TianGong PCR

Granite, sandstone and other monumental or building stone

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published versionLast updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:15130 · exact

Source

1. Scope and Applicability

This PCR covers granite, sandstone and other non-calcareous monumental/building stone as quarry blocks or rough-cut blanks at one declared quarry or rough-processing gate. Distinguish integrated extraction from standalone processing of supplied burden-bearing stone. Include actual site development, extraction, cutting/splitting, sorting, storage/loading, water/waste/dust controls and attributable rehabilitation through the gate. Separate granite, sandstone and other stone types by actual quarry and cutting route. Bedding-controlled sandstone extraction and harder-rock sawing do not share a universal density, wire consumption, silica fraction, cutting rate or yield. Subsequent finishing, installation and building-service performance are separate datasets. ifc-construction-2007

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.ores-and-minerals-electricity-gas-and-water.stone-sand-and-clay.granite-sandstone-and-other-monumental-or-building-stone
classification_refsCPC 3.0:15130
covered_productsgranite, sandstone and other non-calcareous monumental/building stone as quarry blocks or rough-cut blanks
excluded_productsslate and calcareous stone methods; engineered stone; aggregate/sand as reference output; polished/coated finished articles; installed systems
representative_productGranite, sandstone and other monumental or building stone at the declared rough gate
production_routeQuarry development and rehabilitation; Rock extraction and block handling; Rough cutting, splitting and sorting; Water, waste and dust management; Accepted-product loading
market_stateOne declared raw block, quarry slab or simple rough blank at loading, with measured moisture

3. Reference Flow

FieldValue
WhatSupply 1 kg of qualified non-calcareous dimension stone; no equivalence claim per installed area or service lifetime
How much1 kg
How wellsite/year; geology and extraction method; integrated/standalone start; actual rock type and mineralogy; granite fabric or sandstone bedding/cement; block/slab dimensions; defects; rough-cut state; moisture; actual quartz fraction and dust characterization; loading gate; net mass and stock change; cut/split losses; water source/return; waste fate; allocation; development/closure lifetime-output basis
How long or cycleOne gate supply within a declared production period
reference_flow_linkfinal_product
FieldValue
Reference amount1
Reference product flowGranite, sandstone and other monumental or building stone at the declared rough gate
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifierssite/year; geology and extraction method; integrated/standalone start; actual rock type and mineralogy; granite fabric or sandstone bedding/cement; block/slab dimensions; defects; rough-cut state; moisture; actual quartz fraction and dust characterization; loading gate; net mass and stock change; cut/split losses; water source/return; waste fate; allocation; development/closure lifetime-output basis

Declare all qualifiers in dataset metadata or reference-flow comments. The representative identity is usable only for its confirmed product state, geography and property; resolve a distinct flow for incompatible variants. It does not impose a default product composition.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_basisfinal_productMasskgD is the positive accepted net gate-output total in kg. Exclude packaging and cancelled internal transfers. cp_output records D; every card uses per 1 kg reference flow.
conversionutility and material rowsDeclared row propertykg; m3; MJRetain raw readings. Electricity: 1 kWh = 3.6 MJ. Mass/volume conversion requires measured density, temperature and applicable pressure; retain water content and active chemical fraction.
category_balanceproductionMasskgD is positive accepted net as-received stone mass in kg at the declared gate, excluding packaging, reject pieces and returned product. Independently weigh net loads or validate piece/volume records against measured mass/density and actual shape; never assume a universal density or per-piece mass. Reconcile extracted/supplied stone, saleable stone, scrap, saw kerf/slurry solids, stock changes and dust. Measure moisture and solid fraction separately; circulated cutting water is not repeated new intake.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionActual rock deposit for integrated quarrying, or purchased raw stone for standalone rough processing
starting_condition_roleResource or supplied feed; declare which
product_classification_scopegranite, sandstone and other non-calcareous monumental/building stone as quarry blocks or rough-cut blanks
recursive_input_rulePurchased same-category material carries a distinct supplier dataset; internal recycling is a balance observation, not a new external input or credit.
upstream_dataset_requirementLink feed, electricity, fuels, chemicals, infrastructure and waste-management burdens; disclose any missing coverage.
disclosuresite/year; geology and extraction method; integrated/standalone start; actual rock type and mineralogy; granite fabric or sandstone bedding/cement; block/slab dimensions; defects; rough-cut state; moisture; actual quartz fraction and dust characterization; loading gate; net mass and stock change; cut/split losses; water source/return; waste fate; allocation; development/closure lifetime-output basis
rule_idApplies toRulesource_ids
boundary_operationssiteThis PCR covers granite, sandstone and other non-calcareous monumental/building stone as quarry blocks or rough-cut blanks at one declared quarry or rough-processing gate. Distinguish integrated extraction from standalone processing of supplied burden-bearing stone. Include actual site development, extraction, cutting/splitting, sorting, storage/loading, water/waste/dust controls and attributable rehabilitation through the gate. Separate granite, sandstone and other stone types by actual quarry and cutting route. Bedding-controlled sandstone extraction and harder-rock sawing do not share a universal density, wire consumption, silica fraction, cutting rate or yield. Subsequent finishing, installation and building-service performance are separate datasets.ifc-construction-2007
boundary_partitionall exchangesInclude actual conditioning, storage, handling and pollution controls through the declared gate. Account for attributable construction and closure with a disclosed lifetime-output basis or justified exclusion and sensitivity. Separate purchased fuel supply from foreground combustion and purchased treatment from site releases.
boundary_completenessinventoryCards define individual likely exchanges and route conditions, not an exhaustive site audit. Add each actual absent chemical, waste, resource, land transformation and pollutant as its own row. Absence, measured zero and unknown must be distinguished.

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
developmentQuarry development and rehabilitationconditionalIntegrated quarry and attributable closureForeground productionper 1 kg reference flow
extractionRock extraction and block handlingconditionalIntegrated primary quarryingForeground productionper 1 kg reference flow
roughingRough cutting, splitting and sortingconditionalActual rough-processing operationsForeground productionper 1 kg reference flow
controlsWater, waste and dust managementconditionalActual site controlsForeground productionper 1 kg reference flow
dispatchAccepted-product loadingrequiredAll declared sitesForeground productionper 1 kg reference flow

Process: Quarry development and rehabilitation (development)

Inputs

Product flows
Development and rehabilitation diesel (development_diesel)

Actual stripping/rehabilitation equipment; retain lifetime-output attribution and avoid repeated annual full charge.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_development_diesel; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_development_diesel
  • Sources: ifc-construction-2007

Outputs

Waste flows
Quarry overburden (overburden)

Actual removed overburden; topsoil stock/reuse and habitat-specific land change require separate records.

  • Selected flow: Quarry overburden
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_overburden; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_overburden
  • Sources: ifc-construction-2007

Process: Rock extraction and block handling (extraction)

Inputs

Product flows
Extraction and quarry-haul diesel (quarry_diesel)

Actual equipment and loaded/empty movement, excluding downstream road transport outside the gate.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_quarry_diesel; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_quarry_diesel
  • Sources: ifc-construction-2007
Extraction machinery electricity (extraction_power)

This purchased electricity exchange requires independently confirmed actual supplier, consumption or production interface, geography, voltage, generation attributes and energy property/unit; its UUID remains unresolved until a compatible direct-read identity is confirmed. A waste-incineration generation flow must not represent arbitrary site power.

Actual drilling, diamond-wire cutting or powered lifting; exclude rough-cutting meter duplication.

  • Selected flow: Electricity
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Collect the attributable reporting-period quantity under cp_extraction_power; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_extraction_power
  • Sources: ifc-construction-2007
Ammonium-nitrate/fuel-oil explosive (anfo)

Only an actual ANFO blasting route; retain charge and product quality effects. Other explosives need individual identities; nonblasted routes exclude this row.

  • Selected flow: Ammonium-nitrate/fuel-oil explosive
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_anfo; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_anfo
  • Sources: ifc-construction-2007
Elementary flows
Granite resource (rock_resource)

Only the confirmed granite resource route; sandstone and other rocks require their own resource identities and never use this granite identity.

  • Selected flow: granite 08a91e70-3ddc-11dd-9449-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_rock_resource; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_rock_resource
  • Sources: ifc-construction-2007

Outputs

Waste flows
Non-calcareous dimension stone quarry reject (quarry_reject)

Actual damaged or unsuitable extracted rock transferred to management; define recovery to fill or aggregate separately.

  • Selected flow: Non-calcareous dimension stone quarry reject
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_quarry_reject; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_quarry_reject
  • Sources: ifc-construction-2007

Process: Rough cutting, splitting and sorting (roughing)

Inputs

Product flows
Supplied raw non-calcareous dimension stone (supplied_stone)

Only standalone processing; supplier carries extraction and agreed transport. Cancel integrated internal block transfer.

  • Selected flow: Supplied raw non-calcareous dimension stone
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_supplied_stone; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_supplied_stone
  • Sources: ifc-construction-2007
Rough-cutting and splitting electricity (roughing_power)

This purchased electricity exchange requires independently confirmed actual supplier, consumption or production interface, geography, voltage, generation attributes and energy property/unit; its UUID remains unresolved until a compatible direct-read identity is confirmed. A waste-incineration generation flow must not represent arbitrary site power.

Only actual saws/splitters/compressors; manual splitting retains actual other utilities without invented electricity.

  • Selected flow: Electricity
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Collect the attributable reporting-period quantity under cp_roughing_power; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_roughing_power
  • Sources: ifc-construction-2007
Replacement diamond cutting wire (diamond_wire)

Only actual diamond-wire equipment; allocate replaced wire mass by measured lifetime cutting output. Each blade or different tool is separate.

  • Selected flow: Replacement diamond cutting wire
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_diamond_wire; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_diamond_wire
  • Sources: ifc-construction-2007
Supplied cutting-water make-up (cutting_water)

Only purchased new water; circulating slurry/water is internal. Direct abstraction needs its own resource/basin record.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_cutting_water; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_cutting_water
  • Sources: ifc-construction-2007

Outputs

Waste flows
Non-calcareous dimension stone cutting/splitting offcuts (cut_reject)

Only actual rejected solid pieces; distinguish from kerf slurry and from accepted product grades.

  • Selected flow: Non-calcareous dimension stone cutting/splitting offcuts
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_cut_reject; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_cut_reject
  • Sources: ifc-construction-2007

Process: Water, waste and dust management (controls)

Inputs

Product flows
Site-control electricity (control_power)

This purchased electricity exchange requires independently confirmed actual supplier, consumption or production interface, geography, voltage, generation attributes and energy property/unit; its UUID remains unresolved until a compatible direct-read identity is confirmed. A waste-incineration generation flow must not represent arbitrary site power.

Actual pumping, settlement/dewatering and dust control; shared meters allocated once.

  • Selected flow: Electricity
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Collect the attributable reporting-period quantity under cp_control_power; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_control_power
  • Sources: ifc-construction-2007

Outputs

Waste flows
Non-calcareous dimension stone sawing sludge (saw_sludge)

Actual transferred wet kerf sludge; measure dry solids, moisture and management fate; do not count recycled solids twice.

  • Selected flow: Non-calcareous dimension stone sawing sludge
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_saw_sludge; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_saw_sludge
  • Sources: ifc-construction-2007
Stone-process wastewater transferred for treatment (water_purge)

Only actual purge/treatment transfer; receiving-water discharge needs species and compartment rows plus returned volume.

  • Selected flow: Stone-process wastewater transferred for treatment
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_water_purge; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_water_purge
  • Sources: ifc-construction-2007
Elementary flows
Mineral PM10 to outdoor air (pm10_air)

Actual quarry, haul and cutting dust after controls; retain measured particle/composition basis and actual mineral dust identity.

  • Selected flow: Mineral PM10 to outdoor air
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_pm10_air; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_pm10_air
  • Sources: ifc-construction-2007
Fossil carbon dioxide to outdoor air (co2_air)

Only actual foreground fuel combustion; retain measured fuel/carbon balance and traceable factor. Carbonate rock is not automatically a combustion/calcination emission.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_co2_air; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_co2_air
  • Sources: ifc-construction-2007

Process: Accepted-product loading (dispatch)

Inputs

Product flows
Loading diesel (loading_diesel)

Actual accepted-product loading equipment; separate quarry handling and downstream transport.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_loading_diesel; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_loading_diesel
  • Sources: ifc-construction-2007

Outputs

Product flows
Granite, sandstone and other monumental or building stone at the declared rough gate (final_product)

One actual lithology and market state; net accepted stone mass excludes packaging, slurry and reject pieces.

  • Selected flow: Granite, sandstone and other monumental or building stone at the declared rough gate
  • Flow property / unit: Mass / kg
  • Amount rule: 1 kg
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_output
  • Sources: ifc-construction-2007

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
allocation_hierarchyjoint productionPrefer process subdivision or defensible system expansion; otherwise use demonstrated physical causality. Use economic allocation only with consistent period, price, currency and sensitivity when physical causality is unavailable. Retain the unallocated inventory.ef-allocation-2021
allocation_productreference and co-productsSubdivide extraction, rough cutting/splitting and downstream finishing where possible. Attribute development and closure once by disclosed lifetime accepted output. Retain unallocated inventory for true jointly produced grades or by-products. Scrap sold as aggregate or reused as fill does not automatically gain avoided-product credit; disclose its actual burden and destination.
allocation_wastewaste and recyclingClassify each output by physical state and actual fate. A sale does not automatically make a residue a co-product; internal recycling receives no avoided-product credit. Apply treatment burdens once.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_development_dieseldevelopmentdevelopment_dieselmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_overburdendevelopmentoverburdenmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_rock_resourceextractionrock_resourcemeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_quarry_dieselextractionquarry_dieselmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_extraction_powerextractionextraction_powermeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.MJEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_anfoextractionanfomeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_quarry_rejectextractionquarry_rejectmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersUse matched-period weighing, surveyed volume with measured bulk density or calibrated slurry flow and solids assay. Record wet/dry basis, actual rock type, stock changes, recycling fraction and treatment/fill/aggregate destination; reconcile solids and water separately.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_supplied_stoneroughingsupplied_stonemeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_roughing_powerroughingroughing_powermeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.MJEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_diamond_wireroughingdiamond_wiremeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersRetain purchased and retired tool masses, actual replaced fraction, tool service life and measured attributable output over that life. Count reusable wire once; no generic kg/tool or wire-per-stone factor.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_cutting_waterroughingcutting_watermeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_cut_rejectroughingcut_rejectmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersUse matched-period weighing, surveyed volume with measured bulk density or calibrated slurry flow and solids assay. Record wet/dry basis, actual rock type, stock changes, recycling fraction and treatment/fill/aggregate destination; reconcile solids and water separately.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_control_powercontrolscontrol_powermeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.MJEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_saw_sludgecontrolssaw_sludgemeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersUse matched-period weighing, surveyed volume with measured bulk density or calibrated slurry flow and solids assay. Record wet/dry basis, actual rock type, stock changes, recycling fraction and treatment/fill/aggregate destination; reconcile solids and water separately.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_water_purgecontrolswater_purgemeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersUse matched-period weighing, surveyed volume with measured bulk density or calibrated slurry flow and solids assay. Record wet/dry basis, actual rock type, stock changes, recycling fraction and treatment/fill/aggregate destination; reconcile solids and water separately.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_pm10_aircontrolspm10_airmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_co2_aircontrolsco2_airmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_loading_dieseldispatchloading_dieselmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_outputdispatchfinal_productmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersIndependently record positive accepted net loading kg D by calibrated weighbridge/scale, subtract packaging/returns/rejects and reconcile stocks. If collected by piece, area or volume, sample measured dimensions, actual shape and density/net mass to document conversion to kg for that product state, with uncertainty; no assumed block or piece weight.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne declared raw block, quarry slab or simple rough blank at loading, with measured moistureper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
normalizationall cardsExchange = attributable period quantity / D. Reconcile inventories and cancel internal transfers before aggregation.cp_output; row-specific cp recordsper 1 kg reference flow
physical_balanceproductionD is positive accepted net as-received stone mass in kg at the declared gate, excluding packaging, reject pieces and returned product. Independently weigh net loads or validate piece/volume records against measured mass/density and actual shape; never assume a universal density or per-piece mass. Reconcile extracted/supplied stone, saleable stone, scrap, saw kerf/slurry solids, stock changes and dust. Measure moisture and solid fraction separately; circulated cutting water is not repeated new intake.Matched mass, volume, composition and stock measurementsBalance residual and uncertainty

Data Quality Requirements

requirement_idApplies toRequirementEvidence
representativenessdatasetUse matching production and exchange periods, actual technology, geography and supplier state. Record startup, shutdown, seasonal variation and substitutions.collection records
identity_and_rangesall cardsUnresolved identities and missing independent range evidence remain explicit. Do not replace measurement by a guessed industry range or by missing-as-zero.manifest review metadata

9. Validation Rules

rule_idApplies toRulesource_ids
validate_referencefinal_productVerify 1 kg, positive D, product state, property/unit and every required qualifier. Each dataset fixes one product and route.
validate_balancesiteD is positive accepted net as-received stone mass in kg at the declared gate, excluding packaging, reject pieces and returned product. Independently weigh net loads or validate piece/volume records against measured mass/density and actual shape; never assume a universal density or per-piece mass. Reconcile extracted/supplied stone, saleable stone, scrap, saw kerf/slurry solids, stock changes and dust. Measure moisture and solid fraction separately; circulated cutting water is not repeated new intake.
validate_coveragehandoffVerify each applicable exchange, its provider or environmental compartment and final waste fate; identify skipped checks, unresolved identities, missing measurements and upstream gaps. Errors or unassessed mandatory coverage cannot be labelled complete.

10. Published Dataset Profile

FieldValue
dataset_roleforeground_dataset
downstream_usesecondary_dataset; background_dataset
allowed_useSupply 1 kg of qualified non-calcareous dimension stone; no equivalence claim per installed area or service lifetime
excluded_useslate and calcareous stone methods; engineered stone; aggregate/sand as reference output; polished/coated finished articles; installed systems
required_metadatasite/year; geology and extraction method; integrated/standalone start; actual rock type and mineralogy; granite fabric or sandstone bedding/cement; block/slab dimensions; defects; rough-cut state; moisture; actual quartz fraction and dust characterization; loading gate; net mass and stock change; cut/split losses; water source/return; waste fate; allocation; development/closure lifetime-output basis
required_quality_disclosureIdentity and measurement gaps; boundary coverage; uncertainty; allocation; temporal and geographical representativeness
update_triggerChanged product, route, yield, supply, waste fate, site or representative period

11. Data Sources

Source idTypeReferenceUsed for
ifc-construction-2007official_guidanceIFC, Environmental Health and Safety Guidelines for Construction Materials Extraction, 30 April 2007, sections 1.1 and Annex A. https://www.ifc.org/content/dam/ifc/doc/2000/2007-construction-materials-extraction-ehs-guidelines-en.pdfQuarry route, dust, water, waste and land scope; no universal consumption range.
cpc3-notes-2025official_guidanceUNSD, CPC Version 3.0 Explanatory Notes, 30 June 2025. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdfClassification scope only; no process quantities.
ef-allocation-2021official_guidanceCommission Recommendation (EU) 2021/2279, Annex I section 4.5, consolidated 30 December 2021. https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02021H2279-20211230Multifunctionality hierarchy; not a claim of complete PEF conformity.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 3
Rule IDApplies toRuleSource IDs
boundary_operationssiteThis PCR covers granite, sandstone and other non-calcareous monumental/building stone as quarry blocks or rough-cut blanks at one declared quarry or rough-processing gate. Distinguish integrated extraction from standalone processing of supplied burden-bearing stone. Include actual site development, extraction, cutting/splitting, sorting, storage/loading, water/waste/dust controls and attributable rehabilitation through the gate. Separate granite, sandstone and other stone types by actual quarry and cutting route. Bedding-controlled sandstone extraction and harder-rock sawing do not share a universal density, wire consumption, silica fraction, cutting rate or yield. Subsequent finishing, installation and building-service performance are separate datasets.ifc-construction-2007
boundary_partitionall exchangesInclude actual conditioning, storage, handling and pollution controls through the declared gate. Account for attributable construction and closure with a disclosed lifetime-output basis or justified exclusion and sensitivity. Separate purchased fuel supply from foreground combustion and purchased treatment from site releases.
boundary_completenessinventoryCards define individual likely exchanges and route conditions, not an exhaustive site audit. Add each actual absent chemical, waste, resource, land transformation and pollutant as its own row. Absence, measured zero and unknown must be distinguished.
Allocation rules · 3
Rule IDApplies toRuleSource IDs
allocation_hierarchyjoint productionPrefer process subdivision or defensible system expansion; otherwise use demonstrated physical causality. Use economic allocation only with consistent period, price, currency and sensitivity when physical causality is unavailable. Retain the unallocated inventory.ef-allocation-2021
allocation_productreference and co-productsSubdivide extraction, rough cutting/splitting and downstream finishing where possible. Attribute development and closure once by disclosed lifetime accepted output. Retain unallocated inventory for true jointly produced grades or by-products. Scrap sold as aggregate or reused as fill does not automatically gain avoided-product credit; disclose its actual burden and destination.
allocation_wastewaste and recyclingClassify each output by physical state and actual fate. A sale does not automatically make a residue a co-product; internal recycling receives no avoided-product credit. Apply treatment burdens once.
Validation rules · 3
Rule IDApplies toRuleSource IDs
validate_referencefinal_productVerify 1 kg, positive D, product state, property/unit and every required qualifier. Each dataset fixes one product and route.
validate_balancesiteD is positive accepted net as-received stone mass in kg at the declared gate, excluding packaging, reject pieces and returned product. Independently weigh net loads or validate piece/volume records against measured mass/density and actual shape; never assume a universal density or per-piece mass. Reconcile extracted/supplied stone, saleable stone, scrap, saw kerf/slurry solids, stock changes and dust. Measure moisture and solid fraction separately; circulated cutting water is not repeated new intake.
validate_coveragehandoffVerify each applicable exchange, its provider or environmental compartment and final waste fate; identify skipped checks, unresolved identities, missing measurements and upstream gaps. Errors or unassessed mandatory coverage cannot be labelled complete.
Processes and inputs/outputs · 5
Process IDProcess nameInput flowsOutput flows
developmentQuarry development and rehabilitation11
extractionRock extraction and block handling41
roughingRough cutting, splitting and sorting41
controlsWater, waste and dust management14
dispatchAccepted-product loading11

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page