TianGong PCR产品类别规则

Thermionic, cold cathode or photo-cathode valves and tubes (including cathode ray tubes)

Thermionic, cold cathode or photo-cathode valves and tubes (including cathode ray tubes): This PCR governs foreground data production for finished electron valves and…

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0
Readiness
Review required
Last updated

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:47140 · exact

Source

1. Scope and Applicability

This PCR governs foreground data production for finished electron valves and tubes whose electron transport occurs in a sealed vacuum or gaseous envelope, including thermionic, cold-cathode and photo-cathode devices and CRTs. The representative foreground starts with a purchased or separately modelled unsealed assembly and covers final preparation, sealing, evacuation, activation, ageing, testing and packing. Upstream fabrication must remain linked. A mass-declared dataset is not a claim that different tube functions are equivalent. [un-cpc-3-0-structure-2025; epa-electronic-components-phase-2-1984; hamamatsu-about-pmts]

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.radio-television-and-communication-equipment-and-apparatus.thermionic-cold-cathode-or-photo-cathode-valves-and-tubes-including-cathode-ray-tubes
classification_refsCPC 3.0: 47140; classification context, not an accepted mapping decision
covered_productsFinished thermionic, cold-cathode and photo-cathode electron tubes, including CRTs
excluded_productsOpen glass envelopes and separate parts; semiconductor devices; electric lamps; complete television sets, monitors and instruments; X-ray apparatus
representative_productOne declared model of a sealed glass-envelope vacuum electron tube
production_routeUnsealed assembly receipt; optional water rinse; electric sealing and evacuation; cathode/getter activation; ageing and acceptance testing; optional corrugated box packing
market_stateNew, sealed, tested tube at factory gate; net tube mass excludes transport packaging

3. Reference Flow

FieldValue
WhatElectron control, amplification, switching, light detection or image production, as declared for the specific model
How muchDeclared unit: 1 kg of accepted finished tubes of one model; record item count and mean net mass
How wellMeet declared manufacturer acceptance tests, electrical ratings and model-specific response requirements
How long or cycleOne manufacturing campaign; service life is a disclosed product qualifier, not included operational energy
reference_flow_linkfinished_tube
FieldValue
Reference amount1
Reference product flowThermionic, cold cathode or photo-cathode valves and tubes (including cathode ray tubes) ac3173f5-f70e-4122-a541-ac35b54330cc
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifiersTube model and function; cathode type; envelope material and lead content; vacuum or gas fill and pressure; finished dimensions; net mass per item; electrical ratings; CRT screen or photocathode response when applicable; acceptance tests and reject criteria; declared life and duty; assembly starting state; site, period and upstream coverage

Required qualifiers must be recorded in dataset metadata, product description or equivalent fields; missing qualifiers make the reference flow incomplete.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
net_massfinished tubesMass 93a60a56-a3c8-11da-a746-0800200b9a66kgCross-check output using measured item count times model mean net mass; do not normalize by packed gross mass.
energy_conversionelectricityNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJRetain raw kWh; convert with 1 kWh = 3.6 MJ; upstream grid emissions are not direct emissions here.
water_massrinse waterMass 93a60a56-a3c8-11da-a746-0800200b9a66kgFor volume-to-mass conversion retain measured density and temperature; do not silently assume density.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionUnsealed assembly with fabricated envelope, electrodes and functional surfaces; disclose whether getter and frit are already incorporated
starting_condition_roleintermediate_product
product_classification_scopeFinished tubes within CPC 47140; unsealed assembly is a separately identified same-category precursor
recursive_input_ruleRecord the unsealed input once with its upstream dataset and exact fabrication state; do not link it recursively to the finished-tube dataset
upstream_dataset_requirementInclude envelope, electrode, cathode, phosphor or photocathode fabrication and assembly in linked supplier or separate foreground datasets; verify no gap at the interface
disclosureDisclose gate-to-gate foreground and upstream links separately; use and end-of-life are downstream scenarios
rule_idapplies_torulesource_ids
boundary_operationsforegroundInclude actual sealing, evacuation, activation, ageing, failed tests, rework energy and waste transfers. The historical EPA sequence and modern PMT description support these operations; neither supplies a current plant inventory.epa-electronic-components-phase-2-1984; hamamatsu-about-pmts
boundary_extensionrouteThe tabulated route uses electric heating and a dry vacuum pump. For gas-filled, fuel-heated, oil-pumped, in-house coated or CRT externally coated/banded routes, add measured atomic exchanges and supplier links for the actual operation before claiming completeness; do not assign zeros to uncollected exchanges.
boundary_wastewasteRecord rejected whole tubes separately from dismantled glass, and rinse wastewater as a waste transfer to identified treatment. If treatment is on site, add treatment inputs, sludge and measured species discharged at the environmental boundary; do not count the same pollutant again as untreated wastewater.epa-electronic-components-phase-2-1984

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
rinseFinal water rinseconditionalWater-only rinsing is performed after assembly receiptforeground production1 kg accepted tubes
finishSeal, evacuate, activate and testrequiredAll datasetsforeground production1 kg accepted tubes
packCorrugated box packingconditionalCorrugated boxes cross the delivery boundaryforeground production1 kg accepted tubes

Process: Final water rinse (rinse)

Inputs

Product flows
Process Water (rinse_water)

Include only water-only final rinsing actually performed; meter fresh water, not recirculated throughput.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg; unit group 93a60a57-a4c8-11da-a746-0800200c9a66
  • Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg accepted net finished tube mass
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_rinse
  • Sources: epa-electronic-components-phase-2-1984

Outputs

Waste flows
Wastewater from cleaning (rinse_wastewater)

Include when rinsing discharges a liquid waste stream; record mass, composition and treatment destination.

  • Selected flow: Wastewater from cleaning f0402393-e82c-47e8-9cd8-a486c97f3e89
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg; unit group 93a60a57-a4c8-11da-a746-0800200c9a66
  • Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg accepted net finished tube mass
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_rinse
  • Sources: epa-electronic-components-phase-2-1984

Process: Seal, evacuate, activate and test (finish)

Inputs

Product flows
Assembled electronic valve or tube, unsealed (unsealed_assembly)

Measure net assemblies consumed including those later rejected; link the exact upstream fabrication state.

  • Selected flow: Assembled electronic valve or tube, unsealed 5a46a125-0b34-4e90-b714-2e46bb5c1257
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg; unit group 93a60a57-a4c8-11da-a746-0800200c9a66
  • Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg accepted net finished tube mass
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_lot
  • Sources: hamamatsu-about-pmts
Lead-containing glass sealing frit (sealing_frit)

inclusion_condition: frit sealing occurs and frit is not already in the assembly inventory; weigh dry frit and declare binder separately if used.

  • Selected flow: Lead-containing glass sealing frit
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg; unit group 93a60a57-a4c8-11da-a746-0800200c9a66
  • Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg accepted net finished tube mass
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_lot
  • Sources: epa-electronic-components-phase-2-1984
BaAl4/Ni evaporable getter device (getter_device)

inclusion_condition: this purchased getter is installed in the foreground and is not already included in the unsealed assembly; measure the whole device mass. Activation deposits barium inside the tube, not automatically into ambient air.

  • Selected flow: BaAl4/Ni evaporable getter device
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg; unit group 93a60a57-a4c8-11da-a746-0800200c9a66
  • Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg accepted net finished tube mass
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_lot
  • Sources: saes-ep1402554a1
Electricity (electricity)

Meter sealing, bakeout, dry pumping, activation, ageing and acceptance tests, including rejected units; allocate auxiliary operations once.

  • Selected flow: Electricity 890a70b7-b677-4e2a-8a1b-7d017e0a10ae
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ; unit group 93a60a57-a3c8-11da-a746-0800200c9a66
  • Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg accepted net finished tube mass
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_energy

Outputs

Product flows
Thermionic, cold cathode or photo-cathode valves and tubes (including cathode ray tubes) (finished_tube)

Weigh accepted sealed tubes without transport packaging; reconcile item count and acceptance logs.

  • Selected flow: Thermionic, cold cathode or photo-cathode valves and tubes (including cathode ray tubes) ac3173f5-f70e-4122-a541-ac35b54330cc
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg; unit group 93a60a57-a4c8-11da-a746-0800200c9a66
  • Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg accepted net finished tube mass
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_lot
Waste flows
Rejected sealed electron tube (rejected_tube)

Record intact rejected tubes transferred out for treatment or recovery, with envelope composition and destination; do not substitute mixed electronic scrap.

  • Selected flow: Rejected sealed electron tube
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg; unit group 93a60a57-a4c8-11da-a746-0800200c9a66
  • Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg accepted net finished tube mass
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_lot
  • Sources: epa-electronic-components-phase-2-1984

Process: Corrugated box packing (pack)

Inputs

Product flows
corrugated board boxes (corrugated_box)

Include only when this box is used; weigh net box consumption per dispatched accepted tube mass. Add any actual cushioning as separate identified exchanges.

  • Selected flow: corrugated board boxes 4f197bec-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg; unit group 93a60a57-a4c8-11da-a746-0800200c9a66
  • Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per 1 kg accepted net finished tube mass
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_pack

7. Allocation and Co-product Handling

rule_idapplies_torulesource_ids
allocation_subdivideshared_equipmentUse direct campaign meters first. Allocate shared vacuum and oven electricity by measured equipment power multiplied by occupied operating time, including attributable standby; document remaining shared services.
allocation_rejectsaccepted_outputCharge rejects and rework to accepted tube output; do not treat failed units as burden-free co-products. Internal reuse is an internal loop; exported recovery is a separate waste fate with no automatic avoided-production credit.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_rinserinserinse_water; rinse_wastewaterwater_meter; waste_transfertime; inlet/outlet mass; temperature; density; composition; destinationcalibrated meters and weighing; sampling; transfer ticketskgeach batchcomplete representative campaign with start/end datesdeclared site and equipmentsum actual quantities then divide by same-campaign accepted net mass; document absent operations as not applicablecalibration; original logs; supporting tickets
cp_lotfinishunsealed_assembly; sealing_frit; getter_device; finished_tube; rejected_tubebatch_recordbatch; model; count; net mass; issues and stocks; test results; waste destinationweighing; stores reconciliation; test logskgeach batchcomplete representative campaign with start/end datesdeclared site and equipmentsum actual quantities then divide by same-campaign accepted net mass; document absent operations as not applicablecalibration; original logs; supporting tickets
cp_energyfinishelectricitymeter_recordequipment; timestamps; kWh; batch; occupancy; standby; allocation sharesubmeter readings; measured power and time for shared equipmentkWheach batchcomplete representative campaign with start/end datesdeclared site and equipmentsum actual quantities then divide by same-campaign accepted net mass; document absent operations as not applicablecalibration; original logs; supporting tickets
cp_packpackcorrugated_boxstores_recordbox grade; count; unit mass; dispatch batch; stock changesweighing and dispatch reconciliationkgeach batchcomplete representative campaign with start/end datesdeclared site and equipmentsum actual quantities then divide by same-campaign accepted net mass; document absent operations as not applicablecalibration; original logs; supporting tickets

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
normalizeall rowsq_i = sum(Q_i) / M_acceptedsame-campaign measured exchange and accepted massexchange per kg
yieldmass reconciliationM_in + M_added = M_accepted + M_rejected + M_losses + delta_stockcampaign weighing and stock recordsreconciliation, not a universal yield factor

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_samplingoutput and energyCover startup, stable production, shutdown, ageing and rejects; do not select only best batchescampaign logs and complete meter series
dq_upstreamunsealed assemblySupplier boundary must cover incorporated materials and preceding operations; model uncovered operations separatelysupplier process map, bill of materials and dataset boundary
dq_rangesquantitiesUse foreground records; no external inferred range without synthesis of two independent, original-text-verified, boundary-compatible sourcesraw records and uncertainty disclosure

9. Validation Rules

rule_idapplies_torulesource_ids
validate_identityreference_flowReject a dataset without model, net mass, cathode/envelope state and test criteria; do not compare different functions using kg alone.
validate_balanceinventoryReconcile assembly intake, added retained solids, accepted tubes, rejected tubes, measured losses and stock change. Explain discrepancies using weighing uncertainty and rework records, not an invented tolerance.
validate_coverageboundaryRequire route applicability, upstream interfaces, meter coverage and destination evidence; unresolved flow identity is disclosed and never silently substituted by a proxy. Missing route-specific exchanges make completeness inconclusive.

10. Published Dataset Profile

FieldValue
dataset_rolesecondary_dataset
downstream_useComponent supply for equipment process and lifecyclemodel projections
allowed_useDeclared model and compatible manufacturing route with explicit upstream links
excluded_useUniversal mass-based comparison between CRTs, receiving tubes and photomultipliers; complete equipment footprint; use-phase or disposal claims
required_metadataModel, site, period, assembly supplier, cathode, envelope, gas/vacuum state, ratings, unit mass, process boundary and allocation drivers
required_quality_disclosureMeters, calibration, yield reconciliation, missing flows, upstream representativeness, waste destinations and uncertainty
update_triggerChange in tube design, cathode chemistry, pump or furnace technology, supplier, yield, energy supply or waste treatment

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-3-0-structure-2025official_guidanceUN Statistics Division, CPC Version 3.0 structure, row 47140 (30 June 2025); https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Structure_30Jun2025.csv; retrieved 2026-09-09Classification identity only
epa-electronic-components-phase-2-1984official_guidanceUS EPA, Development Document for Electrical and Electronic Components, Phase II (1984), sections 4.1.3, 4.2 and 5.2.2; https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=2000K55B.TXT; retrieved 2026-09-09Historical tube process sequence and rinse-water pathways; no numerical transfer
hamamatsu-about-pmtsliteratureHamamatsu Photonics, About PMTs, Behind high-performance PMTs and Main components; https://www.hamamatsu.com/jp/en/product/optical-sensors/pmt/about_pmts.html; retrieved 2026-09-09Photo-cathode tube components, sealing, evacuation and inspection
saes-ep1402554a1literatureSAES Getters, EP1402554A1, Evaporable getter device for cathode-ray tubes, description; https://patents.google.com/patent/EP1402554A1/en; retrieved 2026-09-09Conditional purchased BaAl4/Ni getter device and in-envelope activation; no numeric factor

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 3
Rule IDApplies toRuleSource IDs
boundary_operationsforegroundInclude actual sealing, evacuation, activation, ageing, failed tests, rework energy and waste transfers. The historical EPA sequence and modern PMT description support these operations; neither supplies a current plant inventory.epa-electronic-components-phase-2-1984, hamamatsu-about-pmts
boundary_extensionrouteThe tabulated route uses electric heating and a dry vacuum pump. For gas-filled, fuel-heated, oil-pumped, in-house coated or CRT externally coated/banded routes, add measured atomic exchanges and supplier links for the actual operation before claiming completeness; do not assign zeros to uncollected exchanges.
boundary_wastewasteRecord rejected whole tubes separately from dismantled glass, and rinse wastewater as a waste transfer to identified treatment. If treatment is on site, add treatment inputs, sludge and measured species discharged at the environmental boundary; do not count the same pollutant again as untreated wastewater.epa-electronic-components-phase-2-1984
Allocation rules · 2
Rule IDApplies toRuleSource IDs
allocation_subdivideshared_equipmentUse direct campaign meters first. Allocate shared vacuum and oven electricity by measured equipment power multiplied by occupied operating time, including attributable standby; document remaining shared services.
allocation_rejectsaccepted_outputCharge rejects and rework to accepted tube output; do not treat failed units as burden-free co-products. Internal reuse is an internal loop; exported recovery is a separate waste fate with no automatic avoided-production credit.
Validation rules · 3
Rule IDApplies toRuleSource IDs
validate_identityreference_flowReject a dataset without model, net mass, cathode/envelope state and test criteria; do not compare different functions using kg alone.
validate_balanceinventoryReconcile assembly intake, added retained solids, accepted tubes, rejected tubes, measured losses and stock change. Explain discrepancies using weighing uncertainty and rework records, not an invented tolerance.
validate_coverageboundaryRequire route applicability, upstream interfaces, meter coverage and destination evidence; unresolved flow identity is disclosed and never silently substituted by a proxy. Missing route-specific exchanges make completeness inconclusive.
Processes and inputs/outputs · 3
Process IDProcess nameInput flowsOutput flows
rinseFinal water rinse11
finishSeal, evacuate, activate and test42
packCorrugated box packing10

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page