TianGong PCR

Seamless steel line pipe for oil or gas pipelines · Calculation Rules

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published versionLast updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:41281 · exact

Source

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
normalizationall exchangesq_i = allocated external amount_i / D; output reference = 1 kg. Reconcile material stocks and cancel internal transfers before calculation.cp_final_product; row-specific cpper 1 kg
physical_balancesiteRetain separate gross masses of received steel, accepted steel body, scrap, wet solids, water and opening/closing work in progress; do not add contained-iron mass to gross steel mass. Close the elemental iron balance on one contained-Fe basis: measured Fe in external feed plus opening work in progress = measured Fe in accepted steel body, external scrap, scale, sludge and effluent plus closing work in progress and every other measured Fe release. Derive each term from its own measured gross mass and Fe assay; use matched concentration and volume for effluent. Retain carbon and each actual alloy-element oxidation, release, retained mass and chemical-reaction records as separate elemental balances. Account for oxygen uptake, water content and actual reaction products; never assume pure iron, common composition, a fixed conversion or an invented yield. Cancel internal rework; retain its repeated energy and chemistry. Close water makeup + opening storage = external transfer + discharge + evaporation + product carryover + closing storage; close acid/chemical active-component stock, reaction, carryover and waste balances with measured uncertainty.Steel/iron assays; water meters; acid concentration; stocks; waste recordsClosure residual with measurement uncertainty; no invented tolerance
energy_conversionutilitiesMetered kWh × 3.6 = MJ; fuel mass × measured NCV = MJ. Shared service allocations sum to measured total.Meters; NCV; calibration; allocation driverMJ

Data Quality Requirements

requirement_idApplies toRequirementEvidence
qualificationpipeoil/gas linepipe application; specification and edition; product specification level; steel grade and heat chemistry; outside diameter, wall thickness and length; seamless forming route; hot/cold finishing; delivery heat-treatment condition; sour-service requirements; inspection and hydrotest acceptance; surface/coating system and coating mass; end preparation; site, period and feed starting stateOrder; mill certificate; dimensional/heat-treatment and test records
coverageall rowsRecord applicability as present, absent, measured zero or unknown. No missing-as-zero. Resolve exact flow identity, supplier geography/year, treatment destination and emission compartment before dataset completion.manifest review_metadata
rangesall rowsNo default process intensity, yield, chemistry or empirical range is established. Use foreground records; independent compatible range evidence remains pending.Retained records and uncertainty

9. Validation Rules

rule_idApplies toRulesource_ids
validate_referencefinal_productCheck positive measured D, 1 kg reference, accepted product, steel/coating separation and all qualifiers. Do not label generic tube or welded/OCTG UUID as seamless linepipe.
validate_balanceproductionRetain separate gross masses of received steel, accepted steel body, scrap, wet solids, water and opening/closing work in progress; do not add contained-iron mass to gross steel mass. Close the elemental iron balance on one contained-Fe basis: measured Fe in external feed plus opening work in progress = measured Fe in accepted steel body, external scrap, scale, sludge and effluent plus closing work in progress and every other measured Fe release. Derive each term from its own measured gross mass and Fe assay; use matched concentration and volume for effluent. Retain carbon and each actual alloy-element oxidation, release, retained mass and chemical-reaction records as separate elemental balances. Account for oxygen uptake, water content and actual reaction products; never assume pure iron, common composition, a fixed conversion or an invented yield. Cancel internal rework; retain its repeated energy and chemistry. Close water makeup + opening storage = external transfer + discharge + evaporation + product carryover + closing storage; close acid/chemical active-component stock, reaction, carryover and waste balances with measured uncertainty.
validate_completedatasetCheck applicable routes, each atomic external exchange, normalization, provider/waste fate and post-control emissions. Unresolved UUID, mandatory unknown quantity or unsupported unit conversion blocks a complete dataset; candidate methodology checks do not constitute product conformance.

10. Published Dataset Profile

FieldValue
dataset_roleforeground_dataset
downstream_useprocess; lifecyclemodel
allowed_useSpecified seamless linepipe manufacturing, with upstream burdens linked
excluded_useWelded/OCTG or installed pipeline; full API conformity inferred from this PCR
required_metadataoil/gas linepipe application; specification and edition; product specification level; steel grade and heat chemistry; outside diameter, wall thickness and length; seamless forming route; hot/cold finishing; delivery heat-treatment condition; sour-service requirements; inspection and hydrotest acceptance; surface/coating system and coating mass; end preparation; site, period and feed starting state
required_quality_disclosureRoute, upstream coverage, identity/measurement gaps, uncertainty, allocation and waste fate
update_triggerGrade/specification, process route, coating, yield, supply or acceptance requirement change

11. Data Sources

Source idTypeReferenceUsed for
ec-fmp-bref-2022official_guidanceEuropean Commission JRC, Ferrous Metals Processing BREF (2022), DOI 10.2760/196475, chapter 1 steel tubes; 2.2.1.6 tube mills; 2.2.18 wastes; 2.3.2 energy; 2.3.5 emissions. https://bureau-industrial-transformation.jrc.ec.europa.eu/sites/default/files/2022-12/FMP%20BREF_Final%20Version.pdfSeamless billet heating, piercing, elongation, final rolling and heat treatment; conditional cold drawing; water, oil, scale and combustion controls. No universal intensity or temperature adopted.
api-5l-announcement-2026official_guidanceAPI, API Announces 47th Edition of Foundational Line Pipe Standard, 2 June 2026. https://www.api.org/news-policy-and-issues/news/2026/06/02/api-announces-47th-edition-of-api-specification-5lOfficial scope and manufacture/inspection/test/marking/traceability categories only. Announcement is not the specification: obtain the actual order edition and clauses for conformance.
tenaris-coatingsextension_guidanceTenaris, Offshore and Onshore Pipeline Coating Solutions, pages 4 and 6, undated brochure, retrieved 2 October 2026. https://www.tenaris.com/media/1jtmlf5o/offshore-onshore-pipeline-coatingsolutions.pdfConditional FBE, adhesive and polyethylene/polypropylene layers; separate internal coating. Manufacturer offerings do not establish mandatory coating or universal thickness/intensity.
ef-allocation-2021official_guidanceCommission Recommendation (EU) 2021/2279, Annex I section 4.5. https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02021H2279-20211230Subdivision, physical-causality and other-relationship allocation hierarchy; no claim of complete PEF conformance.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page