TianGong PCR

Stoves, grates, braziers and similar non-electric domestic appliances (other than cooking appliances and plate warmers) of iron or steel

Stoves, grates, braziers and similar non-electric domestic appliances (other than cooking appliances and plate warmers) of iron or steel: This rule covers the…

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published versionLast updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:44822 · exact

Source

1. Scope and Applicability

This rule covers the factory-gate production of an accepted, complete iron or steel domestic non-electric appliance primarily used for local heating or an equivalent non-cooking fire function. It covers solid-, gas-, or liquid-fuel designs when their declared product configuration fits the category. The foreground starts at receipt of metal stock and purchased components, includes attributable factory fabrication, finishing, assembly and packaging, and ends with the accepted appliance at the factory gate. Supplier production is linked through purchased-input datasets. Use-phase fuel combustion, installation, distribution, maintenance and end of life are outside this production dataset. The exact fuel, construction, and operations must be stated; a fuel-specific regulatory limit is not a manufacturing inventory range. [un-cpc-3-2025; iso-14044-2006]

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.special-purpose-machinery.stoves-grates-braziers-and-similar-non-electric-domestic-appliances-other-than-cooking-3665f7e2
classification_refsCPC 3.0: 44822, identity context only
covered_productsComplete iron or steel non-electric domestic heating stoves, grates and braziers; fuel route declared
excluded_productsCooking appliances and plate warmers; central-heating radiators; electric heaters; parts sold separately; outdoor cooking equipment
representative_productOne accepted complete steel-bodied or cast-iron-bodied non-electric domestic heating stove
production_routePurchased steel stock and/or cast iron firebox components; attributable fabrication, finishing, assembly and packing
market_stateSale-ready complete appliance at factory gate, without operating fuel and excluding transport packaging from net mass

3. Reference Flow

FieldValue
WhatProvide one complete non-electric domestic local-heating appliance of the declared configuration.
How muchOne accepted finished unit, represented by its measured net mass M kg.
How wellState model, fuel, iron/steel body construction, nominal heat-output designation and acceptance criteria.
How long or cycleOne accepted sale-ready unit at factory gate; no assumed service life is embedded in this production reference.
reference_flow_linkfinished_stove
FieldValue
Reference amountM
Reference product flowStoves, grates, braziers and similar non-electric domestic appliances (other than cooking appliances and plate warmers) of iron or steel e4f06ae9-21fe-4b4e-a2ba-46b1d8824f14
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifiersdomestic non-electric heating purpose; model and fuel type; body material; accepted complete configuration; nominal heat-output designation; net mass M excludes transport packaging and fuel

The package must declare every Required qualifier. One accepted unit equals M kg for the same configuration. Per-unit inventory is not assigned a fabricated mass; a later producer weighs M. A mass-normalized export may divide a measured per-unit exchange by that measured M, with the conversion disclosed. [iso-14044-2006]

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_massreference productMass 93a60a56-a3c8-11da-a746-0800200b9a66kgM = accepted net mass of one complete unit of the same configuration in kg; collect using cp_mass.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionPurchased metal stock and components arrive at the factory gate with supplier production represented by linked upstream datasets.
starting_condition_roleForeground manufacturing input boundary.
product_classification_scopeComplete iron or steel domestic non-electric heating appliance, independent of a classification code.
recursive_input_ruleA purchased complete appliance in the same category is a distinct upstream product, never silently reclassified as raw material; disclose its mass and avoid double counting.
upstream_dataset_requirementLink specific upstream production datasets for each purchased material or component, including transport to the factory when included in the declared cradle-to-gate study.
disclosureDeclare model, fuel route, purchased versus in-house operations, supplier data coverage, excluded stages and any omitted exchange.
rule_idapplies_torulesource_ids
boundary_factory_gateall processesInclude all attributable factory inputs and outputs through accepted product release, with purchased inputs linked upstream; document exclusions and cut-off decisions.iso-14044-2006; jauhiainen-2024
boundary_use_exclusionuse stageDo not add household operating fuel or use emissions to this manufacturing inventory; report any separate use model with its own scenario.iso-14044-2006

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
stove_factoryMetal fabrication, finishing, assembly and packingrequiredAll accepted complete units; each conditional exchange applies only when physically used.Foreground factory productionper one accepted finished unit

Process: Metal fabrication, finishing, assembly and packing (stove_factory)

Inputs

Product flows
Steel sheet for body fabrication (steel_sheet)

Include when the factory cuts or forms uncoated low-carbon sheet into the stove body; use the purchased sheet mass crossing the factory boundary.

  • Selected flow: Uncoated low-carbon steel sheet
  • Flow property / unit: Mass / kg
  • Amount rule: Purchased sheet mass attributable per one accepted finished unit; collect using cp_materials.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per one accepted finished unit
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
  • Sources:
Purchased cast firebox (cast_firebox)

Include only when a distinct cast-iron firebox is purchased and installed. An integrated foundry must be represented as a linked upstream foreground process with its own exchanges.

  • Selected flow: Cast iron firebox casting
  • Flow property / unit: Mass / kg
  • Amount rule: Purchased casting mass attributable per one accepted finished unit; collect using cp_materials.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per one accepted finished unit
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_materials
  • Sources:
Purchased factory electricity (factory_electricity)

Record metered grid electricity used for attributable forming, joining, assembly, coating and packing operations; exclude supplier electricity already included in purchased part datasets.

  • Selected flow: Grid alternating-current electricity
  • Flow property / unit: Electrical energy / kWh
  • Amount rule: Metered kWh attributable per one accepted finished unit; collect using cp_electricity.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per one accepted finished unit
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_electricity
  • Sources:
Powder coating consumed (powder_coating)

Include only when powder coating is applied inside the foreground factory; purchased precoated components retain their supplier dataset instead.

  • Selected flow: Powder Coating 6e3010f9-fbd3-48f6-95fc-c1b38d2800d2
  • Flow property / unit: Mass / kg
  • Amount rule: Powder coating feed mass attributable per one accepted finished unit; collect using cp_coating.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per one accepted finished unit
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_coating
  • Sources:
Corrugated shipping box (carton_box)

Include one corrugated board box when supplied with the finished unit at the factory gate; its mass is excluded from M.

  • Selected flow: corrugated board boxes 4f197bec-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: Mass / kg
  • Amount rule: Box mass supplied per one accepted finished unit; collect using cp_packaging.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per one accepted finished unit
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_packaging
  • Sources:
Waste flows
Elementary flows

Outputs

Product flows
Accepted finished non-electric domestic heater (finished_stove)

One accepted, sale-ready iron or steel domestic non-electric heater leaves the factory. Transport packaging and operating fuel are outside the measured net appliance mass M.

  • Selected flow: Stoves, grates, braziers and similar non-electric domestic appliances (other than cooking appliances and plate warmers) of iron or steel e4f06ae9-21fe-4b4e-a2ba-46b1d8824f14
  • Flow property / unit: Mass / kg
  • Amount rule: M kg
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per one accepted finished unit
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_mass
  • Sources:
Waste flows
Factory steel offcuts and rejects (steel_scrap)

Include separated steel offcuts and rejected fabricated steel leaving the factory as post-industrial scrap; do not net them against steel-sheet purchases.

  • Selected flow: Post-industrial steel scrap c143745d-be4f-4d8f-b403-2dcbfe685349
  • Flow property / unit: Mass / kg
  • Amount rule: Dispatched steel scrap mass attributable per one accepted finished unit; collect using cp_scrap.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per one accepted finished unit
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_scrap
  • Sources:
Elementary flows

7. Allocation and Co-product Handling

rule_idapplies_torulesource_ids
allocation_subdivideshared factory operationsSubdivide metered lines and materials by model where possible before allocating shared exchanges.iso-14044-2006
allocation_physicalresidual shared factory exchangesIf subdivision is impossible, allocate by a documented physical driver such as machine time or measured mass that reflects the exchange; reconcile allocated totals to facility totals.iso-14044-2006
allocation_scrapsteel scrapRecord scrap as a separate waste output; disclose the recycling boundary and do not subtract a speculative avoided-production credit from factory inputs.iso-14044-2006

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_massstove_factoryaccepted complete appliance masscalibrated scale recordmodel; configuration; serial number; accepted net mass MWeigh the accepted complete unit on a calibrated scale, excluding transport packaging; reconcile the same configuration and acceptance record.kgeach model or representative accepted unitcurrent production campaignreporting factoryaccepted net mass per unitscale calibration and acceptance record
cp_materialsstove_factorypurchased steel sheet or cast fireboxsupplier invoice and bill of materialsmaterial specification; delivered mass; used mass; model; accepted unit countReconcile supplier records, material issues and bill of materials for the same model; separate steel sheet and cast firebox.kgeach production campaigncurrent production campaignreporting factoryattributable material mass / accepted unitsinvoices; inventory issue log; bill of materials
cp_electricitystove_factorypurchased grid electricitymeter and production logmeter kWh; line; period; model; accepted unit countRead calibrated meters and allocate only attributable factory use to accepted units.kWheach production campaigncurrent production campaignreporting factoryattributable kWh / accepted unitsmeter calibration and production log
cp_coatingstove_factorypowder coating feedissue and return logcoating batch; issued kg; returned kg; model; accepted unit countWeigh or reconcile net coating powder consumed by the model.kgeach coating campaigncurrent production campaignreporting factorynet coating feed kg / accepted unitsmaterial issue and return records
cp_packagingstove_factorycorrugated board boxpackaging bill of materialsbox mass; count; model; accepted unit countWeigh the supplied box or use traceable supplier mass for the specified box.kgeach packaging specificationcurrent specificationreporting factorysupplied box mass / accepted unitspackaging specification and supplier record
cp_scrapstove_factorypost-industrial steel scrapweighbridge and dispatch logscrap kg; grade; model or line; period; accepted unit countWeigh separated steel scrap dispatched and allocate to the manufacturing campaign.kgeach production campaigncurrent production campaignreporting factoryattributable dispatched scrap kg / accepted unitsweighbridge ticket and scrap transfer record

Calculation Rules

No additional calculation formula is prescribed for this per-unit reference. Each protocol states its aggregation; the measured net mass M is the linked reference amount.

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_configurationall rowsReconcile model, fuel, body material and accepted configuration across mass, bill of materials and meters.acceptance record; bill of materials
dq_periodall rowsUse a declared current production campaign and disclose missing, estimated or supplier-proxy data.dated records and gap log
dq_completenessfactory inputs and outputsAdd a separate atomic row for every other actual factory material, energy carrier, waste or direct emission before publishing a concrete dataset; document cut-off decisions.reconciled material and energy balance; site inventory

9. Validation Rules

rule_idapplies_torulesource_ids
validate_product_identityfinished_stoveRequire a complete non-electric iron or steel domestic non-cooking heater with model and fuel recorded.un-cpc-3-2025
validate_reference_massfinished_stoveRequire positive measured M for one accepted complete unit of the same configuration, excluding fuel and transport packaging.iso-14044-2006
validate_factory_balancestove_factoryReconcile purchased materials, energy, finished units and separately dispatched scrap to the campaign records; explain unmatched quantities.iso-14044-2006; jauhiainen-2024

10. Published Dataset Profile

FieldValue
dataset_roleForeground factory production data package for one declared heater model and fuel route.
downstream_usesecondary_dataset or background_dataset after review; process and lifecyclemodel projections.
allowed_useManufacturing-stage LCA with linked supplier datasets and disclosed allocation.
excluded_useDirect comparison of unlike heating functions, use-phase emissions or compliance certification without separate models.
required_metadataProduct model; fuel; body material; nominal heat designation; factory; year; M; packaging state; purchased components; site operations.
required_quality_disclosureData period; primary-data share; meters; supplier coverage; allocation drivers; unresolved flows and omitted exchanges.
update_triggerMaterial, fuel, supplier, factory, coating route or measurement change.

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-3-2025official_guidanceCPC Version 3.0 Structure, 30 June 2025; https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Structure_30Jun2025.csvProduct identity and adjacent category exclusions, row 2365.
iso-14044-2006standardEnvironmental management — Life cycle assessment — Requirements and guidelines, IS/ISO 14044:2006; https://fenix.ciencias.ulisboa.pt/downloadFile/2251937252647064/is.iso.14044.2006.pdfUnit-process boundary, foreground collection, allocation and data quality, clauses 4.2.3.3, 4.3.2 and 4.3.4.
jauhiainen-2024literatureSelvitys puulämmitteisen tulisijan EPD-ympäristöselosteen laadinnasta, 2024; https://www.theseus.fi/bitstream/10024/867657/2/Jauhiainen_Katri.pdfOne Finnish wood-fired sauna-stove case supports factory material, energy, waste and component-weighing record types; no cross-product amounts or empirical ranges.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 2
Rule IDApplies toRuleSource IDs
boundary_factory_gateall processesInclude all attributable factory inputs and outputs through accepted product release, with purchased inputs linked upstream; document exclusions and cut-off decisions.iso-14044-2006, jauhiainen-2024
boundary_use_exclusionuse stageDo not add household operating fuel or use emissions to this manufacturing inventory; report any separate use model with its own scenario.iso-14044-2006
Allocation rules · 3
Rule IDApplies toRuleSource IDs
allocation_subdivideshared factory operationsSubdivide metered lines and materials by model where possible before allocating shared exchanges.iso-14044-2006
allocation_physicalresidual shared factory exchangesIf subdivision is impossible, allocate by a documented physical driver such as machine time or measured mass that reflects the exchange; reconcile allocated totals to facility totals.iso-14044-2006
allocation_scrapsteel scrapRecord scrap as a separate waste output; disclose the recycling boundary and do not subtract a speculative avoided-production credit from factory inputs.iso-14044-2006
Validation rules · 3
Rule IDApplies toRuleSource IDs
validate_product_identityfinished_stoveRequire a complete non-electric iron or steel domestic non-cooking heater with model and fuel recorded.un-cpc-3-2025
validate_reference_massfinished_stoveRequire positive measured M for one accepted complete unit of the same configuration, excluding fuel and transport packaging.iso-14044-2006
validate_factory_balancestove_factoryReconcile purchased materials, energy, finished units and separately dispatched scrap to the campaign records; explain unmatched quantities.iso-14044-2006, jauhiainen-2024
Processes and inputs/outputs · 1
Process IDProcess nameInput flowsOutput flows
stove_factoryMetal fabrication, finishing, assembly and packing52

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page