TianGong PCR

Dam and waterside retaining embankment delivery · Data Quality Requirements

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53233 · exact

Source

Data Quality Requirements

requirement_idApplies toRequirementEvidence
identity_scopereference entity and routesRequire site, actual purpose, geometry/datum, hydraulic/retaining conditions, route, complete component schedule and signed acceptance; comparison needs compatible functions and interfaces.cp_handover; as-built survey
source_unitsall measurements and identitiesMaintain material states and actual public reference properties/unit groups; validate each supplier geography/voltage/route/gate and Chinese public name. No generic cement strength, sand grade, fuel density or life.certificates, calibration, actual supplier/gate evidence
coveragefull construction periodInclude all selected work packages, subcontractors, tests, rework, temporary installation/use/removal, site/borrow production, stocks and actual exports. Identify absent versus not measured; quantify uncertainty and missing upstream links.work-package reconciliation; quantity/water balances
review_limitsconstruction and environmental interpretationHistorical sources are qualitative route evidence only. Actual specifications and current competent acceptance records govern this project. LCA checks do not certify dam safety; unresolved identities, shared-asset denominators and unquantified land/noise/ecology pathways remain declared limitations.original sources and independent methodology review

9. Validation Rules

rule_idapplies_torulesource_ids
complete_referencedeclared datasetOne accepted entity output equals the declared reference product name and 1 item, with actual site, surveyed geometry, route, hydraulic/retaining purpose and complete permanent interfaces. No cost-, average-mass-, lifetime- or energy-output substitute.un-cpc-dams-2025
inventory_unit_gatedeclared datasetEach selected exchange is one physical/chemical flow with its correct type, material state, direction and unit; verified identities require exact primary property and supplier/route/compartment fit. Treat non-applicable with evidence, never aggregate labels or silent omission.usace-concrete-civil-works-1994
quantities_and_sharesdeclared datasetReconcile each route material/stock/reject ledger, fill geometry and moisture/density measurements, energy and water balances, real transport legs and serialized reusable shares. Unknown H, unproved conversion or inconsistent reference denominator makes the dataset incomplete and requires review.usace-embankment-dams-2004
releases_and_fatesdeclared datasetVerify actual fuel origin and measured species/size/phase/compartment. Captured effluent and sludge cannot masquerade as pure water. Distinguish construction removal from later demolition, and unknown release from zero. Missing required measurements or identities remain inconclusive; do not claim full lifecycle, safety or methodological approval.epa-concrete-washout-2012

10. Published Dataset Profile

FieldValue
dataset_roleforeground_dataset
downstream_usesecondary_dataset; background_dataset
allowed_useConstruction handover comparison of functionally compatible dam entities at compatible sites/routes/interfaces; verified linked construction-stage input for later water-service/generation models
excluded_useFull-life storage/generation factor; generic per-kg/metre/capacity dam burden; default reservoir emissions; safety, current compliance or methodology approval
required_metadataComplete reference qualifiers; actual structural route/geometry; physical quantities/material states; site/time/supply gates; process/component interfaces; measurement/protocols; upstream links; lifecycle stages
required_quality_disclosureCoverage by actual route, errors/uncertainty; identity gaps, unmeasured releases, unquantified land/noise/ecology, unknown asset H and missing upstream stages; acceptance records do not imply LCA approval
update_triggerActual scope/type/geometry/material-source/construction-period or measurement correction; changed component/burden interfaces, identities or quality evidence

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-dams-2025official_guidanceUNSD, CPC Version 3.0 Explanatory Notes, 30 June 2025, printed/PDF p. 280, 53233 and adjacent 53232/53234. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdfEntity/category boundary; no quantitative inventory evidence.
usace-embankment-dams-2004official_guidanceUSACE EM 1110-2-2300, General Design and Construction Considerations for Earth and Rock-Fill Dams, 30 July 2004; §§5-1, 6-1–6-3, 9-2, 9-10; PDF pp.35–36,39,63,68; printed 5-1–5-2,6-1,9-1,9-6. https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_1110-2-2300.pdf?ver=2014-04-07-145941-947Historical documented foundation, zoned fill, seepage and field-control/as-constructed practices; no design values or current approval generalized.
usace-concrete-civil-works-1994official_guidanceUSACE EM 1110-2-2000, Standard Practice for Concrete for Civil Works Structures, 1 February 1994, publisher file includes Change 2 of 31 March 2001; §§7-6–7-8,9-1,9-4; PDF pp.68,70,80,88; printed 7-6,7-8,9-1,9-9. https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_1110-2-2000.pdfHistorical conventional hydraulic concrete preparation, vibration/curing and quality verification; excludes RCC, repair and shotcrete. No recipe/temperature/strength thresholds adopted.
usace-rcc-dams-2000official_guidanceUSACE EM 1110-2-2006, Roller-Compacted Concrete, 15 January 2000; §§6-1–6-4,6-8; PDF pp.46,48,50,54; printed 6-1,6-3,6-5,6-9. https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_1110-2-2006.pdf?ver=2013-09-04-070814-530Historical RCC dam batching, transport, spreading/compaction and joint/waterstop practices; no numerical lift/recipe/productivity adopted.
cedd-seawalls-2026official_guidanceHong Kong CEDD, Port Works Design Manual Part 4, Guide to Design of Seawalls and Breakwaters, April 2026 e-version; §§2.3.1–2.3.5,4.5.1–4.5.2, PDF pp.15–16,27, printed pp.13–14,25. https://www.cedd.gov.hk/filemanager/eng/content_89/p4_combined.pdfQualitative actual retaining-bank, block/caisson, rock armour, seabed dredging/replacement and conditional foundation-treatment operations only; harbour wave-protection/berthing needs separate category review. No universal HK specification, fuel grade, emission factor or lifetime.
epa-concrete-washout-2012official_guidanceUS EPA, Stormwater Best Management Practice: Concrete Washout, EPA 833-F-11-006, February 2012, pp.1–2. https://www.epa.gov/sites/default/files/2015-11/documents/concretewashout_0.pdfHistorical process description supports water/slurry/solids containment and actual treatment/reuse interface; no assumed chemistry, pH threshold, recycling percentage or approval.
ipcc-flooded-land-2019official_guidanceIPCC, 2019 Refinement to the 2006 IPCC Guidelines for National Greenhouse Gas Inventories, Volume 4 Chapter 7 Wetlands, §7.3, Table 7.7 and origin/pathway distinctions, PDF pp.6–7 / printed 7.6–7.7. https://www.ipcc-nggip.iges.or.jp/public/2019rf/pdf/4_Volume4/19R_V4_Ch07_Wetlands.pdfConditional gas origin/pathway and baseline/attribution review for actual pre-acceptance inundation only; national annual defaults and 20-year categories are not applied directly to this construction event, and establish neither lifetime nor inevitable emissions.

Historical documents support documented operations and collection structure, not current local mandatory requirements. All mixtures, physical quantities, energy, losses, geometry, hydraulic conditions, life/reuse denominators and emission parameters require actual project evidence; this PCR supplies no default quantitative ranges.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.