TianGong PCR

Hardwall touring caravan trailer manufacture

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:49222 · narrower

Source

1. Scope and Applicability

This candidate PCR covers manufacture of new complete hardwall drawbar-towed touring caravan trailers with declared fixed habitation, narrower than CPC3.0 49222. Exclude fifth-wheel semi-trailers, self-propelled motorhomes/campervans, tent/pop-up trailers, static buildings, cargo/utility/agricultural trailers, separately traded chassis/body/spares and refurbishment. Each actual chassis, panel, berth, plumbing/appliance/battery option configuration is modelled separately. Include actual site fabrication, body-panel bonding, cabinetry, shell/rolling-gear assembly, fixed fit-out, factory trials and attributable rework/wastes. Exclude towing vehicle production/use, road travel, campsite occupancy, customer utilities and maintenance, assumed service life and disposal. No accommodation-night or towing-distance functional unit is supplied. Throughout the PCR one accepted finished unit means one complete configured trailer, with Chinese 设备 carrying the same meaning.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.transport-equipment.caravan-trailer
classification_refsCPC3.0 49222; narrower product context, not an accepted mapping
covered_productsComplete hardwall drawbar touring caravan trailers with configured fixed habitation
excluded_productsFifth-wheel/semi-trailers, motorhomes/campervans, tent/pop-up and cargo/agricultural trailers, static buildings, spares and refurbishment
representative_productOne complete accepted clean empty configured caravan trailer
production_routeReceive actual stock or finished chassis/panels; conditional chassis, sandwich-panel and furniture fabrication; rolling chassis/shell assembly; fixed habitation fit-out; actual factory trials, drainage and acceptance
market_stateNew accepted clean empty trailer with installed habitation, actual fitted battery/options and declared retained service fluids; water tanks/heater drained, LPG bottle/fuel and loose gear excluded

3. Reference Flow

FieldValue
WhatProvide the configured complete accepted hardwall drawbar touring caravan trailer
How much1 kg of the same complete accepted configured unit using measured net mass M
How wellMeet actual drawings and configuration-specific signed acceptance criteria for coupling/axle/wheels/braking, shell joints and drainage, installed furniture/openings, road lights, electrical insulation/earthing, plumbing tightness and each actual appliance check. Record conditions, instruments, duration and results. Prototype cold-chamber ratings, catalogue payload, warranties and regulatory references in a brochure are not prescribed factory limits or manufacturing amounts.
How long or cycleOne manufacturing delivery; no assumed towing or camping service life
reference_flow_linkfinished_machine
FieldValue
Reference amount1
Reference product flowTrailers and semi-trailers of the caravan type, for housing or camping fc37f9b4-d36f-4b33-8cf1-ac2d4af0800e
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifiersmodel/serial/batch; drawbar/hardwall status; axle count, chassis/coating/coupling/brake supplier gates; shell skin/core/frame/bond/floor composition and geometry; berth layout and actual installed furniture/bedding; plumbing/appliances, battery and options; supplier module inclusions; retained service fluids; clean empty state, tank/heater drainage and no LPG bottle/fuel; measured M; actual factory/site/period/route/test and protective delivery scope

Weigh the same complete accepted clean empty unit on calibrated scales. Installed habitation, actual installed battery and accessories and declared retained service fluids are included; persons, towing vehicle, payload, loose camping equipment, LPG bottle/fuel, handling fixtures and shipping protection are excluded. Water and heater tanks are drained after factory testing. Catalogue MRO, MTPLM, personal-effects or battery/LPG allowances are not M; brochure empty-state and loose-item boundaries differ. Kilogram normalization does not establish equal berth capacity, towing performance or accommodation comfort. The broad public finished-product name is narrowed by these qualifiers and does not admit semi-trailers or other excluded variants.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_massreference productMass 93a60a56-a3c8-11da-a746-0800200b9a66kgM = accepted net mass of one complete unit of the same configuration in kg; collect using cp_mass.
energy_unitselectricity rowsNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJPreserve the meter unit; convert kWh to MJ using exactly 1 kWh = 3.6 MJ. Do not interpret the electricity property name as a combustion inventory.
volume_unitsgroundwater rowsVolume 93a60a56-a3c8-22da-a746-0800200c9a66m3Retain measured volume and its conditions; do not invent gas density, water density or calorific value to switch to mass or energy.
rule_idApplies toRequired propertyRequired unitRule
tyre_count_unitstyreNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345Item(s)Count actual installed compatible trailer tyres per accepted unit through cp_assembly. Retain the public count reference property and normalize q_item/M to Item(s) per kg of trailer. Separately measured tyre mass supports physical mass reconciliation only, not a public-property rewrite.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionMaterials and configured components received at declared supplier gates, with no implicit upstream steelmaking or component fabrication in foreground
starting_condition_roleManufacturing input boundary for an accepted complete unit
product_classification_scopeComplete hardwall drawbar touring caravan trailers within broader CPC49222 context
recursive_input_ruleA purchased complete unit used as an input is a separately declared upstream product. Do not recursively regenerate this category; distinguish new production from refurbishment.
upstream_dataset_requirementLink input-specific upstream datasets matching material, finished-component gate, geography, voltage and treatment state. Missing links remain disclosed coverage gaps.
disclosureReport foreground factory stages, outsourced operations, component content, incoming transport coverage, protective packaging gate, capital-equipment policy and every exclusion; no complete cradle-to-gate claim without verified upstream and logistics closure.
rule_idapplies_torulesource_ids
manufacturing_gateforegroundInclude every actual operation and attributable rework from declared received inputs through factory acceptance; distinguish purchased parts from site fabrication to prevent duplication. Use documented route records.
conditional_fabricationfabricationActivate only documented chassis/panel/furniture fabrication and actual material/adhesive recipes. Manufacturer examples establish possible architecture and alternatives, not universal site routes or formulations.
exclude_customer_campingcamping_serviceExclude towing vehicle, road journeys, customer camping and accommodation service, utilities and maintenance/disposal. Include actual factory trials and their individually identified materials, energy, wastewater and measured emissions; appliance firing occurs only if recorded.
rule_idapplies_torulesource_ids
empty_delivery_configurationreferenceActual fitted battery and installed accessories are included in measured M; catalogue battery allowances are not measurements. Drain water/heater/toilet tanks and exclude LPG cylinder/fuel, loose hook-up leads, steps and camping equipment. Separately supplied items require separate product inventory rather than hidden inclusion in vehicle M. Disassembled delivery requires calibrated component-mass reconciliation to the same complete accepted configuration.

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
formingOptional chassis stock fabricationconditionalOnly actual site stock fabrication; exclude parts already in purchased chassisforeground manufacturingper 1 kg reference flow; collected per one accepted finished unit
panelsConditional sandwich-panel cutting and bondingconditionalOnly actual site fabrication of specified panels; purchased finished panel constituents excludedforeground manufacturingper 1 kg reference flow; collected per one accepted finished unit
cabinetryConditional furniture-board fabricationconditionalOnly actual site furniture fabrication; purchased finished cabinets exclude supplier cuttingforeground manufacturingper 1 kg reference flow; collected per one accepted finished unit
assemblyRolling chassis and habitation shell assemblyrequiredEvery accepted complete trailer; activate only actual installed supplied modulesforeground manufacturingper 1 kg reference flow; collected per one accepted finished unit
fitoutConfigured fixed habitation fit-outrequiredEvery complete accepted trailer; individual appliance rows only when actually installedforeground manufacturingper 1 kg reference flow; collected per one accepted finished unit
acceptanceFactory acceptance and net-mass determinationrequiredEvery accepted complete trailer; tests, water, firing and emissions only under actual recorded conditionsforeground manufacturingper 1 kg reference flow; collected per one accepted finished unit
packagingShipment protection at factory gateconditionalOnly when actual shipment protection is within the declared gateforeground manufacturingper 1 kg reference flow; collected per one accepted finished unit

Process records are separate contributors to one final accepted output, not seven separately traded reference products. Retain traceable internal-part transfer and bill-of-material records; internal transfers cancel within this foreground and do not receive duplicated upstream burdens. The cards below are explicit route-conditioned exchanges. Add each actual additional part, chemical, fuel, packaging piece, wastewater stream or measured elementary substance as its own identified row; absence of a card is not a cut-off permission. For outsourced chassis, panel or furniture manufacture, replace corresponding site materials and energy with the exact purchased component or service record and disclose its supplier gate.

Process: Optional chassis stock fabrication (forming)

Inputs

Product flows
Cold-formed non-alloy steel caravan chassis channel (steel_channel)

Only actual stock fabricated on site; record grade, gauge, zinc/surface state and weighed issue less unused return. A purchased finished galvanized chassis excludes this constituent input and its supplier fabrication. Galvanizing performed on site requires its own full atomic route, not an assumed coating allowance.

  • Selected flow: Cold-formed non-alloy steel caravan chassis channel
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_forming.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_forming
Solid carbon-steel welding wire (solid_wire)

Only actual qualified welding of chassis brackets; record wire designation, chemistry and weighed spool consumption. Flux-cored wire is a different identity and no welding route is prescribed for a purchased bolted chassis.

  • Selected flow: Solid carbon-steel welding wire
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_forming.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_forming
Pure argon welding gas (argon)

Only actual pure argon delivered in the documented welding route, measured by cylinder net mass. Mixed shielding gas and liquid argon are different supplied states; collect them separately if present.

  • Selected flow: Pure argon welding gas
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_forming.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_forming
Alternating current (forming_electricity)

Meter actual stock cutting, drilling and welding plus attributable extraction. Identity applies only to purchased user-side grid-average1–35kV supply. Internal low-voltage circuits are not additional purchased energy. Other voltage, own solar generation and contracted renewable supply need their own applicable identity and coverage.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_forming.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_forming

Outputs

Waste flows
Post-industrial steel scrap (steel_offcut)

Only segregated untreated post-industrial steel offcuts exported from actual site fabrication; weigh and record alloy/coating fractions and destination. Internal recirculation and oily swarf are not this exported waste.

  • Selected flow: Post-industrial steel scrap c143745d-be4f-4d8f-b403-2dcbfe685349
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_forming.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_forming

Process: Conditional sandwich-panel cutting and bonding (panels)

Inputs

Product flows
Finished glass-fibre-reinforced polyester caravan panel skin sheet (grp_skin)

Only actual supplier-confirmed cured polyester GRP sheet for onsite panel fabrication; record resin, glass reinforcement, surface finish, geometry and issued mass. Swift supports GRP architecture, not polyester chemistry. Raw glass fibre or plate glass is not the finished composite sheet; supplier resin curing is outside this gate.

  • Selected flow: Finished glass-fibre-reinforced polyester caravan panel skin sheet
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_panels.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_panels
  • Sources: swift-caravans-2026
Finished expanded-polystyrene rigid caravan insulation board (ps_core)

Only actual supplier-confirmed EPS board; record polymer, additives, expansion state, dimensions, density evidence and mass. The brochure specifies polystyrene, not universally EPS versus XPS. Purchased sandwich walls already include their cores; do not duplicate.

  • Selected flow: Finished expanded-polystyrene rigid caravan insulation board
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_panels.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_panels
  • Sources: swift-caravans-2026
Finished hard-polyurethane caravan body framing profile (pu_frame)

Only installed actual supplier-confirmed hard-PU framing profiles used in onsite panel build. Record composition, fillers, geometry and mass; do not identify a hard structural product as unspecified soft foam or prescribe all caravans as timberless.

  • Selected flow: Finished hard-polyurethane caravan body framing profile
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_panels.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_panels
  • Sources: swift-caravans-2026
Water-based polyvinyl-acetate dispersion panel adhesive (pvac_adhesive)

Only an actual qualified PVAc formulation confirmed by supplier/SDS and joint records; record supplied wet mass, solids, additives and water fraction, issue less return. Bailey supports water-based panel adhesive, not PVAc resin or mandatory recipe. A two-component PU adhesive needs separate component rows; no substitution.

  • Selected flow: Water-based polyvinyl-acetate dispersion panel adhesive
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_panels.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_panels
  • Sources: bailey-manufacturing
Alternating current (panel_electricity)

Meter actual cutting, adhesive application, press/vacuum equipment and electrically controlled curing; record time/temperature and actual recipe. No water-jet, heated press, GRP molding or generic curing energy is mandatory from architecture evidence.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_panels.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_panels

Outputs

Waste flows
Segregated dry expanded-polystyrene board cutting waste (eps_offcut)

Only actual segregated characterized EPS offcuts exported untreated; weigh and identify coating/glue contamination and destination. Mixed bonded panel scrap is different.

  • Selected flow: Segregated dry expanded-polystyrene board cutting waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_panels.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_panels
Cured glass-fibre-reinforced polyester sheet cutting waste (grp_offcut)

Only segregated waste of the same characterized cured sheet; weigh and identify resin, glass and surface constituents and treatment. It is a waste transfer, not inevitable styrene or air particulate emission.

  • Selected flow: Cured glass-fibre-reinforced polyester sheet cutting waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_panels.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_panels
Uncured aqueous polyvinyl-acetate adhesive residue waste (adhesive_residue)

Only actual separately collected residue of the declared adhesive; weigh supplied-state wet waste, characterize solids and identify treatment. Cured adhesive bonded to panels is part of installed mass or a separate composite-waste stream.

  • Selected flow: Uncured aqueous polyvinyl-acetate adhesive residue waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_panels.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_panels

Process: Conditional furniture-board fabrication (cabinetry)

Inputs

Product flows
Paper-faced plywood caravan furniture board (furniture_board)

Only actual specified plywood with decorative paper facing; record species, ply/resin/face construction, moisture and issue less returns by mass. Bailey supports paper-coated furniture plywood but not bamboo, tropical timber or generic particleboard substitution. Purchased complete cabinets already include this material.

  • Selected flow: Paper-faced plywood caravan furniture board
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_cabinetry.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_cabinetry
  • Sources: bailey-manufacturing
Alternating current (cabinet_electricity)

Meter actual furniture-board cutting, routing, edge fabrication and captured-dust extraction with the stated purchased-energy condition. Record tools and issue/return; outsourced finished furniture excludes this supplier operation from site foreground.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_cabinetry.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_cabinetry

Outputs

Waste flows
Segregated paper-faced plywood furniture-board offcut waste (plywood_offcut)

Weigh separately collected characterized offcuts and record paper, wood, binder and contamination/destination. Do not call the composite pure wood or elementary dust; captured fine dust and mixed panel waste require their own rows.

  • Selected flow: Segregated paper-faced plywood furniture-board offcut waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_cabinetry.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_cabinetry

Process: Rolling chassis and habitation shell assembly (assembly)

Inputs

Product flows
Complete galvanized-steel drawbar caravan chassis (chassis)

One actually purchased finished configured chassis; record steel/zinc finish, geometry, mass and axle/coupling/stabilizer content. Supplier fabrication/galvanizing is not site foreground. Constituents included here are not counted in separate modules or stock. A powered-truck chassis is not a proxy.

  • Selected flow: Complete galvanized-steel drawbar caravan chassis
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
Trailer axle (axle)

This row is restricted to an actual complete braked torsion trailer axle with documented module contents. Only actual separately supplied trailer axle outside the purchased chassis; declare housing, suspension elastomers, hub/bearing/brake contents, mass and count. Other leaf-spring/air-suspension types need distinct module rows; no universal axle count assumed.

  • Selected flow: Trailer axle e1bf60f6-8831-49e2-ad46-9bad63ff50a3
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
Complete mechanical overrun-brake caravan towing coupling (coupler)

Only actual supplied drawbar coupling outside chassis/axle modules; record tow-ball interface, overrun mechanism, breakaway/parking linkage and measured mass. These functions define one configured physical assembly, not separate duplicated exchanges.

  • Selected flow: Complete mechanical overrun-brake caravan towing coupling
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
Tire (tyre)

Only actual finished new pneumatic rubber trailer tyres compatible with this public other-new-tyre class. Record compound, reinforcement, dimensions, load/rating and physical installed count; count q_item in Item(s) per accepted unit, normalize q_item/M and retain the public Number of items property. Measure tyre net mass separately for installed-mass reconciliation, excluding rim. Uncured passenger-car tyres, waste tyres and rubber powder are not substitutes.

  • Selected flow: Tire 11c2e97a-624f-41de-957d-543cddb777ef
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / Item(s)
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
Finished steel caravan trailer wheel rim (rim)

Only actually supplied steel rim with coating, dimensions and net mass recorded; tyres and hubs are outside this single physical part unless a complete wheel module is explicitly used instead.

  • Selected flow: Finished steel caravan trailer wheel rim
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
Finished GRP-skinned polystyrene-core caravan wall sandwich panel (wall)

One actual supplied finished bonded wall panel; record exact resin/skin, core polymer/expansion state, frame, adhesive, surface and module mass. Upstream constituents/curing are excluded from duplicate site inputs. Other material skins and cores need different physical rows.

  • Selected flow: Finished GRP-skinned polystyrene-core caravan wall sandwich panel
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
  • Sources: swift-caravans-2026
Finished GRP-skinned polystyrene-core caravan roof sandwich panel (roof)

One actual supplied roof panel with verified skin/core/frame/bond composition, openings and mass. Installed vents and roof-mounted accessories are separate unless included in module records. Do not repeat constituent stock or infer generic reinforcement.

  • Selected flow: Finished GRP-skinned polystyrene-core caravan roof sandwich panel
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
  • Sources: swift-caravans-2026
Finished plywood-faced GRP-backed caravan insulated floor panel (floor)

One actual finished supplied floor; declare plywood species/binder, GRP resin, supplier-confirmed insulation polymer, frame/bonding and mass. Swift floor brand is not assigned PU or XPS chemistry from an ambiguous name. No generic thickness or density factor.

  • Selected flow: Finished plywood-faced GRP-backed caravan insulated floor panel
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
  • Sources: swift-caravans-2026
Single-component silane-modified-polymer caravan joint sealant (sealant)

Only actual supplier-qualified SMP sealant, with binder/additives, cartridge issue less return, cured retention and waste documented. Architecture does not mandate SMP; silicone, butyl tape and multi-component products require separate identities.

  • Selected flow: Single-component silane-modified-polymer caravan joint sealant
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
Complete double-glazed acrylic caravan window (window)

Only actual installed supplier-confirmed PMMA window assembly; record glazing/frame/seal/hardware composition, geometry and net mass. Safety glass, polycarbonate and a raw acrylic sheet do not represent this finished module.

  • Selected flow: Complete double-glazed acrylic caravan window
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
Complete insulated caravan entrance door (door)

One actually installed configured door with skin/core/frame, glazing, locks and hinges declared and mass measured. Complete door inputs include these constituents; do not repeat them in material or window rows.

  • Selected flow: Complete insulated caravan entrance door
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly
Alternating current (assembly_electricity)

Meter chassis, shell, floor, roof and opening installation tools, presses and attributable lifts/utilities with the stated purchased condition. Include attributable rework and document moisture/joint acceptance.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_assembly.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_assembly

Process: Configured fixed habitation fit-out (fitout)

Inputs

Product flows
Complete paper-faced plywood caravan kitchen cabinet (cabinet)

One actual configured supplied finished cabinet; record plywood species, paper, binder, fittings, dimensions and mass. Do not duplicate its furniture-board constituents or supplier cutting energy. Other fitted wardrobes need distinct rows.

  • Selected flow: Complete paper-faced plywood caravan kitchen cabinet
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Complete polyurethane-foam caravan mattress (mattress)

Only actual installed finished mattress whose foam, cover and reinforcement composition is verified; record delivered dimensions and mass. Brand or berth count does not identify PU chemistry. Detachable camping mattresses not in the accepted installed configuration are excluded from M.

  • Selected flow: Complete polyurethane-foam caravan mattress
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Ignition wiring sets and other wiring sets of a kind used in vehicles, aircraft or ships (harness)

Use the other-vehicle-wiring portion of the public category for one actual supplied non-ignition caravan wiring harness; declare conductor, insulation, connectors, circuits, road-light/control content and measured mass. Retain the official Chinese name; no ignition or engine system required. Wiring already inside complete appliances is excluded.

  • Selected flow: Ignition wiring sets and other wiring sets of a kind used in vehicles, aircraft or ships 4b3f48dd-97a6-427e-9baf-742d7eb6e9c2
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Complete sealed AGM lead-acid caravan auxiliary battery (battery)

Only actual installed supplier-confirmed absorbed-glass-mat sealed lead-acid battery; record model, capacity, filled state, mass and enclosure boundary. No catalogue battery allowance is mass evidence. Lithium packs and flooded starter batteries need distinct identities; prefilled electrolyte is not counted twice.

  • Selected flow: Complete sealed AGM lead-acid caravan auxiliary battery
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Complete caravan mains power supply and battery charger (charger)

One actual combined physical supplied power unit, not a list of alternatives; declare installed converter/charger, circuit boards, enclosure, control/wiring boundary and measured mass. Separate standalone converters or controllers require their own rows.

  • Selected flow: Complete caravan mains power supply and battery charger
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Complete electric-compressor caravan refrigerator (fridge)

Only actual installed electric-compressor unit; record model, insulation, delivered mass, compressor and refrigerant species/charge/boundary. Factory-filled refrigerant is inside this finished product, not a duplicate raw input or inevitable emission. Absorption/LPG refrigerator is a different route.

  • Selected flow: Complete electric-compressor caravan refrigerator
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Complete electric caravan water heater (water_heater)

Only actual installed electric heater; declare vessel, element, control, pipe/fitting boundary and delivered drained mass. Gas-fired or combined products need distinct module identity. Retained service glycol is declared separately only if not already included.

  • Selected flow: Complete electric caravan water heater
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Complete propane caravan cooking hob (hob)

Only actual installed supplier-confirmed propane-compatible cooking appliance; record burners, regulator/control inclusion, mass and acceptance mode. Natural-gas and electrically heated hobs are different. Fuel is not part of the delivered empty reference state.

  • Selected flow: Complete propane caravan cooking hob
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Finished stainless-steel caravan kitchen sink (sink)

Only actual specified sink with steel grade, surface, drain/fitting boundary and measured mass. Integrated purchased kitchen modules already including it exclude this separate row.

  • Selected flow: Finished stainless-steel caravan kitchen sink
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Finished polyethylene caravan fresh-water tank (tank)

Only actual installed PE tank; record polymer grade, molded state, capacity, cap/valve boundary and drained net mass. Waste-water tanks are separate products. Water used in testing is not part of empty tank mass.

  • Selected flow: Finished polyethylene caravan fresh-water tank
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Finished polyethylene caravan potable-water pipe (water_pipe)

Only actual separately supplied PE tubing with resin, dimensions and weighed installed mass; fittings and pumps require separate rows. Do not include it again if already inside a complete water-system module.

  • Selected flow: Finished polyethylene caravan potable-water pipe
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Finished copper caravan propane pipe (gas_pipe)

Only actual supplied copper gas pipe outside appliances; record alloy, dimensions, surface and installed mass. Complete regulator, hose and fittings need distinct identities. Factory gas test consumption is not pipe material.

  • Selected flow: Finished copper caravan propane pipe
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Complete caravan cassette toilet (toilet)

One actual installed finished cassette system; declare bowl/cassette, polymer, pump, seals and wiring contents, drained delivered mass. No toilet chemicals or waste assumed at delivery; actual factory test media require their own rows.

  • Selected flow: Complete caravan cassette toilet
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout
Alternating current (fitout_electricity)

Meter actual fixed-furniture, bedding, wiring, plumbing and appliance installation under the declared purchased energy condition; include attributable leak repair and rejects. Purchased finished appliances retain their supplier gate.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_fitout.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_fitout

Process: Factory acceptance and net-mass determination (acceptance)

Inputs

Product flows
Process Water (supplied_water)

Only purchased treated process water actually issued for factory water/plumbing tests and cleanup; measure supplied mass, treatment state and unused return. Not a resource abstraction; do not count supplier water extraction again.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_acceptance.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_acceptance
Propane (propane)

Only actual fossil-origin propane supplied in liquefied state from cylinders for recorded factory appliance firing tests; collect net cylinder-mass consumption, composition, returned/retained gas and time. Do not substitute unspecified LPG or natural gas. Empty reference excludes bottle/fuel; pressure-only or electric acceptance has no prescribed fuel consumption. Supplier-confirmed fossil composition and liquid delivery state are required; no density or standard assertion is inferred from a public candidate.

  • Selected flow: Propane
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_acceptance.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_acceptance
Alternating current (test_electricity)

Meter actual factory lights, insulation/earthing, charger/battery, water pump/heater, refrigerator, leak-test equipment and adjustment/rework. Record actual installed configuration, test time, initial/final battery charge and heater water drainage. Brochure current or power is not energy. Camping hook-up electricity and towing vehicle are outside the manufacturing gate.

  • Selected flow: Alternating current 3d76981f-964a-4865-b588-0e067a2a1163
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_acceptance.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_acceptance
Elementary flows
ground water (well_water)

Only direct site groundwater abstraction actually used for factory tests; meter gross m3 and identify well/country, Resources / Resources from water / Renewable material resources from water. Do not also count this same water as purchased process water. No compulsory well or scarcity claim.

  • Selected flow: ground water 4f462198-40cd-4184-8733-86648a20dc3f
  • Flow property / unit: Volume 93a60a56-a3c8-22da-a746-0800200c9a66 / m3
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_acceptance.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_acceptance

Outputs

Product flows
Trailers and semi-trailers of the caravan type, for housing or camping (finished_machine)

One kilogram of the same complete accepted clean empty configured hardwall drawbar touring caravan trailer. Include actual installed chassis/axle/coupling, shell/floor/openings, cabinetry, fitted bedding, electrical/plumbing/appliances, fitted battery/options and retained service fluids. Tanks and heater drained. Exclude towing vehicle, persons, payload, loose camping equipment, LPG bottle/fuel, fixtures, shipping protection and loose spares. Semi-trailer, tent trailer and motorhome variants in broader contexts are excluded.

  • Selected flow: Trailers and semi-trailers of the caravan type, for housing or camping fc37f9b4-d36f-4b33-8cf1-ac2d4af0800e
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: 1 kg
  • Value mode: fixed_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_mass
Waste flows
Aqueous caravan hydrostatic-test drain water waste (test_effluent)

Only an actual collected outgoing aqueous waste stream from the declared tests; weigh, characterize additives/contamination and identify receiving treatment. Tank drainage reused within factory is internal transfer; a freshwater resource or environmental water emission is not this waste identity.

  • Selected flow: Aqueous caravan hydrostatic-test drain water waste
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_acceptance.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_acceptance
Elementary flows
carbon dioxide (fossil) (co2_air)

Only actual measured fossil-carbon dioxide from foreground factory propane firing, CAS124-38-9, released promptly to external air with no defensible more specific subcompartment: Emissions / Emissions to air / unspecified. Preserve calibrated substance-specific concentration and gas-flow/time, temperature/pressure and actual mass conversion. Do not use soil, water, indoor-only or long-term air records, or a biogenic identity. No combustion factor or compulsory firing/emission is assumed; inventory other observed substances separately.

  • Selected flow: carbon dioxide (fossil) 08a91e70-3ddc-11dd-923d-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_acceptance.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_acceptance

Process: Shipment protection at factory gate (packaging)

Inputs

Product flows
Polyethylene film (pack_film)

Only actual polyethylene shipping film; weigh applied protection, without adding it to accepted net trailer mass. Scrap film is separately characterized and not hidden as a lower vehicle M.

  • Selected flow: Polyethylene film e64eb06c-6dc9-45f1-b003-3dc6c44b27e2
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_packaging.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_packaging
Corrugated paperboard caravan protective pad (pack_board)

Only actual supplied corrugated pads with fibre mix, recycled content and mass declared. Finished fibre-specific boxes are not assumed to identify unspecified protective pads.

  • Selected flow: Corrugated paperboard caravan protective pad
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Apply normalize_mass to q_item; reference_mass; cp_packaging.
  • Value mode: calculated_value
  • Specificity: product_specific
  • Normalization basis: per 1 kg reference flow; collected per one accepted finished unit
  • Basis kind: reference_flow
  • Evidence kind: calculated_from_collection
  • Collection protocol: cp_packaging

7. Allocation and Co-product Handling

rule_idapplies_torulesource_ids
direct_attributionshared_operationsUse job tickets and submetering before allocation. Where a common meter remains, require a measured causal driver such as machine-hours for the identified operation, with all participating jobs and idle load disclosed; divide the attributable quantity by accepted units of the same configuration before mass normalization.ghg-product-allocation-2011
coproduct_decisionsaleable_outputsDo not assume scrap is a co-product. Disclose destination and legal/product status. If multiple saleable co-products actually occur, seek subdivision; justify a physical relation or, when unavailable, documented economic/other allocation with sensitivity. No universal mass share or avoided-steel credit is prescribed.ghg-product-allocation-2011
rework_scrapmanufacturing_lossesRetain rework and rejected-unit burdens attributable to the accepted reporting batch. Record recovered internal material once and exported wastes separately. Disclose upstream recycled-content method and any downstream treatment separately to prevent double credits.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_massacceptanceaccepted net massweighingmodel; configuration; serial number; accepted net mass MWeigh the accepted complete unit on a calibrated scale, excluding transport packaging; reconcile the same configuration and acceptance record.kgeach acceptancecomplete reporting batchsame model and configurationaccepted net mass per unitcalibration, weighing and signed acceptance records
cp_formingformingOptional chassis stock fabricationmeter_and_issue_recordsjob and configuration; accepted unit count; each row-specific issued/returned amount and original unit; constituent/grade; meter readings; allocation driver; waste destination; route conditionsFor each atomic row, use calibrated meters, weighed issue/returns, supplier receipts and disposal tickets. Preserve property: kg for mass, MJ from electricity meters, m3 for directly abstracted groundwater, Item(s) for counted finished tyres. Collect installed counts from issue/return, BOM and signed acceptance inspection; weigh tyre mass separately for physical reconciliation. Purchased-water mass is not converted to volume without measured density and conditions. Reconcile stage utility totals with the factory bill, and component/retained-fluid inclusion with the net-mass record.row-specific kg, MJ, m3, Item(s)each job and meter intervalcomplete same-configuration batch in reporting period; disclose seasonality and mixed linesdeclared factory, outsourced and purchased gatesattributable row amount / accepted units of the same configurationcalibration, supplier composition, job, allocation and disposal evidence
cp_panelspanelsConditional sandwich-panel cutting and bondingmeter_and_issue_recordsjob and configuration; accepted unit count; each row-specific issued/returned amount and original unit; constituent/grade; meter readings; allocation driver; waste destination; route conditionsFor each atomic row, use calibrated meters, weighed issue/returns, supplier receipts and disposal tickets. Preserve property: kg for mass, MJ from electricity meters, m3 for directly abstracted groundwater, Item(s) for counted finished tyres. Collect installed counts from issue/return, BOM and signed acceptance inspection; weigh tyre mass separately for physical reconciliation. Purchased-water mass is not converted to volume without measured density and conditions. Reconcile stage utility totals with the factory bill, and component/retained-fluid inclusion with the net-mass record.row-specific kg, MJ, m3, Item(s)each job and meter intervalcomplete same-configuration batch in reporting period; disclose seasonality and mixed linesdeclared factory, outsourced and purchased gatesattributable row amount / accepted units of the same configurationcalibration, supplier composition, job, allocation and disposal evidence
cp_cabinetrycabinetryConditional furniture-board fabricationmeter_and_issue_recordsjob and configuration; accepted unit count; each row-specific issued/returned amount and original unit; constituent/grade; meter readings; allocation driver; waste destination; route conditionsFor each atomic row, use calibrated meters, weighed issue/returns, supplier receipts and disposal tickets. Preserve property: kg for mass, MJ from electricity meters, m3 for directly abstracted groundwater, Item(s) for counted finished tyres. Collect installed counts from issue/return, BOM and signed acceptance inspection; weigh tyre mass separately for physical reconciliation. Purchased-water mass is not converted to volume without measured density and conditions. Reconcile stage utility totals with the factory bill, and component/retained-fluid inclusion with the net-mass record.row-specific kg, MJ, m3, Item(s)each job and meter intervalcomplete same-configuration batch in reporting period; disclose seasonality and mixed linesdeclared factory, outsourced and purchased gatesattributable row amount / accepted units of the same configurationcalibration, supplier composition, job, allocation and disposal evidence
cp_assemblyassemblyRolling chassis and habitation shell assemblymeter_and_issue_recordsjob and configuration; accepted unit count; each row-specific issued/returned amount and original unit; constituent/grade; meter readings; allocation driver; waste destination; route conditionsFor each atomic row, use calibrated meters, weighed issue/returns, supplier receipts and disposal tickets. Preserve property: kg for mass, MJ from electricity meters, m3 for directly abstracted groundwater, Item(s) for counted finished tyres. Collect installed counts from issue/return, BOM and signed acceptance inspection; weigh tyre mass separately for physical reconciliation. Purchased-water mass is not converted to volume without measured density and conditions. Reconcile stage utility totals with the factory bill, and component/retained-fluid inclusion with the net-mass record.row-specific kg, MJ, m3, Item(s)each job and meter intervalcomplete same-configuration batch in reporting period; disclose seasonality and mixed linesdeclared factory, outsourced and purchased gatesattributable row amount / accepted units of the same configurationcalibration, supplier composition, job, allocation and disposal evidence
cp_fitoutfitoutConfigured fixed habitation fit-outmeter_and_issue_recordsjob and configuration; accepted unit count; each row-specific issued/returned amount and original unit; constituent/grade; meter readings; allocation driver; waste destination; route conditionsFor each atomic row, use calibrated meters, weighed issue/returns, supplier receipts and disposal tickets. Preserve property: kg for mass, MJ from electricity meters, m3 for directly abstracted groundwater, Item(s) for counted finished tyres. Collect installed counts from issue/return, BOM and signed acceptance inspection; weigh tyre mass separately for physical reconciliation. Purchased-water mass is not converted to volume without measured density and conditions. Reconcile stage utility totals with the factory bill, and component/retained-fluid inclusion with the net-mass record.row-specific kg, MJ, m3, Item(s)each job and meter intervalcomplete same-configuration batch in reporting period; disclose seasonality and mixed linesdeclared factory, outsourced and purchased gatesattributable row amount / accepted units of the same configurationcalibration, supplier composition, job, allocation and disposal evidence
cp_acceptanceacceptanceFactory acceptance and net-mass determinationmeter_and_issue_recordsjob and configuration; accepted unit count; each row-specific issued/returned amount and original unit; constituent/grade; meter readings; allocation driver; waste destination; route conditions; actual coupling/brake/road-light and electrical/plumbing/appliance test criteria/results/time; water issue, return and drainage; battery installed mass and initial/final charge; propane cylinder mass/composition/return; measured fossil CO2 concentration and external exhaust flow/time/conditions; retained service fluidsFor each atomic row, use calibrated meters, weighed issue/returns, supplier receipts and disposal tickets. Preserve property: kg for mass, MJ from electricity meters, m3 for directly abstracted groundwater, Item(s) for counted finished tyres. Collect installed counts from issue/return, BOM and signed acceptance inspection; weigh tyre mass separately for physical reconciliation. Purchased-water mass is not converted to volume without measured density and conditions. Reconcile stage utility totals with the factory bill, and component/retained-fluid inclusion with the net-mass record. Drain and reconcile actual water trials before cp_mass. Meter AC input including charger losses rather than duplicate battery discharge. Record actual propane firing and measured emitted substance quantities without generic combustion factors; no camping load or catalogue mass substitute.row-specific kg, MJ, m3, Item(s)each job and meter intervalcomplete same-configuration batch in reporting period; disclose seasonality and mixed linesdeclared factory, outsourced and purchased gatesattributable row amount / accepted units of the same configurationcalibration, supplier composition, job, allocation and disposal evidence
cp_packagingpackagingShipment protection at factory gatemeter_and_issue_recordsjob and configuration; accepted unit count; each row-specific issued/returned amount and original unit; constituent/grade; meter readings; allocation driver; waste destination; route conditionsFor each atomic row, use calibrated meters, weighed issue/returns, supplier receipts and disposal tickets. Preserve property: kg for mass, MJ from electricity meters, m3 for directly abstracted groundwater, Item(s) for counted finished tyres. Collect installed counts from issue/return, BOM and signed acceptance inspection; weigh tyre mass separately for physical reconciliation. Purchased-water mass is not converted to volume without measured density and conditions. Reconcile stage utility totals with the factory bill, and component/retained-fluid inclusion with the net-mass record.row-specific kg, MJ, m3, Item(s)each job and meter intervalcomplete same-configuration batch in reporting period; disclose seasonality and mixed linesdeclared factory, outsourced and purchased gatesattributable row amount / accepted units of the same configurationcalibration, supplier composition, job, allocation and disposal evidence

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
normalize_massall inventory rowsq_ref = q_item / M; q_item = exchange amount per one accepted finished unit; q_ref = exchange amount per 1 kg reference flow.q_item; M; cp_massq_ref

The finished_machine output is fixed at 1 kg and is not divided again. Apply the conversion to each other applicable row using the same configuration and batch; quantity numerator units remain unchanged. Mixed configurations must be separated, not averaged by count with a catalogue mass.

Data Quality Requirements

requirement_idApplies toRequirementEvidence
configuration_traceall rowsTrace every input to installed BOM, route and accepted unit; supplier finished parts do not also receive raw-stock burdens. Disclose remaining components as missing coverage until separate atomic records are added.drawings, BOM, supplier receipts
basis_qualitycp_massM must be positive measured net mass, with the same delivered configuration, fluid state and acceptance gate as all collected exchanges.calibration and weighing records
coverage_qualityall processesDocument full batch temporal coverage, meter overlap, rejects, rework, stock changes, outsourced stages and unmeasured emissions. A missing record is unknown, not zero or not_applicable.ledger, coverage matrix and measurement uncertainty
chemistry_qualitypanels; cabinetry; assembly; fitoutVerify recipe, concentration and SDS for each supplied formulated chemical; characterize each outgoing waste stream and identify treatment separately from environmental emissions.recipe, SDS, analyses and transfer tickets

9. Validation Rules

rule_idapplies_torulesource_ids
validate_referencereferenceReject missing qualifiers, LPG/water/payload-loaded or shipping-gross mass substitution, non-positive M or mismatch between configuration, cp_mass and finished_machine. Require 1 kg output and explicit normalize_mass on every non-reference applicable row.
validate_atomicinventoryRequire one physical exchange per row, verified public identity when supplied, correct property/unit, localized display and medium. Unresolved UUIDs do not authorize proxy substitution or mixed rows.
validate_balancecoverageReconcile installed mass, stock, waste, retained fluids and purchased parts using the actual BOM; independently reconcile installed chassis/shell/panel/adhesive/cabinet/appliance/battery content and retained fluids with measured BOM mass; reconcile test water issue, internal reuse and drainage, propane consumption and measured external-air emissions. Reconcile utilities by stage; internal transfers cancel. Explain differences against recorded measurement uncertainty, without a fabricated numerical tolerance.
validate_completenessdatasetCheck every conditional stage against route evidence. Require missing chemicals, parts, test media and actual emissions to be split and collected before claiming a complete inventory; prohibit cradle-to-gate or service comparisons while upstream or functional coverage is incomplete.
validate_allocationshared_operationsRequire complete driver records and justification for allocation and scrap treatment; document sensitivity where another defensible allocation may change results.ghg-product-allocation-2011

10. Published Dataset Profile

FieldValue
dataset_roleManufacturing foreground process for a configured accepted unit
downstream_usesecondary_dataset; background_dataset
allowed_useInput to a declared caravan supply model with identical configuration and disclosed upstream coverage
excluded_useTowing, customer camping/accommodation service or comparisons across berth/layout, chassis and appliance configurations without separate functional modelling
required_metadataModel, configuration, empty state, M, retained fluids, manufacturer/site, reporting period, process route, voltage/geography, supplier gates, transport/packaging scope and allocation
required_quality_disclosureMeasured versus estimated quantities; unresolved identities; unmeasured emissions and components; upstream linkage completeness; uncertainty, data age and configuration limitations
update_triggerChanged chassis/axle/brake, shell/core/frame/adhesive chemistry, floor/furniture layout, appliance/battery/options, supplier module boundary, test/firing/drainage, energy mix, acceptance or mass protocol

11. Data Sources

Source idTypeReferenceUsed for
swift-caravans-2026handbookSwift Group, Touring Caravans2026 brochure, PDF p.4 / printed pp.6–7 SMART construction diagram; PDF p.17 / printed pp.32–33 specification and MRO footnotes. https://www.swiftgroup.co.uk/media/rs5dz3ji/2026_swift_caravan_brochure.pdfEdition-specific qualitative GRP/polystyrene/PU framing and plywood-floor architecture; branded floor insulation chemistry unresolved. Mass footnotes demonstrate catalogue MRO includes loose equipment/LPG allowances; these are not adopted as M. No thickness, prototype test limit, warranty/lifetime or material grade mandated.
bailey-manufacturinghandbookBailey of Bristol, Sustainable Manufacturing, undated publisher HTML, Green Products manufacturing-material paragraph. https://www.baileyofbristol.co.uk/why-bailey/sustainable-manufacturing/Independent qualitative example of water-based panel adhesive and paper-coated plywood furniture board. Does not establish PVAc resin, species, grade or mandatory timberless design. No holiday-carbon comparison, recyclability, electricity claim or waste percentage adopted.
ghg-product-allocation-2011official_guidanceWRI/WBCSD, Product Life Cycle Accounting and Reporting Standard2011, chapter9, printed p.63 / PDF p.65, tables9.1–9.2. https://ghgprotocol.org/sites/default/files/standards/Product-Life-Cycle-Accounting-Reporting-Standard_041613.pdfHistorical allocation hierarchy; actual causal driver records required, no current comprehensive conformity claim.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 4
Rule IDApplies toRuleSource IDs
manufacturing_gateforegroundInclude every actual operation and attributable rework from declared received inputs through factory acceptance; distinguish purchased parts from site fabrication to prevent duplication. Use documented route records.
conditional_fabricationfabricationActivate only documented chassis/panel/furniture fabrication and actual material/adhesive recipes. Manufacturer examples establish possible architecture and alternatives, not universal site routes or formulations.
exclude_customer_campingcamping_serviceExclude towing vehicle, road journeys, customer camping and accommodation service, utilities and maintenance/disposal. Include actual factory trials and their individually identified materials, energy, wastewater and measured emissions; appliance firing occurs only if recorded.
empty_delivery_configurationreferenceActual fitted battery and installed accessories are included in measured M; catalogue battery allowances are not measurements. Drain water/heater/toilet tanks and exclude LPG cylinder/fuel, loose hook-up leads, steps and camping equipment. Separately supplied items require separate product inventory rather than hidden inclusion in vehicle M. Disassembled delivery requires calibrated component-mass reconciliation to the same complete accepted configuration.
Allocation rules · 3
Rule IDApplies toRuleSource IDs
direct_attributionshared_operationsUse job tickets and submetering before allocation. Where a common meter remains, require a measured causal driver such as machine-hours for the identified operation, with all participating jobs and idle load disclosed; divide the attributable quantity by accepted units of the same configuration before mass normalization.ghg-product-allocation-2011
coproduct_decisionsaleable_outputsDo not assume scrap is a co-product. Disclose destination and legal/product status. If multiple saleable co-products actually occur, seek subdivision; justify a physical relation or, when unavailable, documented economic/other allocation with sensitivity. No universal mass share or avoided-steel credit is prescribed.ghg-product-allocation-2011
rework_scrapmanufacturing_lossesRetain rework and rejected-unit burdens attributable to the accepted reporting batch. Record recovered internal material once and exported wastes separately. Disclose upstream recycled-content method and any downstream treatment separately to prevent double credits.
Validation rules · 5
Rule IDApplies toRuleSource IDs
validate_referencereferenceReject missing qualifiers, LPG/water/payload-loaded or shipping-gross mass substitution, non-positive M or mismatch between configuration, cp_mass and finished_machine. Require 1 kg output and explicit normalize_mass on every non-reference applicable row.
validate_atomicinventoryRequire one physical exchange per row, verified public identity when supplied, correct property/unit, localized display and medium. Unresolved UUIDs do not authorize proxy substitution or mixed rows.
validate_balancecoverageReconcile installed mass, stock, waste, retained fluids and purchased parts using the actual BOM; independently reconcile installed chassis/shell/panel/adhesive/cabinet/appliance/battery content and retained fluids with measured BOM mass; reconcile test water issue, internal reuse and drainage, propane consumption and measured external-air emissions. Reconcile utilities by stage; internal transfers cancel. Explain differences against recorded measurement uncertainty, without a fabricated numerical tolerance.
validate_completenessdatasetCheck every conditional stage against route evidence. Require missing chemicals, parts, test media and actual emissions to be split and collected before claiming a complete inventory; prohibit cradle-to-gate or service comparisons while upstream or functional coverage is incomplete.
validate_allocationshared_operationsRequire complete driver records and justification for allocation and scrap treatment; document sensitivity where another defensible allocation may change results.ghg-product-allocation-2011
Processes and inputs/outputs · 7
Process IDProcess nameInput flowsOutput flows
formingOptional chassis stock fabrication41
panelsConditional sandwich-panel cutting and bonding53
cabinetryConditional furniture-board fabrication21
assemblyRolling chassis and habitation shell assembly120
fitoutConfigured fixed habitation fit-out140
acceptanceFactory acceptance and net-mass determination43
packagingShipment protection at factory gate20

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page