025), printed/PDF p281, 53262. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdfHeavy electrical generating plants including nuclear; adjacent category context only, not methodology approval
iaea-nuclear-construction-2011official_guidanceIAEA, NP-T-2.5 Construction Technologies for Nuclear Power Plants (2011), printed p23/PDF37 §4.1; printed pp48–50/PDF62–64 §4.2; printed pp99–104/PDF113–118 §5.1; printed pp112–114/PDF126–128 §6. https://www-pub.iaea.org/mtcd/publications/pdf/p1526_web.pdfQualitative nuclear civil/containment/turbine-island construction and installation; no adoption of historical case dimensions, recipes, duration or licence
ifc-thermal-power-2008official_guidanceIFC, EHS Guidelines for Thermal Power Plants (19 December 2008), pp1–2 Applicability; Annex A pp26–29; p8 cooling. https://www.ifc.org/content/dam/ifc/doc/2000/2008-thermal-power-ehs-guidelines-en.pdfHistorical non-nuclear combustion-route/component distinctions; guideline applicability >50 MWth HHV, not a PCR capacity default or construction emission factor. Operational cooling/emissions are not mandatory construction releases
ifc-biomass-construction-2017official_guidanceIFC, Converting Biomass to Energy: A Guide for Developers and Investors (June 2017), printed pp91–94/PDF109–112 §8.1; printed pp95–100/PDF113–118 §8.2. https://www.ifc.org/content/dam/ifc/doc/mgrt-pub/biomass-report-06-2017.pdfBiomass steam/biogas examples: erection, civil/mechanical/electrical records and cold/hot/function/performance acceptance distinctions; no universal thermal-plant recipes or trial quantities
ifc-hydropower-2018official_guidanceIFC, Environmental, Health, and Safety Approaches for Hydropower Projects (March 2018), printed pp13–14/PDF23–24 §1.1.7; printed pp48–50/PDF58–60 Annex A. https://www.ifc.org/content/dam/ifc/doc/mgrt/gpn-ehshydropower.pdfSite-specific hydro civil/waterways/powerhouse and electromechanical interfaces; conditional excavation, spoil and drainage; no default dimensions, life, reservoir emissions or numerical factors
doe-wind-siting-2021official_guidanceUS DOE/NREL, Land-Based Wind Energy Siting: A Foundational and Technical Resource (August 2021), §2.1 Construction, printed pp9–11/PDF19–21, Figures 6–7. https://www.energy.gov/sites/default/files/2025-10/land-based-wind-energy-siting-guide.pdfHistorical land-based preparation, foundation concrete/rebar and crane/tower/nacelle/rotor erection; not offshore construction evidence or default quantities
ifc-mocuba-solar-2016official_guidanceIFC ESRS project 36787 Mocuba Solar, disclosed 21 January 2016, Project Description and PS3 Water consumption. https://disclosures.ifc.org/project-detail/ESRS/36787/mocuba-solarOne Mozambique polycrystalline PV case: steel substructure, array electrical configuration and construction/O&M separation; no case capacity, module count, area or date is a PCR default, and no transfer of case geography to CN identities
epa-concrete-washout-2012official_guidanceUS EPA, Stormwater Best Management Practice: Concrete Washout, EPA-833-F-11-006 (February 2012), pp1–3. https://www.epa.gov/sites/default/files/2015-11/documents/concretewashout_0.pdfHistorical ready-mix chute/pump washing and separate captured liquid/solid handling; no default pH, density, mandatory leakage or treatment credit

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page