TianGong PCR产品类别规则

Other telephone sets and apparatus for transmission or reception of voice, images or other data, including apparatus for communication in a wired or wireless network (such as a local or wide area network)

Other telephone sets and apparatus for transmission or reception of voice, images or other data, including apparatus for communication in a wired or wireless network……

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published version
Readiness
Review required
Last updated

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:47223 · exact

Source

1. Scope and Applicability

This PCR applies to finished equipment whose principal product function is transmitting or receiving voice, images, or other data, including communication over wired or wireless local- or wide-area networks. The category is deliberately heterogeneous: it includes non-cordless line telephone sets, building intercom apparatus, non-cellular portable radio telephones, base stations, hubs, routers, gateways, channel-to-channel adapters, modems, radiotelegraphic apparatus, telephone switchboards, and radio-telephonic or radio-telegraphic telemetry receivers. A foreground package shall identify its actual device family and configuration; a router, switch, access point, base station, or telephone shall never be used as a proxy for the whole category.

The core reference is factory-gate production per kilogram of net finished equipment. Purchased components and modules retain their upstream burdens through linked datasets. Use, maintenance, refurbishment, and end-of-life processes are conditional extensions for cradle-to-grave studies and shall use the declared configuration, operating lifetime, traffic or duty profile, geography, and route-specific records. This PCR does not provide generic numerical defaults across device families; missing quantities require foreground collection.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.radio-television-and-communication-equipment-and-apparatus.other-telephone-sets-and-apparatus-for-transmission-or-reception-of-voice-images-or-oth-5b63ed57
classification_refsCPC 3.0: 47223 (exact scope reference)
covered_productsFinished non-cordless line telephone and building intercom apparatus; non-cellular portable radio telephones; base stations; hubs, routers, gateways and other switching/routing apparatus; channel adapters; modems and access termination apparatus; radiotelegraphic apparatus; telephone switchboards; radio-telephonic or radio-telegraphic telemetry receivers; other finished voice, image or data transmission/reception apparatus within the stated boundary.
excluded_productsCordless-handset line telephones (CPC 47221); cellular or other wireless-network telephone handsets (CPC 47222); broadcast transmission apparatus and cameras (CPC 47211-47215); network cards for automatic data-processing machines (CPC 45281); separately sold parts (CPC 47401); telecommunications services; standalone servers, storage, UPS, cables, antennas or site infrastructure unless supplied as integral declared components of the finished equipment.
representative_productNo single physical model represents the category. The representative object is the declared, production-weighted finished-equipment configuration within one named device family.
production_routePurchased and/or in-house electronic, electromechanical and mechanical parts; PCBA/module integration; chassis assembly; software/firmware loading and configuration; functional and safety testing; optional packaging and factory dispatch. In-house part fabrication is included only when performed within the declared foreground boundary.
market_stateFinished, manufactured and functionally tested equipment at the factory gate; packaging state and included accessories are declared separately.

3. Reference Flow

FieldValue
WhatProduction of a declared finished apparatus configuration for transmitting or receiving voice, images or other data.
How much1 kg net mass of finished equipment, excluding separately reported packaging.
How wellThe declared model/configuration is assembled, configured and has passed the manufacturer's release tests for its stated communication function and market.
How long or cycleOne declared production campaign or reporting period. Operating lifetime and use profile are required only when use or cradle-to-grave stages are added.
reference_flow_linkequipment_output
FieldValue
Reference amount1 kg
Reference product flowOther telephone sets and apparatus for transmission or reception of voice, images or other data, including apparatus for communication in a wired or wireless network (such as a local or wide area network) 8b57a042-ffa4-4f3d-a5c7-556fce28e7b3
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifiersdevice family; manufacturer model and configuration identifier; fixed or modular construction; installed modules and power supplies; port/interface counts, media and rated speeds; wired/wireless protocols and frequency bands where applicable; rated capacity, throughput, users or coverage where applicable; power-input type and nameplate rating; PoE input/output treatment where applicable; included antennas, batteries, handsets, cables, accessories and software/firmware; net equipment mass; packaging inclusion and mass; production geography and period; production-weighting method; factory-gate state; release-test status

When constructing a foreground data package, the items listed in Required qualifiers must be declared in dataset metadata, process notes, reference flow comment, product description, or an equivalent data package field. Missing required qualifiers make the reference flow definition incomplete for that data package.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_massreference productMass 93a60a56-a3c8-11da-a746-0800200b9a66kgNormalize all factory-gate inventory to 1 kg net finished equipment. Measure net equipment separately from packaging, removable accessories not included in the sale configuration, and shipping pallets.
configuration_weightingmulti-model or configurable productionMass 93a60a56-a3c8-11da-a746-0800200b9a66kgBuild results from the actual declared model/configuration or a documented production-weighted mix. Do not average unrelated device families or use one model as a whole-category proxy.
operational_energyconditional use stageEnergykWhCalculate electricity from measured input power and time in each declared state/load bin. Record hardware/software configuration, connected ports or radio load, traffic/duty profile, supply conditions, measurement boundary, and treatment of power delivered to downstream devices.
transport_servicetransport processesTransport servicetkmCalculate tonne-kilometres from shipped mass, route distance and mode; use chargeable mass or volume where it constrains capacity and disclose included empty returns.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionPurchased raw materials, parts, modules, subassemblies and accessories at the first foreground-controlled manufacturing gate; earlier in-house fabrication is included only when explicitly declared.
starting_condition_roleForeground manufacturing entry point for the actual equipment configuration.
product_classification_scopeSemantic scope of finished voice, image and data transmission/reception apparatus described above; classification is used as a scope reference and does not define a generic technology route.
recursive_input_ruleA purchased input that is itself finished equipment in this category shall be linked to a separate upstream dataset and recorded as an equipment/module input. Do not recursively decompose it with this PCR and do not substitute the broad reference flow for unidentified components.
upstream_dataset_requirementEvery purchased material, part, module, power supply, battery, cable, antenna and accessory with material significance or environmental significance requires an identity-matched upstream dataset or a documented data gap and sensitivity treatment.
disclosureDeclare device family, configuration, BOM coverage, in-house versus purchased processes, production geography/period, allocation basis, cut-offs, packaging state, included accessories, test boundary, and any conditional use, maintenance, refurbishment or end-of-life scenario.
rule_idApplies toRulesource_ids
boundary_no_single_device_proxycategory representationRepresent each declared device family/configuration from its own BOM and process/use records. Results for routers, switches, access points, base stations, telephones or another narrow family shall not be generalized to the entire category.un-cpc-v3-47223; etsi-es-203-199-v1-4-1
boundary_production_corefactory-gate datasetInclude applicable parts production, PCBA/module and final assembly, configuration, release testing, packaging when declared, production yields, wastes, direct releases, energy supplies and transports within or between included stages.etsi-es-203-199-v1-4-1
boundary_lifecycle_extensioncradle-to-grave extensionWhen the study extends beyond the factory gate, include installation, operating electricity, maintenance/spares, de-installation, transport, preparation for reuse/refurbishment and route-specific end-of-life treatment. State any omitted stage and justification.etsi-es-203-199-v1-4-1; eu-weee-directive-2012-19-eu
boundary_cutoffall included stagesAvoid cut-off where practicable. Any exclusion shall be checked for mass, energy and environmental significance, cumulatively documented, and included in sensitivity analysis when it could affect conclusions.etsi-es-203-199-v1-4-1

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
in_house_part_productionIn-house part and subassembly productionconditionalInclude when PCBAs, electronic modules, enclosures, cables, power assemblies or other parts are fabricated within the foreground-controlled site.foreground part productionkg accepted part/subassembly output
equipment_assembly_and_testEquipment assembly, configuration and release testingrequiredAlways include for the declared finished-equipment configuration.foreground manufacturingkg tested equipment output
packaging_and_factory_gatePackaging and factory-gate releaserequiredAlways include; packaging inputs may be zero only when the declared reference state is unpackaged.foreground finalization1 kg net finished equipment
use_and_maintenanceEquipment use and maintenanceconditionalInclude for use-stage or cradle-to-grave studies.conditional downstream usedeclared operating year or lifetime, reconciled to 1 kg equipment
end_of_life_treatmentDe-installation and end-of-life treatmentconditionalInclude for cradle-to-grave, reuse, refurbishment or disposal scenarios.conditional downstream treatmentkg de-installed equipment routed

Process: In-house part and subassembly production (in_house_part_production)

Inputs

Product flows
BOM-traced raw materials and purchased parts (part_material_inputs)

Record each material and purchased part separately by identity, supplier route and accepted mass when it enters an in-house part process.

  • Selected flow: Foreground-selected Tiangong product flow matching each declared material or part
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: accepted quantity from receiving records and BOM reconciliation
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per kg accepted part or subassembly output
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_bom_materials
  • Sources: etsi-es-203-199-v1-4-1
Part-process energy, water and process chemicals (part_process_utilities)

Record electricity, fuels, water, gases, plating/cleaning chemicals and other utilities as separate flows for each applicable in-house technology.

  • Selected flow: Foreground-selected utility or chemical flow matching metered and purchase records
  • Flow property / unit: flow-specific property and unit
  • Amount rule: metered or purchase-balanced consumption allocated to accepted part output
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per kg accepted part or subassembly output
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_part_process_records
  • Sources: etsi-es-203-199-v1-4-1
Waste flows
Elementary flows

Outputs

Product flows
Accepted in-house parts and subassemblies (in_house_subassemblies)

These accepted intermediates leave the part process and enter equipment assembly; transferred mass is measured by batch.

  • Selected flow: Foreground-defined intermediate part or subassembly flow
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: measured accepted output transferred to assembly
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per production campaign
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_part_process_records
  • Sources:
Waste flows
In-house part scrap and treatment routes (part_scrap)

Scrap crosses to rework, recycling or disposal and is recorded by material, measured mass and destination.

  • Selected flow: Separate Tiangong waste flow for each recorded scrap or hazardous-waste stream
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: weighed or mass-balanced scrap by material and treatment route
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per kg accepted part or subassembly output
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste_and_release_records
  • Sources:
Elementary flows
Direct releases from in-house part processing (part_process_releases)

Monitored emissions to air, water or soil cross the environment boundary and are recorded separately by elementary-flow identity.

  • Selected flow: Separate verified Tiangong elementary flow for each monitored release
  • Flow property / unit: release-specific property and unit
  • Amount rule: measured release or calculated value from monitored activity and a cited factor
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per kg accepted part or subassembly output
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste_and_release_records
  • Sources:

Process: Equipment assembly, configuration and release testing (equipment_assembly_and_test)

Inputs

Product flows
Purchased and in-house components, modules and accessories (assembly_components)

Keep PCBAs, integrated modules, chassis/enclosures, power supplies, batteries, displays, cooling parts, cables, antennas, handsets and other included accessories as separate BOM-traced inputs.

  • Selected flow: Identity-matched upstream product flow for each component or module
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: accepted BOM quantity multiplied by measured or supplier-declared unit mass, reconciled to receiving and production records
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per kg tested equipment output
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_bom_materials
  • Sources: etsi-es-203-199-v1-4-1
Assembly consumables (assembly_consumables)

Consumables are incorporated, consumed or lost during assembly and are quantified from issued, returned and measured process records.

  • Selected flow: Foreground-selected product flow for solder, adhesive, fasteners, cleaning agents and other consumed materials
  • Flow property / unit: flow-specific property and unit
  • Amount rule: issued minus returned inventory, or measured process consumption
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per kg tested equipment output
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assembly_records
  • Sources:
Assembly, configuration and test electricity (assembly_test_electricity)

Electricity crosses the assembly/test boundary and is obtained from submeters or a documented causal allocation of facility meters.

  • Selected flow: Geography- and period-matched electricity supply flow selected in the foreground package
  • Flow property / unit: Energy / kWh
  • Amount rule: submetered consumption, or facility-meter consumption allocated by documented machine-hours or production time
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per kg tested equipment output
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_assembly_records
  • Sources: etsi-es-203-199-v1-4-1
Waste flows
Elementary flows

Outputs

Product flows
Functionally tested equipment before packaging (tested_equipment)

Accepted tested equipment leaves assembly for final packaging; only units passing release criteria are included in the measured output.

  • Selected flow: Foreground intermediate equipment flow matching the declared configuration
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: measured mass of accepted units that pass release testing
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per production campaign
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_production_output_and_tests
  • Sources:
Waste flows
Assembly rejects and failed parts (assembly_rejects)

Failed parts and rejected units leave assembly for rework, supplier return, recycling or disposal and are measured by final disposition.

  • Selected flow: Separate waste or reusable-part flow by disposition
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: weighed rejects classified as rework, return to supplier, recycling or disposal; do not count reworked units twice
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per kg tested equipment output
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_production_output_and_tests
  • Sources:
Elementary flows

Process: Packaging and factory-gate release (packaging_and_factory_gate)

Inputs

Product flows
Tested equipment input (tested_equipment_input)

This intermediate transfers from the matched assembly output into finalization without changing identity or double-counting upstream burdens.

  • Selected flow: Foreground intermediate equipment flow matching tested_equipment
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: transferred accepted mass from equipment assembly and test
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per kg net finished equipment
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_production_output_and_tests
  • Sources:
Packaging materials (packaging_materials)

Record primary, secondary and tertiary packaging separately; enter zero only for a verified unpackaged reference state.

  • Selected flow: Identity-matched packaging material or packaging product flow
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: purchased or issued packaging mass reconciled to packed units and packaging waste
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per kg net finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_packaging_records
  • Sources: etsi-es-203-199-v1-4-1
Waste flows
Elementary flows

Outputs

Product flows
Finished equipment at factory gate (equipment_output)

The declared net equipment leaves the foreground production boundary after final release; its fixed mass is the quantitative reference.

  • Selected flow: Other telephone sets and apparatus for transmission or reception of voice, images or other data, including apparatus for communication in a wired or wireless network (such as a local or wide area network) 8b57a042-ffa4-4f3d-a5c7-556fce28e7b3
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: fixed reference output of 1 kg net finished equipment; packaging mass is excluded and reported separately
  • Value mode: Fixed value (fixed_value)
  • Specificity: Generic (generic)
  • Normalization basis: 1 kg reference product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Identity reference (identity_reference)
  • Sources:
Waste flows
Packaging operation waste (packaging_waste)

Packaging offcuts and rejected packs leave the packing process for treatment and are weighed or calculated by material balance.

  • Selected flow: Separate waste flow by packaging material and treatment route
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: weighed waste or packaging material input minus packaging shipped with accepted products
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per kg net finished equipment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_packaging_records
  • Sources:
Elementary flows

Process: Equipment use and maintenance (use_and_maintenance)

Inputs

Product flows
Operating electricity (operating_electricity)

Measure the actual declared configuration across representative states or load bins; do not transfer router, switch, access-point or base-station power data to another family.

  • Selected flow: Geography- and period-matched electricity supply flow
  • Flow property / unit: Energy / kWh
  • Amount rule: sum of measured input power in each state/load bin multiplied by time in that bin over the declared operating period
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per kg equipment and declared operating year or lifetime
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_use_power_profile
  • Sources: etsi-es-203-199-v1-4-1; epa-energy-star-lne-v1-1
Maintenance and replacement parts (maintenance_parts)

Installed spares cross into the use-stage system during service and are quantified from configuration-specific maintenance records.

  • Selected flow: Identity-matched replacement part, module, battery, fan, power supply or consumable flow
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: installed replacement quantities from service records over the declared operating period
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per kg equipment and declared operating year or lifetime
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_maintenance_records
  • Sources: etsi-es-203-199-v1-4-1
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Replaced parts and maintenance waste (maintenance_waste)

Removed parts cross from equipment use to reuse, recycling or disposal and are reconciled to maintenance interventions.

  • Selected flow: Separate waste or reusable-part flow by disposition
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: removed quantity from service records, reconciled to installed replacements
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per kg equipment and declared operating year or lifetime
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_maintenance_records
  • Sources:
Elementary flows

Process: De-installation and end-of-life treatment (end_of_life_treatment)

Inputs

Product flows
Waste flows
De-installed equipment routed to treatment (deinstalled_equipment)

Equipment crosses from use into the declared reuse, refurbishment, recycling or disposal route and is weighed at route entry.

  • Selected flow: Foreground-defined waste equipment flow matching the declared configuration
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: measured mass by route to reuse, refurbishment, recycling or final disposal
  • Value mode: Foreground record (foreground_record)
  • Specificity: Scenario-specific (scenario_specific)
  • Normalization basis: per kg equipment leaving the use stage
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_eol_routes
  • Sources: etsi-es-203-199-v1-4-1; eu-weee-directive-2012-19-eu
Elementary flows

Outputs

Product flows
Reusable equipment, parts and recovered materials (recovered_outputs)

Verified reusable goods and recovered materials leave treatment as product outputs and are measured by identity and destination.

  • Selected flow: Separate product flow for each verified reusable equipment/part or recovered material output
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: measured treatment output by material and destination; credits are applied only under the declared recycling allocation method
  • Value mode: Foreground record (foreground_record)
  • Specificity: Scenario-specific (scenario_specific)
  • Normalization basis: per kg equipment entering treatment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_eol_routes
  • Sources: etsi-es-203-199-v1-4-1; eu-weee-directive-2012-19-eu
Waste flows
End-of-life treatment residues (eol_residues)

Non-recovered residues leave treatment for final recovery or disposal and are recorded separately by waste identity and route.

  • Selected flow: Separate waste flow for each residue and final route
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: measured treatment residues after dismantling and material recovery
  • Value mode: Foreground record (foreground_record)
  • Specificity: Scenario-specific (scenario_specific)
  • Normalization basis: per kg equipment entering treatment
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_eol_routes
  • Sources: eu-weee-directive-2012-19-eu
Elementary flows

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
allocation_avoidshared manufacturing and support processesAvoid allocation by submetering or subdividing lines, test stations, part processes and support activities for the declared product/configuration wherever practicable.etsi-es-203-199-v1-4-1
allocation_physicalunavoidable shared facility burdensAllocate shared burdens by a causal physical driver such as machine-hours, test time, PCB area, good-die area, accepted mass, floor-time or another documented driver. Use one method consistently for all environmental loads from the common process.etsi-es-203-199-v1-4-1
allocation_economic_fallbackshared burdens lacking a defensible physical relationshipEconomic allocation may be used only when physical allocation is not feasible; disclose values, period, affected burdens and sensitivity to the alternative.etsi-es-203-199-v1-4-1
allocation_recyclingreuse, refurbishment and recovered materialState the recycling/reuse allocation convention and life-cycle boundary explicitly. Do not count both an avoided-primary-material credit and the same recovered output without a consistent method.etsi-es-203-199-v1-4-1

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_bom_materialsin_house_part_production; equipment_assembly_and_testmaterials, components and modulescontrolled BOM, receiving record and supplier specificationpart_id; revision; supplier; quantity_per_unit; unit_mass; material; included_accessory; accepted_quantity; scrapreconcile released BOM to goods receipts, production issues and measured sample masseskg and itemeach BOM revision and campaigncomplete reporting periodall included models and sitessum accepted mass by configuration; retain separate component identitiesapproved BOM; scale record; supplier declaration; reconciliation log
cp_part_process_recordsin_house_part_productionin-house parts, utilities and outputsmeter, batch ticket and production logtechnology; batch; input_quantity; utility; meter_start; meter_end; accepted_output; rejects; downtimecollect by part technology and batch; allocate only shared meters with a documented driverflow-specificeach batch with monthly reconciliationrepresentative period covering seasonal/route variationevery in-scope part facilitynormalize to accepted part output, preserving technology routemeter calibration; batch record; yield reconciliation
cp_waste_and_release_recordsin_house_part_productionscrap and direct releaseswaste manifest, monitor and permit reportstream; quantity; destination; pollutant; concentration; volume; factor_sourceweigh waste and use monitored releases; calculated releases require cited factors and activity dataflow-specificeach shipment or monitoring intervalsame period as productionall included sites and outletssum by flow and route; no netting of recovered valuemanifests; laboratory/monitor QA; permits; factor reference
cp_assembly_recordsequipment_assembly_and_testassembly consumables and energysubmeter, stores issue and line logline; model; configuration; units; net_mass; kWh; consumable_issue; consumable_return; test_timesubmeter preferred; otherwise allocate by causal machine/test timekWh and flow-specificshift or batchrepresentative reporting periodevery included assembly/test siteaggregate by configuration then production-weight to the declared mixcalibrated meter; ERP issue/return; line record
cp_production_output_and_testsequipment_assembly_and_test; packaging_and_factory_gateaccepted product and rejectsproduction count, mass and release-test recordserial_or_lot; configuration; produced; passed; reworked; rejected; net_mass; test_resultreconcile accepted output, rework and final rejects to production inputkg and itemeach lotcomplete reporting periodall included linescount a unit once when finally accepted; retain rejects by dispositionrelease-test report; calibrated scale; reconciliation
cp_packaging_recordspackaging_and_factory_gatepackaging and packaging wastepackaging BOM, issue and waste recordmaterial; pack_level; mass_per_pack; units_per_pack; issue; return; waste; pallet_shareweigh representative packs and reconcile issued material to shipped packs and wastekgeach packaging revision with period reconciliationreporting periodall included packing sitesnormalize packaging separately per kg net equipmentpackaging specification; scale record; waste manifest
cp_use_power_profileuse_and_maintenanceoperating electricitycalibrated power test or field telemetryconfiguration; firmware; supply; ports; modules; radio_or_traffic_profile; state; input_power; duration; downstream_power; ambient; test_methodmeasure at equipment input across representative states/load bins; for eligible LNE use the documented ENERGY STAR configuration/test method or justify an equivalentW, h, kWhtest per configuration; field bins continuously or representative samplingdeclared operating year/lifetimedeclared market and deploymentsum state power multiplied by time; keep downstream delivered power treatment explicitcalibration certificate; test setup; telemetry completeness; configuration record
cp_maintenance_recordsuse_and_maintenancereplacement parts and removed wasteservice and spare-parts logdate; configuration; part; installed_quantity; removed_quantity; disposition; travelreconcile service tickets to spare-parts issues and returnskg and itemeach interventiondeclared operating perioddeclared deployment populationaggregate per configuration and operating periodservice ticket; inventory record; disposition proof
cp_eol_routesend_of_life_treatmentde-installed equipment and treatment outputsde-installation, transport and recycler recordmass; route; distance; reuse_test; removed_components; recovered_material; residue; destinationfollow measured consignments or a declared, region-specific scenario; keep reuse/refurbishment and waste routes separatekg and tkmeach consignment or representative audited campaignscenario yeardeclared end marketmass-balance each route from received equipment to outputs/residuesweighbridge; transport record; functionality test; recycler certificate

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calc_reference_normalizationall manufacturing rowsnormalized amount = period amount / accepted net finished-equipment massperiod flow amount; accepted kgamount per 1 kg reference productetsi-es-203-199-v1-4-1
calc_bom_masscomponent inputscomponent mass = accepted units × quantity per unit × verified unit mass; reconcile sum plus consumables, wastes and outputsBOM; receiving; sample mass; yieldkg component per kg productetsi-es-203-199-v1-4-1
calc_production_mixmultiple configurationsmix result = sum(configuration result × accepted net mass share); never combine semantically different device families without separate resultsconfiguration inventories; accepted massesproduction-weighted resultun-cpc-v3-47223; etsi-es-203-199-v1-4-1
calc_use_energyconditional use stageelectricity = sum(input power in state/load bin × hours in bin) / 1000; state whether downstream PoE or other delivered power is includedW; hours; configuration; load profilekWh per declared periodetsi-es-203-199-v1-4-1; epa-energy-star-lne-v1-1
calc_transporttransporttransport service = shipped mass in tonnes × route distance in km, by mode and legkg; km; mode; load factortkmetsi-es-203-199-v1-4-1
calc_mass_balanceproduction and end-of-lifeinputs = product outputs + waste outputs + measured releases ± stock change, using consistent dry/as-received basis as applicablemass records; stock change; releasesbalance and unexplained differenceetsi-es-203-199-v1-4-1

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_identityreference product and inputsPreserve exact flow identity and declare device family/configuration; no narrow device or wrong-classification proxy is acceptable for the broad reference product.Tiangong UUID readback; BOM; model/configuration record
dq_representativenessall foreground recordsReport time, geography, technology, model mix and site coverage; explain exclusions and production weighting.coverage table; production totals; site list
dq_completenessBOM and process inventoryReconcile BOM mass, accepted product, rejects, packaging and stock changes; assess mass-, energy- and environmentally significant omissions cumulatively.reconciliation; cut-off register; sensitivity analysis
dq_measurementmeters, scales and test equipmentUse calibrated or verified instruments with traceable units and retain measurement boundary and uncertainty.calibration/verification certificates; test setup; uncertainty statement
dq_secondary_dataupstream and scenario dataUse geography-, time- and technology-matched datasets; record source, version/year and substitution rationale.dataset register; source references; data-quality assessment
dq_power_profileconditional use stageThe profile shall represent the actual hardware/software configuration and declared traffic, radio, port and duty states; LNE tests shall disclose tested ports/modules and measurement setup.power report; configuration; telemetry; epa-energy-star-lne-v1-1
dq_eolconditional end-of-lifePreserve route-specific masses and evidence for reuse/refurbishment, removed hazardous components, recovery and residues.functionality tests; recycler records; WEEE treatment evidence where applicable

9. Validation Rules

rule_idApplies toRulesource_ids
validate_reference_identityreference flowThe reference product UUID shall be 8b57a042-ffa4-4f3d-a5c7-556fce28e7b3, state code 100, Product flow, with Mass 93a60a56-a3c8-11da-a746-0800200b9a66 and kg from Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66.
validate_family_configurationcategory scopeReject a package lacking device family and configuration qualifiers, or one that generalizes a router, switch, access point, base station, telephone or another narrow product to the whole category.un-cpc-v3-47223; epa-energy-star-lne-v1-1
validate_reference_amountfactory-gate outputNet finished-equipment output shall equal 1 kg after normalization; packaging shall be reported separately and must not be embedded silently.
validate_process_coverageforeground boundaryRequire assembly/configuration/testing and factory-gate release, plus every applicable in-house part process. Conditional lifecycle processes shall appear whenever the claimed scope includes them.etsi-es-203-199-v1-4-1
validate_bom_and_mass_balanceproduction inventoryRequire BOM/component traceability and a documented mass balance; unresolved significant differences are findings, not automatic cut-offs.etsi-es-203-199-v1-4-1
validate_operational_energyconditional use stageRequire measured power/load-state data and time profile for the actual configuration, with explicit PoE/downstream-power boundary; borrowed narrow-family power values fail unless justified as a named scenario with sensitivity.etsi-es-203-199-v1-4-1; epa-energy-star-lne-v1-1
validate_allocationshared processesRequire subdivision where practicable, otherwise a causal physical allocation basis; economic fallback and sensitivity shall be disclosed.etsi-es-203-199-v1-4-1
validate_eol_routesconditional end-of-lifeRequire route mass balance and conditional removal/treatment of batteries, qualifying PCBAs, brominated-flame-retardant plastics, displays, external cables and other applicable components.eu-weee-directive-2012-19-eu
validate_data_qualityall dataReport methodological consistency, completeness, uncertainty, representativeness, age, acquisition method, supplier independence, geography, technology and cut-off treatment.etsi-es-203-199-v1-4-1

10. Published Dataset Profile

FieldValue
dataset_roleProduct- and configuration-specific foreground manufacturing dataset; conditional lifecycle extensions remain separate, explicitly linked processes.
downstream_usesecondary_dataset; background_dataset after review of representativeness, upstream links, allocation and completeness
allowed_useModel production of the declared finished equipment/configuration at factory gate; aggregate only within the same device family using documented production weights; extend to use and end-of-life with configuration- and scenario-specific records.
excluded_useWhole-category proxy based on one router, switch, access point, base station, telephone or model; comparison across unlike devices without equivalent function/capacity/lifetime; use-stage modelling from nameplate power alone; unidentified BOM substitution; unqualified market-average claims.
required_metadataPCR id/version; reference UUID; device family; manufacturer/model/configuration; fixed/modular state; modules, ports/interfaces, protocols/bands, capacity/performance; power architecture and PoE boundary; included accessories/software; net mass and packaging; production sites/period; technology route; BOM coverage; allocation; cut-offs; geography; data sources; conditional lifetime/use/EoL scenario.
required_quality_disclosureForeground/secondary data shares; temporal, geographical and technological representativeness; configuration and production weighting; BOM and mass-balance completeness; measurement/calibration; uncertainty; cut-offs; allocation sensitivity; missing upstream datasets; use-profile and end-of-life scenario quality.
update_triggerBOM, model family, chassis/module or power architecture change; material change in production route, site, supplier, yield or energy mix; firmware change affecting power; new measured use profile; market or end-of-life route change; source/standard revision; unresolved data gap becomes material.

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-v3-47223official_guidanceUnited Nations Statistics Division, CPC Ver. 3.0 Explanatory Notes, updated 30 June 2025, https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdf (retrieved 2026-08-09)Product-family inclusions/exclusions and the evidence that this is a heterogeneous category.
etsi-es-203-199-v1-4-1standardETSI ES 203 199 V1.4.1 (2025-01), Methodology for environmental Life Cycle Assessment (LCA) of Information and Communication Technology (ICT) goods, networks and services, https://www.etsi.org/deliver/etsi_es/203100_203199/203199/01.04.01_60/es_203199v010401p.pdf (retrieved 2026-08-09)BOM and part decomposition, life-cycle boundary, primary data, cut-off, allocation, use energy, maintenance, transport, end-of-life and data-quality rules.
epa-energy-star-lne-v1-1official_guidanceU.S. EPA ENERGY STAR Product Specification for Large Network Equipment, Eligibility Criteria Version 1.1 and Test Method Rev. Jan-2016, https://www.energystar.gov/sites/default/files/ENERGY%20STAR%20LNE%20Version%201.1%20Final%20Specification.pdf (retrieved 2026-08-09)Conditional large-network-equipment family/configuration descriptors and active/idle power-performance test records; not a proxy for other device families.
eu-weee-directive-2012-19-euofficial_guidanceDirective 2012/19/EU on waste electrical and electronic equipment (WEEE), current consolidated version available from EUR-Lex, http://data.europa.eu/eli/dir/2012/19/oj (retrieved 2026-08-09)Conditional end-of-life functionality evidence and selective treatment of applicable batteries, PCBAs, plastics, displays, cables and other components.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 4
Rule IDApplies toRuleSource IDs
boundary_no_single_device_proxycategory representationRepresent each declared device family/configuration from its own BOM and process/use records. Results for routers, switches, access points, base stations, telephones or another narrow family shall not be generalized to the entire category.un-cpc-v3-47223, etsi-es-203-199-v1-4-1
boundary_production_corefactory-gate datasetInclude applicable parts production, PCBA/module and final assembly, configuration, release testing, packaging when declared, production yields, wastes, direct releases, energy supplies and transports within or between included stages.etsi-es-203-199-v1-4-1
boundary_lifecycle_extensioncradle-to-grave extensionWhen the study extends beyond the factory gate, include installation, operating electricity, maintenance/spares, de-installation, transport, preparation for reuse/refurbishment and route-specific end-of-life treatment. State any omitted stage and justification.etsi-es-203-199-v1-4-1, eu-weee-directive-2012-19-eu
boundary_cutoffall included stagesAvoid cut-off where practicable. Any exclusion shall be checked for mass, energy and environmental significance, cumulatively documented, and included in sensitivity analysis when it could affect conclusions.etsi-es-203-199-v1-4-1
Allocation rules · 4
Rule IDApplies toRuleSource IDs
allocation_avoidshared manufacturing and support processesAvoid allocation by submetering or subdividing lines, test stations, part processes and support activities for the declared product/configuration wherever practicable.etsi-es-203-199-v1-4-1
allocation_physicalunavoidable shared facility burdensAllocate shared burdens by a causal physical driver such as machine-hours, test time, PCB area, good-die area, accepted mass, floor-time or another documented driver. Use one method consistently for all environmental loads from the common process.etsi-es-203-199-v1-4-1
allocation_economic_fallbackshared burdens lacking a defensible physical relationshipEconomic allocation may be used only when physical allocation is not feasible; disclose values, period, affected burdens and sensitivity to the alternative.etsi-es-203-199-v1-4-1
allocation_recyclingreuse, refurbishment and recovered materialState the recycling/reuse allocation convention and life-cycle boundary explicitly. Do not count both an avoided-primary-material credit and the same recovered output without a consistent method.etsi-es-203-199-v1-4-1
Validation rules · 9
Rule IDApplies toRuleSource IDs
validate_reference_identityreference flowThe reference product UUID shall be 8b57a042-ffa4-4f3d-a5c7-556fce28e7b3, state code 100, Product flow, with Mass 93a60a56-a3c8-11da-a746-0800200b9a66 and kg from Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66.
validate_family_configurationcategory scopeReject a package lacking device family and configuration qualifiers, or one that generalizes a router, switch, access point, base station, telephone or another narrow product to the whole category.un-cpc-v3-47223, epa-energy-star-lne-v1-1
validate_reference_amountfactory-gate outputNet finished-equipment output shall equal 1 kg after normalization; packaging shall be reported separately and must not be embedded silently.
validate_process_coverageforeground boundaryRequire assembly/configuration/testing and factory-gate release, plus every applicable in-house part process. Conditional lifecycle processes shall appear whenever the claimed scope includes them.etsi-es-203-199-v1-4-1
validate_bom_and_mass_balanceproduction inventoryRequire BOM/component traceability and a documented mass balance; unresolved significant differences are findings, not automatic cut-offs.etsi-es-203-199-v1-4-1
validate_operational_energyconditional use stageRequire measured power/load-state data and time profile for the actual configuration, with explicit PoE/downstream-power boundary; borrowed narrow-family power values fail unless justified as a named scenario with sensitivity.etsi-es-203-199-v1-4-1, epa-energy-star-lne-v1-1
validate_allocationshared processesRequire subdivision where practicable, otherwise a causal physical allocation basis; economic fallback and sensitivity shall be disclosed.etsi-es-203-199-v1-4-1
validate_eol_routesconditional end-of-lifeRequire route mass balance and conditional removal/treatment of batteries, qualifying PCBAs, brominated-flame-retardant plastics, displays, external cables and other applicable components.eu-weee-directive-2012-19-eu
validate_data_qualityall dataReport methodological consistency, completeness, uncertainty, representativeness, age, acquisition method, supplier independence, geography, technology and cut-off treatment.etsi-es-203-199-v1-4-1
Processes and inputs/outputs · 5
Process IDProcess nameInput flowsOutput flows
in_house_part_productionIn-house part and subassembly production23
equipment_assembly_and_testEquipment assembly, configuration and release testing32
packaging_and_factory_gatePackaging and factory-gate release22
use_and_maintenanceEquipment use and maintenance21
end_of_life_treatmentDe-installation and end-of-life treatment12

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page

1. Scope and Applicability2. Product Category Identity3. Reference Flow4. Measurement and Unit Rules5. System BoundaryBoundary Abstraction6. Process Inventory StructureProcess MapProcess: In-house part and subassembly production (in_house_part_production)InputsProduct flowsBOM-traced raw materials and purchased parts (part_material_inputs)Part-process energy, water and process chemicals (part_process_utilities)Waste flowsElementary flowsOutputsProduct flowsAccepted in-house parts and subassemblies (in_house_subassemblies)Waste flowsIn-house part scrap and treatment routes (part_scrap)Elementary flowsDirect releases from in-house part processing (part_process_releases)Process: Equipment assembly, configuration and release testing (equipment_assembly_and_test)InputsProduct flowsPurchased and in-house components, modules and accessories (assembly_components)Assembly consumables (assembly_consumables)Assembly, configuration and test electricity (assembly_test_electricity)Waste flowsElementary flowsOutputsProduct flowsFunctionally tested equipment before packaging (tested_equipment)Waste flowsAssembly rejects and failed parts (assembly_rejects)Elementary flowsProcess: Packaging and factory-gate release (packaging_and_factory_gate)InputsProduct flowsTested equipment input (tested_equipment_input)Packaging materials (packaging_materials)Waste flowsElementary flowsOutputsProduct flowsFinished equipment at factory gate (equipment_output)Waste flowsPackaging operation waste (packaging_waste)Elementary flowsProcess: Equipment use and maintenance (use_and_maintenance)InputsProduct flowsOperating electricity (operating_electricity)Maintenance and replacement parts (maintenance_parts)Waste flowsElementary flowsOutputsProduct flowsWaste flowsReplaced parts and maintenance waste (maintenance_waste)Elementary flowsProcess: De-installation and end-of-life treatment (end_of_life_treatment)InputsProduct flowsWaste flowsDe-installed equipment routed to treatment (deinstalled_equipment)Elementary flowsOutputsProduct flowsReusable equipment, parts and recovered materials (recovered_outputs)Waste flowsEnd-of-life treatment residues (eol_residues)Elementary flows7. Allocation and Co-product Handling8. Foreground Data Collection, Calculation, and Quality RulesData Collection ProtocolsCalculation RulesData Quality Requirements9. Validation Rules10. Published Dataset Profile11. Data Sources