TianGong PCR

Aluminium ores and concentrates

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published versionLast updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:14230 · exact

Source

1. Scope and Applicability

This PCR covers aluminium-bearing ores and physically beneficiated concentrates at a declared mine or processing gate, with bauxite as the representative material. Include actual development, topsoil/overburden removal, extraction, handling, crushing, sizing and optional washing/dewatering through that gate. Distinguish integrated mining from standalone processing receiving burden-bearing ore. Not all bauxite is washed. Other aluminium minerals require their actual mineralogy, extraction and beneficiation evidence and distinct flow identities; they cannot inherit bauxite washing quantities. Exclude Bayer digestion/alumina refining, aluminium smelting, calcined refractory products, finished abrasives and downstream customer processing. iai-bauxite-mining-2026, ifc-mining-2007

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.ores-and-minerals-electricity-gas-and-water.metal-ores.aluminium-ores-and-concentrates
classification_refsCPC 3.0:14230
covered_productsAluminium-bearing raw ores and physically upgraded ore/concentrate; one mineral, grade and moisture state per dataset
excluded_productsAlumina chemicals/refining; aluminium metal; calcined refractory bauxite; finished abrasives; customer conversion
representative_productWashed bauxite representative product
production_routeMine development and rehabilitation; Ore extraction and haulage; Crushing and sizing; Washing and dewatering; Stockpiling, loading and site controls
market_stateOne actual ore grade and measured as-received moisture at the mine/processing loading gate

3. Reference Flow

FieldValue
WhatSupply 1 kg of specified aluminium ore or physical concentrate; no equivalence to 1 kg aluminium or alumina
How much1 kg
How wellsite/year; mineralogy; mining method; integrated/standalone start; raw/crushed/washed state; particle size; as-received moisture; dry-basis total and available alumina and reactive silica where relevant; gate; yield and rejects; water basin; waste fate; allocation; development and closure basis; representative UUID applies only to washed bauxite, with a distinct identity required for unwashed or other aluminium minerals
How long or cycleOne gate supply within a declared production period
reference_flow_linkfinal_product
FieldValue
Reference amount1
Reference product flowWashed Bauxite bd0c6203-d2b3-4e7f-8602-027aa93e87df
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifierssite/year; mineralogy; mining method; integrated/standalone start; raw/crushed/washed state; particle size; as-received moisture; dry-basis total and available alumina and reactive silica where relevant; gate; yield and rejects; water basin; waste fate; allocation; development and closure basis; representative UUID applies only to washed bauxite, with a distinct identity required for unwashed or other aluminium minerals

Declare all qualifiers in dataset metadata or reference-flow comments. The representative identity is usable only for its confirmed product state, geography and property; resolve a distinct flow for incompatible variants. It does not impose a default product composition.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_basisfinal_productMasskgD is the positive accepted net gate-output total in kg. Exclude packaging and cancelled internal transfers. cp_output records D; every card uses per 1 kg reference flow.
conversionutility and material rowsDeclared row propertykg; m3; MJRetain raw readings. Electricity: 1 kWh = 3.6 MJ. Mass/volume conversion requires measured density, temperature and applicable pressure; retain water content and active chemical fraction.
category_balanceproductionMasskgD is positive accepted net as-received product mass in kg at the selected gate, excluding packaging and rejects. Record each stream moisture w and dry-solids mass m_dry = m_wet × (1 − w); assay grades on their stated basis. Contained-alumina mass is dry-solids mass times the matching dry-basis Al2O3 fraction, not the reference denominator. Reconcile dry ore, product, waste rock, wash fines, losses, stock changes and transferred water. Separate circulated wash water, new intake and measured return; no universal recovery, grade or density.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionOre in the geological deposit for integrated mining, or purchased ore for standalone physical processing
starting_condition_roleResource or supplied feed; declare which
product_classification_scopeAluminium-bearing raw ores and physically upgraded ore/concentrate; one mineral, grade and moisture state per dataset
recursive_input_rulePurchased same-category material carries a distinct supplier dataset; internal recycling is a balance observation, not a new external input or credit.
upstream_dataset_requirementLink feed, electricity, fuels, chemicals, infrastructure and waste-management burdens; disclose any missing coverage.
disclosuresite/year; mineralogy; mining method; integrated/standalone start; raw/crushed/washed state; particle size; as-received moisture; dry-basis total and available alumina and reactive silica where relevant; gate; yield and rejects; water basin; waste fate; allocation; development and closure basis; representative UUID applies only to washed bauxite, with a distinct identity required for unwashed or other aluminium minerals
rule_idApplies toRulesource_ids
boundary_operationssiteThis PCR covers aluminium-bearing ores and physically beneficiated concentrates at a declared mine or processing gate, with bauxite as the representative material. Include actual development, topsoil/overburden removal, extraction, handling, crushing, sizing and optional washing/dewatering through that gate. Distinguish integrated mining from standalone processing receiving burden-bearing ore. Not all bauxite is washed. Other aluminium minerals require their actual mineralogy, extraction and beneficiation evidence and distinct flow identities; they cannot inherit bauxite washing quantities. Exclude Bayer digestion/alumina refining, aluminium smelting, calcined refractory products, finished abrasives and downstream customer processing.iai-bauxite-mining-2026, ifc-mining-2007
boundary_partitionall exchangesInclude actual conditioning, storage, handling and pollution controls through the declared gate. Account for attributable construction and closure with a disclosed lifetime-output basis or justified exclusion and sensitivity. Separate purchased fuel supply from foreground combustion and purchased treatment from site releases.
boundary_completenessinventoryCards define individual likely exchanges and route conditions, not an exhaustive site audit. Add each actual absent chemical, waste, resource, land transformation and pollutant as its own row. Absence, measured zero and unknown must be distinguished.

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
developmentMine development and rehabilitationconditionalIntegrated mine and attributable closureForeground productionper 1 kg reference flow
extractionOre extraction and haulageconditionalIntegrated miningForeground productionper 1 kg reference flow
preparationCrushing and sizingconditionalActual physical preparation or supplied oreForeground productionper 1 kg reference flow
washingWashing and dewateringconditionalActual wet-beneficiation route onlyForeground productionper 1 kg reference flow
dispatchStockpiling, loading and site controlsrequiredAll declared sitesForeground productionper 1 kg reference flow

Process: Mine development and rehabilitation (development)

Inputs

Product flows
Mine-development diesel (development_diesel)

Actual stripping/rehabilitation equipment, allocated once by disclosed lifetime output.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_development_diesel; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_development_diesel
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

Outputs

Waste flows
Overburden sent to mine management (overburden)

Actual removed overburden; topsoil storage and reuse remain a separate land/stock record.

  • Selected flow: Overburden sent to mine management
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_overburden; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_overburden
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

Process: Ore extraction and haulage (extraction)

Inputs

Product flows
Extraction and haulage diesel (mining_diesel)

Actual equipment, haul distances and load cycles; exclude supplier fuel combustion.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_mining_diesel; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_mining_diesel
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007
Ammonium-nitrate/fuel-oil explosive (anfo_explosive)

Only actual ANFO blasting; record formulation and charge. Nonblasted extraction excludes this row; each other explosive needs its own card.

  • Selected flow: Ammonium-nitrate/fuel-oil explosive
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_anfo_explosive; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_anfo_explosive
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007
Elementary flows
Bauxite ore extracted from the deposit (bauxite_resource)

Only primary bauxite extraction; measure ore mass, mineralogy and moisture, separately from overburden. Other aluminium minerals need their own resource identity.

  • Selected flow: Bauxite ore extracted from the deposit
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_bauxite_resource; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_bauxite_resource
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

Outputs

Waste flows
Mine waste rock (waste_rock)

Actual barren/rejected rock sent to defined management; measure dry solids and leaching potential.

  • Selected flow: Mine waste rock
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_waste_rock; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_waste_rock
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

Process: Crushing and sizing (preparation)

Inputs

Product flows
Supplied bauxite ore (purchased_ore)

Only standalone bauxite processing; supplier carries extraction and agreed transport, without also counting direct mine resource.

  • Selected flow: Supplied bauxite ore
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_purchased_ore; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_purchased_ore
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007
Crushing and sizing electricity (crusher_power)

This purchased electricity exchange requires independently confirmed actual supplier, consumption or production interface, geography, voltage, generation attributes and energy property/unit; its UUID remains unresolved until a compatible direct-read identity is confirmed. A waste-incineration generation flow must not represent arbitrary site power.

Actual crushers/screens/conveyors, excluding washing and dispatch meter duplication.

  • Selected flow: Electricity
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Collect the attributable reporting-period quantity under cp_crusher_power; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_crusher_power
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

Outputs

Waste flows
Rejected ore from sizing (sizing_reject)

Only rejected fraction leaving productive route; assay moisture and aluminium/silica content.

  • Selected flow: Rejected ore from sizing
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_sizing_reject; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_sizing_reject
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

Process: Washing and dewatering (washing)

Inputs

Product flows
Supplied wash make-up water (supplied_wash_water)

Only purchased new make-up; internal circulating wash water is a balance observation.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_supplied_wash_water; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_supplied_wash_water
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007
Wash and dewatering electricity (wash_power)

This purchased electricity exchange requires independently confirmed actual supplier, consumption or production interface, geography, voltage, generation attributes and energy property/unit; its UUID remains unresolved until a compatible direct-read identity is confirmed. A waste-incineration generation flow must not represent arbitrary site power.

Actual scrubbers, pumps, screens and dewatering units only.

  • Selected flow: Electricity
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Collect the attributable reporting-period quantity under cp_wash_power; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_wash_power
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007
Elementary flows
River-water withdrawal (river_water)

Only direct abstraction; measure basin and intake separately from purchased water.

  • Selected flow: river water 805a7346-1664-4483-afe3-4b224be5e361
  • Flow property / unit: Volume / m3
  • Amount rule: Collect the attributable reporting-period quantity under cp_river_water; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_river_water
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

Outputs

Waste flows
Clay-rich bauxite wash fines (clay_fines)

Only actual wet tailings sent to management; measure water, dry solids and residual aluminium and prevent duplicate internal recycling.

  • Selected flow: Clay-rich bauxite wash fines
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_clay_fines; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_clay_fines
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007
Wash-water purge transferred for treatment (wash_effluent)

Only actual treatment transfer; direct discharge needs separate species/compartment and return-volume observations.

  • Selected flow: Wash-water purge transferred for treatment
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_wash_effluent; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_wash_effluent
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

Process: Stockpiling, loading and site controls (dispatch)

Inputs

Product flows
Loading diesel (loading_diesel)

Actual stockpile/loading equipment only, separate from mining haulage.

  • Selected flow: Diesel fuel 9d258d75-6792-4f1c-9856-81602ed8f816
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_loading_diesel; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_loading_diesel
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007
Site-control electricity (site_power)

This purchased electricity exchange requires independently confirmed actual supplier, consumption or production interface, geography, voltage, generation attributes and energy property/unit; its UUID remains unresolved until a compatible direct-read identity is confirmed. A waste-incineration generation flow must not represent arbitrary site power.

Actual drainage, dust-control and tailings auxiliaries; shared meters allocated once.

  • Selected flow: Electricity
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Collect the attributable reporting-period quantity under cp_site_power; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_site_power
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

Outputs

Product flows
Washed bauxite representative product (final_product)

The confirmed representative UUID applies only to washed bauxite at its compatible state; raw/unwashed ore and other aluminium minerals require distinct actual product identities at the same declared mass reference.

  • Selected flow: Washed Bauxite bd0c6203-d2b3-4e7f-8602-027aa93e87df
  • Flow property / unit: Mass / kg
  • Amount rule: 1 kg
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_output
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007
Elementary flows
Fossil carbon dioxide to outdoor air (co2_air)

Only foreground diesel and other actual fossil combustion; record fuel/carbon balance and factor provenance, no generic mine intensity.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_co2_air; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_co2_air
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007
Mineral PM10 to outdoor air (pm10_air)

Only measured/reconciled extraction, crushing, handling or haul-road fugitive dust; other particle fractions have separate identities and quantities.

  • Selected flow: Mineral PM10 to outdoor air
  • Flow property / unit: Mass / kg
  • Amount rule: Collect the attributable reporting-period quantity under cp_pm10_air; divide by D after stock, transfer and allocation reconciliation.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_pm10_air
  • Sources: iai-bauxite-mining-2026, ifc-mining-2007

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
allocation_hierarchyjoint productionPrefer process subdivision or defensible system expansion; otherwise use demonstrated physical causality. Use economic allocation only with consistent period, price, currency and sensitivity when physical causality is unavailable. Retain the unallocated inventory.ef-allocation-2021
allocation_productreference and co-productsSubdivide extraction, crushing, washing and grade-sorting activities where measured. Assign development/closure using disclosed attributable lifetime saleable output; do not charge the full development once to each annual dataset. Retain unallocated inventory for genuine co-products; sorting grades are not automatically distinct co-products. Clay fines or waste rock are not burden-free products merely because sold or reused.
allocation_wastewaste and recyclingClassify each output by physical state and actual fate. A sale does not automatically make a residue a co-product; internal recycling receives no avoided-product credit. Apply treatment burdens once.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_development_dieseldevelopmentdevelopment_dieselmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_overburdendevelopmentoverburdenmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCollect matched survey/weighbridge or slurry-flow records, representative moisture and solids assays, mineral composition and management fate. Reconcile internal returns; record allocated lifetime basis for development rather than a full repeated annual charge.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_bauxite_resourceextractionbauxite_resourcemeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_mining_dieselextractionmining_dieselmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_anfo_explosiveextractionanfo_explosivemeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_waste_rockextractionwaste_rockmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCollect matched survey/weighbridge or slurry-flow records, representative moisture and solids assays, mineral composition and management fate. Reconcile internal returns; record allocated lifetime basis for development rather than a full repeated annual charge.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_purchased_orepreparationpurchased_oremeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_crusher_powerpreparationcrusher_powermeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.MJEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_sizing_rejectpreparationsizing_rejectmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCollect matched survey/weighbridge or slurry-flow records, representative moisture and solids assays, mineral composition and management fate. Reconcile internal returns; record allocated lifetime basis for development rather than a full repeated annual charge.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_supplied_wash_waterwashingsupplied_wash_watermeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_river_waterwashingriver_watermeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.m3Each meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_wash_powerwashingwash_powermeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.MJEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_clay_fineswashingclay_finesmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCollect matched survey/weighbridge or slurry-flow records, representative moisture and solids assays, mineral composition and management fate. Reconcile internal returns; record allocated lifetime basis for development rather than a full repeated annual charge.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_wash_effluentwashingwash_effluentmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_loading_dieseldispatchloading_dieselmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_site_powerdispatchsite_powermeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.MJEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_co2_airdispatchco2_airmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_pm10_airdispatchpm10_airmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersCalibrated weighing, metering or traceable transfer records; reconcile period, opening/closing stock, actual grade and boundary.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty
cp_outputdispatchfinal_productmeasurement_recordperiod; site; amount; original unit; uncertainty; stock changes; route condition; allocation; D; product qualifiersUse calibrated net loading weights and inventory/transfer reconciliation to independently record positive accepted as-received kg D. Sample each representative lot for moisture, mineralogy, total/available alumina and reactive silica where relevant. Match the chosen raw/washed state and retain dry-basis assays separately from the wet-mass reference.kgEach meter interval or shipment; monthly reconciliationComplete year or justified representative production campaignOne actual ore grade and measured as-received moisture at the mine/processing loading gateper 1 kg reference flowCalibration; original records; assay; balance residuals; uncertainty

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
normalizationall cardsExchange = attributable period quantity / D. Reconcile inventories and cancel internal transfers before aggregation.cp_output; row-specific cp recordsper 1 kg reference flow
physical_balanceproductionD is positive accepted net as-received product mass in kg at the selected gate, excluding packaging and rejects. Record each stream moisture w and dry-solids mass m_dry = m_wet × (1 − w); assay grades on their stated basis. Contained-alumina mass is dry-solids mass times the matching dry-basis Al2O3 fraction, not the reference denominator. Reconcile dry ore, product, waste rock, wash fines, losses, stock changes and transferred water. Separate circulated wash water, new intake and measured return; no universal recovery, grade or density.Matched mass, volume, composition and stock measurementsBalance residual and uncertainty

Data Quality Requirements

requirement_idApplies toRequirementEvidence
representativenessdatasetUse matching production and exchange periods, actual technology, geography and supplier state. Record startup, shutdown, seasonal variation and substitutions.collection records
identity_and_rangesall cardsUnresolved identities and missing independent range evidence remain explicit. Do not replace measurement by a guessed industry range or by missing-as-zero.manifest review metadata

9. Validation Rules

rule_idApplies toRulesource_ids
validate_referencefinal_productVerify 1 kg, positive D, product state, property/unit and every required qualifier. Each dataset fixes one product and route.
validate_balancesiteD is positive accepted net as-received product mass in kg at the selected gate, excluding packaging and rejects. Record each stream moisture w and dry-solids mass m_dry = m_wet × (1 − w); assay grades on their stated basis. Contained-alumina mass is dry-solids mass times the matching dry-basis Al2O3 fraction, not the reference denominator. Reconcile dry ore, product, waste rock, wash fines, losses, stock changes and transferred water. Separate circulated wash water, new intake and measured return; no universal recovery, grade or density.
validate_coveragehandoffVerify each applicable exchange, its provider or environmental compartment and final waste fate; identify skipped checks, unresolved identities, missing measurements and upstream gaps. Errors or unassessed mandatory coverage cannot be labelled complete.

10. Published Dataset Profile

FieldValue
dataset_roleforeground_dataset
downstream_usesecondary_dataset; background_dataset
allowed_useSupply 1 kg of specified aluminium ore or physical concentrate; no equivalence to 1 kg aluminium or alumina
excluded_useAlumina chemicals/refining; aluminium metal; calcined refractory bauxite; finished abrasives; customer conversion
required_metadatasite/year; mineralogy; mining method; integrated/standalone start; raw/crushed/washed state; particle size; as-received moisture; dry-basis total and available alumina and reactive silica where relevant; gate; yield and rejects; water basin; waste fate; allocation; development and closure basis; representative UUID applies only to washed bauxite, with a distinct identity required for unwashed or other aluminium minerals
required_quality_disclosureIdentity and measurement gaps; boundary coverage; uncertainty; allocation; temporal and geographical representativeness
update_triggerChanged product, route, yield, supply, waste fate, site or representative period

11. Data Sources

Source idTypeReferenceUsed for
iai-bauxite-mining-2026extension_guidanceInternational Aluminium Institute, The Aluminium Story, Mining: Process, web snapshot 1 October 2026, Mining: The process. https://alustory.international-aluminium.org/mining-refining/process-mining/Surface extraction, topsoil/overburden separation, optional crushing/washing and refinery handover; no universal grade or consumption.
ifc-mining-2007official_guidanceIFC, Environmental Health and Safety Guidelines for Mining, 10 December 2007, sections 1.1 and Annex A. https://www.ifc.org/content/dam/ifc/doc/2000/2007-mining-ehs-guidelines-en.pdfMining water, wastes, emissions, development and closure; no product-specific default factors.
cpc3-notes-2025official_guidanceUNSD, CPC Version 3.0 Explanatory Notes, 30 June 2025. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdfClassification scope only; no process quantities.
ef-allocation-2021official_guidanceCommission Recommendation (EU) 2021/2279, Annex I section 4.5, consolidated 30 December 2021. https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02021H2279-20211230Multifunctionality hierarchy; not a claim of complete PEF conformity.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 3
Rule IDApplies toRuleSource IDs
boundary_operationssiteThis PCR covers aluminium-bearing ores and physically beneficiated concentrates at a declared mine or processing gate, with bauxite as the representative material. Include actual development, topsoil/overburden removal, extraction, handling, crushing, sizing and optional washing/dewatering through that gate. Distinguish integrated mining from standalone processing receiving burden-bearing ore. Not all bauxite is washed. Other aluminium minerals require their actual mineralogy, extraction and beneficiation evidence and distinct flow identities; they cannot inherit bauxite washing quantities. Exclude Bayer digestion/alumina refining, aluminium smelting, calcined refractory products, finished abrasives and downstream customer processing.iai-bauxite-mining-2026, ifc-mining-2007
boundary_partitionall exchangesInclude actual conditioning, storage, handling and pollution controls through the declared gate. Account for attributable construction and closure with a disclosed lifetime-output basis or justified exclusion and sensitivity. Separate purchased fuel supply from foreground combustion and purchased treatment from site releases.
boundary_completenessinventoryCards define individual likely exchanges and route conditions, not an exhaustive site audit. Add each actual absent chemical, waste, resource, land transformation and pollutant as its own row. Absence, measured zero and unknown must be distinguished.
Allocation rules · 3
Rule IDApplies toRuleSource IDs
allocation_hierarchyjoint productionPrefer process subdivision or defensible system expansion; otherwise use demonstrated physical causality. Use economic allocation only with consistent period, price, currency and sensitivity when physical causality is unavailable. Retain the unallocated inventory.ef-allocation-2021
allocation_productreference and co-productsSubdivide extraction, crushing, washing and grade-sorting activities where measured. Assign development/closure using disclosed attributable lifetime saleable output; do not charge the full development once to each annual dataset. Retain unallocated inventory for genuine co-products; sorting grades are not automatically distinct co-products. Clay fines or waste rock are not burden-free products merely because sold or reused.
allocation_wastewaste and recyclingClassify each output by physical state and actual fate. A sale does not automatically make a residue a co-product; internal recycling receives no avoided-product credit. Apply treatment burdens once.
Validation rules · 3
Rule IDApplies toRuleSource IDs
validate_referencefinal_productVerify 1 kg, positive D, product state, property/unit and every required qualifier. Each dataset fixes one product and route.
validate_balancesiteD is positive accepted net as-received product mass in kg at the selected gate, excluding packaging and rejects. Record each stream moisture w and dry-solids mass m_dry = m_wet × (1 − w); assay grades on their stated basis. Contained-alumina mass is dry-solids mass times the matching dry-basis Al2O3 fraction, not the reference denominator. Reconcile dry ore, product, waste rock, wash fines, losses, stock changes and transferred water. Separate circulated wash water, new intake and measured return; no universal recovery, grade or density.
validate_coveragehandoffVerify each applicable exchange, its provider or environmental compartment and final waste fate; identify skipped checks, unresolved identities, missing measurements and upstream gaps. Errors or unassessed mandatory coverage cannot be labelled complete.
Processes and inputs/outputs · 5
Process IDProcess nameInput flowsOutput flows
developmentMine development and rehabilitation11
extractionOre extraction and haulage31
preparationCrushing and sizing21
washingWashing and dewatering32
dispatchStockpiling, loading and site controls23

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page