TianGong PCR

Dry nonpropulsive small-spacecraft platform manufacture

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:49630 · narrower

Source

1. Scope and Applicability

New complete dry uncrewed Earth-orbiting small-spacecraft bus/platform with aluminium-alloy primary frame, solar photovoltaic generation, filled rechargeable lithium-ion storage, power management, passive thermal hardware and configured avionics/communications/attitude control, without installed propulsion. The declared delivered flight platform excludes mission payload but includes its bus-side mechanical/electrical interfaces. Manufacture covers declared stock/received subsystems to same-configuration factory acceptance/handover. This narrower platform route is context within CPC 49630, not all spacecraft and launch vehicles.

Exclude complete payload-bearing spacecraft, launch vehicles/upper stages, propulsion/thrusters/propellant, crewed/deep-space/nuclear/fuel-cell platforms, composite-primary-frame and other undeclared power/structure routes, ground station/dispenser/launch adapter, payload instruments and integration after the platform gate, qualification-only engineering models, spares/repair/refurbishment, software R&D/training services, launch transport/ascent/deployment/in-orbit operation and end of life. Model operational lifetime or mission output separately.

ISISPACE separates platform and payload and offers optional propulsion; NASA documents aluminium modular structures and photovoltaic/Li-ion subsystems. Those examples motivate this narrower manufactured product, not a universal recipe, CubeSat dimensions or certified mission lifetime. GSFC-STD-7000B (2021) is historical mission-tailored environmental/mass-property verification context, not a universal test schedule or evidence of actual platform M. Scientific review is pending. Receipt-to-acceptance foreground is not complete cradle-to-gate without compatible disclosed upstream links.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.transport-equipment.spacecraft-platform
classification_refsCPC 3.0 49630; narrower nonpropulsive dry uncrewed small-spacecraft bus, context only
covered_productsNew complete dry uncrewed Earth-orbiting small-spacecraft bus/platform with aluminium-alloy primary frame, solar photovoltaic generation, filled rechargeable lithium-ion storage, power management, passive thermal hardware and configured avionics/communications/attitude control, without installed propulsion. The declared delivered flight platform excludes mission payload but includes its bus-side mechanical/electrical interfaces. Manufacture covers declared stock/received subsystems to same-configuration factory acceptance/handover. This narrower platform route is context within CPC 49630, not all spacecraft and launch vehicles.
excluded_productsExclude complete payload-bearing spacecraft, launch vehicles/upper stages, propulsion/thrusters/propellant, crewed/deep-space/nuclear/fuel-cell platforms, composite-primary-frame and other undeclared power/structure routes, ground station/dispenser/launch adapter, payload instruments and integration after the platform gate, qualification-only engineering models, spares/repair/refurbishment, software R&D/training services, launch transport/ascent/deployment/in-orbit operation and end of life. Model operational lifetime or mission output separately.
representative_productOne serial/configuration-linked accepted complete dry flight bus excluding payload, with measured positive M
production_routeConditional aluminium fabrication/cleaning/bonding; frame/thermal, power, avionics/attitude integration; configured mass/functional/tailored environmental acceptance; conditional protection
market_stateNew accepted complete configured dry platform at declared manufacturing gate

3. Reference Flow

FieldValue
WhatManufacture a complete configured nonpropulsive spacecraft bus excluding payload
How much1 kg accepted complete configured dry platform net mass; per-unit records divided by measured M
How wellActual delivered flight-platform configuration with documented mass, electrical/mechanical/software interface, functional and tailored acceptance; no equal-mass mission performance or flight certification equivalence
How long or cycleOne manufacturing/acceptance cycle; no orbit duration, lifetime or launch-service functional unit
reference_flow_linkfinished_platform
FieldValue
Reference amount1
Reference product flowAccepted complete dry nonpropulsive photovoltaic lithium-ion spacecraft platform
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifiersmanufacturer/model/serial and controlled configuration/drawings/BOM; flight hardware versus engineering model; aluminium alloy/temper and stock-versus-received-frame scope; bus-side payload interface with payload excluded; solar semiconductor technology/panel completeness/stowed delivery; filled Li-ion pack chemistry, BMS, state of charge and safety records; exact computer/radio/antenna/ADCS component part numbers and containment; actual thermal layers/pads and installed fittings; no propulsion/propellant; actual dry net M kg from calibrated complete-bus weighing with measured fixture tare and same-serial acceptance record; integral detached flight parts reconciled, no payload simulators/packaging/GSE; actual functional/environmental acceptance plan and tailored test levels/utility meters; manufacturing site/period/gate, outsourced services, allocation, upstream linkage, uncertainty and omissions

Dry M includes the complete installed bus structure/thermal, solar panels, filled battery electrolyte, wiring, electronics and all declared integral flight components. Dry does not mean an emptied battery. Exclude payload, propellant, launch adapter/dispenser, packaging, ground/test fixtures and removable simulated payload. Actual integral delivered detached panels/fittings must be physically weighed and reconciled once to the same accepted serial. No catalogue bus mass, CubeSat mass cap, launch wet mass or mass from U-size establishes M.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_massreference productMass 93a60a56-a3c8-11da-a746-0800200b9a66kgM = accepted net mass of one complete unit of the same configuration in kg; collect using cp_mass.
mass_record_provenancecp_massMasskgPhysically weigh the actual complete dry accepted platform on calibrated suitable equipment with measured fixture/tare correction, controlled installed equipment list and serial/configuration release. Record stowed/detached integral parts, filled battery and actual included thermal/electronic state; remove measured temporary loads, payload simulators and ground fixtures. Reconcile component mass sum to actual whole-bus reading, uncertainty, scale resolution/calibration, date/operator and positive net M. Catalogue estimates, component sum alone or launcher limits do not replace weighing.
energy_unitseach electricity rowNet calorific valueMJUse verified energy unit-group conversion 1 kWh = 3.6 MJ; keep electrical intake energy distinct from semiconductor area, battery capacity, mass and generated orbit power. No heating-value or fuel density factor supplied.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionSpecified aluminium stock and received completed bus structure/subsystem units
starting_condition_roleDeclared foreground receipt-to-flight-platform manufacturing acceptance
product_classification_scopeConfigured spacecraft bus excluding payload and launch vehicle
recursive_input_ruleNever input the same finished bus to its own manufacture. Purchased completed units replace their contained stock/components/processing; in-house steps require their own measured exchanges
upstream_dataset_requirementLink actual alloy/temper/finish, panel semiconductor, battery formulation and pack completeness, computer/ADCS supply, site/period/provider and compatible unit. Disclose supplier gaps
disclosuremanufacturer/model/serial and controlled configuration/drawings/BOM; flight hardware versus engineering model; aluminium alloy/temper and stock-versus-received-frame scope; bus-side payload interface with payload excluded; solar semiconductor technology/panel completeness/stowed delivery; filled Li-ion pack chemistry, BMS, state of charge and safety records; exact computer/radio/antenna/ADCS component part numbers and containment; actual thermal layers/pads and installed fittings; no propulsion/propellant; actual dry net M kg from calibrated complete-bus weighing with measured fixture tare and same-serial acceptance record; integral detached flight parts reconciled, no payload simulators/packaging/GSE; actual functional/environmental acceptance plan and tailored test levels/utility meters; manufacturing site/period/gate, outsourced services, allocation, upstream linkage, uncertainty and omissions
rule_idApplies toRulesource_ids
boundary_manufactureall stagesInclude actual fabrication/integration, attributable rework, programming, pre-gate acceptance and attributable test/cleanroom utilities. Outsourced tests/processing are separate actual services with scope and unit. Exclude platform-independent software development, payload manufacture/integration after gate and launch/mission service.isispace-platform
boundary_completenessreceived assemblies and BOMCount each complete received frame/panel/battery/avionics unit once with included fittings, cells, electrolyte and wiring. Match hardware installed at accepted configuration; physical removal for shipment does not remove integral flight parts. Complete actual missing switches, connectors, sensors, adhesives, gases, waste/emissions and utilities before quantitative data completion. These candidate cards are not an exhaustive universal bus BOM.

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
structure_fabricationAluminium frame and panel fabricationconditionalActual in-house manufacture of the declared aluminium platform structure.foregroundone accepted configured dry spacecraft platform, normalized using M
clean_bondPrecision cleaning and adhesive joiningconditionalActual foreground solvent/water cleaning or epoxy bonding.foregroundone accepted configured dry spacecraft platform, normalized using M
mechanical_thermalStructure and passive thermal hardware integrationrequiredEvery covered platform; particular thermal hardware only as configured.foregroundone accepted configured dry spacecraft platform, normalized using M
power_integrationPhotovoltaic power and battery integrationrequiredEvery covered solar photovoltaic and lithium-ion powered bus.foregroundone accepted configured dry spacecraft platform, normalized using M
avionics_attitudeComputer, communications and attitude subsystem integrationrequiredEvery covered configured nonpropulsive bus.foregroundone accepted configured dry spacecraft platform, normalized using M
acceptanceMass, functional and tailored environmental acceptancerequiredEvery flight platform; particular environmental tests follow its actual approved plan.foregroundone accepted configured dry spacecraft platform, normalized using M
protectionProtective delivery preparationconditionalActual temporary protective film for delivery.foregroundone accepted configured dry spacecraft platform, normalized using M

Conditional aluminium fabrication/cleaning supplies frame/thermal, power and avionics/attitude integration; actual flight-platform acceptance precedes protection. Stages may overlap; assign resources once. All exchange cards require actual configuration/composition even within required stages. One physical or chemical exchange per card; no emission or fabrication recipe is compulsory.

Process: Aluminium frame and panel fabrication (structure_fabrication)

Cut and machine actual alloy/temper frame/panel stock under controlled drawings, segregate alloy chips, inspect geometry and join separately supplied fasteners. Purchased completed frames replace stock and contained fabrication. Actual anodizing, heat treatment, welding and outsourced operations require their own measured exchanges; none is universally assumed.

Inputs

Product flows
Wrought 6061-T6 aluminium-alloy structural plate (aluminium_plate)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Wrought 6061-T6 aluminium-alloy structural plate
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_structure_fabrication.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_structure_fabrication
  • Sources: nasa-structures
Solid aluminium-alloy structural rivet (aluminium_fastener)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Solid aluminium-alloy structural rivet
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_structure_fabrication.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_structure_fabrication
  • Sources: nasa-structures
Water-miscible semi-synthetic metalworking-fluid concentrate (machining_fluid)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Water-miscible semi-synthetic metalworking-fluid concentrate
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_structure_fabrication.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_structure_fabrication
  • Sources: nasa-structures
Process Water (machining_water)

Actual treated supplied process water for dilution/cleaning; exclude internal circulating water and natural withdrawal.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_structure_fabrication.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_structure_fabrication
  • Sources: nasa-structures
Alternating-current electricity at factory intake (structure_fabrication_electricity)

Meter attributable factory/test kWh and convert 1 kWh = 3.6 MJ using verified unit group. Retain actual region/provider/voltage; ground test loads and cleanroom utilities are allocated by measured resource use, not satellite photovoltaic generation during orbit. Each actual supplied heat, compressed air or other carrier/service needs a separate row.

  • Selected flow: Alternating-current electricity at factory intake
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_structure_fabrication.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_structure_fabrication
  • Sources: nasa-structures

Outputs

Waste flows
Segregated untreated 6061 aluminium-alloy machining chips (aluminium_chips)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Segregated untreated 6061 aluminium-alloy machining chips
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_structure_fabrication.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_structure_fabrication
  • Sources: nasa-structures

Process: Precision cleaning and adhesive joining (clean_bond)

Record each actual solvent, supplied water, wipe and identified adhesive formulation/curing component; retain cleaning, cure and inspection originals. Epoxy examples apply only to matching real formulations and release state. Captured cleaning effluent/wipes differ from direct solvent air emission; each actual waste/emission has its own record. Supplier bonded assemblies replace contained bonds. No universal cleanroom class, cure schedule, outgassing limit or solvent emission factor assumed.

Inputs

Product flows
Anhydrous isopropanol cleaning solvent (isopropanol_solvent)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Anhydrous isopropanol cleaning solvent
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_clean_bond.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_clean_bond
  • Sources: nasa-structures
Process Water (clean_water)

Actual supplied treated process cleaning water, separate from effluent.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_clean_bond.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_clean_bond
  • Sources: nasa-structures
Dry nonwoven polyester cleaning wipe (polyester_wipe)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Dry nonwoven polyester cleaning wipe
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_clean_bond.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_clean_bond
  • Sources: nasa-structures
Bisphenol-A epoxy structural adhesive base formulation (epoxy_adhesive)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Bisphenol-A epoxy structural adhesive base formulation
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_clean_bond.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_clean_bond
  • Sources: nasa-structures
Polyamine epoxy structural-adhesive hardener formulation (epoxy_hardener)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Polyamine epoxy structural-adhesive hardener formulation
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_clean_bond.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_clean_bond
  • Sources: nasa-structures
Alternating-current electricity at factory intake (clean_bond_electricity)

Meter attributable factory/test kWh and convert 1 kWh = 3.6 MJ using verified unit group. Retain actual region/provider/voltage; ground test loads and cleanroom utilities are allocated by measured resource use, not satellite photovoltaic generation during orbit. Each actual supplied heat, compressed air or other carrier/service needs a separate row.

  • Selected flow: Alternating-current electricity at factory intake
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_clean_bond.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_clean_bond
  • Sources: nasa-structures

Outputs

Waste flows
Spent polyester cleaning wipe contaminated with isopropanol (spent_wipe)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Spent polyester cleaning wipe contaminated with isopropanol
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_clean_bond.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_clean_bond
  • Sources: nasa-structures
Aqueous aluminium-part cleaning effluent transferred to treatment (clean_effluent)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Aqueous aluminium-part cleaning effluent transferred to treatment
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_clean_bond.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_clean_bond
  • Sources: nasa-structures

Outputs

Elementary flows
isopropanol (ipa_release)

Only actually demonstrated immediate isopropanol release to air, unspecified, from attributable wet cleaning. Indoor air, water/soil and long-term identities are distinct. Use actual solvent balance or measured speciated releases; do not assume all issued IPA evaporates or fabricate an emission factor.

  • Selected flow: isopropanol fe0acd60-3ddc-11dd-a843-0050c2490048
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_clean_bond.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_clean_bond
  • Sources: nasa-structures

Process: Structure and passive thermal hardware integration (mechanical_thermal)

Integrate the received or in-house aluminium frame, actual brackets and payload mechanical interface, then actual passive thermal films/radiator/contact pads. Each physical film or formulated pad is a distinct exchange. Keep modular subsystem contained structure/fasteners and separately supplied structure distinct. Installed passive thermal hardware and payload electrical/mechanical interface belong to bus M; payload and launch dispenser do not. Each deployable hinge/release mechanism needs a separate actual component record.

Inputs

Product flows
Complete aluminium-alloy satellite-bus structural frame assembly (frame_received)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete aluminium-alloy satellite-bus structural frame assembly
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_mechanical_thermal.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_mechanical_thermal
  • Sources: nasa-structures
Aluminized polyimide passive-thermal-control film (thermal_film)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Aluminized polyimide passive-thermal-control film
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_mechanical_thermal.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_mechanical_thermal
  • Sources: nasa-structures
Finished aluminium-alloy passive spacecraft radiator plate (radiator_plate)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Finished aluminium-alloy passive spacecraft radiator plate
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_mechanical_thermal.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_mechanical_thermal
  • Sources: nasa-structures
Filled silicone thermal-interface pad sheet (thermal_pad)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Filled silicone thermal-interface pad sheet
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_mechanical_thermal.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_mechanical_thermal
  • Sources: nasa-structures
Alternating-current electricity at factory intake (mechanical_thermal_electricity)

Meter attributable factory/test kWh and convert 1 kWh = 3.6 MJ using verified unit group. Retain actual region/provider/voltage; ground test loads and cleanroom utilities are allocated by measured resource use, not satellite photovoltaic generation during orbit. Each actual supplied heat, compressed air or other carrier/service needs a separate row.

  • Selected flow: Alternating-current electricity at factory intake
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_mechanical_thermal.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_mechanical_thermal
  • Sources: nasa-structures

Process: Photovoltaic power and battery integration (power_integration)

Install actual photovoltaic panel assemblies, complete filled lithium-ion battery pack, power management/distribution board and wiring. Retain cell technology, panel/battery supplier completeness and actual installed state; do not duplicate contained cells, laminate, controller or electrolyte. Triple-junction panel card is conditional on actual InGaP/GaAs/Ge technology; silicon/other arrays require their own explicit rows. Record attributable charging, functional checks and test loads; stored charge is not a second manufacturing electricity input.

Inputs

Product flows
Complete InGaP/GaAs/Ge triple-junction spacecraft photovoltaic panel assembly (solar_panel)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete InGaP/GaAs/Ge triple-junction spacecraft photovoltaic panel assembly
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_power_integration.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_power_integration
  • Sources: nasa-power
Complete filled rechargeable lithium-ion spacecraft battery pack (battery_pack)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete filled rechargeable lithium-ion spacecraft battery pack
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_power_integration.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_power_integration
  • Sources: nasa-power
Complete spacecraft power-management and distribution circuit-board assembly (power_board)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete spacecraft power-management and distribution circuit-board assembly
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_power_integration.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_power_integration
  • Sources: nasa-power
Insulated copper satellite-bus wiring-harness assembly (copper_harness)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Insulated copper satellite-bus wiring-harness assembly
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_power_integration.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_power_integration
  • Sources: nasa-power
Alternating-current electricity at factory intake (power_integration_electricity)

Meter attributable factory/test kWh and convert 1 kWh = 3.6 MJ using verified unit group. Retain actual region/provider/voltage; ground test loads and cleanroom utilities are allocated by measured resource use, not satellite photovoltaic generation during orbit. Each actual supplied heat, compressed air or other carrier/service needs a separate row.

  • Selected flow: Alternating-current electricity at factory intake
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_power_integration.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_power_integration
  • Sources: nasa-power

Process: Computer, communications and attitude subsystem integration (avionics_attitude)

Install each actual on-board computer, RF transceiver and antenna, and separately received reaction-wheel, magnetic actuator and sensor units. Retain part numbers, installed firmware/interface verification and mass; one row never stands for a set of interchangeable electronics. Particular sensors/actuators are conditional on real configuration; alternative units need separate rows. Software development and mission ground station are excluded services; assembly programming and attributable acceptance loads are included manufacturing. No aircraft avionics, wind rotor or propulsion substitute.

Inputs

Product flows
Complete satellite on-board computer assembly (onboard_computer)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete satellite on-board computer assembly
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_avionics_attitude.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_avionics_attitude
  • Sources: isispace-platform
Complete UHF satellite telemetry and command transceiver unit (uhf_transceiver)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete UHF satellite telemetry and command transceiver unit
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_avionics_attitude.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_avionics_attitude
  • Sources: isispace-platform
Complete deployable UHF satellite antenna assembly (uhf_antenna)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete deployable UHF satellite antenna assembly
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_avionics_attitude.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_avionics_attitude
  • Sources: isispace-platform
Complete spacecraft reaction-wheel actuator assembly (reaction_wheel)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete spacecraft reaction-wheel actuator assembly
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_avionics_attitude.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_avionics_attitude
  • Sources: isispace-platform
Complete satellite magnetorquer rod assembly (magnetorquer)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete satellite magnetorquer rod assembly
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_avionics_attitude.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_avionics_attitude
  • Sources: isispace-platform
Complete spacecraft optical sun-sensor unit (sun_sensor)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete spacecraft optical sun-sensor unit
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_avionics_attitude.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_avionics_attitude
  • Sources: isispace-platform
Complete satellite three-axis magnetometer unit (magnetometer)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Complete satellite three-axis magnetometer unit
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_avionics_attitude.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_avionics_attitude
  • Sources: isispace-platform
Alternating-current electricity at factory intake (avionics_attitude_electricity)

Meter attributable factory/test kWh and convert 1 kWh = 3.6 MJ using verified unit group. Retain actual region/provider/voltage; ground test loads and cleanroom utilities are allocated by measured resource use, not satellite photovoltaic generation during orbit. Each actual supplied heat, compressed air or other carrier/service needs a separate row.

  • Selected flow: Alternating-current electricity at factory intake
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_avionics_attitude.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_avionics_attitude
  • Sources: isispace-platform

Process: Mass, functional and tailored environmental acceptance (acceptance)

Weigh the accepted complete dry platform with calibrated equipment and actual fixture/tare correction; reconcile configuration and release. Collect unit-specific functional/interface checks and actually required vibration, thermal cycling/thermal vacuum or other environmental tests with their equipment resources and subcontract boundaries. Acceptance flight units differ from qualification/prototype/destructive samples; allocate their attributable common development/test burden only with explicit records. Dry nitrogen purge and liquid nitrogen cold shroud are separate conditional purchased carriers, not automatic vent emissions. Test support hardware/simulated payload is excluded from M. No universal GEVS test level, duration, sample count or temperature adopted.

Inputs

Product flows
Nitrogen (nitrogen_gas)

Only actual purchased dry gaseous molecular nitrogen from air separation matching the public supplied route. Retain supplier moisture/purity/pressure and measured net supplied gas mass; no standard-density conversion or atmospheric resource/emission substitution.

  • Selected flow: Nitrogen 67bb2ea6-2fd8-43c5-b227-bca12040b773
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_acceptance.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_acceptance
  • Sources: gsfc-gevs-2021
Nitrogen, liquid (liquid_nitrogen)

Only actual purchased cryogenic air-separated liquid nitrogen for a real cold-shroud test, with documented matching supplier product/specification and liquid delivery state. Weigh actual net consumption and record boil-off and return; public GJB route is an identity condition, not universal test requirement. No temperature, density or automatic nitrogen-release amount assumed.

  • Selected flow: Nitrogen, liquid febfc973-1eca-4a08-8ffb-7f8c7f4b797b
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_acceptance.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_acceptance
  • Sources: gsfc-gevs-2021
Alternating-current electricity at factory intake (acceptance_electricity)

Meter attributable factory/test kWh and convert 1 kWh = 3.6 MJ using verified unit group. Retain actual region/provider/voltage; ground test loads and cleanroom utilities are allocated by measured resource use, not satellite photovoltaic generation during orbit. Each actual supplied heat, compressed air or other carrier/service needs a separate row.

  • Selected flow: Alternating-current electricity at factory intake
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_acceptance.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_acceptance
  • Sources: gsfc-gevs-2021

Outputs

Product flows
Accepted complete dry nonpropulsive photovoltaic lithium-ion spacecraft platform (finished_platform)

Only this actual specific material/formulation or complete physical component; record exact supplier specification, supplied completeness, measured net issues and transfer. Demonstrated absence is not_applicable; unknown is a gap. Split different actual identities into separate rows.

  • Selected flow: Accepted complete dry nonpropulsive photovoltaic lithium-ion spacecraft platform
  • Flow property / unit: Mass / kg
  • Amount rule: 1 kg
  • Value mode: fixed_value
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: method_formula
  • Collection protocol: cp_mass
  • Sources: gsfc-gevs-2021

Process: Protective delivery preparation (protection)

Separately record and weigh removable protection. Dry platform includes its integral delivered flight parts and retained solid/filled components in declared configuration, never packaging, ground fixtures, ground software kits, simulated/real payload, launch adapter or propellant. Delivered detached integral panels need physically measured same-serial reconciliation. Post-gate payload integration, transport and launch are separate boundaries.

Inputs

Product flows
Low-density polyethylene foil (PE-LD) (pe_protection)

Only actual unlaminated non-adhesive LDPE protection foil, separately weighed and excluded from dry bus M.

  • Selected flow: Low-density polyethylene foil (PE-LD) 2cecd3a7-d90e-44b4-aec5-1d9dfb907477
  • Flow property / unit: Mass / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_protection.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_protection
  • Sources: isispace-platform
Alternating-current electricity at factory intake (protection_electricity)

Meter attributable factory/test kWh and convert 1 kWh = 3.6 MJ using verified unit group. Retain actual region/provider/voltage; ground test loads and cleanroom utilities are allocated by measured resource use, not satellite photovoltaic generation during orbit. Each actual supplied heat, compressed air or other carrier/service needs a separate row.

  • Selected flow: Alternating-current electricity at factory intake
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_protection.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: process_output
  • Evidence kind: collected_record
  • Collection protocol: cp_protection
  • Sources: isispace-platform

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
allocation_ordersshared manufacturing utilitiesDirectly attribute serial/configuration-linked material net issues, submeters, assembly/test jobs and rework first. For inseparable shared resources use a measured causal occupied fixture/chamber time and actual electrical load or other documented actual driver: share = order driver / sum of covered order drivers. Retain full period and denominator. Equal bus counts, U-size, nameplate test power, launch payload capacity or mission lifetime are not defaults.
allocation_testsacceptance and shared qualificationKeep flight-unit acceptance, qualification/prototype/destructive hardware and payload-interface test simulators distinguishable. Direct unit acceptance resources to the tested unit; document actual programme applicability and reviewed causal denominator before attributing shared qualification resources. Do not count destroyed/prototype mass as accepted platform output or charge independent R&D to this manufacturing foreground. Outsourced test resources and purchased services cannot both represent the same test twice.gsfc-gevs-2021
allocation_recoverychips, rework and rejectsDocument measured waste versus saleable output and actual scrap collection route. Internal rework remains in accepted production without making another product. Do not grant avoided-primary-aluminium or landfill credits solely because chips are recyclable. Disclose any actual co-product allocation method, causal evidence, alternatives and sensitivity before use; mass transfer alone is not economic/substitution evidence.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_massacceptancereference_productaccepted physical weighing recordmodel; configuration; serial number; accepted net mass M; actual equipment/BOM; all scale readings and fixture tare; detached integral parts; battery state; payload/GSE exclusions; calibration/uncertainty; signed mass reconciliationWeigh the accepted complete unit on a calibrated scale, excluding transport packaging; reconcile the same configuration and acceptance record.kgeach accepted unitactual manufacturing/acceptance perioddeclared platform acceptance gateaccepted net mass per unitoriginal calibrated physical weighing with measured tare and controlled dry flight configuration
cp_structure_fabricationstructure_fabricationinventoryactual stage exchange recordsserial/configuration; exact physical/chemical exchange; issue/return/stock; supplied assembly scope; net mass; kWh; transfer destination; test phase; waste/emission method; shared resource driverCollect same serial/configuration drawings, supplier scope/receipts, issue/return/stock records, measured net material/component masses, meter logs, actual assembly and acceptance records.kg for Mass rows; MJ for electrical-energy rowseach accepted unit and actual batch/test cycleactual manufacturing/acceptance perioddeclared factory and subcontractor gatesattribute measured period exchange / accepted units of the same configurationoriginal calibrations, supplier specifications, net issues and acceptance/transfer originals
cp_clean_bondclean_bondinventoryactual stage exchange recordsserial/configuration; exact physical/chemical exchange; issue/return/stock; supplied assembly scope; net mass; kWh; transfer destination; test phase; waste/emission method; shared resource driverCollect same serial/configuration drawings, supplier scope/receipts, issue/return/stock records, measured net material/component masses, meter logs, actual assembly and acceptance records.kg for Mass rows; MJ for electrical-energy rowseach accepted unit and actual batch/test cycleactual manufacturing/acceptance perioddeclared factory and subcontractor gatesattribute measured period exchange / accepted units of the same configurationoriginal calibrations, supplier specifications, net issues and acceptance/transfer originals
cp_mechanical_thermalmechanical_thermalinventoryactual stage exchange recordsserial/configuration; exact physical/chemical exchange; issue/return/stock; supplied assembly scope; net mass; kWh; transfer destination; test phase; waste/emission method; shared resource driverCollect same serial/configuration drawings, supplier scope/receipts, issue/return/stock records, measured net material/component masses, meter logs, actual assembly and acceptance records.kg for Mass rows; MJ for electrical-energy rowseach accepted unit and actual batch/test cycleactual manufacturing/acceptance perioddeclared factory and subcontractor gatesattribute measured period exchange / accepted units of the same configurationoriginal calibrations, supplier specifications, net issues and acceptance/transfer originals
cp_power_integrationpower_integrationinventoryactual stage exchange recordsserial/configuration; exact physical/chemical exchange; issue/return/stock; supplied assembly scope; net mass; kWh; transfer destination; test phase; waste/emission method; shared resource driverCollect same serial/configuration drawings, supplier scope/receipts, issue/return/stock records, measured net material/component masses, meter logs, actual assembly and acceptance records.kg for Mass rows; MJ for electrical-energy rowseach accepted unit and actual batch/test cycleactual manufacturing/acceptance perioddeclared factory and subcontractor gatesattribute measured period exchange / accepted units of the same configurationoriginal calibrations, supplier specifications, net issues and acceptance/transfer originals
cp_avionics_attitudeavionics_attitudeinventoryactual stage exchange recordsserial/configuration; exact physical/chemical exchange; issue/return/stock; supplied assembly scope; net mass; kWh; transfer destination; test phase; waste/emission method; shared resource driverCollect same serial/configuration drawings, supplier scope/receipts, issue/return/stock records, measured net material/component masses, meter logs, actual assembly and acceptance records.kg for Mass rows; MJ for electrical-energy rowseach accepted unit and actual batch/test cycleactual manufacturing/acceptance perioddeclared factory and subcontractor gatesattribute measured period exchange / accepted units of the same configurationoriginal calibrations, supplier specifications, net issues and acceptance/transfer originals
cp_acceptanceacceptanceinventoryactual stage exchange recordsserial/configuration; exact physical/chemical exchange; issue/return/stock; supplied assembly scope; net mass; kWh; transfer destination; test phase; waste/emission method; shared resource driverCollect same serial/configuration drawings, supplier scope/receipts, issue/return/stock records, measured net material/component masses, meter logs, actual assembly and acceptance records.kg for Mass rows; MJ for electrical-energy rowseach accepted unit and actual batch/test cycleactual manufacturing/acceptance perioddeclared factory and subcontractor gatesattribute measured period exchange / accepted units of the same configurationoriginal calibrations, supplier specifications, net issues and acceptance/transfer originals
cp_protectionprotectioninventoryactual stage exchange recordsserial/configuration; exact physical/chemical exchange; issue/return/stock; supplied assembly scope; net mass; kWh; transfer destination; test phase; waste/emission method; shared resource driverCollect same serial/configuration drawings, supplier scope/receipts, issue/return/stock records, measured net material/component masses, meter logs, actual assembly and acceptance records.kg for Mass rows; MJ for electrical-energy rowseach accepted unit and actual batch/test cycleactual manufacturing/acceptance perioddeclared factory and subcontractor gatesattribute measured period exchange / accepted units of the same configurationoriginal calibrations, supplier specifications, net issues and acceptance/transfer originals

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
normalize_massall inventory rowsq_ref = q_item / M; q_item = exchange amount per one accepted finished unit; q_ref = exchange amount per 1 kg reference flow.q_item; M; cp_massq_ref

Data Quality Requirements

requirement_idApplies toRequirementEvidence
quality_masscp_massImplement mass_record_provenance using current actual calibrated whole-platform readings, measured tare/temporary loads and same-serial dry flight BOM. Independently reconcile battery electrolyte, integrated thermal/power/attitude components and physically measured detached integral panels. No launcher limit, catalogue mass, U-size or inferred part sum substitutes for M. Missing physical originals or uncertainty blocks quantitative completion and requires scientific/data review.actual weighing/calibration/BOM/release; GEVS 2.4.7 mission-dependent context only
quality_atomicall exchangesOne physical/formulated identity per row. Match actual public reference property/unit group, chemistry/state, supplied completeness and route. Space photovoltaic III-V panels differ from silicon terrestrial cells; Li-ion pack differs from lead-acid/NiCd; spacecraft computer differs from aircraft avionics; gas differs from liquid nitrogen and elementary nitrogen. Preserve blank identities with reasons.supplier spec/SDS/receipt and public identity records
quality_testscp_acceptanceRetain actual tailored serial-linked test plan/reports, functional and interface pass criteria, chamber/shaker/cleanroom resources, calibration, test fixtures and outsourcing. Qualification versus acceptance and thermal cycling versus thermal vacuum are different cases. Neither manufacturer tables nor historical GEVS makes every test or fixed level universal; disclose failed tests and attributable rework.actual acceptance plan, meter/job/outsourcing originals
quality_balancematerial, solvent and utilitiesClose input, accepted incorporation, measured returns/stock and waste/release balances on same period/configuration. Separate supplied process water, wastewater transfer and natural withdrawal; no mandatory natural-water flow. IPA releases require actually evidenced species/medium, not all solvent issue. Measure actual kWh and gas mass/state rather than nameplate power or nominal gas-volume conversion.period balances, calibrated meters and transfer/release originals
quality_completenessdataset and upstream linksSeparate measured, calculated, missing and demonstrated not_applicable. Disclose all omitted actual components/processes, supplier boundary mismatch, unresolved identities/ranges, uncertainty and shared test burden. No candidate completeness or cradle-to-gate claim until actual foreground and compatible upstream coverage are verified.actual complete BOM/process map, quality and gap register

9. Validation Rules

rule_idApplies toRulesource_ids
validate_referencereference productCheck positive actual complete dry bus M and mass/acceptance protocol. Reference name exactly matches finished_platform, excluding payload/launch vehicle/propellant and temporary fixtures. Actual missing weighing or supplied completeness requires review; no complete-spacecraft identity forced onto a bus.
validate_basisall inventory rowsCheck same lower-case row/rule/protocol ids, q_item per accepted unit, measured M kg, explicit normalize_mass application and identical EN/ZH bases. Preserve actual public properties rather than relabeling counts/area/energy as Mass.
validate_boundarytest and BOMAudit actual acceptance versus qualification, outsourced versus in-house test resource, received versus fabricated assembly and detached integral versus simulator/packaging. Expand all actual exchanges beyond candidate cards; never count a whole purchased battery and its contained cells/electrolyte again.
validate_profiledataset and intended useRequire scope/configuration, measurement and test provenance, omitted/unresolved data, allocation and compatible upstream unit disclosure. Finite measurement-check pass is not scientific approval, certification or mission-lifetime validation.

10. Published Dataset Profile

FieldValue
dataset_rolesecondary_dataset and background_dataset after actual-data completion and review
downstream_useConfigured bus manufacturing input to a separately bounded complete-spacecraft model
allowed_useCompare compatible actual manufacturing gates, configurations, test coverage and upstream linkage per kg; no mission equivalence from equal mass
excluded_useExclude complete payload-bearing spacecraft, launch vehicles/upper stages, propulsion/thrusters/propellant, crewed/deep-space/nuclear/fuel-cell platforms, composite-primary-frame and other undeclared power/structure routes, ground station/dispenser/launch adapter, payload instruments and integration after the platform gate, qualification-only engineering models, spares/repair/refurbishment, software R&D/training services, launch transport/ascent/deployment/in-orbit operation and end of life. Model operational lifetime or mission output separately.
required_metadatamanufacturer/model/serial and controlled configuration/drawings/BOM; flight hardware versus engineering model; aluminium alloy/temper and stock-versus-received-frame scope; bus-side payload interface with payload excluded; solar semiconductor technology/panel completeness/stowed delivery; filled Li-ion pack chemistry, BMS, state of charge and safety records; exact computer/radio/antenna/ADCS component part numbers and containment; actual thermal layers/pads and installed fittings; no propulsion/propellant; actual dry net M kg from calibrated complete-bus weighing with measured fixture tare and same-serial acceptance record; integral detached flight parts reconciled, no payload simulators/packaging/GSE; actual functional/environmental acceptance plan and tailored test levels/utility meters; manufacturing site/period/gate, outsourced services, allocation, upstream linkage, uncertainty and omissions
required_quality_disclosureForeground measured/calculated/missing status, actual mass/test evidence, unresolved identities/ranges, omission and upstream mismatch, allocation and uncertainties; candidate status and pending scientific review
update_triggerActual bus configuration/component chemistry or supplied scope, manufacturer acceptance/test plan, mass method, factory utilities or upstream data change

11. Data Sources

Source idTypeReferenceUsed for
isispace-platformliteratureISISPACE PlatformsProduct Specification, Qualification and Acceptance Testing and platform FAQ: platform/payload interfaces and optional propulsion, integrated subsystem positioning/interface verification. Acceptance and qualification tables have distinct checks; thermal cycling does not establish universal thermal-vacuum test. No U-size, power/data rate, quoted lifetime, mass or acceptance threshold adopted.
nasa-powerofficial_guidanceNASA Small Spacecraft Technology: 3.0 Power2026 online chapter: 3.2 current photovoltaic III-V junction architecture, 3.4 batteries and PMAD context. Technology identity and solar/battery configuration only; no efficiency, cell/pack mass, Wh/kg, lifetime or mandatory supplier choice used. Actual supplied chemistry and scope govern.
nasa-structuresofficial_guidanceNASA Small Spacecraft Technology: 6.0 Structures, Materials, and Mechanisms2026 online chapter, 6.1/6.2 structure material/modular-frame discussion and CubeSat primary structures: metallic/nonmetallic route differences, machined 6061/7075 examples and attached secondary thermal/power components. No nominal spacecraft weight limit, volume, universal alloy/temper or machining intensity adopted. 6061-T6 stock and thermal cards remain conditional actual foreground specifications.
gsfc-gevs-2021standardGSFC-STD-7000B (2021): General Environmental Verification StandardSections 2.1 general verification, 2.4.7 mass properties and 2.6 thermal verification: mission-dependent configuration, analytical/measurement distinction and verification planning context. Historical Goddard standard, not current universal requirement or method approval. Physical net-M weighing is this declared foreground protocol and needs actual records; GEVS analysis allowance does not establish actual measured M. No test levels, tolerance, duration, cycles or temperature imposed.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 2
Rule IDApplies toRuleSource IDs
boundary_manufactureall stagesInclude actual fabrication/integration, attributable rework, programming, pre-gate acceptance and attributable test/cleanroom utilities. Outsourced tests/processing are separate actual services with scope and unit. Exclude platform-independent software development, payload manufacture/integration after gate and launch/mission service.isispace-platform
boundary_completenessreceived assemblies and BOMCount each complete received frame/panel/battery/avionics unit once with included fittings, cells, electrolyte and wiring. Match hardware installed at accepted configuration; physical removal for shipment does not remove integral flight parts. Complete actual missing switches, connectors, sensors, adhesives, gases, waste/emissions and utilities before quantitative data completion. These candidate cards are not an exhaustive universal bus BOM.
Allocation rules · 3
Rule IDApplies toRuleSource IDs
allocation_ordersshared manufacturing utilitiesDirectly attribute serial/configuration-linked material net issues, submeters, assembly/test jobs and rework first. For inseparable shared resources use a measured causal occupied fixture/chamber time and actual electrical load or other documented actual driver: share = order driver / sum of covered order drivers. Retain full period and denominator. Equal bus counts, U-size, nameplate test power, launch payload capacity or mission lifetime are not defaults.
allocation_testsacceptance and shared qualificationKeep flight-unit acceptance, qualification/prototype/destructive hardware and payload-interface test simulators distinguishable. Direct unit acceptance resources to the tested unit; document actual programme applicability and reviewed causal denominator before attributing shared qualification resources. Do not count destroyed/prototype mass as accepted platform output or charge independent R&D to this manufacturing foreground. Outsourced test resources and purchased services cannot both represent the same test twice.gsfc-gevs-2021
allocation_recoverychips, rework and rejectsDocument measured waste versus saleable output and actual scrap collection route. Internal rework remains in accepted production without making another product. Do not grant avoided-primary-aluminium or landfill credits solely because chips are recyclable. Disclose any actual co-product allocation method, causal evidence, alternatives and sensitivity before use; mass transfer alone is not economic/substitution evidence.
Validation rules · 4
Rule IDApplies toRuleSource IDs
validate_referencereference productCheck positive actual complete dry bus M and mass/acceptance protocol. Reference name exactly matches finished_platform, excluding payload/launch vehicle/propellant and temporary fixtures. Actual missing weighing or supplied completeness requires review; no complete-spacecraft identity forced onto a bus.
validate_basisall inventory rowsCheck same lower-case row/rule/protocol ids, q_item per accepted unit, measured M kg, explicit normalize_mass application and identical EN/ZH bases. Preserve actual public properties rather than relabeling counts/area/energy as Mass.
validate_boundarytest and BOMAudit actual acceptance versus qualification, outsourced versus in-house test resource, received versus fabricated assembly and detached integral versus simulator/packaging. Expand all actual exchanges beyond candidate cards; never count a whole purchased battery and its contained cells/electrolyte again.
validate_profiledataset and intended useRequire scope/configuration, measurement and test provenance, omitted/unresolved data, allocation and compatible upstream unit disclosure. Finite measurement-check pass is not scientific approval, certification or mission-lifetime validation.
Processes and inputs/outputs · 7
Process IDProcess nameInput flowsOutput flows
structure_fabricationAluminium frame and panel fabrication51
clean_bondPrecision cleaning and adhesive joining63
mechanical_thermalStructure and passive thermal hardware integration50
power_integrationPhotovoltaic power and battery integration50
avionics_attitudeComputer, communications and attitude subsystem integration80
acceptanceMass, functional and tailored environmental acceptance31
protectionProtective delivery preparation20

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page