TianGong PCR

Coal or rock cutters and tunnelling machinery; other boring and sinking machinery · Data Quality Requirements

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published versionLast updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:44412 · exact

Source

Data Quality Requirements

requirement_idApplies toRequirementEvidence
configuration_recordsall inventory rowsRetain independent family/module state, actual supplier data and the make/buy ledger; product identity is not supplier evidenceDrawing, BOM, purchase order and direct identity
period_completenessall inventory rowsDisclose every missing exchange, provider and quantity; no default ranges or zero substitution. Verify total utility assignments and each physical closure with actual combined uncertaintyCalibrated logs, samples, closure ledgers and gap register

9. Validation Rules

rule_idApplies toRulesource_ids
accepted_denominatorall inventory rowsVerify family/configuration, accepted N > 0, traceable calibrated net masses and acceptance records match Q period and BOM; normalize_mass is applied to each non-reference row; 1 kg output contains no transport package or rejects. Missing mass or allocation is unknown, not zero.
route_identityall inventory rowsEvery active physical exchange has one exact substance, grade/module/state and interface, supplier or disposal destination; add separate atomic rows for every actual omitted exchange. not_applicable requires evidence of absence, zero requires measurement and unknown requires a gap. UUIDs never prove completed upstream burdens; CN medium-voltage electricity cannot represent another grid or voltage.
water_closuredilution_water; coat_water; test_water; service_water; spent_coolant; coat_sludge; test_effluentFor one matched period close water inputs plus input moisture, opening stock and actual reaction formation against retained product water, each waste moisture, effluent water, evaporation, closing stock and actual reaction consumption. Use the moisture of each actual term, cancel paired internal coolant/test-water returns, and retain combined meter, sampling, density and allocation uncertainty. Investigate residuals beyond that evidence; no universal tolerance or clipping.
contained_metal_closureplate; forged_blank; weld_wire; swarf; weld_dust; coat_sludge; test_effluent; reference_productClose each actual metal separately using the own matched assay and wet/dry basis of every input, accepted product, scrap, dust, sludge, effluent, release and opening/closing stock; include actual reaction partitioning and cancel paired internal transfers. Product BOM metal mass and waste gross mass are never automatically contained Fe, Mn, Ni or other element. Compare residual with combined weighing, assay, sampling and allocation uncertainty; investigate, do not invent yield.
solvent_and_oil_closurecoolant; quench_oil; epoxy; mek; hydraulic_fill; grease; test_oil; spent_oil; mek_airBalance each actual solvent and oil separately with own composition fractions, retained product, opening/closing stocks, recovered returns, capture media, actual destruction and non-air residues. Internal recovered fluid is paired, not new external input or fictitious waste. A total VOC result cannot establish MEK; disclose unresolved species.
utility_reconciliationall inventory rowsFor identical period and units reconcile purchased imports plus measured on-site generation and storage discharge against assigned fabrication/treatment/integration/assembly/test/dispatch load, exports, storage charge and only unassigned residual shared services. Apply measured causal allocation only to residual. Never add factory total to submeters; investigate negative residuals with meter and timing uncertainty, do not clip. Fuel, actual generation and stack species are separate; carbon balance cannot alone establish CO or NO2.
test_use_splittest; reference_productRetain before-gate test power, water, oil, test medium, rejected parts and corrective work; identify acceptance dates. Later excavation feed, rock removal, support concrete, cutter changes and operating energy belong only to a separately stated use/service model. OEM project performance and cutter weights are not manufacturing defaults.sandvik-testing-2026; herrenknecht-follo-2018

10. Published Dataset Profile

FieldValue
dataset_roleForeground manufacturing data package
downstream_usesecondary_dataset; background_dataset; process and lifecyclemodel projections retain same boundary
allowed_useConfiguration-qualified factory manufacture and explicitly linked upstream production; separately evidenced downstream scenario
excluded_usePer-kg mass alone as equivalent excavation service; unexplained fleet average; lifetime impact without operating scenario; complete upstream claim with unresolved providers
required_metadataRequired qualifiers; supplier/make-buy gates; N, D and M; Q period; actual routes; acceptance and uncertainty
required_quality_disclosureEvery unresolved UUID/provider, omitted exchange, source/recipe and quantitative gap; not_applicable/zero/unknown distinctions and measured closure
update_triggerChange of family/model/BOM, supplier or treatment state, test boundary, voltage/geography, factory route or acceptance criteria

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-2025official_guidanceUN Statistics Division, CPC Version 3.0 Explanatory Notes (30 June 2025), p.234, https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdfFull category and adjacent independent underground conveyors and earthmoving machinery; title establishes classification, not a recipe
sandvik-cutting-2024handbookSandvik Cutting Catalogue 2024, 2024, https://www.rocktechnology.sandvik/siteassets/product-documents/rock-tools/cutting/sandvik_cutting_catalog_2024.pdfPrinted p.13 / PDF p.7: continuous/bolter/borer miners and roadheaders; integral track, cutter and control alternatives; no numerical defaults
sandvik-zeltweg-manufacturinghandbookSandvik Zeltweg Contract Manufacturing, publisher brochure; acquired 2026-10-02, https://www.mining.sandvik/globalassets/products/mechanical-cutting-equipment/pdf/lohnfertigung-brochure-english.pdfUndated brochure, pp.3 and 6: actual machining, welding, treatment and assembly capability; site examples are conditional, not universal
herrenknecht-double-shieldhandbookHerrenknecht Double Shield TBM, snapshot 2026-10-02, https://www.herrenknecht.com/en/products/productdetail/double-shield-tbm/Architecture, internal belt versus external transport, shields/thrust/bearing and erector; operational water/lining is not factory input by default
herrenknecht-raise-2024handbookHerrenknecht Full Range Raise Boring, 05.2024 / HK3774, https://www.herrenknecht.com/?eID=file_download&file=fileadmin%2Fuser_upload%2FMain_Website%2F03_Produkte%2F02_Mining%2F02_Raise-Boring-Rig%2F02_Content%2FHK3774_DB_Mining_RBR_Full_Range_Raise_Borig_GB_20240514_MidRes.pdf05.2024 HK3774 p.1: modular raise-boring and variable-frequency drives/rod handling; counterexample to tunnel-only architecture
herrenknecht-vsmhandbookHerrenknecht Vertical Shaft Sinking Machine VSM, snapshot 2026-10-02, https://www.herrenknecht.com/en/products/productdetail/vertical-shaft-sinking-machine-vsm/Shaft-sinking boom, pump and lowering architecture; separate site separation and shaft lining uses
sandvik-testing-2026handbookSandvik 175 years at mining’s cutting edge, 20 March 2026, https://www.mining.sandvik/en/solid-ground/sandvik-perspective/2026/03/175-years-at-minings-cutting-edge/20 March 2026: dedicated factory machine validation and cutting test facility; no measured consumption default
herrenknecht-follo-2018handbookHerrenknecht Double Breakthrough on the Follo Line, publisher press release; acquired 2026-10-02, https://www.herrenknecht.com/fileadmin/user_upload/Herrenknecht_Press_Release__Double_Breakthrough_on_the_Follo_Line.pdf28 September 2018 press release p.2: factory acceptance precedes site assembly and tunnelling; project cutter mass/performance not adopted

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page