Thermionic, cold cathode or photo-cathode valves and tubes (including cathode ray tubes)
- Lifecycle status
- Candidate
- Content maturity
- Authored methodology
- Current version
- 0.1.0Last updated
- Readiness
- Review required
Methodology and translation states come from the source record; publishing this website does not change their review status.
Content languages
Status, classification and source details
Readiness
- Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.
Classification mapping
Source
1. Scope and Applicability
This PCR governs foreground data production for finished electron valves and tubes whose electron transport occurs in a sealed vacuum or gaseous envelope, including thermionic, cold-cathode and photo-cathode devices and CRTs. The representative foreground starts with a purchased or separately modelled unsealed assembly and covers final preparation, sealing, evacuation, activation, ageing, testing and packing. Upstream fabrication must remain linked. A mass-declared dataset is not a claim that different tube functions are equivalent. [un-cpc-3-0-structure-2025; epa-electronic-components-phase-2-1984; hamamatsu-about-pmts]
2. Product Category Identity
| Field | Value |
|---|---|
| canonical_pcr_id | pcr.metal-products-machinery-and-equipment.radio-television-and-communication-equipment-and-apparatus.thermionic-cold-cathode-or-photo-cathode-valves-and-tubes-including-cathode-ray-tubes |
| classification_refs | CPC 3.0: 47140; classification context, not an accepted mapping decision |
| covered_products | Finished thermionic, cold-cathode and photo-cathode electron tubes, including CRTs |
| excluded_products | Open glass envelopes and separate parts; semiconductor devices; electric lamps; complete television sets, monitors and instruments; X-ray apparatus |
| representative_product | One declared model of a sealed glass-envelope vacuum electron tube |
| production_route | Unsealed assembly receipt; optional water rinse; electric sealing and evacuation; cathode/getter activation; ageing and acceptance testing; optional corrugated box packing |
| market_state | New, sealed, tested tube at factory gate; net tube mass excludes transport packaging |
3. Reference Flow
| Field | Value |
|---|---|
| What | Electron control, amplification, switching, light detection or image production, as declared for the specific model |
| How much | Declared unit: 1 kg of accepted finished tubes of one model; record item count and mean net mass |
| How well | Meet declared manufacturer acceptance tests, electrical ratings and model-specific response requirements |
| How long or cycle | One manufacturing campaign; service life is a disclosed product qualifier, not included operational energy |
| reference_flow_link | finished_tube |
| Field | Value |
|---|---|
| Reference amount | 1 |
| Reference product flow | Thermionic, cold cathode or photo-cathode valves and tubes (including cathode ray tubes) ac3173f5-f70e-4122-a541-ac35b54330cc |
| Reference flow property | Mass 93a60a56-a3c8-11da-a746-0800200b9a66 |
| Reference unit group | Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66 |
| Reference unit | kg |
| Required qualifiers | Tube model and function; cathode type; envelope material and lead content; vacuum or gas fill and pressure; finished dimensions; net mass per item; electrical ratings; CRT screen or photocathode response when applicable; acceptance tests and reject criteria; declared life and duty; assembly starting state; site, period and upstream coverage |
Required qualifiers must be recorded in dataset metadata, product description or equivalent fields; missing qualifiers make the reference flow incomplete.
4. Measurement and Unit Rules
| rule_id | Applies to | Required property | Required unit | Rule |
|---|---|---|---|---|
| net_mass | finished tubes | Mass 93a60a56-a3c8-11da-a746-0800200b9a66 | kg | Cross-check output using measured item count times model mean net mass; do not normalize by packed gross mass. |
| energy_conversion | electricity | Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 | MJ | Retain raw kWh; convert with 1 kWh = 3.6 MJ; upstream grid emissions are not direct emissions here. |
| water_mass | rinse water | Mass 93a60a56-a3c8-11da-a746-0800200b9a66 | kg | For volume-to-mass conversion retain measured density and temperature; do not silently assume density. |
5. System Boundary
Boundary Abstraction
| Field | Value |
|---|---|
| declared_starting_condition | Unsealed assembly with fabricated envelope, electrodes and functional surfaces; disclose whether getter and frit are already incorporated |
| starting_condition_role | intermediate_product |
| product_classification_scope | Finished tubes within CPC 47140; unsealed assembly is a separately identified same-category precursor |
| recursive_input_rule | Record the unsealed input once with its upstream dataset and exact fabrication state; do not link it recursively to the finished-tube dataset |
| upstream_dataset_requirement | Include envelope, electrode, cathode, phosphor or photocathode fabrication and assembly in linked supplier or separate foreground datasets; verify no gap at the interface |
| disclosure | Disclose gate-to-gate foreground and upstream links separately; use and end-of-life are downstream scenarios |
| rule_id | applies_to | rule | source_ids |
|---|---|---|---|
| boundary_operations | foreground | Include actual sealing, evacuation, activation, ageing, failed tests, rework energy and waste transfers. The historical EPA sequence and modern PMT description support these operations; neither supplies a current plant inventory. | epa-electronic-components-phase-2-1984; hamamatsu-about-pmts |
| boundary_extension | route | The tabulated route uses electric heating and a dry vacuum pump. For gas-filled, fuel-heated, oil-pumped, in-house coated or CRT externally coated/banded routes, add measured atomic exchanges and supplier links for the actual operation before claiming completeness; do not assign zeros to uncollected exchanges. | |
| boundary_waste | waste | Record rejected whole tubes separately from dismantled glass, and rinse wastewater as a waste transfer to identified treatment. If treatment is on site, add treatment inputs, sludge and measured species discharged at the environmental boundary; do not count the same pollutant again as untreated wastewater. | epa-electronic-components-phase-2-1984 |
6. Process Inventory Structure
Process Map
| process_id | process_name | inclusion | inclusion_condition | role | quantitative_reference |
|---|---|---|---|---|---|
| rinse | Final water rinse | conditional | Water-only rinsing is performed after assembly receipt | foreground production | 1 kg accepted tubes |
| finish | Seal, evacuate, activate and test | required | All datasets | foreground production | 1 kg accepted tubes |
| pack | Corrugated box packing | conditional | Corrugated boxes cross the delivery boundary | foreground production | 1 kg accepted tubes |
Process: Final water rinse (rinse)
Inputs
Product flows
Process Water (rinse_water)
Include only water-only final rinsing actually performed; meter fresh water, not recirculated throughput.
- Selected flow: Process Water
94a04f7e-2d5c-41f0-b182-d54a3b373a02 - Flow property / unit: Mass
93a60a56-a3c8-11da-a746-0800200b9a66/ kg; unit group93a60a57-a4c8-11da-a746-0800200c9a66 - Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
- Value mode:
foreground_record - Specificity:
site_specific - Normalization basis: per 1 kg accepted net finished tube mass
- Basis kind:
reference_flow - Evidence kind:
collected_record - Collection protocol:
cp_rinse - Sources:
epa-electronic-components-phase-2-1984
Outputs
Waste flows
Wastewater from cleaning (rinse_wastewater)
Include when rinsing discharges a liquid waste stream; record mass, composition and treatment destination.
- Selected flow: Wastewater from cleaning
f0402393-e82c-47e8-9cd8-a486c97f3e89 - Flow property / unit: Mass
93a60a56-a3c8-11da-a746-0800200b9a66/ kg; unit group93a60a57-a4c8-11da-a746-0800200c9a66 - Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
- Value mode:
foreground_record - Specificity:
site_specific - Normalization basis: per 1 kg accepted net finished tube mass
- Basis kind:
reference_flow - Evidence kind:
collected_record - Collection protocol:
cp_rinse - Sources:
epa-electronic-components-phase-2-1984
Process: Seal, evacuate, activate and test (finish)
Inputs
Product flows
Assembled electronic valve or tube, unsealed (unsealed_assembly)
Measure net assemblies consumed including those later rejected; link the exact upstream fabrication state.
- Selected flow: Assembled electronic valve or tube, unsealed
5a46a125-0b34-4e90-b714-2e46bb5c1257 - Flow property / unit: Mass
93a60a56-a3c8-11da-a746-0800200b9a66/ kg; unit group93a60a57-a4c8-11da-a746-0800200c9a66 - Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
- Value mode:
foreground_record - Specificity:
site_specific - Normalization basis: per 1 kg accepted net finished tube mass
- Basis kind:
reference_flow - Evidence kind:
collected_record - Collection protocol:
cp_lot - Sources:
hamamatsu-about-pmts
Lead-containing glass sealing frit (sealing_frit)
inclusion_condition: frit sealing occurs and frit is not already in the assembly inventory; weigh dry frit and declare binder separately if used.
- Selected flow: Lead-containing glass sealing frit
- Flow property / unit: Mass
93a60a56-a3c8-11da-a746-0800200b9a66/ kg; unit group93a60a57-a4c8-11da-a746-0800200c9a66 - Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
- Value mode:
foreground_record - Specificity:
site_specific - Normalization basis: per 1 kg accepted net finished tube mass
- Basis kind:
reference_flow - Evidence kind:
collected_record - Collection protocol:
cp_lot - Sources:
epa-electronic-components-phase-2-1984
BaAl4/Ni evaporable getter device (getter_device)
inclusion_condition: this purchased getter is installed in the foreground and is not already included in the unsealed assembly; measure the whole device mass. Activation deposits barium inside the tube, not automatically into ambient air.
- Selected flow: BaAl4/Ni evaporable getter device
- Flow property / unit: Mass
93a60a56-a3c8-11da-a746-0800200b9a66/ kg; unit group93a60a57-a4c8-11da-a746-0800200c9a66 - Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
- Value mode:
foreground_record - Specificity:
site_specific - Normalization basis: per 1 kg accepted net finished tube mass
- Basis kind:
reference_flow - Evidence kind:
collected_record - Collection protocol:
cp_lot - Sources:
saes-ep1402554a1
Electricity (electricity)
Meter sealing, bakeout, dry pumping, activation, ageing and acceptance tests, including rejected units; allocate auxiliary operations once.
- Selected flow: Electricity
890a70b7-b677-4e2a-8a1b-7d017e0a10ae - Flow property / unit: Net calorific value
93a60a56-a3c8-11da-a746-0800200c9a66/ MJ; unit group93a60a57-a3c8-11da-a746-0800200c9a66 - Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
- Value mode:
foreground_record - Specificity:
site_specific - Normalization basis: per 1 kg accepted net finished tube mass
- Basis kind:
reference_flow - Evidence kind:
collected_record - Collection protocol:
cp_energy
Outputs
Product flows
Thermionic, cold cathode or photo-cathode valves and tubes (including cathode ray tubes) (finished_tube)
Weigh accepted sealed tubes without transport packaging; reconcile item count and acceptance logs.
- Selected flow: Thermionic, cold cathode or photo-cathode valves and tubes (including cathode ray tubes)
ac3173f5-f70e-4122-a541-ac35b54330cc - Flow property / unit: Mass
93a60a56-a3c8-11da-a746-0800200b9a66/ kg; unit group93a60a57-a4c8-11da-a746-0800200c9a66 - Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
- Value mode:
foreground_record - Specificity:
site_specific - Normalization basis: per 1 kg accepted net finished tube mass
- Basis kind:
reference_flow - Evidence kind:
collected_record - Collection protocol:
cp_lot
Waste flows
Rejected sealed electron tube (rejected_tube)
Record intact rejected tubes transferred out for treatment or recovery, with envelope composition and destination; do not substitute mixed electronic scrap.
- Selected flow: Rejected sealed electron tube
- Flow property / unit: Mass
93a60a56-a3c8-11da-a746-0800200b9a66/ kg; unit group93a60a57-a4c8-11da-a746-0800200c9a66 - Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
- Value mode:
foreground_record - Specificity:
site_specific - Normalization basis: per 1 kg accepted net finished tube mass
- Basis kind:
reference_flow - Evidence kind:
collected_record - Collection protocol:
cp_lot - Sources:
epa-electronic-components-phase-2-1984
Process: Corrugated box packing (pack)
Inputs
Product flows
corrugated board boxes (corrugated_box)
Include only when this box is used; weigh net box consumption per dispatched accepted tube mass. Add any actual cushioning as separate identified exchanges.
- Selected flow: corrugated board boxes
4f197bec-7b3b-11dd-ad8b-0800200c9a66 - Flow property / unit: Mass
93a60a56-a3c8-11da-a746-0800200b9a66/ kg; unit group93a60a57-a4c8-11da-a746-0800200c9a66 - Amount rule: Collect campaign quantity under the linked protocol; normalize by accepted net tube mass in the same campaign.
- Value mode:
foreground_record - Specificity:
site_specific - Normalization basis: per 1 kg accepted net finished tube mass
- Basis kind:
reference_flow - Evidence kind:
collected_record - Collection protocol:
cp_pack
7. Allocation and Co-product Handling
| rule_id | applies_to | rule | source_ids |
|---|---|---|---|
| allocation_subdivide | shared_equipment | Use direct campaign meters first. Allocate shared vacuum and oven electricity by measured equipment power multiplied by occupied operating time, including attributable standby; document remaining shared services. | |
| allocation_rejects | accepted_output | Charge rejects and rework to accepted tube output; do not treat failed units as burden-free co-products. Internal reuse is an internal loop; exported recovery is a separate waste fate with no automatic avoided-production credit. |
8. Foreground Data Collection, Calculation, and Quality Rules
Data Collection Protocols
| protocol_id | process_id | flow_role | record_type | raw_fields | collection_method | unit | frequency | temporal_coverage | site_scope | aggregation_rule | quality_evidence |
|---|---|---|---|---|---|---|---|---|---|---|---|
| cp_rinse | rinse | rinse_water; rinse_wastewater | water_meter; waste_transfer | time; inlet/outlet mass; temperature; density; composition; destination | calibrated meters and weighing; sampling; transfer tickets | kg | each batch | complete representative campaign with start/end dates | declared site and equipment | sum actual quantities then divide by same-campaign accepted net mass; document absent operations as not applicable | calibration; original logs; supporting tickets |
| cp_lot | finish | unsealed_assembly; sealing_frit; getter_device; finished_tube; rejected_tube | batch_record | batch; model; count; net mass; issues and stocks; test results; waste destination | weighing; stores reconciliation; test logs | kg | each batch | complete representative campaign with start/end dates | declared site and equipment | sum actual quantities then divide by same-campaign accepted net mass; document absent operations as not applicable | calibration; original logs; supporting tickets |
| cp_energy | finish | electricity | meter_record | equipment; timestamps; kWh; batch; occupancy; standby; allocation share | submeter readings; measured power and time for shared equipment | kWh | each batch | complete representative campaign with start/end dates | declared site and equipment | sum actual quantities then divide by same-campaign accepted net mass; document absent operations as not applicable | calibration; original logs; supporting tickets |
| cp_pack | pack | corrugated_box | stores_record | box grade; count; unit mass; dispatch batch; stock changes | weighing and dispatch reconciliation | kg | each batch | complete representative campaign with start/end dates | declared site and equipment | sum actual quantities then divide by same-campaign accepted net mass; document absent operations as not applicable | calibration; original logs; supporting tickets |
Calculation Rules
| rule_id | Applies to | Formula or rule | Inputs | Output | source_ids |
|---|---|---|---|---|---|
| normalize | all rows | q_i = sum(Q_i) / M_accepted | same-campaign measured exchange and accepted mass | exchange per kg | |
| yield | mass reconciliation | M_in + M_added = M_accepted + M_rejected + M_losses + delta_stock | campaign weighing and stock records | reconciliation, not a universal yield factor |
Data Quality Requirements
| requirement_id | Applies to | Requirement | Evidence |
|---|---|---|---|
| dq_sampling | output and energy | Cover startup, stable production, shutdown, ageing and rejects; do not select only best batches | campaign logs and complete meter series |
| dq_upstream | unsealed assembly | Supplier boundary must cover incorporated materials and preceding operations; model uncovered operations separately | supplier process map, bill of materials and dataset boundary |
| dq_ranges | quantities | Use foreground records; no external inferred range without synthesis of two independent, original-text-verified, boundary-compatible sources | raw records and uncertainty disclosure |
9. Validation Rules
| rule_id | applies_to | rule | source_ids |
|---|---|---|---|
| validate_identity | reference_flow | Reject a dataset without model, net mass, cathode/envelope state and test criteria; do not compare different functions using kg alone. | |
| validate_balance | inventory | Reconcile assembly intake, added retained solids, accepted tubes, rejected tubes, measured losses and stock change. Explain discrepancies using weighing uncertainty and rework records, not an invented tolerance. | |
| validate_coverage | boundary | Require route applicability, upstream interfaces, meter coverage and destination evidence; unresolved flow identity is disclosed and never silently substituted by a proxy. Missing route-specific exchanges make completeness inconclusive. |
10. Published Dataset Profile
| Field | Value |
|---|---|
| dataset_role | secondary_dataset |
| downstream_use | Component supply for equipment process and lifecyclemodel projections |
| allowed_use | Declared model and compatible manufacturing route with explicit upstream links |
| excluded_use | Universal mass-based comparison between CRTs, receiving tubes and photomultipliers; complete equipment footprint; use-phase or disposal claims |
| required_metadata | Model, site, period, assembly supplier, cathode, envelope, gas/vacuum state, ratings, unit mass, process boundary and allocation drivers |
| required_quality_disclosure | Meters, calibration, yield reconciliation, missing flows, upstream representativeness, waste destinations and uncertainty |
| update_trigger | Change in tube design, cathode chemistry, pump or furnace technology, supplier, yield, energy supply or waste treatment |
11. Data Sources
| Source id | Type | Reference | Used for |
|---|---|---|---|
| un-cpc-3-0-structure-2025 | official_guidance | UN Statistics Division, CPC Version 3.0 structure, row 47140 (30 June 2025); https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Structure_30Jun2025.csv; retrieved 2026-09-09 | Classification identity only |
| epa-electronic-components-phase-2-1984 | official_guidance | US EPA, Development Document for Electrical and Electronic Components, Phase II (1984), sections 4.1.3, 4.2 and 5.2.2; https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=2000K55B.TXT; retrieved 2026-09-09 | Historical tube process sequence and rinse-water pathways; no numerical transfer |
| hamamatsu-about-pmts | literature | Hamamatsu Photonics, About PMTs, Behind high-performance PMTs and Main components; https://www.hamamatsu.com/jp/en/product/optical-sensors/pmt/about_pmts.html; retrieved 2026-09-09 | Photo-cathode tube components, sealing, evacuation and inspection |
| saes-ep1402554a1 | literature | SAES Getters, EP1402554A1, Evaporable getter device for cathode-ray tubes, description; https://patents.google.com/patent/EP1402554A1/en; retrieved 2026-09-09 | Conditional purchased BaAl4/Ni getter device and in-envelope activation; no numeric factor |
Raw downloads
These files are byte-identical to the canonical files for this revision in the repository.
Structured rule index
This index comes from verified structured.yaml and retains the canonical English rule text.
System boundary rules · 3
| Rule ID | Applies to | Rule | Source IDs |
|---|---|---|---|
boundary_operations | foreground | Include actual sealing, evacuation, activation, ageing, failed tests, rework energy and waste transfers. The historical EPA sequence and modern PMT description support these operations; neither supplies a current plant inventory. | epa-electronic-components-phase-2-1984, hamamatsu-about-pmts |
boundary_extension | route | The tabulated route uses electric heating and a dry vacuum pump. For gas-filled, fuel-heated, oil-pumped, in-house coated or CRT externally coated/banded routes, add measured atomic exchanges and supplier links for the actual operation before claiming completeness; do not assign zeros to uncollected exchanges. | |
boundary_waste | waste | Record rejected whole tubes separately from dismantled glass, and rinse wastewater as a waste transfer to identified treatment. If treatment is on site, add treatment inputs, sludge and measured species discharged at the environmental boundary; do not count the same pollutant again as untreated wastewater. | epa-electronic-components-phase-2-1984 |
Allocation rules · 2
| Rule ID | Applies to | Rule | Source IDs |
|---|---|---|---|
allocation_subdivide | shared_equipment | Use direct campaign meters first. Allocate shared vacuum and oven electricity by measured equipment power multiplied by occupied operating time, including attributable standby; document remaining shared services. | |
allocation_rejects | accepted_output | Charge rejects and rework to accepted tube output; do not treat failed units as burden-free co-products. Internal reuse is an internal loop; exported recovery is a separate waste fate with no automatic avoided-production credit. |
Validation rules · 3
| Rule ID | Applies to | Rule | Source IDs |
|---|---|---|---|
validate_identity | reference_flow | Reject a dataset without model, net mass, cathode/envelope state and test criteria; do not compare different functions using kg alone. | |
validate_balance | inventory | Reconcile assembly intake, added retained solids, accepted tubes, rejected tubes, measured losses and stock change. Explain discrepancies using weighing uncertainty and rework records, not an invented tolerance. | |
validate_coverage | boundary | Require route applicability, upstream interfaces, meter coverage and destination evidence; unresolved flow identity is disclosed and never silently substituted by a proxy. Missing route-specific exchanges make completeness inconclusive. |
Processes and inputs/outputs · 3
| Process ID | Process name | Input flows | Output flows |
|---|---|---|---|
rinse | Final water rinse | 1 | 1 |
finish | Seal, evacuate, activate and test | 4 | 2 |
pack | Corrugated box packing | 1 | 0 |
Complete field inspector
Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.