Tunnel construction delivery

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53222 · exact

Source

1. Scope and Applicability

Applies to physical highway, road and railway tunnels and related underground constructions for underground railway traffic. Excludes ordinary vehicular/pedestrian underpasses, underground rail lines as such, mining tunnels, water conduits, construction services and tunnel operation services. The reference is an actually defined completed asset, not a materials bundle or a construction-service transaction (un-cpc).

Retain actual cut-and-cover, mined/SEM, mechanical bored/shield, immersed and box-jacked routes, singly or combined. Ground conditions and accepted design determine applicability; no mandatory explosive, foam, grout, lining type or universal structural recipe. Underground stations/caverns, shafts, cross-passages and portals are included only as identified related construction in the same delivery. Separate road surfacing and rail track/electrification packages by agreed interfaces to avoid overlap with road/rail PCRs. Civil-method context comes from the historical FHWA manual; it is not current design or safety approval (fhwa-tunnel).

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.constructions-and-construction-services.constructions.tunnel-construction-delivery
classification_refsCPC 3.0 53222 — Tunnels
covered_productsAccepted physical transport tunnel entities and explicitly related underground railway constructions
excluded_productsUnderpasses; rail lines; mining tunnels; aqueducts; services; standalone machinery/materials
representative_productOne specified and measured complete tunnel delivery unit
production_routeActual project excavation/support/lining/installation route, including mixed-route interfaces
market_stateCompleted and accepted asset at its declared site; not an assumed operational-service output

3. Reference Flow

FieldValue
WhatAn enclosed road/rail transport passage and declared related underground structures
How muchOne complete delivery unit with measured tunnel length, bore count, clear cross-sections, component extents and capacity configuration
How wellAs-built geometry, ground/structural/waterproofing and installed-system specifications reconciled with actual acceptance records
How long or cycleActual construction start through acceptance; operation duration and service life are excluded unless separately evidenced and modelled
reference_flow_linkreference_tunnel
FieldValue
Reference amount1
Reference product flowCompleted tunnel construction delivery unit
Reference flow propertyNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345
Reference unit groupUnits of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159
Reference unititem
Required qualifierssite and coordinates; acceptance/contract ID and date; transport function; measured length and bore count; clear/excavated sections; ground and groundwater; excavation routes; lining/material state; portals/shafts/cross-passages/caverns; drainage/ventilation/fire/lighting/control system scope; road/rail interfaces; complete delivery and temporary-work restoration; boundary stages

Here item is the same count unit as public Item(s); 件 is its Chinese display. Geometry qualifies the physical delivery and does not create a universal per-metre result. Product UUID remains unresolved; use this candidate only with that limitation disclosed.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
delivery_countreference productNumber of itemsitemUse 1 item for one complete accepted declared tunnel entity; collect using cp_delivery. Every exchange uses the same delivery boundary.
geometryreference productLength; Area; Volumem; m2; m3Collect measured as-built centreline lengths, sections and installed extents; preserve bore/route segmentation. Do not convert an asset count to mass or length without actual scope and measurement evidence.
numerator_unitsall inventory rowsActual selected reference propertyrow-specific unitKeep mass, volume, length, count and energy distinct. Density, linear mass, concentration and heating value must come from actual matching batches and state/temperature; no nominal 1000 kg/m3 water density or generic concrete density. Preserve public flow reference properties.
energy_conversionpower_lv; power_mvNet calorific valueMJ1 kWh = 3.6 MJ; preserve the original energy-property identity, not Mass. Diesel is separately measured in kg and fuel heat does not imply electricity output.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionDeclared site and actual existing ground/structures before the recorded construction works; supplied materials/components cross at the stated site gate
starting_condition_roleuser_defined_foreground_boundary
product_classification_scopeCPC 3.0 53222
recursive_input_ruleExisting/reused tunnel parts require explicit inherited condition and prior burdens; do not recurse into another unbounded tunnel or treat an existing asset as burden-free
upstream_dataset_requirementMatch manufacture and delivery transport separately by material/component state, region, date and gate; do not add constituent burdens already in purchased segments/elements
disclosureSite construction-to-acceptance foreground; disclose every added upstream, transport, treatment and downstream stage. Not complete cradle-to-gate or whole life by default
rule_idrulesource_ids
boundary_workInclude actual access/launch shafts, excavation and muck haul, ground improvement, support, lining, portals, dewatering, installation, testing, rework and temporary-work restoration attributable to delivery. Each actual work package needs its atomic inventory; examples below are not a universal exhaustive recipe.fhwa-tunnel
boundary_stageSeparate purchased-material/equipment manufacture, external transport, site works, off-site treatment, later operation, actual maintenance/replacement, demolition and destination. Excluded/unmeasured stages retain coverage gaps; do not claim full-life results or avoided-burden credits.
boundary_interfacesRecord road/rail track and station interfaces from actual acceptance scope; related underground construction belongs here only when explicitly included. Public highway manual supports civil route context, not railway system design or regulatory compliance.un-cpc; fhwa-tunnel

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
cut_coverCut-and-cover excavation and supportconditionalWhere actual top-down or bottom-up tunnel worksforegroundper declared reference flow
minedMined excavation and initial ground supportconditionalWhere drill-and-blast or sequential/mechanical excavationforegroundper declared reference flow
boredBored excavation, muck transfer and conditioningconditionalWhere TBM, EPB or slurry shield is actually usedforegroundper declared reference flow
immersedImmersed trench preparation, towing, placement and joiningconditionalWhere actual immersed-tube constructionforegroundper declared reference flow
jackedBox jacking, excavation and joint completionconditionalWhere actual jacked-box tunnel constructionforegroundper declared reference flow
liningPermanent structure, lining, waterproofing and portalsconditionalActual specified structural and waterproofing work; no assumed universal liningforegroundper declared reference flow
systemsPermanent drainage and specified installed systemsconditionalActual delivery scope; record every specified componentforegroundper declared reference flow
site_operationCross-work-package energy, water, logistics, waste and releasesrequiredAll actual site work including access, shafts, temporary works and restorationforegroundper declared reference flow
acceptanceInspection, testing, completion and physical deliveryrequiredAll accepted tunnel deliveriesforegroundper declared reference flow

Attribute shared site-operation exchanges to actual work packages using meters/logs; their central listing does not imply omission from excavation or lining. Immersed-element prefabrication outside the site is upstream; a project casting basin inside the boundary instead requires its measured constituent and fabrication process inventory. Mechanical shield work distinguishes excavation, face conditioning, slurry separation, muck transport, segment assembly and annular injection. Top-down and bottom-up work retain their actual sequence. Safety/geotechnical observation and acceptance records remain required context, with no invented design loads (fhwa-tunnel).

Process: Cut-and-cover excavation and support (cut_cover)

Inputs

Product flows
Fabricated steel sheet pile for excavation support (support_pile)

Where actual cut-and-cover excavation uses sheet piles; distinguish retained piles from reusable support. Allocate reusable pile manufacture through the same-asset ledger; never charge full manufacture at each project.

  • Selected flow: Fabricated steel sheet pile for excavation support
  • Flow property / unit: Mass / kg
  • Amount rule: Separate new supplied piles permanently incorporated or consumed from reusable or previously used piles. For the new-consumed portion use measured attributable gross receipts + opening stock - verified returns/transfers - closing reusable stock, retaining consumed losses, with cp_materials. For reusable or previously used piles use measured asset net mass multiplied by the evidenced dimensionless manufacturing share under the section 8 same-asset manufacturing calculation and cp_assets; returning the physical pile does not cancel its use share. Prior manufacture already assigned is never charged again, including if a previously used pile is finally retained or lost. Keep physical delivery/return/incorporation/loss movements separate and do not count the same pile in both branches.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assets
Imported uncontaminated mineral soil for tunnel backfill (backfill)

Only imported soil actually used above/around the completed cut-and-cover structure; record moisture, compaction and provenance. Site soil reused internally is not an external input.

  • Selected flow: Imported uncontaminated mineral soil for tunnel backfill
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Mined excavation and initial ground support (mined)

Inputs

Product flows
Emulsion Explosive (explosive)

Only drill-and-blast using sensitized ammonium-nitrate water-in-oil emulsion explosive; not ANFO or blasting-service identity. Separate actual detonator and fuse inputs by their specifications. Mechanical excavation does not require explosives.

  • Selected flow: Emulsion Explosive eb58ee82-ee46-4306-baef-51dfef1d1ccc
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual charged mass, returned stock, misfires and controlled disposal from blast records.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_blasting
Finished steel rock bolt (rock_bolt)

Where the actual ground support uses steel rock bolts; record grade, profile, dimensions, embedded length and coating. Grout and resin are separate supplies.

  • Selected flow: Finished steel rock bolt
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Fabricated steel tunnel support rib (steel_rib)

When installed for staged excavation; count and weigh the supplied configuration, distinguishing initial support from final lining reinforcement.

  • Selected flow: Fabricated steel tunnel support rib
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Wet-mix shotcrete before spraying (wet_shotcrete)

Only actual wet-mix supply, with declared mix, fibres, strength specification and included additives. Record rebound and overspray separately; dry-mix route requires its separate actual constituent rows and measured water.

  • Selected flow: Wet-mix shotcrete before spraying
  • Flow property / unit: Volume / m3
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Bored excavation, muck transfer and conditioning (bored)

Inputs

Product flows
Bentonite powder for tunnel slurry (bentonite)

Only slurry-shield or ground-treatment use confirmed by the actual recipe; distinguish purchased powder from carrier water and internally recirculated slurry. EPB excavation does not automatically require bentonite.

  • Selected flow: Bentonite powder for tunnel slurry
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Aqueous sodium alkyl ether sulfate soil-conditioning concentrate (conditioning)

Conditional on actual EPB conditioning with this chemically identified concentrate. Collect supplier composition, concentration and dilution; other surfactants/polymers need distinct atomic rows, without inventing a universal foam recipe.

  • Selected flow: Aqueous sodium alkyl ether sulfate soil-conditioning concentrate
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Complete tunnel boring machine manufacturing share (tbm_share)

Where equipment manufacture is included: use the actual configured machine count multiplied by a dimensionless project share based on supported cumulative activity. Retain cross-project ledger and cumulative shares ≤1. Unknown lifetime activity keeps this contribution under review; no default service life.

  • Selected flow: Complete tunnel boring machine manufacturing share
  • Flow property / unit: Number of items / item
  • Amount rule: Record attributed machine count and supported manufacturing share separately; disclose missing denominator rather than resetting manufacture per tunnel.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assets
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Immersed trench preparation, towing, placement and joining (immersed)

Inputs

Product flows
Prefabricated reinforced-concrete immersed tunnel element (immersed_element)

For concrete immersed tubes fabricated outside the foreground gate: record complete element dimensions, bulkhead/configuration and included components. Do not duplicate its embodied concrete/rebar; steel-shell tube routes require a separate actual shell element row.

  • Selected flow: Prefabricated reinforced-concrete immersed tunnel element
  • Flow property / unit: Number of items / item
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Rubber immersion-joint sealing gasket (seal)

Only supplied separately from the prefabricated element; record actual rubber formulation, profile, joint count and installed mass.

  • Selected flow: Rubber immersion-joint sealing gasket
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Crushed granite foundation bedding aggregate (bed_stone)

Where this lithology is actually placed in the prepared trench/foundation; state grading, moisture, bed geometry and protective fill distinction. Other bedding materials need separate rows.

  • Selected flow: Crushed granite foundation bedding aggregate
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Dredged mineral sediment sent for disposal (dredged_sediment)

Only trench sediment leaving as waste; record sampling/contamination status, moisture and receiving site. In-site moved or sold reusable sediment is not this disposal flow.

  • Selected flow: Dredged mineral sediment sent for disposal
  • Flow property / unit: Mass / kg
  • Amount rule: Use dispatch weighbridge quantities and reconcile dredging, reuse, stock and disposal.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
Elementary flows

Process: Box jacking, excavation and joint completion (jacked)

Inputs

Product flows
Prefabricated reinforced-concrete jacked tunnel box (jacked_box)

Only jacked-box tunnel construction within CPC tunnel scope, not ordinary vehicular/pedestrian underpass. Record box geometry, joining, jacking supports, lubrication and included components independently.

  • Selected flow: Prefabricated reinforced-concrete jacked tunnel box
  • Flow property / unit: Number of items / item
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Permanent structure, lining, waterproofing and portals (lining)

Inputs

Product flows
Ready-mixed concrete before tunnel placement (concrete)

For site-cast lining, invert, portals, cut-and-cover structure or related underground works: collect grade, recipe, fresh state and included admixtures. Installed concrete and prefabricated-component identities cannot substitute for delivered fresh mix. Site mixing must replace the mix row with separate actual ingredients and mixing energy.

  • Selected flow: Ready-mixed concrete before tunnel placement
  • Flow property / unit: Volume / m3
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Finished reinforcing steel bar for tunnel concrete (rebar)

Record actual alloy, grade, straight/coil/cut/bent supply, mesh distinction and installed schedule; steel inside purchased segments or elements is not added again.

  • Selected flow: Finished reinforcing steel bar for tunnel concrete
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Precast reinforced-concrete tunnel lining segment (segment)

For segmental bored-tunnel lining; record geometry, ring assembly, reinforcement, gaskets and bolts included in supply. Separate site assembly energy, annular grout and only separately supplied components.

  • Selected flow: Precast reinforced-concrete tunnel lining segment
  • Flow property / unit: Number of items / item
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Cementitious tunnel annulus grout before injection (grout)

Only actual injected cementitious annulus grout; record recipe, concentration, injected volume and returned slurry. Rock-bolt anchoring grout and ground treatment differ and require separate rows when used.

  • Selected flow: Cementitious tunnel annulus grout before injection
  • Flow property / unit: Volume / m3
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Finished PVC tunnel waterproofing membrane (membrane)

Where actual lining design uses PVC sheet; record thickness, reinforcement, installed area and supplier mass per area. Other polymers are different rows; overlap and offcuts are measured, not a default loss factor.

  • Selected flow: Finished PVC tunnel waterproofing membrane
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Permanent drainage and specified installed systems (systems)

Inputs

Product flows
Perforated HDPE tunnel drainage pipe (drainpipe)

Only where actual permanent drainage uses perforated HDPE pipe; record bore, wall, length, fittings and mass per length. Other drainage pipe materials require separate rows.

  • Selected flow: Perforated HDPE tunnel drainage pipe
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Complete tunnel jet ventilation fan (fan)

Where specified for the accepted asset; record model, thrust, power, control and installed count. Construction ventilation consumption is separate from installed equipment and later operation.

  • Selected flow: Complete tunnel jet ventilation fan
  • Flow property / unit: Number of items / item
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Complete tunnel drainage pump (pump)

Only installed permanent pump; record duty, head, flow rate and actual configuration. Temporary pumping fuel/electricity belongs to site operation. Public mass-based generic pump does not imply a count-to-mass conversion.

  • Selected flow: Complete tunnel drainage pump
  • Flow property / unit: Number of items / item
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Low-voltage cable (cable)

Only actual CN-supplied GB/T 12706.1-2020 low-voltage cable matching the public product specification. Preserve Length and metres; collect conductor, section, insulation, voltage and cut loss. Other origin/specification cables need another identity without restricting tunnel geography.

  • Selected flow: Low-voltage cable 49101b44-20cc-46a0-adfb-af07e4cc8908
  • Flow property / unit: Length / m
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Complete LED tunnel luminaire (light)

Conditional on installed LED lighting; record model, power, housing and controls included. Other luminaires, fire equipment and controls require individually specified rows in the actual project inventory.

  • Selected flow: Complete LED tunnel luminaire
  • Flow property / unit: Number of items / item
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Cross-work-package energy, water, logistics, waste and releases (site_operation)

Inputs

Product flows
Diesel fuel (diesel)

For actual diesel-fired excavation, haulage, generator, crane, tow or construction equipment inside the foreground boundary. Public identity leaves fuel grade/refinery/provider unspecified; dataset must collect grade, blend and supply. Fuel production burden and combustion are separate.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass / kg
  • Amount rule: Use tank/delivery/return balance or calibrated equipment consumption; volume-to-mass uses actual batch density and temperature, never a default.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy
Alternating current (power_lv)

Only actual CN user-end supply at <1 kV; separate meter and provider. This row is not universal electricity, plant generation or a different voltage. Other actual supplies require their own identity. Includes attributable pumping, excavation, ventilation, assembly and acceptance tests without double-counting submeter totals.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Meter actual attributable consumption; 1 kWh = 3.6 MJ; retain the public Net calorific value property and energy unit group.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy
Alternating current (power_mv)

Only actual CN user-end supply at 1–35 kV; separate meter and provider. This row is not universal electricity, plant generation or a different voltage. Other actual supplies require their own identity. Includes attributable pumping, excavation, ventilation, assembly and acceptance tests without double-counting submeter totals.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Meter actual attributable consumption; 1 kWh = 3.6 MJ; retain the public Net calorific value property and energy unit group.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy
Treated mains water supplied to tunnel construction site (mains_water)

Actual drilling, concrete curing, washing, mixing or dust suppression supply; record location, provider and delivery gate. Internal reuse is not fresh input.

  • Selected flow: Treated mains water supplied to tunnel construction site
  • Flow property / unit: Volume / m3
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_water
lubricating oil (pao)

Only actual fully synthetic PAO (poly alpha olefin) lubricant supply; generic comment does not override this route. Mineral oil, grease and different formulations need separate identities.

  • Selected flow: lubricating oil aec6f1a5-7b09-4704-870d-434d3ada0edd
  • Flow property / unit: Mass / kg
  • Amount rule: Record actual attributable deliveries less returns and stock changes; separate incorporation from loss.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
Waste flows
Elementary flows
ground water (groundwater)

Only actual fresh-groundwater withdrawal from the environment, public resource-from-water identity; collect aquifer, salinity, extraction country, pumping purpose and abstraction volume. Country-specific scarcity characterization uses the actual process country, never an assumed scarcity class. Dewatering, purchased water and discharged water are separately balanced; do not label water-resource abstraction as wastewater.

  • Selected flow: ground water 4f462198-40cd-4184-8733-86648a20dc3f
  • Flow property / unit: Volume / m3
  • Amount rule: Measure actual abstraction volume; keep rainwater, natural ingress and recirculation distinct.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_water

Outputs

Product flows
Waste flows
Uncontaminated excavated mineral soil sent for disposal (soil_waste)

Only actual soil waste crossing the site gate. Determine composition, moisture/contamination, legal waste/product status and receiver. Do not merge with other excavated streams or discharges.

  • Selected flow: Uncontaminated excavated mineral soil sent for disposal
  • Flow property / unit: Mass / kg
  • Amount rule: Use actual dispatched quantities and destination records; reconcile with measured supply, incorporation, reuse and stocks.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
Excavated rock sent for disposal (rock_waste)

Only actual rock waste crossing the site gate. Determine composition, moisture/contamination, legal waste/product status and receiver. Do not merge with other excavated streams or discharges.

  • Selected flow: Excavated rock sent for disposal
  • Flow property / unit: Mass / kg
  • Amount rule: Use actual dispatched quantities and destination records; reconcile with measured supply, incorporation, reuse and stocks.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
Spent bentonite tunnel excavation slurry sent for treatment (slurry_waste)

Only actual bentonite slurry waste crossing the site gate. Determine composition, moisture/contamination, legal waste/product status and receiver. Do not merge with other excavated streams or discharges.

  • Selected flow: Spent bentonite tunnel excavation slurry sent for treatment
  • Flow property / unit: Mass / kg
  • Amount rule: Use actual dispatched quantities and destination records; reconcile with measured supply, incorporation, reuse and stocks.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
Hardened concrete construction offcut (concrete_waste)

Only actual hardened concrete waste crossing the site gate. Determine composition, moisture/contamination, legal waste/product status and receiver. Do not merge with other excavated streams or discharges.

  • Selected flow: Hardened concrete construction offcut
  • Flow property / unit: Mass / kg
  • Amount rule: Use actual dispatched quantities and destination records; reconcile with measured supply, incorporation, reuse and stocks.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
Contained concrete washout liquid sent for treatment (washout)

Only actual concrete washout liquid waste crossing the site gate. Determine composition, moisture/contamination, legal waste/product status and receiver. Do not merge with other excavated streams or discharges.

  • Selected flow: Contained concrete washout liquid sent for treatment
  • Flow property / unit: Mass / kg
  • Amount rule: Use actual dispatched quantities and destination records; reconcile with measured supply, incorporation, reuse and stocks.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
Spent PAO lubricating oil sent for treatment (oil_waste)

Only actual spent pao oil waste crossing the site gate. Determine composition, moisture/contamination, legal waste/product status and receiver. Do not merge with other excavated streams or discharges.

  • Selected flow: Spent PAO lubricating oil sent for treatment
  • Flow property / unit: Mass / kg
  • Amount rule: Use actual dispatched quantities and destination records; reconcile with measured supply, incorporation, reuse and stocks.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
Elementary flows
Construction drainage water discharged to river (water_return)

Only actual release to the receiving freshwater river; record treatment and actual composition, suspended solids and dissolved constituents as separate measured rows. A contained treatment-bound waste is not this release.

  • Selected flow: Water 5e50fc01-19c6-4377-a1cc-bc65a12498ea
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Measure actual discharge, reconcile ingress/abstraction/reuse and water retained or exported.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_water
carbon dioxide (fossil) (co2)

Conditional on fossil-fuel combustion. Immediate emission to air, unspecified subcompartment only where finer receptor compartment is unavailable and disclosed; use a more specific public identity when location supports it. Underground workplace concentration is not automatically an external emission: resolve tunnel ventilation, portal release and captured fractions. Do not infer mandatory emission or species from fuel alone.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Use representative site measurement or traceable equipment/process model with actual activity, species, control efficiency and source uncertainty; never invent a factor or split total NOx without speciation evidence.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_emissions
nitrogen monoxide (no)

Conditional on measured/modelled NO from actual combustion or blasting. Immediate emission to air, unspecified subcompartment only where finer receptor compartment is unavailable and disclosed; use a more specific public identity when location supports it. Underground workplace concentration is not automatically an external emission: resolve tunnel ventilation, portal release and captured fractions. Do not infer mandatory emission or species from fuel alone.

  • Selected flow: nitrogen monoxide 08a91e70-3ddc-11dd-96ee-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Use representative site measurement or traceable equipment/process model with actual activity, species, control efficiency and source uncertainty; never invent a factor or split total NOx without speciation evidence.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_emissions
nitrogen dioxide (no2)

Conditional on measured/modelled NO₂ from actual combustion or blasting. Immediate emission to air, unspecified subcompartment only where finer receptor compartment is unavailable and disclosed; use a more specific public identity when location supports it. Underground workplace concentration is not automatically an external emission: resolve tunnel ventilation, portal release and captured fractions. Do not infer mandatory emission or species from fuel alone.

  • Selected flow: nitrogen dioxide 08a91e70-3ddc-11dd-96e5-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Use representative site measurement or traceable equipment/process model with actual activity, species, control efficiency and source uncertainty; never invent a factor or split total NOx without speciation evidence.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_emissions
particles (PM10) (pm10)

Conditional on actual measured/modelled PM10 from excavation, transfer or exhaust. Immediate emission to air, unspecified subcompartment only where finer receptor compartment is unavailable and disclosed; use a more specific public identity when location supports it. Underground workplace concentration is not automatically an external emission: resolve tunnel ventilation, portal release and captured fractions. Do not infer mandatory emission or species from fuel alone.

  • Selected flow: particles (PM10) 08a91e70-3ddc-11dd-91be-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Use representative site measurement or traceable equipment/process model with actual activity, species, control efficiency and source uncertainty; never invent a factor or split total NOx without speciation evidence.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_emissions

Process: Inspection, testing, completion and physical delivery (acceptance)

Inputs

Product flows
Waste flows
Elementary flows

Outputs

Product flows
Completed tunnel construction delivery unit (reference_tunnel)

One complete declared and accepted physical tunnel entity, with actual measured geometry and component schedule; testing, rework and temporary-work removal within the agreed delivery boundary are included. No hypothetical asset mass or service lifetime.

  • Selected flow: Completed tunnel construction delivery unit
  • Flow property / unit: Number of items / item
  • Amount rule: 1 item
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_delivery
Waste flows
Elementary flows

7. Allocation and Co-product Handling

rule_idrulesource_ids
allocation_subdivideFirst subdivide records by work package, bore, route and delivery. Attribute shared electricity, haul and pumping by causal metered energy, measured transported mass-distance or actual pumping activity. Collect the real activity and all beneficiaries; no allocation by arbitrary project cost or default tunnel length. Retain formula, physical units and uncertainty.
allocation_reuseFor machines and reusable piles/formwork, use supported cumulative activity or reuse history of the same asset to assign a dimensionless share of manufacturing burdens. Sum of prior, current and future assigned shares must not exceed one; never reset the full burden per project. Actual machine mass/count, net configuration and ledger are collected separately; missing lifespan/activity denominator stays review, not assumed zero. Keep maintenance and consumption separate.
allocation_excavationReconcile excavation volume/mass, internal reuse, off-site reuse/sale, disposal and stock by material and moisture. Excavated rock/soil is not automatically a co-product or a credit. If real co-production remains after subdivision, justify a physical causal allocation with receiving-product evidence; economic fallback needs actual values and sensitivity review. No default avoided landfill or virgin aggregate credit.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_deliveryacceptanceaccepted physical tunnelforeground_recordcontract/site; as-built length, bores, sections, routes, quantities, systems; inspection and acceptance; start/end dates; interfacesReconcile signed completion/acceptance, measured as-built survey and component schedule for the same complete delivery; no assumed geometry or lifespanitem; m; m2; m3each task, batch or event and delivery reconciliationactual construction start through acceptance including reworksame declared site/delivery boundaryper declared reference flowcalibration, raw tickets, as-built survey, certificates and scope reconciliation
cp_materialsall foreground processeseach separate supplied material/componentforeground_recordrow_id; supply identity/state/composition; quantity; batch; concentration; grade; included components; receipt/return/stock; unit; density/linear mass where usedUse calibrated delivery measurements and supplier certificates; reconcile installed quantities and losses; each actual chemical/component is independent, including additional actual site-mixed constituentskg; m3; item; meach task, batch or event and delivery reconciliationactual construction start through acceptance including reworksame declared site/delivery boundaryper declared reference flowcalibration, raw tickets, as-built survey, certificates and scope reconciliation
cp_blastingminedemulsion explosiveforeground_recordcharge kg; blast ID; holes; explosive specification; returns; misfire; detonator/fuse specification; ventilation and fume controlReconcile actual authorized blast logs and stock balance; no presumed charge per metre or universal emission factorkgeach task, batch or event and delivery reconciliationactual construction start through acceptance including reworksame declared site/delivery boundaryper declared reference flowcalibration, raw tickets, as-built survey, certificates and scope reconciliation
cp_energysite_operationdiesel; electricity and actual additional carriersforeground_recordrow_id; equipment/task; tank/meter ID; energy/fuel; region; voltage; provider; dates; returns/stocks; activity; density/heating value basisUse calibrated meter and fuel records per task, including standby, ventilation, slurry separation, towing and tests; reconcile submeter totals without double countingkg; MJeach task, batch or event and delivery reconciliationactual construction start through acceptance including reworksame declared site/delivery boundaryper declared reference flowcalibration, raw tickets, as-built survey, certificates and scope reconciliation
cp_watersite_operationsupply; abstraction; drainage; contained liquidforeground_recordrow_id; origin; aquifer/recipient; salinity; meter; volume; reuse; ingress/rain; treatment; sampling; concentration; exportsMeter supply, abstraction and discharge separately; use actual representative sampling for released species and separate contained waste; do not assume all ingress is resource consumption or clean drainagem3; kgeach task, batch or event and delivery reconciliationactual construction start through acceptance including reworksame declared site/delivery boundaryper declared reference flowcalibration, raw tickets, as-built survey, certificates and scope reconciliation
cp_wastesite_operation; immersedeach separate physical waste streamforeground_recordrow_id; process; classification; composition; moisture; calibrated weight; destination; receiver; internal reuse; stockReconcile weighbridge/receiver evidence per stream; distinguish contaminated soil, sediment, hardened concrete and liquid slurry; no mixed waste label substitutes for actual exchangeskgeach task, batch or event and delivery reconciliationactual construction start through acceptance including reworksame declared site/delivery boundaryper declared reference flowcalibration, raw tickets, as-built survey, certificates and scope reconciliation
cp_emissionssite_operationeach actual elementary substanceforeground_recordrow_id; species/CAS; fossil/biogenic; medium/submedium; timing; concentration; flow/duration; actual activity; control; model/factor source; uncertaintyUse representative actual measurements or traceable site/equipment-specific models; distinguish portal/environment release from indoor exposure, captured fractions and total NOx; retain missing scopekgeach task, batch or event and delivery reconciliationactual construction start through acceptance including reworksame declared site/delivery boundaryper declared reference flowcalibration, raw tickets, as-built survey, certificates and scope reconciliation
cp_assetsall foreground processesreusable machine/component manufacturing sharesforeground_recordasset ID; actual count/net mass and configuration; manufacturing scope; project activity; supported cumulative activity/use history; prior/current shares; remaining shares; repair ; support_pile new/previously-used status; permanent/consumed versus reusable portion; physical receipts/returns/closing stock/incorporation/loss; prior assigned manufactureReconcile same-asset cross-project ledger and supplier records; audit cumulative shares ≤1; unknown denominator or physical conversion requires review without resetting full manufacture For support_pile, reconcile new-consumed material through cp_materials separately from reusable/previously-used asset mass times its conserved share; a returned reusable pile retains this project manufacturing share. A formerly used pile retained or lost may receive only a justified remaining share, never fresh full manufacture. Prevent duplicate attribution between branches and retain physical movements separately.item; kg; heach task, batch or event and delivery reconciliationactual construction start through acceptance including reworksame declared site/delivery boundaryper declared reference flowcalibration, raw tickets, as-built survey, certificates and scope reconciliation

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
delivery_basisall inventory rowsAggregate each atomic exchange attributable to the same accepted delivery; report per declared reference flow, preserving each numerator unit. No arbitrary division by mass, kilometre or lifetime.cp_delivery; cp_materials; cp_blasting; cp_energy; cp_water; cp_waste; cp_emissionsexchange quantity per declared reference flow
complete_outputreference_tunnelOne complete accepted declared entity = 1 item; incomplete/rejected work is not accepted output, but its attributable burden is retained.cp_deliveryreference_tunnel
physical_conversionall inventory rowsUse section 4 with actual matching-batch physical records; retain source quantity, units, measured density/linear mass/concentration and temperature, formula and uncertainty. Unsupported relationships remain review.cp_materials; cp_energy; cp_water; cp_emissionstraceable numerator quantities
asset_attributionsupport_pile; tbm_shareApply section 7 same-asset manufacturing shares to tbm_share and the reusable or previously used portion of support_pile: measured asset count or net mass × evidenced dimensionless share based on supported cumulative activity. Conserve cumulative assigned manufacture ≤1 across all projects/periods; physical return does not set the share to zero, and later retention/loss never resets full manufacture. The new permanently incorporated/consumed support_pile portion follows its separate cp_materials stock balance, not this asset-use formula. Do not replace an unknown denominator or prior ledger with a default.cp_assetsattributed manufacturing contribution and limitations

Data Quality Requirements

requirement_idApplies toRequirementEvidence
identityall inventory rowsVerify substance, composition, route, geography, voltage, gate, physical state, compartment and original reference property/unit; UUID name alone is insufficient.supplier certificates and public identity originals
coverageall foreground processesReconcile every actual work package and installed component, temporary construction and removal, energy, water, loss, waste and release. Add actual atomic rows not in these conditional examples; distinguish absent, excluded and unmeasured.bill of quantities and gap ledger
time_groundall inventory rowsMatch actual construction dates, ground/hydrogeology and site supply; historical manual is qualitative process context only, not a current statutory specification or generic factor.ground records, dates and certificates
noisesite_operationCollect actual construction noise/vibration monitoring, location and duration separately. dB is not an additive physical mass or sound-energy exchange; without supported property relationship disclose non-LCI evidence and coverage.environmental monitoring and site records
uncertaintyall inventory rowsKeep measurement, conversion, allocation and background-link uncertainty; no missing-data-to-zero substitution. Retain unresolved identities and unsupported shares for independent review.calibration, sensitivity and evidence ledger

9. Validation Rules

rule_idrule
validate_referenceReference product name equals reference_tunnel selected flow; 1 item represents the same complete accepted delivery in cp_delivery and all inventory bases; geometry and system interfaces are explicit.
validate_routesActual construction records determine all route conditions; do not replace tunnel scope with a smaller material or easier geography to match identity. Ground improvement, dry/wet spraying, lining and jacking differences retain complete actual inventories.
validate_balanceReconcile excavation, reuse, import, disposal, moisture and stock; supplied materials, installed quantities and losses; pump water balance and energy meters; same-asset shares across projects ≤1.
validate_emissionNO, NO₂ and N₂O, PM10 and larger particles, fossil and biogenic carbon, environmental abstraction and waste/discharge are distinct. Verify actual release and medium; no presumed emission factors or indoor-to-environment conversion.
validate_completenessMissing identity, measurement, tasks, unsupported conversions/shares and separately excluded lifecycle stages remain explicit gaps. Mechanical check success does not approve methodology or engineering acceptance.

10. Published Dataset Profile

FieldValue
dataset_roleSite-specific tunnel construction-to-acceptance foreground data package
downstream_useExplicitly configured tunnel asset comparison or linkage to separately matched upstream/downstream datasets
allowed_useDeclared physical delivery with measured geometry, actual route and transparent stage coverage
excluded_useDefault whole-life/cradle-to-gate claim; operational transport service; universal per-km value; default lifespan, mass, recipe or compliance approval
required_metadataPCR/version; qualifiers; acceptance/as-built scope; route/ground; start/end; quantities; source units; allocation; supply gates; installed and excluded systems
required_quality_disclosureMissing identity/measurements/tasks; background manufacture/transport/treatment coverage; real equipment shares; uncertainty; actual maintenance/demolition coverage; scientific review pending
update_triggerDesign, route, ground, geometry, delivery interfaces, material state, supply, installed systems, construction/testing or lifecycle coverage change

11. Data Sources

Source idTypeReferenceUsed for
un-cpcofficial_guidanceUN Statistics Division, CPC Version 3.0 Explanatory Notes, 30 June 2025, printed/PDF p.279. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdfTransport tunnel inclusion and explicit adjacent-class exclusions; classification only, no quantities
fhwa-tunnelhandbookFHWA, Technical Manual for Design and Construction of Road Tunnels — Civil Elements, FHWA-NHI-09-010, March 2009. Ch.1 p.1-1 (PDF35), Ch.5 p.5-1 (PDF121), Ch.7 p.7-1 (PDF211), Ch.10 p.10-1 (PDF317), Ch.11 p.11-1 (PDF349). https://www.fhwa.dot.gov/bridge/tunnel/pubs/nhi09010/tunnel_manual.pdfHistorical qualitative civil-route, excavation support, lining and immersed-element process context; no adopted design loads, quantities, service life or emission factors; actual project specifications control applicability

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 3
Rule IDApplies toRuleSource IDs
boundary_workforeground_system_boundaryInclude actual access/launch shafts, excavation and muck haul, ground improvement, support, lining, portals, dewatering, installation, testing, rework and temporary-work restoration attributable to delivery. Each actual work package needs its atomic inventory; examples below are not a universal exhaustive recipe.fhwa-tunnel
boundary_stageforeground_system_boundarySeparate purchased-material/equipment manufacture, external transport, site works, off-site treatment, later operation, actual maintenance/replacement, demolition and destination. Excluded/unmeasured stages retain coverage gaps; do not claim full-life results or avoided-burden credits.
boundary_interfacesforeground_system_boundaryRecord road/rail track and station interfaces from actual acceptance scope; related underground construction belongs here only when explicitly included. Public highway manual supports civil route context, not railway system design or regulatory compliance.un-cpc, fhwa-tunnel
Allocation rules · 3
Rule IDApplies toRuleSource IDs
allocation_subdivideforeground_burden_allocationFirst subdivide records by work package, bore, route and delivery. Attribute shared electricity, haul and pumping by causal metered energy, measured transported mass-distance or actual pumping activity. Collect the real activity and all beneficiaries; no allocation by arbitrary project cost or default tunnel length. Retain formula, physical units and uncertainty.
allocation_reuseforeground_burden_allocationFor machines and reusable piles/formwork, use supported cumulative activity or reuse history of the same asset to assign a dimensionless share of manufacturing burdens. Sum of prior, current and future assigned shares must not exceed one; never reset the full burden per project. Actual machine mass/count, net configuration and ledger are collected separately; missing lifespan/activity denominator stays review, not assumed zero. Keep maintenance and consumption separate.
allocation_excavationforeground_burden_allocationReconcile excavation volume/mass, internal reuse, off-site reuse/sale, disposal and stock by material and moisture. Excavated rock/soil is not automatically a co-product or a credit. If real co-production remains after subdivision, justify a physical causal allocation with receiving-product evidence; economic fallback needs actual values and sensitivity review. No default avoided landfill or virgin aggregate credit.
Validation rules · 5
Rule IDApplies toRuleSource IDs
validate_referenceforeground_dataset_conformanceReference product name equals reference_tunnel selected flow; 1 item represents the same complete accepted delivery in cp_delivery and all inventory bases; geometry and system interfaces are explicit.
validate_routesforeground_dataset_conformanceActual construction records determine all route conditions; do not replace tunnel scope with a smaller material or easier geography to match identity. Ground improvement, dry/wet spraying, lining and jacking differences retain complete actual inventories.
validate_balanceforeground_dataset_conformanceReconcile excavation, reuse, import, disposal, moisture and stock; supplied materials, installed quantities and losses; pump water balance and energy meters; same-asset shares across projects ≤1.
validate_emissionforeground_dataset_conformanceNO, NO₂ and N₂O, PM10 and larger particles, fossil and biogenic carbon, environmental abstraction and waste/discharge are distinct. Verify actual release and medium; no presumed emission factors or indoor-to-environment conversion.
validate_completenessforeground_dataset_conformanceMissing identity, measurement, tasks, unsupported conversions/shares and separately excluded lifecycle stages remain explicit gaps. Mechanical check success does not approve methodology or engineering acceptance.
Processes and inputs/outputs · 9
Process IDProcess nameInput flowsOutput flows
cut_coverCut-and-cover excavation and support20
minedMined excavation and initial ground support40
boredBored excavation, muck transfer and conditioning30
immersedImmersed trench preparation, towing, placement and joining31
jackedBox jacking, excavation and joint completion10
liningPermanent structure, lining, waterproofing and portals50
systemsPermanent drainage and specified installed systems50
site_operationCross-work-package energy, water, logistics, waste and releases611
acceptanceInspection, testing, completion and physical delivery01

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.