Construction and delivery of outdoor sport and recreation facilities · Data Quality Requirements
- Lifecycle status
- Candidate
- Content maturity
- Authored methodology
- Current version
- 0.1.0Last updated
- Readiness
- Review required
Methodology and translation states come from the source record; publishing this website does not change their review status.
Content languages
en-US · canonicalzh-CN · Aligned
Status, classification and source details
Readiness
- Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.
Classification mapping
CPC 3.0:53270 · exact
Source
Data Quality Requirements
| requirement_id | Applies to | Requirement | Evidence |
|---|---|---|---|
| dq_entity | reference entity | Same site/perimeter/function/measured geometry/configuration/complete acceptance/establishment; no fabricated mass/life/recipe/certification | cp_handover |
| dq_material | each material/waste | Traceable lot/composition/state/gate/physical quantity/destination; disclose identity/range evidence gaps | cp_material; cp_material_drainage; cp_material_surface; cp_material_landscape; cp_material_structure; cp_material_services; cp_plant; cp_services; cp_waste; cp_waste_support; cp_waste_handover |
| dq_environment | environmental inventory | Actual receiver/species/fraction/time/representativeness; separate contaminants, unmeasured not zero, dB/NTU not forced to exchange quantity | cp_water; cp_release |
| dq_reuse | reused equipment/components | Persistent cross-project physical ledger/supported denominator/cumulative shares≤1; unknown life/activity requires review | cp_reuse |
| dq_completeness | project package | All actual routes/tasks/exchanges, individual non-applicability and separate upstream/downstream/measurement/identity coverage; candidate checks do not establish actual measured data/scientific approval | actual BOM/task ledger; cp_handover |
9. Validation Rules
| rule_id | Rule | source_ids |
|---|---|---|
| v_reference | Require one actual complete accepted configuration, site/perimeter/use, measured geometry and final establishment/acceptance endpoint; output exactly 1 item with same reference product. Not a material bundle or construction service. | un-cpc3-2025 |
| v_route | Verify required support/handover and each occurring conditional task from drawings/ledger/BOM/tests. Cover all actual components, equipment, utilities, establishment/rework/logistics/waste; unseen branches cannot be claimed complete. | se-natural-2025; se-artificial-2013; cedd-landscape-2026; defra-zoo-2012; epa-marina-2001 |
| v_identity | Adopted UUIDs must match actual substance/state/origin/route/geography/medium/time and reference property/unit. Chinese name is official baseName. Cable remains Length/m, sea intake Mass/kg, discharge Volume/m3 with matching receiver. Unresolved identities remain explicit. | un-cpc3-2025 |
| v_basis | Consistent per-declared-reference-flow inventory/protocol basis, verified physical conversions, supplied/site interfaces, stock/waste balance and conserved reuse shares; inconclusive relationships stay review. | cedd-landscape-2026 |
| v_release | No fabricated compulsory dust/exhaust or clean/zero-pollution water. Verify NO versus NO2/NOx, disjoint PM fractions, actual external transfer, correct fresh/sea receiver and separately monitored constituents. Disclose uncharacterized noise/habitat/land carbon. | epa-heavy-construction-1995; epa-marina-2001 |
| v_coverage | Report checks, findings, omissions and measurement/identity/route/stage coverage separately. Upstream links do not make this whole-life/complete cradle-to-gate/comparative-equivalence methodology; technical candidate checks grant neither scientific approval nor publication. | un-cpc3-2025 |
10. Published Dataset Profile
| Field | Value |
|---|---|
| dataset_role | Foreground construction/accepted facility entity record |
| downstream_use | secondary_dataset; background_dataset |
| allowed_use | Matched site/function/configuration and declared construction-delivery boundary; full life requires independent evidenced upstream/downstream stages |
| excluded_use | Unqualified full-life/complete cradle-to-gate/comparative equivalence; operational/husbandry service; assumed mass/life/recipe/certification/legal approval |
| required_metadata | Reference measured geometry/configuration; all routes/tasks; supply/transport; dates/acceptance/establishment; taxa/material states; grid/voltage; water resource/receiver; ledger/protocols; reuse shares; external links |
| required_quality_disclosure | Measured/modelled evidence/uncertainty/identity-range gaps; route/stage coverage; uncharacterized noise/habitat/land carbon/water contamination/missing releases; scientific review governed by metadata |
| update_trigger | Changed function/site/configuration/layers/taxa/supply/acceptance-establishment/water receiver/reuse denominator or new actual evidence/identity |
11. Data Sources
| Source id | Type | Reference | Used for |
|---|---|---|---|
| un-cpc3-2025 | official_guidance | UNSD CPC Version3.0 Explanatory Notes (30Jun2025), PDF/printed pp281–282; https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdf; retrieved 2026-10-06 | Scope only; excludes indoor sport, not methodological approval |
| se-natural-2025 | official_guidance | Sport England Natural Turf for Sport Part B (May2025), pp11–28,33–35; https://sportengland-production-files.s3.eu-west-2.amazonaws.com/s3fs-public/2025-05/NTS-Part-B-Playing-fields.pdf; retrieved 2026-10-06 | Natural turf drainage/construction alternatives and establishment; no transplanted dimensions/recipe |
| se-artificial-2013 | official_guidance | Sport England Artificial Surfaces for Outdoor Sport (Dec Revision003,2013), printed pp9–16,21–26 / PDF10–17,22–27; https://sportengland-production-files.s3.eu-west-2.amazonaws.com/s3fs-public/artificial-surfaces-for-outdoor-sports-2013.pdf; retrieved 2026-10-06 | Historical physical layers/processes only, not current certification/safety/lifetime/legality; actual specification/tests required |
| cedd-landscape-2026 | official_guidance | CEDD General Specification Civil Engineering Works 2020 Edition Vol1 Rev8 (23Jul2026), §3 pp3.3,3.14–3.15,3.18–3.24 / PDF116,127–128,131–137; https://www.cedd.gov.hk/filemanager/eng/content_978/GS%202020%20Vol%201%20Rev%208_clean.pdf; retrieved 2026-10-06 | Soil/planting and contractual establishment/acceptance; HK specifications only if adopted, no copied fixed amounts/periods |
| epa-marina-2001 | official_guidance | EPA National Management Measures Marinas and Recreational Boating (2001), §4 pp4-7,4-13,4-19,4-27,4-31,4-45,4-77; https://www.epa.gov/sites/default/files/2015-10/documents/2001_10_30_nps_mmsp_section4.pdf; retrieved 2026-10-06 | Historical new/expanded marina design/water/habitat mechanisms, selected shoreline/runoff/fueling/sewage installations; no current legal approval or factor |
| defra-zoo-2012 | official_guidance | DEFRA Standards of Modern Zoo Practice (2012), §§2.1–2.11,3.4,8.2–8.18; printed pp6–8,16–17 / PDF10–12,20–21; https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/69596/standards-of-zoo-practice.pdf; retrieved 2026-10-06 | Enclosure/drainage/access and species-specific installed configuration context; actual local acceptance, no universal loads/operation inventory |
| usga-green-2018 | official_guidance | USGA Recommendations for a Method of Putting Green Construction (2018), Steps2–8 printed pp2–15 / PDF3–16; primary authored document linked from USGA official collection; https://archive.lib.msu.edu/tic/usgamisc/monos/2018recommendationsmethodputtinggreen.pdf; retrieved 2026-10-06 | Only actual declared USGA-method greens/rootzone/establishment, not whole-course recipe; no copied layer depth/mix ratio/lifetime |
| epa-heavy-construction-1995 | official_guidance | EPA AP42 §13.2.3 Heavy Construction Operations (Jan1995), pp13.2.3-1–2; https://www.epa.gov/sites/default/files/2020-10/documents/13.2.3_heavy_construction_operations.pdf; retrieved 2026-10-06 | Historical dust mechanisms and limits of area/month TSP only, no numerical factor, molecular exhaust quantity or PM fractions adopted |
Raw downloads
These files are byte-identical to the canonical files for this revision in the repository.
Complete field inspector
Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.