TianGong PCR产品类别规则

Ignition wiring sets and other wiring sets of a kind used in vehicles, aircraft or ships

Ignition wiring sets and other wiring sets of a kind used in vehicles, aircraft or ships: This PCR applies to the foreground manufacture of complete electrical wiring…

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published version
Readiness
Review required
Last updated

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:46330 · exact

Source

1. Scope and Applicability

This PCR applies to the foreground manufacture of complete electrical wiring sets or harness assemblies made for installation in vehicles, aircraft, or ships. A covered product is an assembled and routed set of insulated conductors with the terminations, connector housings, seals, splices, shielding, protective coverings, identification, and securing items required by its declared design. It may carry low-voltage, high-voltage, signal, data, ignition, control, or mixed circuits.

The PCR is application-neutral across road vehicles, including electric and hybrid vehicles, aircraft, and ships. A concrete data package may represent a product family or a specific design, but it shall declare the application family and design qualifiers. The PCR does not treat an individual cable, wire, terminal, connector, sleeve, or prepared component kit as the finished reference product. It also excludes wiring assemblies for buildings, stationary machinery, appliances, and telecommunications equipment unless they are manufactured as a set for installation in a covered vehicle, aircraft, or ship.

The foreground gate-to-gate boundary begins with purchased wires, cables, terminals, connectors, seals, coverings, labels, and other components received at the manufacturing site. It includes preparation, termination, splicing when used, harness forming, protective assembly, marking, inspection, electrical testing, rework, and packaging at the manufacturing site. Upstream production of purchased inputs is represented by linked upstream datasets; installation, operation, maintenance, and end-of-life of the vehicle, aircraft, ship, or installed harness are outside this foreground boundary.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.electrical-machinery-and-apparatus.ignition-wiring-sets-and-other-wiring-sets-of-a-kind-used-in-vehicles-aircraft-or-ships
classification_refsCPC 3.0: 46330 (exact classification context; mapping acceptance is governed separately)
covered_productsComplete ignition wiring sets and other complete electrical wiring sets or harness assemblies made for vehicles, aircraft, or ships, including low-voltage, high-voltage, signal, data, control, and mixed-circuit harnesses when supplied as an assembled set
excluded_productsSingle insulated wires or cables; individual terminals, connectors, seals, grommets, sleeves, tapes, ties, or other parts; prepared component kits and incomplete subassemblies; wiring assemblies for buildings, appliances, stationary machinery, or telecommunications equipment; complete vehicles, aircraft, or ships
representative_productA finished, tested, application-qualified wiring harness supplied at the manufacturing plant gate with permanently attached components and protective elements
production_routePurchased-component preparation; cutting and stripping; crimping, soldering, welding, or splicing as applicable; connector assembly; harness forming and protection; marking; inspection and electrical testing; rework; packaging
market_stateFinished manufactured product at plant gate, before installation into a vehicle, aircraft, or ship

3. Reference Flow

FieldValue
WhatFinished and conforming ignition wiring set or other wiring set made for a vehicle, aircraft, or ship
How much1 kg net mass of accepted finished wiring set
How wellComplete according to the declared bill of materials and drawing, with applicable inspection and electrical acceptance tests passed
How long or cycleOne production lot or reporting-period output normalized to 1 kg of accepted product at the plant gate
reference_flow_linkThe reference amount is the accepted output mass of the Tiangong product flow identified below
FieldValue
Reference amount1
Reference product flowIgnition wiring sets and other wiring sets of a kind used in vehicles, aircraft or ships 4b3f48dd-97a6-427e-9baf-742d7eb6e9c2
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifiersapplication family (road vehicle, aircraft, or ship); harness function and circuit type; declared voltage class; conductor material and gauge or cross-section range; insulation and jacket system; connector and termination technology; shielding and protective-covering configuration; production geography and site; production period; applicable drawing or bill-of-material revision; applicable acceptance and test specification; treatment of supplied packaging

When constructing a foreground data package, the items listed in Required qualifiers must be declared in dataset metadata, process notes, reference flow comment, product description, or an equivalent data package field. Missing required qualifiers make the reference flow definition incomplete for that data package.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_massaccepted finished wiring-set outputMass 93a60a56-a3c8-11da-a746-0800200b9a66kgMeasure net accepted-product mass with calibrated equipment. Include conductors, insulation, permanent connectors, terminals, seals, grommets, shielding, labels, tapes, sleeves, tubes, ties, clips, and other permanently attached items. Exclude reusable fixtures and separately reported packaging.
lot_normalizationall foreground inputs and outputsMass for material rows; the metered unit for utilitieskg for material rows; recorded utility unit before conversionAggregate the same production lot or reporting period for the numerator and denominator, then divide by accepted finished-product mass to report each row per 1 kg reference flow.
component_no_double_countpurchased sets, subassemblies, and individual componentsMasskgIf a purchased subassembly is recorded as one input, do not also record its embedded wires, terminals, connectors, or coverings as separate inputs unless the subassembly dataset expressly excludes them.
mass_reconciliationmaterial inputs, accepted output, scrap, rejects, retained work in progress, and stock changeMasskgReconcile measured material inputs against accepted product, exported scrap or waste, rejected product, work-in-progress change, and inventory change for the same period; document rather than force-close any residual.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionPurchased wires, cables, contacts, terminals, connector housings, seals, coverings, labels, packaging, and any purchased subassemblies received at the wiring-set manufacturing site
starting_condition_roleUpstream product inputs to the foreground manufacturing system
product_classification_scopeComplete wiring sets manufactured for vehicles, aircraft, or ships; component-only and non-transport applications are outside the reference-product scope
recursive_input_ruleA purchased complete wiring set or sub-harness within the same product category is recorded once as a product input with a linked upstream dataset and declared mass and role. Do not recursively reconstruct the supplier foreground unless it is inside the reporting organisation's operational boundary.
upstream_dataset_requirementEvery material or component input contributing to the finished wiring set shall have an applicable upstream dataset or a disclosed data gap; supplier-specific data are preferred for compositionally or technologically significant inputs.
disclosureDeclare the site, reporting period, product family or design basis, production stages under operational control, outsourced stages, supplied-versus-site-added components, packaging treatment, rework loop, scrap destinations, and excluded downstream installation or use stages.
rule_idapplies_torulesource_ids
boundary_foreground_manufacturingforeground process scopeInclude on-site component preparation, termination and splicing as applicable, connector assembly, harness forming and protective covering, marking, inspection, electrical testing, rework, and packaging.ipc-whma-a-620; nasa-std-8739-4a-change-4
boundary_upstream_linkingpurchased inputsKeep purchased material and component production outside the foreground gate-to-gate system while linking each material input to an upstream dataset or disclosing the gap.iso-14044-2006; eu-pef-method-2021
boundary_recursive_wiring_setspurchased same-category wiring sets or sub-harnessesRecord the purchased set once at the point it crosses the foreground boundary and do not expand it into supplier operations unless those operations are within the declared foreground control boundary.eu-pef-method-2021
boundary_downstream_exclusionsdownstream stagesExclude installation into the vehicle, aircraft, or ship, use-phase electrical losses, maintenance, removal, and end-of-life unless a broader study explicitly adds those stages outside this gate-to-gate dataset.iso-14044-2006; eu-pef-method-2021

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
component_preparationWire, cable, and termination preparationrequiredAlways; combine only when records cannot be separated, and disclose the aggregationPrepare conductors, shields, terminals, seals, and connectorized leads for harness formationprepared leads and subassemblies transferred to harness assembly
harness_assemblyHarness forming and protective assemblyrequiredAlwaysRoute, branch, secure, cover, identify, and complete the physical harness assemblyassembled harness transferred to final test and finishing
testing_finishing_packagingInspection, electrical testing, rework, and packagingrequiredAlways; specific tests and packaging operations follow the declared design and acceptance specificationConfirm conformity and produce accepted finished wiring sets at the plant gate1 kg accepted finished wiring set

Process: Wire, cable, and termination preparation (component_preparation)

Inputs

Product flows
Insulated wires and cables (insulated_wires_cables)

Record all purchased insulated conductors, multicore cables, shielded cables, and specialty cables cut or prepared for the wiring set. Quantity comes from receiving, issue, return, and stock-change records reconciled to the reporting period.

  • Selected flow: Application-appropriate insulated wire and cable inputs selected from Tiangong for the declared material and cable construction
  • Flow property / unit: Mass / kg
  • Amount rule: measured issued mass minus unused returned mass, adjusted for stock change
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_component_materials
  • Sources: ipc-whma-a-620; nasa-std-8739-4a-change-4
Terminals, connectors, seals, and termination materials (termination_components)

Record contacts, terminals, connector housings, seals, grommets, splice devices, solder, and other termination materials added during preparation. Use item-level quantities and measured or supplier-declared masses.

  • Selected flow: Product-specific terminal, connector, sealing, and termination-material flows; no single generic component flow is imposed
  • Flow property / unit: Mass / kg
  • Amount rule: item count multiplied by verified unit mass, or direct issued mass where available
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_component_materials
  • Sources: ipc-whma-a-620; nasa-std-8739-4a-change-4
Purchased connectorized leads and subassemblies (purchased_subassemblies)

Record complete purchased leads, branches, or sub-harnesses only when they cross the site boundary as identifiable products. Apply the recursive-input and no-double-count rules.

  • Selected flow: Supplier-specific prepared lead or subassembly flow matching the purchased item
  • Flow property / unit: Mass / kg
  • Amount rule: measured received-and-consumed mass for the reporting period
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_component_materials
Preparation electricity and utilities (preparation_energy)

Record electricity and other metered utilities used for cutting, stripping, crimping, welding, soldering, cleaning, and local extraction. Allocate shared meters using documented machine time or another physical driver.

  • Selected flow: Site- and period-appropriate electricity and utility product flows
  • Flow property / unit: Metered utility property / metered unit
  • Amount rule: submetered use or allocated shared-meter use for the preparation process
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_component_energy
Waste flows
Elementary flows

Outputs

Product flows
Prepared leads and subassemblies transferred internally (prepared_leads_output)

Record the measured mass of prepared conductors, terminated leads, and subassemblies transferred to harness assembly as an internal intermediate output.

  • Selected flow: Internal prepared-lead and subassembly flow
  • Flow property / unit: Mass / kg
  • Amount rule: measured transfer mass or reconciled input mass less recorded preparation scrap
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per process output transferred to harness assembly
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_component_output_waste
Waste flows
Wire, insulation, terminal, and connector preparation scrap (preparation_scrap)

Record conductor offcuts, stripped insulation, rejected crimps, damaged terminals, connector parts, and collected process residues by material and destination where records permit.

  • Selected flow: Destination- and material-specific waste flows
  • Flow property / unit: Mass / kg
  • Amount rule: measured scrap mass by waste stream; do not net revenue against material input
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_component_output_waste
Elementary flows

Process: Harness forming and protective assembly (harness_assembly)

Inputs

Product flows
Prepared leads and subassemblies received internally (prepared_leads_input)

Record the same internal intermediate quantity transferred from component preparation, without adding upstream burden a second time.

  • Selected flow: Internal prepared-lead and subassembly flow
  • Flow property / unit: Mass / kg
  • Amount rule: measured transfer mass equal to the corresponding internal output after reconciliation
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assembly_materials
Protective, securing, identification, and finishing materials (protective_materials)

Record tapes, sleeves, tubes, braid, shields, ties, clips, labels, boots, moulding or potting materials, and other items permanently added during harness forming.

  • Selected flow: Product-specific protective, securing, identification, and finishing-material flows
  • Flow property / unit: Mass / kg
  • Amount rule: measured issued mass or item count multiplied by verified unit mass, less unused returns
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_assembly_materials
  • Sources: ipc-whma-a-620; nasa-std-8739-4a-change-4
Harness-assembly electricity and utilities (assembly_energy)

Record electricity and other metered utilities for layout boards, taping, braiding, heat shrinking, moulding or potting when used, marking, ventilation, and assembly equipment.

  • Selected flow: Site- and period-appropriate electricity and utility product flows
  • Flow property / unit: Metered utility property / metered unit
  • Amount rule: submetered use or allocated shared-meter use for harness assembly
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assembly_energy
Waste flows
Elementary flows

Outputs

Product flows
Assembled harness transferred to final test (assembled_harness_output)

Record the assembled but not yet accepted harness mass transferred to the final inspection, test, and packaging process.

  • Selected flow: Internal assembled-harness flow
  • Flow property / unit: Mass / kg
  • Amount rule: measured transfer mass or reconciled assembly input less recorded assembly waste
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per process output transferred to final testing
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_assembly_output_waste
Waste flows
Assembly trim, protective-material waste, and rejected parts (assembly_scrap)

Record tapes, sleeves, ties, labels, moulding materials, rejected branches, and other assembly waste by material and destination where records permit.

  • Selected flow: Destination- and material-specific waste flows
  • Flow property / unit: Mass / kg
  • Amount rule: measured waste mass by waste stream
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assembly_output_waste
Elementary flows

Process: Inspection, electrical testing, rework, and packaging (testing_finishing_packaging)

Inputs

Product flows
Assembled harness received for testing (assembled_harness_input)

Record the internal assembled-harness mass entering final inspection and electrical testing, matching the upstream internal transfer.

  • Selected flow: Internal assembled-harness flow
  • Flow property / unit: Mass / kg
  • Amount rule: measured transfer mass equal to the corresponding internal output after reconciliation
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_test_finish_inputs
Packaging and final finishing materials (packaging_finishing_materials)

Record packaging and any final labels, caps, protectors, or preservatives added after testing. Report packaging separately from net product mass and state whether it is included in the delivered dataset scope.

  • Selected flow: Material-specific packaging and finishing product flows
  • Flow property / unit: Mass / kg
  • Amount rule: measured issued mass or item count multiplied by verified unit mass, less unused returns
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_test_finish_inputs
Test, rework, and packaging electricity (test_finish_energy)

Record metered electricity for continuity testing and any design-required insulation, dielectric, functional, or automated tests, plus rework and packaging equipment.

  • Selected flow: Site- and period-appropriate electricity product flow
  • Flow property / unit: Energy / kWh
  • Amount rule: submetered use or allocated shared-meter use for test, rework, and packaging
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_test_finish_energy
  • Sources: ipc-whma-a-620; nasa-std-8739-4a-change-4
Waste flows
Elementary flows

Outputs

Product flows
Accepted finished wiring set (finished_wiring_set)

Record only complete wiring sets that passed the applicable inspection and electrical acceptance requirements as reference-product output.

  • Selected flow: Ignition wiring sets and other wiring sets of a kind used in vehicles, aircraft or ships 4b3f48dd-97a6-427e-9baf-742d7eb6e9c2
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: measured net mass of accepted finished wiring sets; reference amount equals 1 kg
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_finished_output_tests
  • Sources: ipc-whma-a-620; nasa-std-8739-4a-change-4
Waste flows
Scrapped rejected wiring sets and test-damaged parts (rejected_finished_waste)

Record rejected units or parts that leave the rework loop as waste, classified by material and treatment destination where known. Do not count units still in rework as waste.

  • Selected flow: Destination- and material-specific waste flows
  • Flow property / unit: Mass / kg
  • Amount rule: measured mass of final rejects transferred out of the rework loop
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished wiring set
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_finished_output_tests
Elementary flows

7. Allocation and Co-product Handling

rule_idapplies_torulesource_ids
allocation_avoid_by_subdivisionshared site operations and metersAvoid allocation by separately metering or subdividing preparation, assembly, test, rework, and packaging operations whenever practicable.iso-14044-2006; eu-pef-method-2021
allocation_internal_reworkinternal rework and recovered work in progressKeep burdens and material returns inside the same foreground system; do not create a co-product credit for an item that returns to production.eu-pef-method-2021
allocation_multiple_productsunavoidable shared burdens across distinct saleable productsUse a documented physical causal driver such as machine time, processed mass, or test time. If no physical relation reasonably represents burden causation, use a documented economic relation and disclose the method, period, prices, and sensitivity.iso-14044-2006; eu-pef-method-2021
allocation_scrap_and_residuessold scrap, recyclable residues, and wasteReport the mass and destination as separate outputs. Do not subtract scrap revenue or an avoided burden from foreground inputs unless the broader study declares and applies a consistent recycling or substitution method.iso-14044-2006; eu-pef-method-2021

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_component_materialscomponent_preparationwires, cables, terminals, connectors, seals, and purchased subassembliesreceiving, issue, return, BOM, unit-mass, and inventory recordsitem_id; material_or_component_description; supplier; quantity_received; quantity_issued; quantity_returned; unit_mass; opening_stock; closing_stock; lot_id; product_familyreconcile ERP or warehouse movements to verified BOM and unit-mass recordskg and itemeach receipt and issue; aggregate monthlyrepresentative reporting period or complete production campaignall preparation lines in the declared sitesum consumed mass by item and product family; retain purchased subassemblies as single rows unless their datasets exclude embedded componentspurchase record; BOM revision; calibrated scale or supplier mass evidence; stock reconciliation
cp_component_energycomponent_preparationpreparation electricity and utilitiesmeter, submeter, equipment-runtime, and utility invoice recordsmeter_id; reading_start; reading_end; utility_type; machine_runtime; allocation_driver; production_lotread submeters; allocate only shared consumption using a documented physical drivermetered utility unitper shift or meter interval; aggregate monthlysame period as material and accepted-output recordsall preparation equipment in the declared sitesubtract meter readings and allocate shared use by machine time or another justified physical drivermeter identity; calibration or invoice; allocation worksheet
cp_component_output_wastecomponent_preparationprepared-lead transfers and preparation scraptransfer weighment, scrap-bin, rejection, and waste-dispatch recordslot_id; output_mass; scrap_material; scrap_mass; destination; dateweigh internal transfers and segregated scrap; reconcile to material inputskgeach transfer and waste dispatch; aggregate monthlysame period as component inputsall preparation lines in the declared sitesum transfers and scrap by product family, material, and destinationscale calibration; transfer ticket; waste manifest; reconciliation record
cp_assembly_materialsharness_assemblyprepared leads and protective, securing, identification, and finishing materialstransfer, issue, return, BOM, count, and unit-mass recordsitem_id; description; quantity_issued; quantity_returned; unit_mass; transfer_mass; lot_id; product_familyreconcile internal transfers and warehouse issues to verified BOM and unit masseskg and itemeach transfer and issue; aggregate monthlysame period as accepted-output recordsall harness assembly lines in the declared sitesum consumed mass by item and product familyBOM and drawing revision; scale or unit-mass evidence; stock reconciliation
cp_assembly_energyharness_assemblyassembly electricity and utilitiesmeter, equipment-runtime, and utility recordsmeter_id; reading_start; reading_end; utility_type; runtime; allocation_driver; production_lotread submeters; allocate shared consumption using documented physical driversmetered utility unitper shift or meter interval; aggregate monthlysame period as assembly material recordsall assembly equipment in the declared sitesubtract meter readings and allocate shared use by machine time or another justified physical drivermeter identity; calibration or invoice; allocation worksheet
cp_assembly_output_wasteharness_assemblyassembled-harness transfers and assembly wastetransfer weighment, scrap-bin, rejection, and waste-dispatch recordslot_id; output_mass; waste_material; waste_mass; destination; dateweigh internal transfers and segregated wastekgeach transfer and waste dispatch; aggregate monthlysame period as assembly inputsall assembly lines in the declared sitesum transfers and waste by product family, material, and destinationscale calibration; transfer ticket; waste manifest; reconciliation record
cp_test_finish_inputstesting_finishing_packagingassembled harnesses, packaging, labels, caps, and finishing inputstransfer, issue, return, BOM, count, and unit-mass recordsitem_id; description; quantity_issued; quantity_returned; unit_mass; transfer_mass; lot_id; product_familyreconcile internal transfers and issued materials to verified BOM and unit masseskg and itemeach transfer and issue; aggregate monthlysame period as accepted-output recordsall test, rework, and packaging areas in the declared sitesum consumed mass by item and product family; keep packaging separate from net reference-product massBOM and packaging specification; scale or unit-mass evidence; stock reconciliation
cp_test_finish_energytesting_finishing_packagingtest, rework, and packaging electricitymeter, test-cycle, equipment-runtime, and utility recordsmeter_id; reading_start; reading_end; test_cycles; runtime; allocation_driver; lot_idread submeters; allocate shared consumption using test cycles, machine time, or another physical driverkWhper shift or meter interval; aggregate monthlysame period as accepted-output recordsall test, rework, and packaging equipment in the declared sitesubtract meter readings and allocate shared use by documented physical drivermeter identity; calibration or invoice; test-equipment log; allocation worksheet
cp_finished_output_teststesting_finishing_packagingaccepted output, inspection and test status, rework, and final rejectsscale, production, test, nonconformance, rework, and waste recordsserial_or_lot_id; product_family; drawing_revision; net_mass; test_specification; test_result; rework_status; reject_mass; waste_destination; dateweigh accepted and rejected output and link test and inspection records to the lot or serial identitykg and test statuseach lot or unit as required by the acceptance specification; aggregate monthlysame period as all foreground inputsall accepted output and final rejects from the declared sitesum accepted net mass and final reject mass; exclude unresolved work in progress from both until dispositionscale calibration; current drawing and BOM; test-equipment calibration; traceable inspection and test report; nonconformance disposition

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calc_count_to_masscounted components and packagingconsumed mass = (issued item count - returned item count) × verified unit massissued count; returned count; verified unit massconsumed mass by item in kg
calc_net_material_consumptionmass-issued materialsconsumed mass = opening stock + receipts - closing stock - documented returns or transfers outopening stock; receipts; closing stock; returns; transfersconsumed input mass in kgeu-pef-method-2021
calc_normalize_reference_massevery foreground inventory rownormalized amount = reporting-period row amount / reporting-period accepted finished-product massaggregated row amount; accepted finished-product massamount per 1 kg accepted wiring setiso-14044-2006; eu-pef-method-2021
calc_mass_reconciliationwhole foreground systemresidual = total material inputs - accepted net product - exported waste and scrap - final rejects - closing work-in-progress increase + opening work-in-progress decrease; investigate and disclose the residual without forced adjustmentmaterial inputs; accepted product; waste; scrap; rejects; work-in-progress change; stock changemass reconciliation and disclosed residual in kgeu-pef-method-2021

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_identity_and_scopeproduct identity and boundaryRetain the current drawing, bill of materials, application family, circuit and voltage class, product revision, site, period, included operations, outsourced operations, and packaging treatment.approved drawing and BOM; routing; scope statement; product metadata
dq_primary_recordsmaterial, energy, waste, and output quantitiesUse site records for foreground quantities. Supplier or generic secondary data may describe upstream production but shall not replace measured foreground consumption or output.receiving and issue records; meters; invoices; scale tickets; production reports; waste manifests
dq_temporal_alignmentall foreground rowsUse one representative reporting period, normally 12 consecutive months or a complete production campaign, and align input, output, rework, stock-change, and waste records to that period. Disclose shutdowns, ramp-up, or exceptional production.period register; production calendar; meter dates; stock records; campaign report
dq_mass_completenessmaterial balanceInclude all bill-of-material items and measurable process additions, accepted product, scrap, final rejects, work-in-progress change, and stock change; explain unresolved residuals and missing supplier datasets.mass-reconciliation worksheet; BOM coverage check; data-gap register
dq_test_traceabilityinspection and electrical testingRetain current acceptance procedures and traceable inspection and test results. At minimum record continuity testing; record insulation-resistance, dielectric-withstand, shielding, functional, or other tests when required by the declared application and specification.test specification; calibrated-equipment record; lot- or serial-linked test report; nasa-std-8739-4a-change-4; ipc-whma-a-620
dq_allocationshared operationsDocument every shared-meter or shared-process allocation driver and retain the calculation and sensitivity when a non-physical relation is used.allocation worksheet; meter map; production statistics; iso-14044-2006; eu-pef-method-2021

9. Validation Rules

rule_idapplies_torulesource_ids
validate_complete_set_scopeproduct identityConfirm that the reference product is a complete wiring set for a vehicle, aircraft, or ship, not a single wire, cable, connector, terminal, component kit, incomplete subassembly, or complete transport equipment item.ipc-whma-a-620
validate_reference_identityreference flowRequire product flow UUID 4b3f48dd-97a6-427e-9baf-742d7eb6e9c2, Mass UUID 93a60a56-a3c8-11da-a746-0800200b9a66, Units of mass UUID 93a60a57-a4c8-11da-a746-0800200c9a66, unit kg, and reference amount 1.
validate_required_qualifiersfunctional unit and dataset metadataFail completeness when any required qualifier is absent or when the bill-of-material, drawing, test-specification, or packaging basis is not identifiable.ipc-whma-a-620; nasa-std-8739-4a-change-4
validate_process_coverageforeground process inventoryRequire all three process-map stages or a documented aggregation that preserves preparation, assembly, testing, rework, packaging, input, output, and waste coverage.ipc-whma-a-620; nasa-std-8739-4a-change-4
validate_internal_transfersprepared-lead and assembled-harness internal flowsConfirm that each internal output has a matching downstream input and carries no duplicated upstream burden.eu-pef-method-2021
validate_mass_reconciliationwhole foreground systemRequire a mass-reconciliation worksheet covering inputs, accepted product, waste, scrap, rejects, work-in-progress, and stock change; unresolved residuals must be disclosed and must not be forced into another row.eu-pef-method-2021
validate_test_recordsaccepted outputRequire traceable inspection and continuity-test evidence for accepted product and all additional tests required by the declared design or acceptance specification.ipc-whma-a-620; nasa-std-8739-4a-change-4
validate_allocation_disclosureshared burdens and scrapRequire the allocation driver, data period, calculations, and scrap or waste treatment to be disclosed; prohibit unexplained revenue netting or avoided-burden credits.iso-14044-2006; eu-pef-method-2021
validate_no_unsourced_defaultsall foreground amountsReject undocumented default quantities presented as measured or source-backed values. Foreground gaps shall remain explicit and replaceable.iso-14044-2006; eu-pef-method-2021

10. Published Dataset Profile

FieldValue
dataset_roleForeground gate-to-gate production dataset for a finished wiring set at the manufacturing plant gate
downstream_useMay be published as a secondary_dataset or background_dataset and used as a component-production input to vehicle, aircraft, ship, process, or lifecyclemodel studies
allowed_useProduct-family or design-specific studies whose application, voltage, material, connector, protection, geography, period, test, and packaging qualifiers are compatible with the dataset
excluded_useSingle wires, cables, connectors, terminals, incomplete kits or subassemblies; non-transport wiring applications; installed-system use or end-of-life claims; comparison across incompatible designs without additional normalization and review
required_metadataPCR id; product flow UUID; application family; harness function; circuit and voltage class; conductor and insulation system; connector and termination technology; shielding and protection; drawing and BOM revision; site and geography; reporting period; production route; outsourced stages; applicable test specification; packaging treatment; allocation method
required_quality_disclosureForeground-data coverage; meter and mass-measurement basis; BOM and supplier-data coverage; mass-reconciliation residual; rejected and reworked output; test coverage and traceability; allocation drivers; upstream dataset gaps; temporal, geographical, and technological representativeness
update_triggerChange in drawing or BOM that materially changes composition; conductor, insulation, connector, termination, shielding, or protection technology change; voltage-class or application change; site or route change; material change in supplier mix, energy mix, scrap treatment, allocation method, test regime, packaging, or reporting period

11. Data Sources

Source idTypeReferenceUsed for
ipc-whma-a-620standardIPC and WHMA, Requirements and Acceptance for Cable and Wire Harness Assemblies, official IPC description: https://www.ipc.org/ipc-validation-services-qualified-manufacturing-companies-qml-ipcwhma-620 (retrieved 2026-08-09)Category meaning; assembly activities; crimped, mechanically secured, and soldered interconnections; inspection and test basis; process-control and acceptance-record expectations
nasa-std-8739-4a-change-4standardNASA-STD-8739.4A Change 4, Workmanship Standard for Crimping, Interconnecting Cables, Harnesses, and Wiring: https://standards.nasa.gov/node/283 (retrieved 2026-08-09)Detailed process decomposition for forming, stripping, shielding, crimping, connector assembly, identification, cleaning, handling, testing, splicing, and quality assurance; test and record traceability for critical applications
iso-14044-2006standardISO 14044:2006, Environmental management — Life cycle assessment — Requirements and guidelines: https://www.iso.org/standard/38498.html (retrieved 2026-08-09)Goal and scope, inventory, allocation, reporting, limitations, and interpretation framework
eu-pef-method-2021official_guidanceCommission Recommendation (EU) 2021/2279, Annex I, Product Environmental Footprint Method: https://eur-lex.europa.eu/eli/reco/2021/2279/2021-12-30/eng (retrieved 2026-08-09)Functional unit and reference flow framing; system boundary; inventory data quality; allocation hierarchy; normalization and reporting

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 4
Rule IDApplies toRuleSource IDs
boundary_foreground_manufacturingforeground process scopeInclude on-site component preparation, termination and splicing as applicable, connector assembly, harness forming and protective covering, marking, inspection, electrical testing, rework, and packaging.ipc-whma-a-620, nasa-std-8739-4a-change-4
boundary_upstream_linkingpurchased inputsKeep purchased material and component production outside the foreground gate-to-gate system while linking each material input to an upstream dataset or disclosing the gap.iso-14044-2006, eu-pef-method-2021
boundary_recursive_wiring_setspurchased same-category wiring sets or sub-harnessesRecord the purchased set once at the point it crosses the foreground boundary and do not expand it into supplier operations unless those operations are within the declared foreground control boundary.eu-pef-method-2021
boundary_downstream_exclusionsdownstream stagesExclude installation into the vehicle, aircraft, or ship, use-phase electrical losses, maintenance, removal, and end-of-life unless a broader study explicitly adds those stages outside this gate-to-gate dataset.iso-14044-2006, eu-pef-method-2021
Allocation rules · 4
Rule IDApplies toRuleSource IDs
allocation_avoid_by_subdivisionshared site operations and metersAvoid allocation by separately metering or subdividing preparation, assembly, test, rework, and packaging operations whenever practicable.iso-14044-2006, eu-pef-method-2021
allocation_internal_reworkinternal rework and recovered work in progressKeep burdens and material returns inside the same foreground system; do not create a co-product credit for an item that returns to production.eu-pef-method-2021
allocation_multiple_productsunavoidable shared burdens across distinct saleable productsUse a documented physical causal driver such as machine time, processed mass, or test time. If no physical relation reasonably represents burden causation, use a documented economic relation and disclose the method, period, prices, and sensitivity.iso-14044-2006, eu-pef-method-2021
allocation_scrap_and_residuessold scrap, recyclable residues, and wasteReport the mass and destination as separate outputs. Do not subtract scrap revenue or an avoided burden from foreground inputs unless the broader study declares and applies a consistent recycling or substitution method.iso-14044-2006, eu-pef-method-2021
Validation rules · 9
Rule IDApplies toRuleSource IDs
validate_complete_set_scopeproduct identityConfirm that the reference product is a complete wiring set for a vehicle, aircraft, or ship, not a single wire, cable, connector, terminal, component kit, incomplete subassembly, or complete transport equipment item.ipc-whma-a-620
validate_reference_identityreference flowRequire product flow UUID 4b3f48dd-97a6-427e-9baf-742d7eb6e9c2, Mass UUID 93a60a56-a3c8-11da-a746-0800200b9a66, Units of mass UUID 93a60a57-a4c8-11da-a746-0800200c9a66, unit kg, and reference amount 1.
validate_required_qualifiersfunctional unit and dataset metadataFail completeness when any required qualifier is absent or when the bill-of-material, drawing, test-specification, or packaging basis is not identifiable.ipc-whma-a-620, nasa-std-8739-4a-change-4
validate_process_coverageforeground process inventoryRequire all three process-map stages or a documented aggregation that preserves preparation, assembly, testing, rework, packaging, input, output, and waste coverage.ipc-whma-a-620, nasa-std-8739-4a-change-4
validate_internal_transfersprepared-lead and assembled-harness internal flowsConfirm that each internal output has a matching downstream input and carries no duplicated upstream burden.eu-pef-method-2021
validate_mass_reconciliationwhole foreground systemRequire a mass-reconciliation worksheet covering inputs, accepted product, waste, scrap, rejects, work-in-progress, and stock change; unresolved residuals must be disclosed and must not be forced into another row.eu-pef-method-2021
validate_test_recordsaccepted outputRequire traceable inspection and continuity-test evidence for accepted product and all additional tests required by the declared design or acceptance specification.ipc-whma-a-620, nasa-std-8739-4a-change-4
validate_allocation_disclosureshared burdens and scrapRequire the allocation driver, data period, calculations, and scrap or waste treatment to be disclosed; prohibit unexplained revenue netting or avoided-burden credits.iso-14044-2006, eu-pef-method-2021
validate_no_unsourced_defaultsall foreground amountsReject undocumented default quantities presented as measured or source-backed values. Foreground gaps shall remain explicit and replaceable.iso-14044-2006, eu-pef-method-2021
Processes and inputs/outputs · 3
Process IDProcess nameInput flowsOutput flows
component_preparationWire, cable, and termination preparation42
harness_assemblyHarness forming and protective assembly32
testing_finishing_packagingInspection, electrical testing, rework, and packaging32

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page

1. Scope and Applicability2. Product Category Identity3. Reference Flow4. Measurement and Unit Rules5. System BoundaryBoundary Abstraction6. Process Inventory StructureProcess MapProcess: Wire, cable, and termination preparation (component_preparation)InputsProduct flowsInsulated wires and cables (insulated_wires_cables)Terminals, connectors, seals, and termination materials (termination_components)Purchased connectorized leads and subassemblies (purchased_subassemblies)Preparation electricity and utilities (preparation_energy)Waste flowsElementary flowsOutputsProduct flowsPrepared leads and subassemblies transferred internally (prepared_leads_output)Waste flowsWire, insulation, terminal, and connector preparation scrap (preparation_scrap)Elementary flowsProcess: Harness forming and protective assembly (harness_assembly)InputsProduct flowsPrepared leads and subassemblies received internally (prepared_leads_input)Protective, securing, identification, and finishing materials (protective_materials)Harness-assembly electricity and utilities (assembly_energy)Waste flowsElementary flowsOutputsProduct flowsAssembled harness transferred to final test (assembled_harness_output)Waste flowsAssembly trim, protective-material waste, and rejected parts (assembly_scrap)Elementary flowsProcess: Inspection, electrical testing, rework, and packaging (testing_finishing_packaging)InputsProduct flowsAssembled harness received for testing (assembled_harness_input)Packaging and final finishing materials (packaging_finishing_materials)Test, rework, and packaging electricity (test_finish_energy)Waste flowsElementary flowsOutputsProduct flowsAccepted finished wiring set (finished_wiring_set)Waste flowsScrapped rejected wiring sets and test-damaged parts (rejected_finished_waste)Elementary flows7. Allocation and Co-product Handling8. Foreground Data Collection, Calculation, and Quality RulesData Collection ProtocolsCalculation RulesData Quality Requirements9. Validation Rules10. Published Dataset Profile11. Data Sources