TianGong PCR产品类别规则

Revolution counters, production counters, taximeters, mileometers, pedometers and the like; speed indicators and tachometers, except hydrographic and meteorological instruments; stroboscopes

Revolution counters, production counters, taximeters, mileometers, pedometers and the like; speed indicators and tachometers, except hydrographic and meteorological……

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published version
Readiness
Review required
Last updated

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:48264 · exact

Source

1. Scope and Applicability

This PCR governs foreground manufacturing data packages for instruments that count revolutions or production events, calculate or record distance or steps, indicate speed or rotational speed, or provide stroboscopic observation. It covers mechanical, electromechanical, and electronic products sold as finished instruments, including taximeters, vehicle or equipment speed indicators, tachometers, mileometers/odometers, pedometers, production counters, and stroboscopes.

Hydrographic and meteorological instruments are excluded. Gas, liquid, electricity-supply, or production meters; automatic regulating or controlling instruments; complete vehicles or machines containing an embedded indicator; general-purpose computers whose software can emulate a counter; and standalone upstream components sold independently are also excluded. The foreground boundary is final product manufacturing from purchased materials and components at the production site through assembly, programming where applicable, calibration or functional testing, and packaging at the factory gate. Distribution, use, maintenance, and end of life are outside this foreground manufacturing data package unless a downstream study adds them explicitly.

Dataset producers shall declare instrument type, sensing principle, display technology, power source, housing material, functional specification, conformity regime, accessories, packaging state, manufacturing geography, and reporting period. The inventory below contains common atomic exchanges; every additional material, component, waste, or direct elementary emission crossing the actual boundary shall be added as a separate atomic flow.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.medical-appliances-precision-and-optical-instruments-watches-and-clocks.revolution-counters-production-counters-taximeters-mileometers-pedometers-and-the-like-047b2a38
classification_refsCPC 3.0: 48264 (un-cpc-3-0-structure-2025)
covered_productsFinished revolution counters, production counters, taximeters, mileometers/odometers, pedometers, speed indicators, tachometers, and stroboscopes, including mechanical, electromechanical, and electronic variants
excluded_productsHydrographic and meteorological instruments; supply or production meters for gas, liquids, or electricity; automatic control equipment; complete vehicles and machines; general-purpose computing devices; standalone components
representative_productA finished, calibrated or functionally tested counter or indicator instrument with declared architecture and performance specification
production_routeReceipt of purchased materials/components; onsite forming or board installation when performed; mechanical/electronic assembly; programming/configuration when performed; calibration and functional testing; final packaging
market_stateFinished instrument at factory gate; product mass excludes separately reported packaging and accessories unless the dataset explicitly declares their inclusion

3. Reference Flow

FieldValue
WhatProvision of the declared counting, distance, speed, rotational-speed, or stroboscopic indication function by a finished instrument
How much1 kg of finished instrument, excluding separately reported packaging
How wellMeets the declared measurement range, resolution, accuracy or indication tolerance, environmental class, interface, and conformity requirements; taximeter datasets additionally declare distance/time and fare functions (oiml-r21-2007-taximeters)
How long or cycleAt factory-gate release after the declared calibration or functional-test cycle; design service life is metadata for downstream use-stage modelling
reference_flow_linkfinished_instrument_output
FieldValue
Reference amount1 kg
Reference product flowRevolution counters, production counters, taximeters, mileometers, pedometers and the like, speed indicators and tachometers, except hydrographic and meteorological instruments, stroboscopes 560acd9e-9e1a-4b2e-b304-5a17f8a4ba3c
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifiersinstrument type; sensing and indication principle; architecture; measurement range and resolution; accuracy or indication tolerance; power source and rated voltage; housing material; display technology; firmware/configuration; calibration or functional-test procedure and pass criterion; legal-metrology or conformity regime; accessories; packaging inclusion; product mass; manufacturing site/geography; reporting period

Missing required qualifiers make the reference flow definition incomplete.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_product_massreference product and mass-normalized exchangesMass 93a60a56-a3c8-11da-a746-0800200b9a66kgNormalize to 1 kg accepted finished instruments. Exclude packaging mass from the denominator and report packaging separately unless another market state is explicitly declared.
batch_to_reference_massbatch and annual recordsMass 93a60a56-a3c8-11da-a746-0800200b9a66kg/kg reference productDivide each exchange by conforming finished-product mass from the same boundary and period; do not include rejects in the denominator.
electricity_energy_conversionpurchased electricityNet calorific value 93a60a56-a3c8-11da-a746-0800200b9a66MJPreserve the metered basis and convert kWh to MJ using exactly 3.6 MJ/kWh. Do not combine electricity with fuel, steam, or heat.
component_mass_consistencypurchased components/materialsMass 93a60a56-a3c8-11da-a746-0800200b9a66kgUse net mass entering the process. For piece records, multiply verified count by measured or supplier-declared unit mass and retain evidence.

5. System Boundary

rule_idapplies_torulesource_ids
boundary_manufacturing_gateforeground manufacturingInclude activities from materials/components entering the site through onsite forming or board installation, assembly, programming/configuration, calibration or functional testing, rework/rejects, and final packaging until factory-gate release.eu-pef-method-2021
boundary_purchased_inputsupstream products and energyRepresent each purchased material, component, electricity supply, and packaging item with a compatible upstream dataset; keep upstream production emissions outside the foreground process.eu-pef-method-2021
boundary_waste_and_emissionsmanufacturing wastes and direct releasesInclude each manufacturing waste and directly measured elementary release generated inside the boundary. Model waste treatment using the declared destination; do not substitute a treatment-service identity for waste.eu-pef-method-2021
boundary_excluded_stagesdistribution, use, maintenance, and end of lifeExclude post-factory-gate stages; a cradle-to-grave study may add them as separate processes and scenarios.eu-pef-method-2021

Boundary Abstraction

FieldValue
declared_starting_conditionPurchased components, materials, energy, and packaging are received at the site gate with identity, state, quantity, supplier, and geography recorded.
starting_condition_roleGate-to-gate foreground start; upstream extraction, material/component production, and delivery use linked datasets.
product_classification_scopeFinished products within Section 1 and CPC 3.0 code 48264; classification context does not replace product qualifiers.
recursive_input_ruleIf an input is itself a finished instrument in this category, record it once as a product input with a separate upstream dataset; do not recursively apply this PCR inside the same process.
upstream_dataset_requirementEvery purchased input shall link to a technology-, geography-, time-, and state-compatible dataset or be disclosed as a data gap; do not silently use proxies.
disclosureDeclare site, period, architecture, onsite/outsourced steps, component and packaging inclusion, product/reject mass, waste destinations, electricity mix/voltage, allocation, exclusions, and data gaps.

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
instrument_manufacturingInstrument assembly, calibration/testing, and packagingrequiredAlways include; use not_applicable for a conditional row only when architecture or route evidence demonstrates absence.Foreground manufacturing from received inputs to accepted factory-gate product1 kg accepted finished instrument output, packaging excluded from denominator

Process: Instrument assembly, calibration/testing, and packaging (instrument_manufacturing)

Inputs

Product flows
Aluminium alloy used in onsite part forming (aluminium_alloy_input)

Record only when the site forms or machines aluminium parts; purchased finished parts require their own exact component flow.

  • Selected flow: Aluminium alloy d2335464-e0fd-574c-b56f-83fdf8c65b0c
  • Flow property / unit: Mass / kg
  • Amount rule: measured net aluminium alloy issued less documented returns to stock
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished instrument output
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material_component_records
  • Sources:
Printed wire board installed onsite (printed_wire_board_input)

Record the bare printed wire board only when installed or populated onsite; do not use it for purchased populated assemblies or electronic-component collections.

  • Selected flow: Printed Wire Board a8bd954c-59b3-4317-b4de-02a17d6da5ca
  • Flow property / unit: Mass / kg
  • Amount rule: measured or count-to-mass converted printed wire board input
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished instrument output
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material_component_records
  • Sources:
LCD display module installed in the product (lcd_display_module_input)

Record only for products containing an LCD module; add another display technology as its own atomic flow.

  • Selected flow: LCD display module 264605c6-41b8-4baa-82b0-e27e815063a0
  • Flow property / unit: Mass / kg
  • Amount rule: measured or count-to-mass converted module input
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished instrument output
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material_component_records
  • Sources:
Purchased electrical energy (electricity_input)

Record electricity attributable to onsite forming, assembly, programming, calibration/testing, rework, production environmental control, and packaging.

  • Selected flow: Electricity 890a70b7-b677-4e2a-8a1b-7d017e0a10ae
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: metered electricity converted to MJ and allocated to the foreground process
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished instrument output
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_electricity_records
  • Sources:
Corrugated board boxes used for shipping (corrugated_board_boxes_input)

Record finished corrugated boxes when included at the factory gate; add other packaging components separately.

  • Selected flow: corrugated board boxes 4f197bec-7b3b-11dd-ad8b-0800200c9a66
  • Flow property / unit: Mass / kg
  • Amount rule: measured or count-to-mass converted box mass issued to accepted products
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished instrument output
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material_component_records
  • Sources:
Waste flows
Elementary flows

Outputs

Product flows
Accepted finished counter, indicator, or stroboscope (finished_instrument_output)

Record accepted calibrated or functionally tested product; packaging remains outside the 1 kg denominator.

  • Selected flow: Revolution counters, production counters, taximeters, mileometers, pedometers and the like, speed indicators and tachometers, except hydrographic and meteorological instruments, stroboscopes 560acd9e-9e1a-4b2e-b304-5a17f8a4ba3c
  • Flow property / unit: Mass / kg
  • Amount rule: exactly 1 kg accepted finished instrument output
  • Value mode: Fixed value (fixed_value)
  • Specificity: Generic (generic)
  • Normalization basis: 1 kg accepted finished instrument output
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Method formula (method_formula)
  • Sources: un-cpc-3-0-structure-2025
Waste flows
Waste populated printed wiring board (waste_populated_printed_wiring_board_output)

Record rejected or irreparable populated boards generated onsite; declare hazardous classification and destination separately.

  • Selected flow: Waste populated printed wiring board eb5ffe4a-49af-450c-9a31-3efdfd343f8a
  • Flow property / unit: Mass / kg
  • Amount rule: measured net mass transferred to the declared destination
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished instrument output
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste_records
  • Sources: eu-pef-method-2021
Aluminium scrap from onsite forming (aluminium_scrap_output)

Record only when onsite forming or machining generates aluminium scrap; disclose alloy, contamination, and destination.

  • Selected flow: Aluminium Scrap 96c5f842-ea53-419b-b1cd-c02c479efb45
  • Flow property / unit: Mass / kg
  • Amount rule: measured net aluminium scrap leaving the foreground process
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished instrument output
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste_records
  • Sources: eu-pef-method-2021
Elementary flows

No direct elementary flow is prescribed for all products. Add every directly measured release from onsite combustion, coating, soldering, cleaning, or other operations as a separate species-and-compartment elementary flow.

7. Allocation and Co-product Handling

rule_idapplies_torulesource_ids
allocation_subdivide_firstshared lines, utilities, and waste handlingAvoid allocation by subdivision or direct metering whenever technically feasible.eu-pef-method-2021
allocation_physical_relationunavoidable shared burdensOtherwise allocate by a documented causal physical driver such as machine time, metered energy, processed mass, or tested unit-hours.eu-pef-method-2021
allocation_economic_last_resortmulti-output operations without a physical relationUse economic allocation only as a last resort, with consistent prices and disclosed sensitivity.eu-pef-method-2021
allocation_scrap_no_avoided_burdenmanufacturing scrapReport scrap mass/destination without avoided-production credit inside this foreground package; apply recycling burdens or credits only in the downstream study method.eu-pef-method-2021

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_material_component_recordsinstrument_manufacturingeach atomic material/component/packaging inputERP issue/return, invoice, BOM, scale, or count-to-mass recordidentity; supplier; grade/model; issued/returned mass; count; unit mass; batch; dateReconcile issue less return by batch; verify piece-to-mass factorskgeach batch, monthly aggregationrepresentative 12 months or complete shorter campaignevery included siteSum net input by exact flow and divide by accepted output masscalibrated scale; approved BOM; ERP/invoice reconciliation; unit-mass evidence
cp_electricity_recordsinstrument_manufacturingpurchased electrical energysubmeter or reconciled facility meterreadings; unit; meter id; voltage; grid mix; allocation driver; output mass; periodPrefer submetering; otherwise allocate contemporaneous meter totals using Section 7kWh and MJmonthly/campaignsame production periodevery included siteConvert kWh × 3.6, apply allocation share, divide by accepted output massmeter calibration/bill; allocation worksheet; grid evidence
cp_finished_product_recordsinstrument_manufacturingaccepted product and conformityscale, release record, calibration certificate, test logmodel; lot; accepted/reject mass; procedure; result; tolerance; pass/fail; configuration; dateWeigh unpackaged conforming product and link to release evidencekgeach batch/lotcomplete reporting periodevery included siteSum conforming released mass onlyscale calibration; signed release; traceable test/conformity record
cp_waste_recordsinstrument_manufacturingeach atomic waste outputscale ticket, transfer note, stock reconciliationidentity; mass; state; hazard class; destination; treatment; dateWeigh separately at transfer and subtract documented returnskgeach transfer, monthly aggregationsame production periodevery included siteSum net waste by exact flow and divide by accepted output massscale calibration; transfer/contractor receipt; hazard classification

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calc_mass_normalizationeach mass input/wastenormalized amount = net exchange mass / accepted unpackaged output mass in the same periodnet flow mass; accepted output masskg/kg reference product
calc_count_to_masspiece-recorded inputsmass = verified count × measured or supplier unit mass, then apply calc_mass_normalizationcount; unit mass; output masskg/kg reference product
calc_electricity_normalizationelectricitynormalized electricity = net kWh × 3.6 MJ/kWh × allocation share / accepted output massreadings; allocation; output massMJ/kg reference product
calc_mass_reconciliationcompletenessReconcile accepted product + each waste + work-in-progress change against all material/component inputs; investigate/disclose residual rather than creating an unspecified balancing flow.atomic inputs; product; wastes; work-in-progressdocumented residualeu-pef-method-2021

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_identity_and_architectureproduct/componentsRecord model, instrument type, architecture, sensing/indication principle, grade/model, and state; add actual BOM exchanges atomically.BOM, product/supplier specification, Tiangong UUIDs
dq_measurement_traceabilitymass, electricity, calibration, wasteUse calibrated or bill-reconciled instruments and link records to one production period.certificates, invoices, meter/scale logs, calculations
dq_temporal_and_site_coveragereporting periodCover all included sites for representative 12 months or disclose the complete shorter campaign and limitations.site list, calendar, reconciliation
dq_completenessinventoryReconcile materials/components, product, rejects, wastes, and work-in-progress; add every missing exchange atomically.mass balance, BOM/ERP, waste records
dq_functional_conformityreleased productRetain test/calibration procedure, criteria, results, and conformity status; taximeters retain distance/time and fare-function evidence.test/calibration/release records; oiml-r21-2007-taximeters; samr-compulsory-verification-catalogue-2020 where applicable
dq_background_compatibilitypurchased input datasetsCheck technology, geography, time, and state; disclose proxies/gaps.dataset metadata; eu-pef-method-2021

9. Validation Rules

rule_idapplies_torulesource_ids
validation_reference_flowreference productConfirm exactly 1 kg accepted unpackaged product and matching reference UUID/property/unit group plus all qualifiers.un-cpc-3-0-structure-2025
validation_process_coverageforeground boundaryConfirm onsite forming/board work, assembly, programming, testing/calibration, rework/rejects, and packaging coverage.eu-pef-method-2021
validation_atomic_inventoryall exchangesConfirm each row is one concrete exchange with compatible UUID, property, unit, state, and route condition; reject umbrellas and treatment-service substitutions.
validation_mass_and_energyquantitiesRecalculate denominator, count-to-mass factors, electricity conversion, allocations, and residual.eu-pef-method-2021
validation_conditional_rowsarchitecture/routeConfirm absent common rows are not_applicable with evidence and every additional actual exchange is added atomically.
validation_conformity_evidenceperformanceConfirm release records demonstrate declared performance and applicable conformity regime.oiml-r21-2007-taximeters; samr-compulsory-verification-catalogue-2020
validation_boundary_and_allocationexclusions/upstream/shared burdensConfirm upstream links, post-gate exclusions, waste destinations, allocation drivers, and gaps are disclosed.eu-pef-method-2021

10. Published Dataset Profile

FieldValue
dataset_roleForeground manufacturing dataset for a declared counter, indicator, distance/speed instrument, tachometer, pedometer, taximeter, or stroboscope
downstream_useMay be a secondary_dataset and used as a background_dataset for systems consuming the declared instrument
allowed_useLCA with compatible function, architecture, performance, geography, technology, market state, period, packaging, and upstream datasets
excluded_useComparative assertions without functional equivalence; excluded instruments/devices; unmodelled use/maintenance/end-of-life claims; silent proxies
required_metadataPCR id/version; product model/type; function/performance; architecture; sensing/display; power source; product/packaging mass; sites/geography; period; onsite/outsourced steps; electricity; component/waste identities and destinations; allocation; sources/upstream versions
required_quality_disclosureCalibration/measurement evidence; BOM/mass-balance completeness; temporal/site coverage; conformity evidence; allocations; proxy/gap register; uncertainty/exclusions; unresolved range-evidence status
update_triggerMaterial change in architecture, BOM, site, supplier/upstream dataset, route, test procedure, electricity mix, allocation, packaging, waste destination, conformity, or reporting period

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-3-0-structure-2025Official guidance (official_guidance)United Nations Statistics Division, CPC Version 3.0 Structure, code 48264, 2025. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Structure_30Jun2025.csv (retrieved 2026-09-07)Classification identity and category boundary
eu-pef-method-2021Official guidance (official_guidance)European Commission, Commission Recommendation (EU) 2021/2279, Environmental Footprint methods. https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02021H2279-20211230 (retrieved 2026-09-07)Manufacturing boundary, upstream inputs, waste, allocation, collection, quality, validation
oiml-r21-2007-taximetersStandard (standard)International Organization of Legal Metrology, OIML R 21:2007, Taximeters. https://www.oiml.org/en/files/pdf_r/r021-e07.pdf/@@download/file/R021-e07.pdf (retrieved 2026-09-07)Taximeter function, distance/time signal, calibration and testing
samr-compulsory-verification-catalogue-2020Official guidance (official_guidance)State Administration for Market Regulation, Catalogue of Measuring Instruments Subject to Compulsory Administration, Announcement No. 42 of 2020. https://www.samr.gov.cn/cms_files/filemanager/samr/www/samrnew/samrgkml/nsjg/jls/202010/W020201027321582061939.pdf (retrieved 2026-09-07)Chinese terminology and verification/conformity disclosure for vehicle speed instruments and taximeters

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 4
Rule IDApplies toRuleSource IDs
boundary_manufacturing_gateforeground manufacturingInclude activities from materials/components entering the site through onsite forming or board installation, assembly, programming/configuration, calibration or functional testing, rework/rejects, and final packaging until factory-gate release.eu-pef-method-2021
boundary_purchased_inputsupstream products and energyRepresent each purchased material, component, electricity supply, and packaging item with a compatible upstream dataset; keep upstream production emissions outside the foreground process.eu-pef-method-2021
boundary_waste_and_emissionsmanufacturing wastes and direct releasesInclude each manufacturing waste and directly measured elementary release generated inside the boundary. Model waste treatment using the declared destination; do not substitute a treatment-service identity for waste.eu-pef-method-2021
boundary_excluded_stagesdistribution, use, maintenance, and end of lifeExclude post-factory-gate stages; a cradle-to-grave study may add them as separate processes and scenarios.eu-pef-method-2021
Allocation rules · 4
Rule IDApplies toRuleSource IDs
allocation_subdivide_firstshared lines, utilities, and waste handlingAvoid allocation by subdivision or direct metering whenever technically feasible.eu-pef-method-2021
allocation_physical_relationunavoidable shared burdensOtherwise allocate by a documented causal physical driver such as machine time, metered energy, processed mass, or tested unit-hours.eu-pef-method-2021
allocation_economic_last_resortmulti-output operations without a physical relationUse economic allocation only as a last resort, with consistent prices and disclosed sensitivity.eu-pef-method-2021
allocation_scrap_no_avoided_burdenmanufacturing scrapReport scrap mass/destination without avoided-production credit inside this foreground package; apply recycling burdens or credits only in the downstream study method.eu-pef-method-2021
Validation rules · 7
Rule IDApplies toRuleSource IDs
validation_reference_flowreference productConfirm exactly 1 kg accepted unpackaged product and matching reference UUID/property/unit group plus all qualifiers.un-cpc-3-0-structure-2025
validation_process_coverageforeground boundaryConfirm onsite forming/board work, assembly, programming, testing/calibration, rework/rejects, and packaging coverage.eu-pef-method-2021
validation_atomic_inventoryall exchangesConfirm each row is one concrete exchange with compatible UUID, property, unit, state, and route condition; reject umbrellas and treatment-service substitutions.
validation_mass_and_energyquantitiesRecalculate denominator, count-to-mass factors, electricity conversion, allocations, and residual.eu-pef-method-2021
validation_conditional_rowsarchitecture/routeConfirm absent common rows are not_applicable with evidence and every additional actual exchange is added atomically.
validation_conformity_evidenceperformanceConfirm release records demonstrate declared performance and applicable conformity regime.oiml-r21-2007-taximeters, samr-compulsory-verification-catalogue-2020
validation_boundary_and_allocationexclusions/upstream/shared burdensConfirm upstream links, post-gate exclusions, waste destinations, allocation drivers, and gaps are disclosed.eu-pef-method-2021
Processes and inputs/outputs · 1
Process IDProcess nameInput flowsOutput flows
instrument_manufacturingInstrument assembly, calibration/testing, and packaging53

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page