Long-distance pipeline construction delivery · 11. Data Sources
- Lifecycle status
- Candidate
- Content maturity
- Authored methodology
- Current version
- 0.1.0Last updated
- Readiness
- Review required
Methodology and translation states come from the source record; publishing this website does not change their review status.
Content languages
zh-CN · Aligned
Status, classification and source details
Readiness
- Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.
Classification mapping
CPC 3.0:53241 · exact
Source
11. Data Sources
| Source id | Type | Reference | Used for |
|---|---|---|---|
| un-cpc3-2025 | official_guidance | UNSD, CPC Version 3.0 Explanatory Notes, 30 June 2025, printed/PDF p.280. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdf | Entity/related station scope and urban-distribution exclusion; classification boundary only |
| ferc-construction-2017 | official_guidance | FERC, Guidance Manual for Environmental Report Preparation, Volume I, February 2017: §4.1.3.1 pp.4-28–4-32 (PDF58–62); §4.1.3.2/4.1.4 p.4-33 (PDF63); §4.2.2 pp.4-45–4-46 (PDF75–76); §4.2.2.4 pp.4-48–4-49 (PDF78–79); §4.9.1–4.9.2. https://www.ferc.gov/sites/default/files/2020-04/guidance-manual-volume-1.pdf | Gas-project processes, station construction/operation distinction, crossings, water and air/noise evidence needs; dated US scope, no universal amounts/current legal approval |
| ferc-upland-2013 | official_guidance | FERC, Upland Erosion Control, Revegetation, and Maintenance Plan, May 2013: III.E p.5 (PDF7), IV.B/IV.F pp.8–11 (PDF10–13), V pp.12–16 (PDF14–18). https://www.ferc.gov/sites/default/files/2020-04/upland-erosion-control-revegetation-maintenance-plan.pdf | Dated gas-project topsoil, residual management and restoration processes; no default timing/seeding/erosion values |
| ferc-wetland-2013 | official_guidance | FERC, Wetland and Waterbody Construction and Mitigation Procedures, May 2013, §VII pp.19–20 (PDF21–22), official GovInfo preserved copy. https://www.govinfo.gov/content/pkg/GOVPUB-E2-PURL-gpo83806/pdf/GOVPUB-E2-PURL-gpo83806.pdf | Verified original test-water intake/discharge pages; historical gas-project scope, no global distances/flow-rate limits; preserved copy is not proof of current policy |
| phmsa-hydrotest | official_guidance | PHMSA, Fact Sheet: Hydrostatic Pressure Testing, Overview and Hydrostatic Testing; displayed Date of Revision 12012011. https://primis.phmsa.dot.gov/stakeholder-comms/factsheets/fshydrostatictesting/ | Postconstruction/operating test distinction, medium, pressurising, repair/retest; historical gas/hazardous-liquid scope, no universal test pressure/duration or no-defect guarantee |
| saipem-subsea | handbook | Saipem, Subsea pipelines: offshore in deep waters, Deep water pipelines section, undated manufacturer page. https://www.saipem.com/en/solutions-energy-transition/offshore/subsea-pipelines | Existence of offshore oil/gas S-Lay/J-Lay routes; not every submarine method or fuel recipe, other actual methods need project evidence |
| nwpipe-steel-water-2019 | handbook | Northwest Pipe Company, Engineered Steel Water Pipe brochure, July 2019, PDF p.1 (unpaginated folded brochure), Suggested Specification of Steel Pipe for Water Transmission; joint/supply/inspection paragraphs. https://www.nwpipe.com/app/uploads/2020/08/NWP-Engineered-Steel-Water-Pipe-Brochure-July-2019.pdf | Historical manufacturer steel-water-pipe supply, joint, lining/coating and inspection states; actual water-project specifications independently verified, not every material/latest standard |
Raw downloads
These files are byte-identical to the canonical files for this revision in the repository.
Complete field inspector
Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.