TianGong PCR

Airfield pavement and associated works construction delivery

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:53213 · exact

Source

1. Scope and Applicability

This rule concerns physical delivered runways, taxiways, aprons and related non-building airport structures at the actual site, rather than construction services, aircraft operation or a bundle of materials. It includes actual flexible asphalt, rigid cement-concrete, aggregate/turf and mixed pavement routes; none is a default. Every package binds the whole declared construction and the accepted area of a consistent use and structure, documenting actual drainage, marking, grooving, lighting and other associated works. Terminal buildings, hangars and standalone equipment manufacture are outside this entity.

Construction foreground begins with the recorded initial site and delivered supply products, includes actual clearance/initial removal, earthworks, layers, installation, tests and corrections, and ends at physical acceptance. Distinguish material production, inbound transport, site work, actual maintenance/renewal, operation, final demolition and destinations. Post-handover stages are excluded. A site inventory alone establishes neither complete cradle-to-delivery nor whole-life coverage. FAA items support process evidence; project-specific specifications and applicability govern actual acceptance, without regulatory approval conferred here.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.constructions-and-construction-services.constructions.airfield-pavement-and-associated-works-delivery
classification_refsCPC 3.0 53213
covered_productsRunways, taxiways, aprons and related non-building airport structures; actual paved/unpaved routes and handover scope
excluded_productsAirport buildings; standalone material/equipment manufacture; general construction services; operational maintenance services; aircraft and airport transport operation
representative_productAirfield pavement works with surveyed area, actual use and signed handover condition
production_routeActual earthworks/compaction, subgrade and layers, corresponding surface construction, specified associated works, inspection/corrections and acceptance
market_stateImmovable constructed civil entity at the site and declared delivery condition

3. Reference Flow

FieldValue
WhatProvide physical airfield pavement and attributable associated works for the declared aircraft landing/take-off, taxiing or standing use
How much1 m2 accepted horizontal plan area; declare whole package area, use zones, lengths/widths, thickness of each layer and associated work quantities
How wellActual structure, subgrade, load/aircraft-use requirements, surface, drainage and installed configuration; retain design and lot tests for smoothness, thickness, compaction or strength, joints and applicable acceptance specifications
How long or cycleOne actual construction-to-handover cycle; no assumed service life. Service-period comparisons need separately supported use, maintenance and renewal scenarios
reference_flow_linkreference_airfield
FieldValue
Reference amount1
Reference product flowDelivered airfield pavement assembly with associated non-building works
Reference flow propertyArea 93a60a56-a3c8-19da-a746-0800200c9a66
Reference unit groupUnits of area 93a60a57-a3c8-18da-a746-0800200c9a66
Reference unitm2
Required qualifierssite/package; runway/taxiway/apron use; actual pavement route; accepted-area survey method and length/width; layer thickness and material state; subgrade and climate; design aircraft/load requirements; associated works and attribution; actual tests and delivery completeness; construction dates; upstream/transport gates; gaps and later stages

The reference includes its share of the complete construction, not an isolated square metre of surfacing. Areas of different use or structure are collected separately; intersections cannot expand output by double counting. Retain whole-project totals and actual areas; cost, assumed mass and nominal area cannot establish a conversion. Missing required qualifiers preclude comparability.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_areareference productArea 93a60a56-a3c8-19da-a746-0800200c9a66m2Use cp_handover to measure accepted plan area; collect every inventory row per declared reference flow. Divide attributable work totals by accepted area of the same scope, preserving totals, attribution and denominator; never sum layer areas as extra output.
energy_unitscn_lv; cn_mvNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJPreserve the public Net calorific value property and energy unit group. Convert metered kWh using the unit-group relation 3.6 MJ/kWh; never relabel this property as Mass.
material_statefresh_concrete; topsoil; supplied_water; washout_liquidVolume 93a60a56-a3c8-22da-a746-0800200c9a66m3Record physical state and measured volume. Volume-to-mass conversion needs measured density of the same material state and batch; excavated, loose and compacted soil volumes are not equal by assumption.
asset_areaplywood_form; pp_geotextile; grass_sodArea 93a60a56-a3c8-19da-a746-0800200c9a66m2Use actual installed/deployed area retaining thickness, composition and areal mass; never change a public Mass property into Area on name similarity.
transport_unitsroad_freightmass*distance 118f2a40-50ec-457c-aa60-9bc6b6af9931t*kmPreserve public massdistance with group reference kgkm; 1 tkm = 1000 kgkm. Use actual consignment mass and distance without assumed distance or load.
FieldValue
mass_unit_group93a60a57-a4c8-11da-a746-0800200c9a66
volume_unit_group93a60a57-a3c8-12da-a746-0800200c9a66
energy_unit_group93a60a57-a3c8-11da-a746-0800200c9a66
item_unit_group5beb6eed-33a9-47b8-9ede-1dfe8f679159
transport_unit_group3620148f-c5db-48ce-9065-a10092089aca

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionActual pre-construction site, retained assets and external supply product gates
starting_condition_roleforeground_start
product_classification_scopeAirfield pavement and related non-building entity; use and delivery scope explicitly declared
recursive_input_ruleRetained same-category pavement is an existing asset input with condition/burden records; do not recursively duplicate its whole construction history
upstream_dataset_requirementLink each actual supplied product to compatible state, technology, geography and unit manufacture data; onsite mixing separately expands actual ingredients, heating, fuel and releases without duplicating finished-product manufacture
disclosureUpstream coverage, actual transport/site work, initial removal, retained assets, associated facilities, subcontracting, tests, gaps and post-handover stages
rule_idapplies_torulesource_ids
boundary_deliverydatasetRecord actual earthworks, layers, drainage, marking/grooving, lighting and tests/handover by process. Listed materials are not a universal complete recipe; individually add every additional actual material, packaging, lubricant, planting input, ancillary and temporary work exchange, documenting absent processes.faa-airport-construction-2018
boundary_stagesdatasetLink manufacture and transport separately; paving does not represent material production. Operating electricity, aircraft, post-handover maintenance/replacement, final demolition and destinations are excluded; separately model those stages only with real scenarios and redeclared scope.fhwa-pavement-lca-2016
boundary_environmentutilities; wasteInclude actual utilities and evidenced direct releases, distinguishing fuel supply/combustion, purchased water/resource abstraction, dewatering transfer/discharge, liquid waste/settled solids. Retain actual equipment, duration, location and measurements for noise without inventing default sound-energy exchanges; any evidenced emissions are separate exact substances and media.epa-construction-dust-1995; epa-concrete-washout-2012

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
siteSite survey, clearance and earthworksrequiredActual site starting condition and all attributable works; excavation, grading, embankment and compaction as requiredforeground_productionper declared reference flow
baseSubgrade, subbase and base constructionrequiredInspect actual pavement design; only installed layers and specified treatment routesforeground_productionper declared reference flow
flexibleFlexible asphalt pavement placing and rollingconditionalActual asphalt layers or asphalt-treated baseforeground_productionper declared reference flow
rigidRigid concrete placing, joints and curingconditionalActual cement-concrete layers or concrete associated structuresforeground_productionper declared reference flow
unpavedAggregate/turf surface establishmentconditionalActual unpaved aggregate/turf route; aggregate is accounted under base without duplicationforeground_productionper declared reference flow
drainageDrainage and associated civil worksconditionalActual drains, culverts, outfalls or ancillary non-building structuresforeground_productionper declared reference flow
finishMarking, grooving and airfield lighting installationconditionalActual specified marking, grooving or installed systems; no universal requirementforeground_productionper declared reference flow
utilitiesSite plant, construction utilities and direct releasesrequiredAll actual contractors, including pumping, compaction, paving, saw cutting, curing, dust control and commissioningforeground_productionper declared reference flow
transportInbound and construction-waste transportrequiredAll actual supply and waste export legs through handoverforeground_productionper declared reference flow
wasteConstruction waste segregation and routingrequiredAll actually generated streams through acceptance; absence requires recordsforeground_productionper declared reference flow
handoverTesting, corrections and physical acceptancerequiredAccepted actual area and declared associated works; include tests and rejected work correctionsforeground_productionper declared reference flow

Process: Site survey, clearance and earthworks (site)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
Imported mineral soil fill (mineral_fill)

Only actual imported engineered fill; retain composition, contamination status and compacted versus loose quantities. Internal excavated soil reuse is a transfer, not a new purchased input.

  • Selected flow: Imported mineral soil fill
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_site to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_site
  • Sources: faa-airport-construction-2018
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Subgrade, subbase and base construction (base)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
Crushed stone pavement base aggregate (crushed_base)

Actual specified crushed aggregate layer, with grading, layer thickness, moisture and compaction records. A rounded gravel or soil-remediation identity is not automatically this material.

  • Selected flow: Crushed stone pavement base aggregate
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_base to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_base
  • Sources: faa-airport-construction-2018
Cement, portland cement (portland_cement)

Only Portland cement actually used in soil/base stabilization or site batching. No default binder fraction; do not add cement separately when it is already inside purchased concrete.

  • Selected flow: Cement, portland cement 3c9e98a5-0a1e-4a18-9545-1475a87fcab7
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_base to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_base
  • Sources: faa-airport-construction-2018
Hydrated lime for subgrade stabilization (hydrated_lime)

Only an actual hydrated-lime treatment specified for the site; distinguish quicklime and kiln dust and record dosage from weighed work records.

  • Selected flow: Hydrated lime for subgrade stabilization
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_base to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_base
  • Sources: faa-airport-construction-2018
Polypropylene geotextile separation sheet (pp_geotextile)

Only installed polypropylene separation fabric matching the actual construction function and supplied material state; retain grade, areal mass and footprint.

  • Selected flow: Polypropylene geotextile separation sheet
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: Use cp_base to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain m2 and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_base
  • Sources: faa-airport-construction-2018
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Flexible asphalt pavement placing and rolling (flexible)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
Asphalt mixture (asphalt_mix)

Only an actual supplied asphalt mix, with binder type, job mix formula, temperature, recycled content and intended layer. Meter laying, rolling and corrections separately; manufacture remains upstream unless site plant is explicitly inventoried.

  • Selected flow: Asphalt mixture ad29a865-2fd6-41da-99d2-9669b9c7984d
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_flexible to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_flexible
  • Sources: faa-airport-construction-2018
Bitumen emulsion for pavement tack coat (asphalt_emulsion)

Only actual tack coat emulsion; weigh the delivered formulation and record residual binder concentration, water and supplier. Do not identify the whole emulsion as neat asphalt.

  • Selected flow: Bitumen emulsion for pavement tack coat
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_flexible to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_flexible
  • Sources: faa-airport-construction-2018
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Rigid concrete placing, joints and curing (rigid)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
Fresh cement concrete delivered before paving (fresh_concrete)

Only actual fresh cement concrete for rigid pavement or lean-concrete layer; use batch tickets, delivered volume, measured density if converting and rejected loads. Neither hardened cast-in-place concrete nor a generic binder description proves this fresh state.

  • Selected flow: Fresh cement concrete delivered before paving
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Use cp_rigid to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain m3 and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_rigid
  • Sources: faa-airport-construction-2018
Steel pavement joint dowel bar (steel_dowel)

Only installed dowel bars; record steel grade, coating and geometry, actual bar count and supplier mass. Reinforcement and tie bars, if used, require separate actual rows.

  • Selected flow: Steel pavement joint dowel bar
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_rigid to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_rigid
  • Sources: faa-airport-construction-2018
Polysulfide, sealing compound (polysulfide_seal)

Only if the actual joint design specifies this polysulfide formulation; record joint dimensions, formulation and applied mass. Other chemistries require separate identities, never substitution.

  • Selected flow: Polysulfide, sealing compound e533bf45-bf2b-47ee-88ff-fc67ba2cac05
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_rigid to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_rigid
  • Sources: faa-airport-construction-2018
Paraffin-wax emulsion concrete curing compound (wax_curing)

Only if this membrane-curing formulation is applied; retain concentration, application records and container residues. Wet curing water is recorded under site water without a mandatory curing recipe.

  • Selected flow: Paraffin-wax emulsion concrete curing compound
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_rigid to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_rigid
  • Sources: faa-airport-construction-2018
Plywood concrete formwork panel (plywood_form)

Only actual reusable plywood forms. Record panel thickness, composition, deployment area and reuse ledger; count manufacturing burden once across uses through cp_assets, not once per pour.

  • Selected flow: Plywood concrete formwork panel
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: Use cp_rigid to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain m2 and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_rigid
  • Sources: faa-airport-construction-2018
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Aggregate/turf surface establishment (unpaved)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
Screened topsoil for turf pavement (topsoil)

Only actual turf route or related graded strip planting; record soil characteristics, layer depth and source, with measured placed volume.

  • Selected flow: Screened topsoil for turf pavement
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Use cp_unpaved to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain m3 and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_unpaved
  • Sources: faa-airport-construction-2018
Cultivated grass sod with rooting soil (grass_sod)

Only actual supplied turf sod. Record species composition, rooting-soil thickness, installed area and establishment acceptance. Seeded establishment must instead enumerate actual seed and any nutrients as separate physical rows.

  • Selected flow: Cultivated grass sod with rooting soil
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: Use cp_unpaved to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain m2 and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_unpaved
  • Sources: faa-airport-construction-2018
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Drainage and associated civil works (drainage)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
Precast cement-concrete storm-drain pipe (concrete_pipe)

Only actual installed concrete drainage pipe; retain diameter, length, class, reinforcement and measured supplier mass. Include actual bedding, headwalls and outfall work as distinct products and processes.

  • Selected flow: Precast cement-concrete storm-drain pipe
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_drainage to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_drainage
  • Sources: faa-airport-construction-2018
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Marking, grooving and airfield lighting installation (finish)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
White waterborne acrylic pavement marking paint (white_paint)

Only actual white acrylic waterborne marking paint. Weigh supplied formulation, declared solids and installed markings; repainting before acceptance is included, operational repainting excluded.

  • Selected flow: White waterborne acrylic pavement marking paint
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_finish to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_finish
  • Sources: faa-airport-construction-2018
Yellow waterborne acrylic pavement marking paint (yellow_paint)

Only actual yellow acrylic waterborne marking paint; retain colour, formulation, used mass and actual marking layout.

  • Selected flow: Yellow waterborne acrylic pavement marking paint
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_finish to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_finish
  • Sources: faa-airport-construction-2018
Glass retroreflective beads for pavement markings (glass_beads)

Only actual applied glass beads, separately weighed from paint; retain grading and supplier treatment.

  • Selected flow: Glass retroreflective beads for pavement markings
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_finish to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_finish
  • Sources: faa-airport-construction-2018
Complete inset airfield LED luminaire (airfield_light)

Only this actual installed complete fixture with model, function and count. Edge lights, isolating transformers, regulators, conduits and bases, when installed, need distinct product rows; no whole lighting system row.

  • Selected flow: Complete inset airfield LED luminaire
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Use cp_finish to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain item and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_finish
  • Sources: faa-airport-construction-2018
Insulated copper airfield lighting cable (copper_cable)

Only installed copper cable with conductor cross-section, insulation, voltage rating, length and measured mass. Supplier kg-per-metre needs verified cable-specific evidence.

  • Selected flow: Insulated copper airfield lighting cable
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_finish to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_finish
  • Sources: faa-airport-construction-2018
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Site plant, construction utilities and direct releases (utilities)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
Complete hydraulic excavator (excavator_asset)

Only an actually used asset manufacture contribution. Retain asset identity/configuration and original manufacture data; cp_assets supplies a conserved project share across its evidenced cumulative use. Deployment time is not consumption of a new whole machine. No complete manufacture burden is reset for each project.

  • Selected flow: Complete hydraulic excavator
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Use actual asset-manufacture share records in cp_assets, normalized per declared reference flow, preserving Number of items without treating deployment time as new-machine count.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_assets
  • Sources: epa-concrete-washout-2012
Complete self-propelled road roller (roller_asset)

Only an actually used asset manufacture contribution. Retain asset identity/configuration and original manufacture data; cp_assets supplies a conserved project share across its evidenced cumulative use. Deployment time is not consumption of a new whole machine. No complete manufacture burden is reset for each project.

  • Selected flow: Complete self-propelled road roller
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Use actual asset-manufacture share records in cp_assets, normalized per declared reference flow, preserving Number of items without treating deployment time as new-machine count.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_assets
  • Sources: epa-concrete-washout-2012
Complete asphalt paving machine (paver_asset)

Only an actually used asset manufacture contribution. Retain asset identity/configuration and original manufacture data; cp_assets supplies a conserved project share across its evidenced cumulative use. Deployment time is not consumption of a new whole machine. No complete manufacture burden is reset for each project.

  • Selected flow: Complete asphalt paving machine
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Use actual asset-manufacture share records in cp_assets, normalized per declared reference flow, preserving Number of items without treating deployment time as new-machine count.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_assets
  • Sources: epa-concrete-washout-2012
Complete cement-concrete pump (pump_asset)

Only an actually used asset manufacture contribution. Retain asset identity/configuration and original manufacture data; cp_assets supplies a conserved project share across its evidenced cumulative use. Deployment time is not consumption of a new whole machine. No complete manufacture burden is reset for each project.

  • Selected flow: Complete cement-concrete pump
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Use actual asset-manufacture share records in cp_assets, normalized per declared reference flow, preserving Number of items without treating deployment time as new-machine count.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_assets
  • Sources: epa-concrete-washout-2012
Diesel fuel (site_diesel)

Actual supplied diesel consumed by excavators, graders, rollers, pavers, pumps or generators; record equipment/task and batch fuel grade, fossil fraction, density and net calorific value. This is a fuel supply identity, not combustion already included in a service.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
Alternating current (cn_lv)

Only site consumption on a Chinese grid supply below 1 kV; supplier, voltage, site geography and metered dates must match. Other geography or voltage requires another verified row.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain MJ and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
Alternating current (cn_mv)

Only site consumption on a Chinese grid supply of 1–35 kV; do not duplicate the same metered supply at low voltage or count generated power again.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain MJ and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
Treated mains water delivered to construction site (supplied_water)

Meter actual purchased water used for compaction, dust control, saw cutting, cleaning or curing by task. Do not impose a density or substitute Hong Kong supply for an unspecified site.

  • Selected flow: Treated mains water delivered to construction site
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain m3 and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
Waste flows
Elementary flows
river water (river_water)

Only direct site abstraction from a river, as a resource input with location, dates and actual volume. Purchased water is a technosphere input; dewatering and returns are separately reconciled.

  • Selected flow: river water 805a7346-1664-4483-afe3-4b224be5e361
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain m3 and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
ground water (ground_water)

Only direct groundwater extraction with source and volume; distinguish construction-use abstraction from dewatering transfer, document destination and returned volume. No unsupported net consumption or scarcity claim.

  • Selected flow: ground water 4f462198-40cd-4184-8733-86648a20dc3f
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain m3 and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012

Outputs

Product flows
Waste flows
Elementary flows
carbon dioxide (fossil) (fossil_co2)

Only measured or fuel-carbon-derived actual fossil CO2 released during site combustion to air, unspecified subcompartment, immediate release. Exclude biogenic carbon and upstream emissions.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
carbon monoxide (fossil) (fossil_co)

Only evidenced actual fossil CO emitted to air, unspecified subcompartment; measurement or equipment-specific factors must match fuel and controls.

  • Selected flow: carbon monoxide (fossil) 08a91e70-3ddc-11dd-924e-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
nitrogen monoxide (nitric_oxide)

Only measured or valid separately speciated NO emitted to air, unspecified subcompartment. Total NOx as NO2-equivalent cannot be silently treated as NO.

  • Selected flow: nitrogen monoxide 08a91e70-3ddc-11dd-96ee-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
nitrogen dioxide (nitrogen_dioxide)

Only evidenced separate NO2 emissions to air, unspecified subcompartment; distinguish NO, nitrite and N2O; no default NOx split.

  • Selected flow: nitrogen dioxide 08a91e70-3ddc-11dd-96e5-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
Particulate matter, particle size unspecified (dust_unspecified)

Only quantified site dust to air with unspecified size fraction and subcompartment. Retain source activity, moisture, controls and uncertainty. Never add its total again to separately inventoried fractions from the same source.

  • Selected flow: Particulate matter, particle size unspecified 0ce3dedb-caca-407b-a856-a90470eb8ec0
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
particles (PM2.5 - PM10) (coarse_pm)

Only a separately quantified 2.5–10 micrometre fraction released to air, unspecified subcompartment; exclude PM2.5 and avoid overlap with a PM10 total or unspeciated dust.

  • Selected flow: particles (PM2.5 - PM10) 08a91e70-3ddc-11dd-9501-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012
particles (PM10) (pm10_total)

Only measured or validly quantified total PM10 to air, unspecified subcompartment. For the same emission source use either this total or its separately measured size fractions, never both; neither TSP nor PM2.5 is automatically PM10.

  • Selected flow: particles (PM10) 08a91e70-3ddc-11dd-91be-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_utilities to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_utilities
  • Sources: epa-concrete-washout-2012

Process: Inbound and construction-waste transport (transport)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
freight transport (road_freight)

Actual road delivery and waste export legs; record consignment mass, distance, vehicle/load and empty return allocation. This service excludes site plant operation; use separate measured fuel if the service is not linked, never both for the same leg.

  • Selected flow: freight transport 4f1a3f30-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: massdistance 118f2a40-50ec-457c-aa60-9bc6b6af9931 / tkm
  • Amount rule: Use cp_transport to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain t*km and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_transport
  • Sources: fhwa-pavement-lca-2016
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Construction waste segregation and routing (waste)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Non-contaminated excavated mineral soil for off-site disposal (soil_export)

Only soil exported as waste; retain measured mass, moisture, contamination tests, disposal destination and whether reused rather than discarded.

  • Selected flow: Non-contaminated excavated mineral soil for off-site disposal
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_waste to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012
Removed asphalt pavement milling waste (asphalt_waste)

Only actual clearance, milling, rejected mix or correction material discarded during this construction cycle; record source and recovery route. Post-handover removal is excluded.

  • Selected flow: Removed asphalt pavement milling waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_waste to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012
Hardened cement-concrete construction waste (concrete_waste)

Only actual segregated hardened cement-concrete debris or acceptance-test cores discarded; wet washout is distinct.

  • Selected flow: Hardened cement-concrete construction waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Use cp_waste to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain kg and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012
Cement-concrete equipment washout slurry (washout_liquid)

Only liquid/slurry exported to treatment, with measured volume, solids content and destination. Do not represent it as water resource or assume discharge to soil/water. Retain settled solids separately.

  • Selected flow: Cement-concrete equipment washout slurry
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Use cp_waste to collect the actual exchange amount, normalized by measured accepted area of the same scope; retain m3 and original work totals.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste
  • Sources: epa-concrete-washout-2012
Elementary flows

Process: Testing, corrections and physical acceptance (handover)

Apply this process to actual design and site records. Attribute equipment, water, fuel, corrections and waste by task to this process and reconcile with utility/waste ledgers without duplicate exchanges. Individually add omitted actual exchanges; an empty UUID or a process heading cannot imply a complete inventory.

Inputs

Product flows
Waste flows
Elementary flows

Outputs

Product flows
Delivered airfield pavement assembly with associated non-building works (reference_airfield)

One square metre of accepted plan area linked to the entire declared runway, taxiway, apron or airfield construction package; includes its attributable underlying layers and specified associated works, not an isolated surface-material sheet.

  • Selected flow: Delivered airfield pavement assembly with associated non-building works
  • Flow property / unit: Area 93a60a56-a3c8-19da-a746-0800200c9a66 / m2
  • Amount rule: 1 m2
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_handover
  • Sources: faa-airport-construction-2018
Waste flows
Elementary flows

7. Allocation and Co-product Handling

rule_idapplies_torulesource_ids
allocation_projectall inventory rowsFirst partition airport work using submeters, weights, equipment time, actual zones and lots; direct attribution precedes allocation. Shared activities use measured causal physical drivers, preserving all beneficiary projects and denominator with shares summing to one. Area normalizes the reference within a consistent use/structure package; it is not a default allocation among heterogeneous works.
allocation_assetsplywood_form; utilitiesUse cp_assets to record each asset/component manufacture burden, project/period activity and supported cumulative service. Across projects, periods and repeated uses, total manufacture shares of the same asset cannot exceed one. Unknown life/cumulative activity remains a review and completeness gap, never reset per project.
allocation_recoverywasteConstruction waste, reused pavement and exported millings do not automatically earn credits. Document actual treatment/recovery gates, quality and receiver. Any substitution benefit or recycling allocation needs a declared sourced method and sensitivity, without simultaneously claiming avoided manufacture and zero burden.fhwa-pavement-lca-2016

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_sitesiterow-specific exchangeforeground_recordsPre/post survey; soil strata; cut/fill volumes; imported mass; contamination and destinationsUse surveyed cross-sections, calibrated weighbridge and earthwork logs; retain loose/compacted states and measured density when convertingrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_basebaserow-specific exchangeforeground_recordsLayer area/depth; grading; each binder issue/return; treatment, moisture, roller passes and compaction testsReconcile measured deliveries and installed geometry against site tests; record actual treatment without assumed dosagerow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_flexibleflexiblerow-specific exchangeforeground_recordsMix batch and job formula; delivered/returned/rejected mass; temperature; laid area, thickness; roller and paver time; cores/smoothnessRetain batch tickets, scale records, trial areas and lot test/correction records; isolate upstream mix plant and onsite activityrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_rigidrigidrow-specific exchangeforeground_recordsConcrete batch; fresh volume and density; mix composition; joint layout; dowels; curing; test strength/thickness; rejected loadsUse batch and delivery tickets, measured geometry and mass records, plant/task meters, joint/curing logs and acceptance testsrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_unpavedunpavedrow-specific exchangeforeground_recordsSurface route; topsoil volume; turf composition, thickness and area; establishment testsSurvey accepted aggregate/turf footprint, retain actual planting deliveries and pre-handover irrigation/establishment workrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_drainagedrainagerow-specific exchangeforeground_recordsPipe grade, diameter, length, mass; bedding; excavation; headwalls; hydraulic route and testsReconcile as-built drainage layout, supplier weighing and installation/inspection logs including outfallsrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_finishfinishrow-specific exchangeforeground_recordsMarking colour/formulation; actual paint/bead mass; groove length/depth; luminaire model/count; cable mass/length; commissioningRetain calibrated issue/return records, as-built markings/grooves, equipment meters, installation schedules and testsrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_utilitiesutilitiesrow-specific exchangeforeground_recordsFuel stock/receipts; plant/task time; electricity meters/geography/voltage; supplied/abstracted water, dewatering and returns; emission species, medium and controlSubmeter by work package; reconcile fuel consumed with stocks and contractors; retain batch density/carbon/NCV, source-specific validated emission method and uncertaintyrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_transporttransportrow-specific exchangeforeground_recordsConsignment kg; actual km each leg; vehicle/load; returns; included service gatesUse waybills, weighing, routes and vehicle logs; convert actual kg to tonnes for t*km; partition project deliveries and background inclusionrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_wastewasterow-specific exchangeforeground_recordsStream identity/state; weight/volume; water/solids; treatment, recycling or disposal destination; transfer dateUse segregated containers, calibrated weights/meters, analysis and licensed receiver tickets; document containment, settling and actual water routingrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_handoverhandoverrow-specific exchangeforeground_recordsProject/package boundary; accepted plan area in m2; runway/taxiway/apron length and widths; layers; capacity/load-use requirements; associated works; tests and signed dateSurvey as-built accepted horizontal surface polygons without overlapping intersections; trace lot acceptance, geometry, actual function, finish and related structures to signed handoverrow-specific kg, m3, m2, MJ, item, t*kmEach delivery, lot, task/meter interval and acceptance eventComplete actual start-to-handover period; disclose unmetered intervalsDeclared package and all attributable subcontractorsper declared reference flowCalibration, original tickets, as-built surveys, lot tests, corrections, attribution and uncertainty
cp_assetsutilities; rigidAsset and reused-component manufacture sharesasset_ledgerAsset id; original manufacture burden; each project activity; prior shares; cumulative-service evidence; retirement/transfersRead manufacture, lease and plant/formwork deployment ledgers; reconcile cumulative shares across projects; unknowns remain gapsdimensionless shares and source unitsEach deployment and period closureAll prior usage periods and supported service totalAll projects using the same assetper declared reference flowTraceable asset records; independent share reconciliation

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
normalize_areaall inventory rowsDivide each attributable exchange total of the consistent use/structure package by actual accepted plan area in m2 from cp_handover, yielding amounts per declared reference flow; output is fixed at 1 m2. Preserve original totals and survey denominator, never substituting layer area or cost.cp_handover; project exchange recordsExchange amounts per declared reference flow
preserve_unitsall inventory rowsConvert same-dimension units using declared unit groups; mass/volume conversion uses actual same-batch density only, and electricity kWh to MJ multiplies by 3.6. Preserve raw measurements and uncertainty.cp_utilities; cp_transport; supplier recordsRow-unit quantities
direct_emissionsutilitiesCalculate each species release from actual measurement or validated methods applicable to the particular plant/fuel/controls, preserving original method units and attribution. Fossil carbon balance uses actual fuel carbon and combustion evidence; no default factors or NOx split, and no addition of dust totals to their fractions.cp_utilities; site measurements; applicable method evidencekg of each exact speciesepa-construction-dust-1995
asset_shareplywood_form; utilitiesApply the actual project share of supported cumulative activity to manufacturing burden, then normalize by the same package area. The cumulative ledger proves all assigned shares are no greater than one; unknown denominators remain review without a numeric result.cp_assets; cp_handoverAttributable manufacture burden per declared reference flow

Data Quality Requirements

requirement_idApplies toRequirementEvidence
quality_scopedatasetPreserve surveyed area and complete configuration by use, layer structure and acceptance scope; equal area does not establish equal load/use function.cp_handover; faa-airport-construction-2018
quality_recordsall inventory rowsRetain whole-period records, calibration, rejections/corrections and subcontracting; reconcile net receipts, installed work and waste. Missing records preclude complete data claims; no default losses fill gaps.cp_site; cp_base; cp_flexible; cp_rigid; cp_waste
quality_environmentutilities; wasteRequire evidence for water routes, particle fractions, release media and fossil origin. Historical AP-42 aggregate factors are not airport-site defaults; ambient monitoring concentrations do not directly establish project emission mass.cp_utilities; epa-construction-dust-1995; epa-concrete-washout-2012
quality_gapsdatasetDisclose unresolved UUIDs, missing upstream coverage, unmetered intervals, asset-manufacture share gaps, method applicability and scientific review status.cp_assets; supplier records

9. Validation Rules

rule_idapplies_torulesource_ids
validate_referencereference_airfieldCheck 1 m2 output, Area property, surveyed area, delivery completeness and qualifiers; all rows/protocols share the same package denominator. Missing survey/attribution evidence or overlapping area makes data incomplete.un-cpc3-2025
validate_routedatasetReconcile earthworks, subgrade, aggregate, asphalt/concrete/turf layers and specified associated works with actual design, documenting applicability/absence and corrections. An empty UUID does not imply absence; collection labels cannot complete the inventory.faa-airport-construction-2018
validate_identitiesall inventory rowsVerify each public identity substance, state, route, geography/voltage, environmental medium and reference property; unsupported mass/area/volume relationships remain unresolved. Align bilingual row_id, rule_id, UUID and official Chinese names.
validate_coveragedatasetCheck no overlap between site combustion, transport, upstream manufacture and treatment. Reconcile water/waste destinations, exact emission species and cumulative asset shares. Gaps prevent complete environmental-inventory claims; site delivery confers neither whole-life coverage nor scientific/regulatory approval.fhwa-pavement-lca-2016; epa-concrete-washout-2012

10. Published Dataset Profile

FieldValue
dataset_roleforeground_dataset
downstream_usesecondary_dataset; background_dataset
allowed_usePer-square-metre construction delivery inventory for declared airfield use/structure; use verified upstream links at declared gates; compare only matching function, load, structure, climate and boundary
excluded_useWhole-life claims; aircraft operation; general construction service; automatic functional equivalence per area; default life/recipe/mass; regulatory approval
required_metadataAll reference qualifiers; surveyed total area/zones; layer structure; delivered associated facilities; stage totals, attribution and units; signed acceptance; source gates and update date
required_quality_disclosureMissing identities/data/upstream; actual measurement/calculation methods; emission applicability; unmetered intervals; reused-asset cumulative shares; all later-stage omissions
update_triggerChanges to use, geometry, structure, load requirements, site, delivery configuration, supply, construction measurements or evidence/identities

11. Data Sources

Source idTypeReferenceUsed for
un-cpc3-2025official_guidanceUNSD, CPC Version 3.0 Explanatory Notes, 30 June 2025, p. 279. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdf53213 entity boundary including taxiways, aprons and related non-building structures; classification scope only
faa-airport-construction-2018official_guidanceFAA AC 150/5370-10H, Standard Specifications for Construction of Airports, 21 December 2018, updated errata 19 August 2020. https://www.faa.gov/documentLibrary/media/Advisory_Circular/150-5370-10H.pdfP-152 pp.103–115 earthworks; P-154 pp.121–128 subbase; P-209 pp.173–182 crushed base; P-217 pp.207–214 aggregate/turf; P-401 pp.263–290 asphalt; P-501 pp.347–396 concrete; P-605 p.499 onward joints; P-620 p.521 onward markings; P-621 p.537 onward grooves; D-701 p.575 onward drains; L-125 p.713 onward lighting; T-901 p.613 onward seeding, T-904 p.627 onward sodding, T-905 p.633 onward topsoiling. US qualitative construction/acceptance evidence, without importing numeric limits, recipes, load thresholds or compliance requirements
fhwa-pavement-lca-2016official_guidanceFHWA-HIF-16-014, Pavement Life-Cycle Assessment Framework, July 2016, §1.2 p.1-4; §3.2.3; Chapter 4. https://rosap.ntl.bts.gov/view/dot/38470/dot_38470_DS1.pdfRoad-framework stage distinctions and boundary disclosure for production/construction/use/maintenance/end-of-life; no road-vehicle impacts or airport service-life values transferred
epa-construction-dust-1995official_guidanceUS EPA AP-42 §13.2.3 Heavy Construction Operations, January 1995, pp.13.2.3-1–2. https://www.epa.gov/sites/default/files/2020-10/documents/13.2.3_heavy_construction_operations.pdfHistorical qualitative construction-dust mechanisms and site conditions only; no old aggregate TSP factor or inferred PM fractions adopted
epa-concrete-washout-2012official_guidanceUS EPA, Stormwater Best Management Practice: Concrete Washout, EPA 833-F-11-006, February 2012, pp.1–2. https://www.epa.gov/sites/default/files/2015-11/documents/concretewashout_0.pdfConcrete washout liquid, settled solids, containment and actual water-route distinction; no assumed soil/water discharge or default pH/concentration

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 3
Rule IDApplies toRuleSource IDs
boundary_deliverydatasetRecord actual earthworks, layers, drainage, marking/grooving, lighting and tests/handover by process. Listed materials are not a universal complete recipe; individually add every additional actual material, packaging, lubricant, planting input, ancillary and temporary work exchange, documenting absent processes.faa-airport-construction-2018
boundary_stagesdatasetLink manufacture and transport separately; paving does not represent material production. Operating electricity, aircraft, post-handover maintenance/replacement, final demolition and destinations are excluded; separately model those stages only with real scenarios and redeclared scope.fhwa-pavement-lca-2016
boundary_environmentutilities; wasteInclude actual utilities and evidenced direct releases, distinguishing fuel supply/combustion, purchased water/resource abstraction, dewatering transfer/discharge, liquid waste/settled solids. Retain actual equipment, duration, location and measurements for noise without inventing default sound-energy exchanges; any evidenced emissions are separate exact substances and media.epa-construction-dust-1995, epa-concrete-washout-2012
Allocation rules · 3
Rule IDApplies toRuleSource IDs
allocation_projectall inventory rowsFirst partition airport work using submeters, weights, equipment time, actual zones and lots; direct attribution precedes allocation. Shared activities use measured causal physical drivers, preserving all beneficiary projects and denominator with shares summing to one. Area normalizes the reference within a consistent use/structure package; it is not a default allocation among heterogeneous works.
allocation_assetsplywood_form; utilitiesUse cp_assets to record each asset/component manufacture burden, project/period activity and supported cumulative service. Across projects, periods and repeated uses, total manufacture shares of the same asset cannot exceed one. Unknown life/cumulative activity remains a review and completeness gap, never reset per project.
allocation_recoverywasteConstruction waste, reused pavement and exported millings do not automatically earn credits. Document actual treatment/recovery gates, quality and receiver. Any substitution benefit or recycling allocation needs a declared sourced method and sensitivity, without simultaneously claiming avoided manufacture and zero burden.fhwa-pavement-lca-2016
Validation rules · 4
Rule IDApplies toRuleSource IDs
validate_referencereference_airfieldCheck 1 m2 output, Area property, surveyed area, delivery completeness and qualifiers; all rows/protocols share the same package denominator. Missing survey/attribution evidence or overlapping area makes data incomplete.un-cpc3-2025
validate_routedatasetReconcile earthworks, subgrade, aggregate, asphalt/concrete/turf layers and specified associated works with actual design, documenting applicability/absence and corrections. An empty UUID does not imply absence; collection labels cannot complete the inventory.faa-airport-construction-2018
validate_identitiesall inventory rowsVerify each public identity substance, state, route, geography/voltage, environmental medium and reference property; unsupported mass/area/volume relationships remain unresolved. Align bilingual row_id, rule_id, UUID and official Chinese names.
validate_coveragedatasetCheck no overlap between site combustion, transport, upstream manufacture and treatment. Reconcile water/waste destinations, exact emission species and cumulative asset shares. Gaps prevent complete environmental-inventory claims; site delivery confers neither whole-life coverage nor scientific/regulatory approval.fhwa-pavement-lca-2016, epa-concrete-washout-2012
Processes and inputs/outputs · 11
Process IDProcess nameInput flowsOutput flows
siteSite survey, clearance and earthworks10
baseSubgrade, subbase and base construction40
flexibleFlexible asphalt pavement placing and rolling20
rigidRigid concrete placing, joints and curing50
unpavedAggregate/turf surface establishment20
drainageDrainage and associated civil works10
finishMarking, grooving and airfield lighting installation50
utilitiesSite plant, construction utilities and direct releases107
transportInbound and construction-waste transport10
wasteConstruction waste segregation and routing04
handoverTesting, corrections and physical acceptance01

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.