TianGong PCR

Construction and delivery of outdoor sport and recreation facilities · Data Quality Requirements

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

en-US · canonicalzh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53270 · exact

Source

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_entityreference entitySame site/perimeter/function/measured geometry/configuration/complete acceptance/establishment; no fabricated mass/life/recipe/certificationcp_handover
dq_materialeach material/wasteTraceable lot/composition/state/gate/physical quantity/destination; disclose identity/range evidence gapscp_material; cp_material_drainage; cp_material_surface; cp_material_landscape; cp_material_structure; cp_material_services; cp_plant; cp_services; cp_waste; cp_waste_support; cp_waste_handover
dq_environmentenvironmental inventoryActual receiver/species/fraction/time/representativeness; separate contaminants, unmeasured not zero, dB/NTU not forced to exchange quantitycp_water; cp_release
dq_reusereused equipment/componentsPersistent cross-project physical ledger/supported denominator/cumulative shares≤1; unknown life/activity requires reviewcp_reuse
dq_completenessproject packageAll actual routes/tasks/exchanges, individual non-applicability and separate upstream/downstream/measurement/identity coverage; candidate checks do not establish actual measured data/scientific approvalactual BOM/task ledger; cp_handover

9. Validation Rules

rule_idRulesource_ids
v_referenceRequire one actual complete accepted configuration, site/perimeter/use, measured geometry and final establishment/acceptance endpoint; output exactly 1 item with same reference product. Not a material bundle or construction service.un-cpc3-2025
v_routeVerify required support/handover and each occurring conditional task from drawings/ledger/BOM/tests. Cover all actual components, equipment, utilities, establishment/rework/logistics/waste; unseen branches cannot be claimed complete.se-natural-2025; se-artificial-2013; cedd-landscape-2026; defra-zoo-2012; epa-marina-2001
v_identityAdopted UUIDs must match actual substance/state/origin/route/geography/medium/time and reference property/unit. Chinese name is official baseName. Cable remains Length/m, sea intake Mass/kg, discharge Volume/m3 with matching receiver. Unresolved identities remain explicit.un-cpc3-2025
v_basisConsistent per-declared-reference-flow inventory/protocol basis, verified physical conversions, supplied/site interfaces, stock/waste balance and conserved reuse shares; inconclusive relationships stay review.cedd-landscape-2026
v_releaseNo fabricated compulsory dust/exhaust or clean/zero-pollution water. Verify NO versus NO2/NOx, disjoint PM fractions, actual external transfer, correct fresh/sea receiver and separately monitored constituents. Disclose uncharacterized noise/habitat/land carbon.epa-heavy-construction-1995; epa-marina-2001
v_coverageReport checks, findings, omissions and measurement/identity/route/stage coverage separately. Upstream links do not make this whole-life/complete cradle-to-gate/comparative-equivalence methodology; technical candidate checks grant neither scientific approval nor publication.un-cpc3-2025

10. Published Dataset Profile

FieldValue
dataset_roleForeground construction/accepted facility entity record
downstream_usesecondary_dataset; background_dataset
allowed_useMatched site/function/configuration and declared construction-delivery boundary; full life requires independent evidenced upstream/downstream stages
excluded_useUnqualified full-life/complete cradle-to-gate/comparative equivalence; operational/husbandry service; assumed mass/life/recipe/certification/legal approval
required_metadataReference measured geometry/configuration; all routes/tasks; supply/transport; dates/acceptance/establishment; taxa/material states; grid/voltage; water resource/receiver; ledger/protocols; reuse shares; external links
required_quality_disclosureMeasured/modelled evidence/uncertainty/identity-range gaps; route/stage coverage; uncharacterized noise/habitat/land carbon/water contamination/missing releases; scientific review governed by metadata
update_triggerChanged function/site/configuration/layers/taxa/supply/acceptance-establishment/water receiver/reuse denominator or new actual evidence/identity

11. Data Sources

Source idTypeReferenceUsed for
un-cpc3-2025official_guidanceUNSD CPC Version3.0 Explanatory Notes (30Jun2025), PDF/printed pp281–282; https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdf; retrieved 2026-10-06Scope only; excludes indoor sport, not methodological approval
se-natural-2025official_guidanceSport England Natural Turf for Sport Part B (May2025), pp11–28,33–35; https://sportengland-production-files.s3.eu-west-2.amazonaws.com/s3fs-public/2025-05/NTS-Part-B-Playing-fields.pdf; retrieved 2026-10-06Natural turf drainage/construction alternatives and establishment; no transplanted dimensions/recipe
se-artificial-2013official_guidanceSport England Artificial Surfaces for Outdoor Sport (Dec Revision003,2013), printed pp9–16,21–26 / PDF10–17,22–27; https://sportengland-production-files.s3.eu-west-2.amazonaws.com/s3fs-public/artificial-surfaces-for-outdoor-sports-2013.pdf; retrieved 2026-10-06Historical physical layers/processes only, not current certification/safety/lifetime/legality; actual specification/tests required
cedd-landscape-2026official_guidanceCEDD General Specification Civil Engineering Works 2020 Edition Vol1 Rev8 (23Jul2026), §3 pp3.3,3.14–3.15,3.18–3.24 / PDF116,127–128,131–137; https://www.cedd.gov.hk/filemanager/eng/content_978/GS%202020%20Vol%201%20Rev%208_clean.pdf; retrieved 2026-10-06Soil/planting and contractual establishment/acceptance; HK specifications only if adopted, no copied fixed amounts/periods
epa-marina-2001official_guidanceEPA National Management Measures Marinas and Recreational Boating (2001), §4 pp4-7,4-13,4-19,4-27,4-31,4-45,4-77; https://www.epa.gov/sites/default/files/2015-10/documents/2001_10_30_nps_mmsp_section4.pdf; retrieved 2026-10-06Historical new/expanded marina design/water/habitat mechanisms, selected shoreline/runoff/fueling/sewage installations; no current legal approval or factor
defra-zoo-2012official_guidanceDEFRA Standards of Modern Zoo Practice (2012), §§2.1–2.11,3.4,8.2–8.18; printed pp6–8,16–17 / PDF10–12,20–21; https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/69596/standards-of-zoo-practice.pdf; retrieved 2026-10-06Enclosure/drainage/access and species-specific installed configuration context; actual local acceptance, no universal loads/operation inventory
usga-green-2018official_guidanceUSGA Recommendations for a Method of Putting Green Construction (2018), Steps2–8 printed pp2–15 / PDF3–16; primary authored document linked from USGA official collection; https://archive.lib.msu.edu/tic/usgamisc/monos/2018recommendationsmethodputtinggreen.pdf; retrieved 2026-10-06Only actual declared USGA-method greens/rootzone/establishment, not whole-course recipe; no copied layer depth/mix ratio/lifetime
epa-heavy-construction-1995official_guidanceEPA AP42 §13.2.3 Heavy Construction Operations (Jan1995), pp13.2.3-1–2; https://www.epa.gov/sites/default/files/2020-10/documents/13.2.3_heavy_construction_operations.pdf; retrieved 2026-10-06Historical dust mechanisms and limits of area/month TSP only, no numerical factor, molecular exhaust quantity or PM fractions adopted

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page