TianGong PCR产品类别规则

Reservoirs, tanks, vats and similar containers (other than for compressed or liquefied gas), of iron, steel or aluminium, of a capacity exceeding 300 litres, not fitted with mechanical or thermal equipment

Reservoirs, tanks, vats and similar containers (other than for compressed or liquefied gas), of iron, steel or aluminium, of a capacity exceeding 300 litres, not fitted…

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published version
Readiness
Review required
Last updated

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:42210 · exact

Source

1. Scope and Applicability

This PCR covers the factory-gate production of finished passive reservoirs, tanks, vats, and similar containers made of iron, steel, or aluminium, with a capacity greater than 300 litres, that are not designed for compressed or liquefied gas and are not fitted with mechanical or thermal equipment. It covers shop fabrication from purchased metal products through cutting, forming, joining, conditional surface finishing, inspection, and release for dispatch.

The PCR excludes containers of 300 litres or less; cylinders and other containers for compressed or liquefied gas; boilers, heat exchangers, agitated or mechanically equipped vessels; pumps, valves, external piping, foundations, site erection, installation, use, maintenance, and end-of-life. Integral passive nozzles, manways, stiffeners, supports, and factory-applied protective finishes are included when delivered as part of the product. Product design, material grade, nominal capacity, pressure basis, finish, and factory test state shall be declared. The official CPC source fixes the category boundary but does not supply inventory quantities (un-cpc-3-0-structure-2025).

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.fabricated-metal-products-except-machinery-and-equipment.reservoirs-tanks-vats-and-similar-containers-other-than-for-compressed-or-liquefied-gas-8adef04a
classification_refsCPC 3.0: 42210 (exact classification context; mapping acceptance remains a separate repository decision)
covered_productsFinished passive iron, steel, or aluminium reservoirs, tanks, vats, and similar containers with capacity greater than 300 L, including delivered integral passive fittings and protective finish
excluded_productsContainers ≤300 L; compressed- or liquefied-gas containers; vessels fitted with mechanical or thermal equipment; boilers; heat exchangers; stand-alone pumps, valves, piping, foundations, and site installation
representative_productA fully fabricated, inspected, factory-gate steel or aluminium storage/process tank exceeding 300 L, supplied without mechanical or thermal equipment
production_routePurchased plate or sheet receipt; cutting and forming; welding/joining; route-specific surface preparation and coating; inspection and factory release
market_stateFinished dry container at the manufacturing gate; material grade, alloy, nominal capacity, wall thickness, coating/lining state, integral fittings, test state, geography, and production year declared

3. Reference Flow

FieldValue
WhatSupply of a finished passive large metal reservoir, tank, vat, or similar container ready to leave the manufacturing gate
How much1 kg net mass of conforming finished product, excluding temporary transport fixtures and test water
How wellCapacity greater than 300 L; iron, steel, or aluminium construction; not for compressed or liquefied gas; no fitted mechanical or thermal equipment; declared grade, capacity, finish, fittings, and inspection state
How long or cycleOne factory-gate product delivery; no service life is represented, and any downstream use-stage duration must be modelled separately
reference_flow_linkThe mass of conforming finished_tank_output released by inspection_dispatch, normalized to 1 kg
FieldValue
Reference amount1 kg
Reference product flowFinished large metal reservoir, tank, vat, or similar container
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200c9a66
Reference unitkg
Required qualifiersbase metal and grade; primary/secondary material route where known; nominal capacity (>300 L); wall thickness and product mass; intended contained medium; confirmation that compressed/liquefied-gas service is excluded; confirmation that mechanical/thermal equipment is absent; coating or lining system and cured state; integral fittings; factory test method and result; manufacturing geography; production period

When constructing a foreground data package, the items listed in Required qualifiers must be declared in dataset metadata, process notes, reference flow comment, product description, or an equivalent data package field. Missing required qualifiers make the reference flow definition incomplete for that data package. The reference-product UUID remains unresolved and must not be replaced by an uncoated intermediate container-body UUID.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_product_massfinished_tank_output and all normalized inventory rowsMass 93a60a56-a3c8-11da-a746-0800200b9a66kgDetermine net mass of one conforming finished product after draining test water and excluding temporary transport fixtures; normalize all rows to 1 kg of this mass.
electricity_energyforming_electricity, joining_electricity, finishing_electricity, inspection_electricityNet calorific value 93a60a56-a3c8-11da-a746-0800200b9a66MJPreserve metered electrical energy and convert kWh to MJ using 3.6 MJ/kWh; disclose voltage level, grid/on-site supply split, and allocation of shared meters.
gas_reference_conditionswelding_argonVolumem3Record delivered argon at the supplier or meter reference temperature and pressure; do not combine argon with carbon dioxide or another shielding gas, and disclose any conversion from cylinder mass.
water_mass_basissurface_treatment_water, hydrotest_water, and related wastewater rowsMass 93a60a56-a3c8-11da-a746-0800200b9a66kgRecord makeup water crossing the foreground boundary; if measured as volume, apply a documented density and reference condition, and distinguish reused internal water from new input.
coating_as_supplied_massepoxy_coatingMasskgRecord the as-supplied formulated coating mass and separately disclose solids fraction, mixed components, solvent/water content, and cured coating retained on the product; do not report only dry film mass as purchased coating.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionPurchased steel plate or aluminium plate and other purchased consumables received at the manufacturing gate, with supplier identity, grade, mass, and delivery state documented
starting_condition_roleForeground gate-to-gate starting point for fabrication; upstream production of purchased materials and energy is represented by linked upstream datasets, not re-created inside the foreground process
product_classification_scopePassive iron, steel, or aluminium containers greater than 300 L, excluding compressed/liquefied-gas service and fitted mechanical or thermal equipment
recursive_input_ruleA purchased same-category container incorporated into another delivered container is recorded once as a product input with its own upstream dataset and declared product state; its fabrication is not recursively expanded in this foreground package
upstream_dataset_requirementLink supplier- and route-representative datasets for metal plate, electricity, process water, sodium hydroxide, welding consumables, shielding gas, coating, and any other actual purchased input; disclose geography, technology, recycled content, and temporal representativeness
disclosureDeclare included shop operations, outsourced operations, shared-utility allocation, scrap destination, surface-treatment route, coating system, test-water reuse, emission controls, excluded capital goods, and any transport or installation brought into scope
rule_idapplies_torulesource_ids
boundary_factory_gateforeground manufacturingInclude purchased-input receipt, cutting/forming, welding/joining, route-specific surface finishing, inspection, on-site waste or emission control, and release of the finished product through the manufacturing gate.un-cpc-3-0-structure-2025; us-ecfr-40-cfr-63-subpart-xxxxxx
boundary_conditional_finishingsurface treatment and coatingInclude aqueous treatment, cleaning, coating application, curing, and equipment cleaning only when performed for the declared product; record each chemical, coating, waste, and emitted substance as a separate exchange.eu-jrc-stm-bref-2006; us-ecfr-40-cfr-63-subpart-xxxxxx
boundary_outsourced_operationsoutsourced fabricationInclude an outsourced operation by its supplier process dataset and the product or service crossing the reporting boundary; avoid double counting its direct energy, chemicals, wastes, or emissions at the reporting factory.eu-commission-recommendation-2021-2279
boundary_exclusionsdownstream and non-product activitiesExclude installation, foundations, external piping, use, maintenance, decommissioning, and end-of-life from this factory-gate profile unless the study explicitly expands the boundary and reports them separately.un-cpc-3-0-structure-2025

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
material_preparation_formingMaterial preparation, cutting, and formingrequiredAlways; include only the declared steel and/or aluminium material rowsForeground fabricationPer kg conforming finished product
joining_assemblyWelding, joining, and assemblyrequiredAlways; activate each consumable and shielding-gas row only for the documented joining routeForeground assemblyPer kg conforming finished product
surface_finishingSurface preparation and protective finishingconditionalInclude when chemical cleaning, aqueous treatment, or factory-applied coating/lining is performedForeground finishingPer kg conforming finished product and declared treated area
inspection_dispatchInspection, testing, draining, and factory releaserequiredAlways; hydrostatic-test water rows apply only when a water test is performedForeground quality release1 kg net conforming finished product

Process: Material preparation, cutting, and forming (material_preparation_forming)

Inputs

Product flows
Steel plate input (steel_plate_input)

Record purchased steel plate crossing the factory boundary when the declared product contains iron or steel. The row is not applicable to a wholly aluminium product; alloy, grade, thickness, coating state, supplier, and recycled content remain product-specific qualifiers.

  • Selected flow: Steel plate
  • Flow property / unit: Mass / kg
  • Amount rule: measured accepted plate mass issued to the product order, net of returned unused stock
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material_and_scrap
  • Sources:
Aluminium plate input (aluminium_plate_input)

Record purchased aluminium plate crossing the factory boundary when the declared product contains aluminium. The row is not applicable to a wholly iron/steel product; alloy, temper, thickness, supplier, recycled content, and surface state remain product-specific qualifiers.

  • Selected flow: Aluminium plate
  • Flow property / unit: Mass / kg
  • Amount rule: measured accepted aluminium plate mass issued to the product order, net of returned unused stock
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material_and_scrap
  • Sources:
Forming electricity (forming_electricity)

Record electrical energy used for cutting, rolling, bending, pressing, machining, grinding, and associated local extraction in this process.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: measured process-meter electricity or documented allocation from a shared meter
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_process_energy
  • Sources: us-ecfr-40-cfr-63-subpart-xxxxxx
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Segregated steel fabrication scrap (steel_fabrication_scrap)

Record steel offcuts, swarf, and rejected steel pieces leaving the process as one segregated waste stream. Keep aluminium scrap in its separate row and disclose internal return to stock rather than counting it as waste.

  • Selected flow: Steel fabrication scrap
  • Flow property / unit: Mass / kg
  • Amount rule: measured mass transferred from the product order to internal recycling storage or an external waste recipient
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material_and_scrap
  • Sources:
Segregated aluminium fabrication scrap (aluminium_fabrication_scrap)

Record aluminium offcuts, swarf, and rejected aluminium pieces leaving the process as one segregated waste stream. Keep steel scrap in its separate row and disclose internal return to stock rather than counting it as waste.

  • Selected flow: Aluminium fabrication scrap
  • Flow property / unit: Mass / kg
  • Amount rule: measured mass transferred from the product order to internal recycling storage or an external waste recipient
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material_and_scrap
  • Sources:
Elementary flows

Process: Welding, joining, and assembly (joining_assembly)

Inputs

Product flows
Flux-cored welding wire (flux_cored_wire)

Record flux-cored wire only when the flux-cored arc welding route is used. Electrode grade and base-metal compatibility shall match the documented weld procedure.

  • Selected flow: Flux Cored Wire 1b74a576-06e0-4764-97ce-11a73f8a4752
  • Flow property / unit: Mass / kg
  • Amount rule: issued mass minus unopened returns, supported by purchasing or weld-shop stock records
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_welding_inputs
  • Sources: us-epa-ap42-12-19-welding-1995
Covered welding electrode (covered_welding_electrode)

Record covered welding electrodes only when shielded metal arc welding is used. Do not combine this exchange with wire, flux, or another electrode class.

  • Selected flow: Covered welding electrode
  • Flow property / unit: Mass / kg
  • Amount rule: issued electrode mass minus unopened returns for the product order
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_welding_inputs
  • Sources: us-epa-ap42-12-19-welding-1995
Argon shielding gas (welding_argon)

Record gaseous argon only when it crosses the boundary as a separately supplied shielding gas. Carbon dioxide and other gases, when used, shall be added as separate atomic exchanges rather than merged into this row.

  • Selected flow: Gaseous argon
  • Flow property / unit: Volume / m3
  • Amount rule: metered or cylinder-inventory argon consumption at documented reference conditions
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_welding_inputs
  • Sources: us-epa-ap42-12-19-welding-1995
Joining electricity (joining_electricity)

Record electricity for welding power sources, positioning, local extraction, and joining-related equipment.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: measured joining-area electricity or documented allocation from a shared meter
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_process_energy
  • Sources: us-epa-ap42-12-19-welding-1995
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows
Welding PM10 to air (welding_pm10)

Record total PM10 released after the documented capture and control system. Select an elementary-flow UUID only after declaring whether the release is close to ground or through a stack and whether the site is urban or non-urban.

  • Selected flow: Welding particles (PM10) to air
  • Flow property / unit: Mass / kg
  • Amount rule: measured controlled release or a documented facility calculation using electrode consumption, welding process, electrode type, base metal, operating conditions, capture efficiency, and control efficiency
  • Value mode: Calculated value (calculated_value)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_welding_emissions
  • Sources: us-epa-ap42-12-19-welding-1995

Process: Surface preparation and protective finishing (surface_finishing)

Inputs

Product flows
Finishing electricity (finishing_electricity)

Record electricity used by surface-preparation, bath circulation, ventilation, coating application, and curing equipment when this process is included.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: measured finishing-line electricity or documented allocation from a shared meter
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_process_energy
  • Sources: eu-jrc-stm-bref-2006; us-ecfr-40-cfr-63-subpart-xxxxxx
Surface-treatment process water (surface_treatment_water)

Record fresh or purchased process water entering cleaning, rinsing, or aqueous chemical treatment. Internal recirculation is disclosed but is not counted repeatedly as an external input.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass / kg
  • Amount rule: measured makeup-water mass entering the included surface-treatment operations
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_surface_finishing
  • Sources: eu-jrc-stm-bref-2006
Sodium hydroxide for alkaline cleaning (sodium_hydroxide)

Record sodium hydroxide only when it is purchased and consumed in the declared alkaline cleaning or treatment bath. Report active sodium hydroxide mass and disclose solution concentration and bath-replenishment basis.

  • Selected flow: Sodium hydroxide e0abcced-0611-4c24-9290-5a2c5a0c4169
  • Flow property / unit: Mass / kg
  • Amount rule: calculated active sodium hydroxide mass from measured solution additions and documented concentration
  • Value mode: Calculated value (calculated_value)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_surface_finishing
  • Sources: eu-jrc-stm-bref-2006
Epoxy coating (epoxy_coating)

Record one formulated epoxy coating product when a factory-applied epoxy system is used. A primer, topcoat, thinner, or curing agent that crosses the boundary separately shall be represented as its own atomic exchange in the completed data package.

  • Selected flow: Formulated epoxy coating
  • Flow property / unit: Mass / kg
  • Amount rule: measured as-supplied coating mass issued to the product order minus documented recoverable return
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_surface_finishing
  • Sources: us-ecfr-40-cfr-63-subpart-xxxxxx
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Metal-surface-treatment wastewater (surface_treatment_wastewater)

Record wastewater leaving surface cleaning, rinsing, or aqueous treatment as a characterized waste flow after internal reuse and any on-site treatment. Do not merge it with sanitary sewage or hydrostatic-test drainage.

  • Selected flow: Metal-surface-treatment wastewater
  • Flow property / unit: Mass / kg
  • Amount rule: measured discharged or transferred wastewater mass, with treatment state and receiving boundary declared
  • Value mode: Foreground record (foreground_record)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_surface_finishing
  • Sources: eu-jrc-stm-bref-2006
Elementary flows

Process: Inspection, testing, draining, and factory release (inspection_dispatch)

Inputs

Product flows
Hydrostatic-test water (hydrotest_water)

Record new process water supplied for a hydrostatic leak or integrity test only when that test is performed. Reused water is tracked in the test record and counted only when it first crosses the foreground boundary.

  • Selected flow: Process Water 94a04f7e-2d5c-41f0-b182-d54a3b373a02
  • Flow property / unit: Mass / kg
  • Amount rule: measured makeup-water mass charged to the test, excluding internally reused water already counted
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_inspection_release
  • Sources:
Inspection electricity (inspection_electricity)

Record electricity used by inspection, non-destructive testing, test pumps, draining, and product-release equipment.

  • Selected flow: Electricity 67b723a9-6f63-4802-adca-b52ce7967d47
  • Flow property / unit: Net calorific value / MJ
  • Amount rule: measured inspection-area electricity or documented allocation from a shared meter
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_process_energy
  • Sources:
Waste flows
Elementary flows

Outputs

Product flows
Finished large metal reservoir, tank, vat, or similar container (finished_tank_output)

Record only conforming finished product released at the manufacturing gate. The product is dry, exceeds 300 L capacity, is not for compressed or liquefied gas, and has no fitted mechanical or thermal equipment.

  • Selected flow: Finished large metal reservoir, tank, vat, or similar container
  • Flow property / unit: Mass / kg
  • Amount rule: measured net mass of conforming finished product released by quality control
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_inspection_release
  • Sources: un-cpc-3-0-structure-2025
Waste flows
Drained hydrostatic-test wastewater (hydrotest_wastewater)

Record test water that leaves the foreground system after use and is not internally reused. Declare water quality, any additives, treatment state, and whether it is discharged or transferred.

  • Selected flow: Drained hydrostatic-test wastewater
  • Flow property / unit: Mass / kg
  • Amount rule: measured drained mass leaving the foreground boundary after subtracting documented reuse and retained water
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg conforming finished product
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_inspection_release
  • Sources:
Elementary flows

7. Allocation and Co-product Handling

rule_idapplies_torulesource_ids
allocation_subdivide_firstshared fabrication and utility systemsAvoid allocation by separately metering or otherwise subdividing product orders, process lines, and utility systems whenever technically feasible.eu-commission-recommendation-2021-2279
allocation_shared_recordsunavoidable shared energy, water, and consumablesWhen subdivision is not feasible, apply a documented causal driver such as machine time, weld length, treated area, bath loading, or measured product mass; do not default to revenue without demonstrating the absence of a physical driver.eu-commission-recommendation-2021-2279
allocation_scrapsteel and aluminium scrapReport measured scrap as a waste output at the point it leaves the foreground process. Do not subtract an avoided-primary-material credit from the foreground inventory; model recycling or treatment consistently in the downstream system and disclose the chosen convention.eu-commission-recommendation-2021-2279
allocation_nonconforming_productsrework and rejectsAssign rework inputs and unrecovered reject burdens to the production order that generated them when traceable; otherwise use the same documented causal allocation driver as the shared process.eu-commission-recommendation-2021-2279

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_material_and_scrapmaterial_preparation_formingmetal inputs and segregated scrap outputsreceiving, issue, return, weighbridge, and waste-transfer recordsorder_id; material; grade/alloy; supplier; batch; gross_mass; returned_mass; scrap_mass; destinationCalibrated scale, stock ledger, and order reconciliationkgEach receipt, issue, return, and transferAt least one representative production year; state shorter campaign coverageAll included production lines and outsourced forming declaredSum accepted issued mass net of returns and sum segregated scrap by metal; divide by conforming output massCalibration records, purchase documents, material certificates, stock reconciliation, waste transfer notes
cp_process_energyall processesprocess electricityutility meter and production logmeter_id; start_reading; end_reading; unit; process_id; order_id; operating_time; allocation_driver; voltage; grid_or_onsiteDedicated meter preferred; otherwise reconciled submeter or shared-meter allocationkWh and MJPer batch/order or monthly with production reconciliationSame representative period as outputAll included site operations; outsourced energy excluded from site totalsConvert kWh to MJ and allocate by measured causal driver; divide by conforming output massMeter calibration, invoices, interval data, allocation worksheet
cp_welding_inputsjoining_assemblywelding wire, covered electrode, and argonstores issue/return, cylinder, and welding procedure recordsorder_id; process_type; consumable_grade; issued_mass; returned_mass; gas_id; gas_volume_or_mass; reference_conditions; weld_lengthWeighed issue/return and gas meter or cylinder inventory reconciliationkg and m3Each order or shiftSame representative period as outputAll included welding cells and declared outsourced joiningNet each atomic consumable separately; convert gas only with documented reference conditions; divide by conforming output massPurchase record, weld procedure, material certificate, scale/meter calibration, cylinder reconciliation
cp_welding_emissionsjoining_assemblycontrolled PM10 releasemonitoring or engineering-calculation recordprocess_type; electrode_type; base_metal; current; voltage; electrode_consumed; capture_efficiency; control_efficiency; measured_PM10; release_compartmentDirect monitoring preferred; otherwise documented approved calculation matched to actual process and controlskgEach monitored campaign or calculation periodRepresentative operating modes in the reporting yearEvery included welding release pointDetermine post-control PM10 and divide by conforming output mass; no default compartment is assignedMonitoring report, method detection limits, equipment settings, control inspection, calculation source and uncertainty
cp_surface_finishingsurface_finishingwater, sodium hydroxide, coating, and wastewatermeter, bath-addition, coating issue/return, concentration, and discharge recordsorder_id; route; treated_area; water_in; water_reused; solution_added; NaOH_concentration; coating_issued; coating_returned; solids_fraction; wastewater_out; treatment_stateCalibrated meters/scales, bath log, supplier formulation, and discharge/transfer measurementkg and m2Each batch/order, with bath additions and discharge eventsSame representative period as finished outputEvery included preparation, bath, coating, curing, and on-site treatment operationKeep each chemical/coating atomic; calculate active NaOH; subtract only documented internal reuse/returns; divide by output massMeter/scale calibration, batch sheet, safety/technical data sheet, bath analysis, wastewater record
cp_inspection_releaseinspection_dispatchtest water, test drainage, inspection electricity, and finished producttest sheet, water meter, electricity record, and release certificateorder_id; nominal_capacity; test_method; water_charged; water_reused; water_drained; additives; inspection_energy; dry_product_mass; pass_fail; release_dateCalibrated meters/scales and signed quality-release recordkg, kWh, and MJEach finished product or production lotFull reporting periodAll products represented by the datasetCount only new water input and water leaving the boundary; normalize all accepted records by released dry product massTest procedure, meter/scale calibration, inspection result, nonconformance log, release certificate

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calc_reference_normalizationall inventory rowsnormalized amount = period or order amount / conforming dry finished-product massatomic flow amount; dry_product_massamount per 1 kg finished_tank_outputeu-commission-recommendation-2021-2279
calc_electricity_conversionelectricity rowselectricity_MJ = electricity_kWh × 3.6metered electricity_kWhMJ electricity
calc_active_sodium_hydroxidesodium_hydroxideactive_NaOH_mass = solution_mass × measured mass fraction of NaOHsolution_mass; NaOH_concentrationkg active sodium hydroxideeu-jrc-stm-bref-2006
calc_welding_pm10welding_pm10Use measured post-control PM10; when measurement is unavailable, apply a documented factor valid for the actual process/electrode/base metal/conditions, then multiply by consumed electrode and by (1 − capture efficiency × control efficiency)measured_PM10 or factor; electrode_consumed; process settings; capture_efficiency; control_efficiencykg PM10 released to the declared air compartmentus-epa-ap42-12-19-welding-1995
calc_water_reconciliationsurface-treatment and hydrostatic-test waterexternal wastewater must be reconciled to new water input, retained water, evaporation, off-site transfer, and documented internal reuse without double counting circulationwater_in; water_reused; water_retained; water_evaporated; water_transferred; wastewater_outreconciled kg water inputs and waste outputseu-jrc-stm-bref-2006

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_product_identityreference productVerify >300 L capacity, metal type/grade, excluded gas service, absence of fitted mechanical/thermal equipment, dry product mass, finish, integral fittings, and release status for every represented product family.Drawings, bill of materials, material certificates, inspection and release records; un-cpc-3-0-structure-2025
dq_temporal_geographicall foreground and upstream dataForeground records shall cover a representative production period and identify site and geography; upstream datasets shall disclose temporal, geographic, and technological representativeness.Record-period reconciliation and upstream dataset metadata; eu-commission-recommendation-2021-2279
dq_completenessall included processesReconcile purchasing/issue/return, utility, scrap, wastewater, emission-control, test, reject, and finished-output records; explain exclusions and missing periods.Mass/energy reconciliation, meter coverage, waste manifests, monitoring reports, nonconformance records
dq_route_specificitywelding and finishingPreserve actual welding process/electrode/gas, base metal, treated area, chemical concentration, coating formulation, water reuse, and control technology; do not apply generic factors without a documented match and uncertainty.Weld procedures, supplier data, bath logs, coating technical data, control records; us-epa-ap42-12-19-welding-1995; eu-jrc-stm-bref-2006
dq_instrument_qualitymeasured foreground dataRetain instrument identity, calibration status, reading resolution, units, missing-data treatment, and responsible reviewer for meters, scales, and emission measurements.Calibration certificates, raw readings, QA sign-off, and corrective-action records; us-ecfr-40-cfr-63-subpart-xxxxxx

9. Validation Rules

rule_idapplies_torulesource_ids
validate_identityreference productFail validation if capacity is not greater than 300 L, compressed/liquefied-gas service is included, mechanical/thermal equipment is fitted, metal construction is not declared, or the output is an unfinished container body.un-cpc-3-0-structure-2025
validate_reference_massreference flowRequire exactly 1 kg net conforming dry finished-product mass as normalization; test water, temporary fixtures, rejected products, and off-site installation items must not be included in the reference mass.
validate_atomic_inventoryprocess inventoryRequire every actual material, electricity, water, gas, coating component, waste stream, and elementary emission to be represented as an atomic exchange; flag merged utilities, merged chemicals, merged waste, or merged emissions.eu-commission-recommendation-2021-2279
validate_mass_water_recordsmetal and water balancesRequire reconciliation of steel/aluminium input to finished product, segregated scrap, rejects, and stock returns, and reconcile new water to reuse, retained water, loss, transfer, and wastewater. Investigate rather than silently balancing unexplained differences.eu-jrc-stm-bref-2006
validate_welding_emissionswelding_pm10Require actual welding process, electrode, base metal, operating conditions, capture/control, calculation or monitoring method, and release compartment; fail UUID completeness when the selected elementary-flow compartment does not match the declared release.us-epa-ap42-12-19-welding-1995; us-ecfr-40-cfr-63-subpart-xxxxxx
validate_allocationshared processes and scrapRequire subdivision or a documented causal allocation driver, consistent scrap recycling convention, and sensitivity disclosure where allocation materially affects results.eu-commission-recommendation-2021-2279
validate_unresolved_identityUUID-empty rowsTreat every UUID-empty row listed in manifest review metadata as unresolved; do not promote a generic, proxy, wrong-property, wrong-compartment, or wrong-product-state candidate.

10. Published Dataset Profile

FieldValue
dataset_roleForeground product-manufacturing dataset for one declared large passive metal container product or a documented representative product family
downstream_usesecondary_dataset; background_dataset after methodology review, UUID closure, upstream-link review, and external range-evidence review appropriate to the intended database
allowed_useFactory-gate product comparisons and lifecycle models where the product identity, material route, capacity, finishing route, geography, production period, allocation, and linked upstream datasets are compatible
excluded_usePressure-gas containers; containers ≤300 L; equipped tanks; use-stage storage service; installation; end-of-life; comparisons that ignore capacity, material grade, finish, service conditions, or unresolved UUIDs
required_metadataPCR id and version when published; product drawing/BOM identity; metal/alloy and recycled content; capacity; dry mass; wall thickness; finish/lining; integral fittings; test method; process routes; site/geography; reporting period; upstream datasets; allocation; cut-offs; data owner; review status
required_quality_disclosureMeter and scale coverage; representativeness; shared-meter allocation; supplier-data gaps; mass/water reconciliation; welding-emission method and compartment; surface-treatment route; wastewater state; scrap treatment convention; uncertainty; unresolved UUID and range-evidence needs
update_triggerMaterial/alloy or capacity-family change; new forming/joining/finishing technology; coating/lining change; major supplier or electricity mix change; altered test-water reuse or emission controls; site/geography change; allocation change; material inventory revision; UUID resolution; or new two-source compatible range evidence

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-3-0-structure-2025official_guidanceUnited Nations Statistics Division, CPC Ver. 3.0 Structure, 30 June 2025, row 42210. https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Structure_30Jun2025.csv (retrieved 2026-09-05; retained bytes verified as SHA-256 5cd2c1c4890dd6be16af48e9bb940fed48efff9865f39ff15edaa921da25fb7c)Official product identity, material scope, >300 L threshold, and exclusions
us-ecfr-40-cfr-63-subpart-xxxxxxstandardU.S. Environmental Protection Agency, 40 CFR Part 63, Subpart XXXXXX, National Emission Standards for Hazardous Air Pollutants Area Source Standards for Nine Metal Fabrication and Finishing Source Categories. https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-63/subpart-XXXXXX (retrieved 2026-09-05)Fabricated-plate-work operations, machining, grinding/polishing, welding, spray-painting preparation/application/curing/cleaning, particulate controls, and records
us-epa-ap42-12-19-welding-1995method_factorU.S. Environmental Protection Agency, AP-42 Section 12.19 Electric Arc Welding, January 1995. https://www.epa.gov/sites/default/files/2020-11/documents/c12s19.pdf (retrieved 2026-09-05)Welding process decomposition, electrode and shielding-gas dependence, PM10 identity, calculation inputs, controls, and uncertainty disclosure; no default factor or range is adopted
eu-jrc-stm-bref-2006official_guidanceEuropean Commission, Joint Research Centre, Reference Document on Best Available Techniques for the Surface Treatment of Metals and Plastics, August 2006. https://bureau-industrial-transformation.jrc.ec.europa.eu/sites/default/files/2019-11/stm_bref_0806.pdf (retrieved 2026-09-05)Conditional aqueous chemical/electrolytic surface-treatment decomposition, water-based processing, corrosion-protection purpose, associated activities, and environmental records; no external range is adopted
eu-commission-recommendation-2021-2279official_guidanceEuropean Commission, Recommendation (EU) 2021/2279 of 15 December 2021 on the use of the Environmental Footprint methods, corrected 23 May 2022. https://eur-lex.europa.eu/eli/reco/2021/2279/corrigendum/2022-05-23/oj/eng (retrieved 2026-09-05)Subdivision/allocation hierarchy, inventory normalization, data quality, consistency, completeness, representativeness, and model disclosure

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 4
Rule IDApplies toRuleSource IDs
boundary_factory_gateforeground manufacturingInclude purchased-input receipt, cutting/forming, welding/joining, route-specific surface finishing, inspection, on-site waste or emission control, and release of the finished product through the manufacturing gate.un-cpc-3-0-structure-2025, us-ecfr-40-cfr-63-subpart-xxxxxx
boundary_conditional_finishingsurface treatment and coatingInclude aqueous treatment, cleaning, coating application, curing, and equipment cleaning only when performed for the declared product; record each chemical, coating, waste, and emitted substance as a separate exchange.eu-jrc-stm-bref-2006, us-ecfr-40-cfr-63-subpart-xxxxxx
boundary_outsourced_operationsoutsourced fabricationInclude an outsourced operation by its supplier process dataset and the product or service crossing the reporting boundary; avoid double counting its direct energy, chemicals, wastes, or emissions at the reporting factory.eu-commission-recommendation-2021-2279
boundary_exclusionsdownstream and non-product activitiesExclude installation, foundations, external piping, use, maintenance, decommissioning, and end-of-life from this factory-gate profile unless the study explicitly expands the boundary and reports them separately.un-cpc-3-0-structure-2025
Allocation rules · 4
Rule IDApplies toRuleSource IDs
allocation_subdivide_firstshared fabrication and utility systemsAvoid allocation by separately metering or otherwise subdividing product orders, process lines, and utility systems whenever technically feasible.eu-commission-recommendation-2021-2279
allocation_shared_recordsunavoidable shared energy, water, and consumablesWhen subdivision is not feasible, apply a documented causal driver such as machine time, weld length, treated area, bath loading, or measured product mass; do not default to revenue without demonstrating the absence of a physical driver.eu-commission-recommendation-2021-2279
allocation_scrapsteel and aluminium scrapReport measured scrap as a waste output at the point it leaves the foreground process. Do not subtract an avoided-primary-material credit from the foreground inventory; model recycling or treatment consistently in the downstream system and disclose the chosen convention.eu-commission-recommendation-2021-2279
allocation_nonconforming_productsrework and rejectsAssign rework inputs and unrecovered reject burdens to the production order that generated them when traceable; otherwise use the same documented causal allocation driver as the shared process.eu-commission-recommendation-2021-2279
Validation rules · 7
Rule IDApplies toRuleSource IDs
validate_identityreference productFail validation if capacity is not greater than 300 L, compressed/liquefied-gas service is included, mechanical/thermal equipment is fitted, metal construction is not declared, or the output is an unfinished container body.un-cpc-3-0-structure-2025
validate_reference_massreference flowRequire exactly 1 kg net conforming dry finished-product mass as normalization; test water, temporary fixtures, rejected products, and off-site installation items must not be included in the reference mass.
validate_atomic_inventoryprocess inventoryRequire every actual material, electricity, water, gas, coating component, waste stream, and elementary emission to be represented as an atomic exchange; flag merged utilities, merged chemicals, merged waste, or merged emissions.eu-commission-recommendation-2021-2279
validate_mass_water_recordsmetal and water balancesRequire reconciliation of steel/aluminium input to finished product, segregated scrap, rejects, and stock returns, and reconcile new water to reuse, retained water, loss, transfer, and wastewater. Investigate rather than silently balancing unexplained differences.eu-jrc-stm-bref-2006
validate_welding_emissionswelding_pm10Require actual welding process, electrode, base metal, operating conditions, capture/control, calculation or monitoring method, and release compartment; fail UUID completeness when the selected elementary-flow compartment does not match the declared release.us-epa-ap42-12-19-welding-1995, us-ecfr-40-cfr-63-subpart-xxxxxx
validate_allocationshared processes and scrapRequire subdivision or a documented causal allocation driver, consistent scrap recycling convention, and sensitivity disclosure where allocation materially affects results.eu-commission-recommendation-2021-2279
validate_unresolved_identityUUID-empty rowsTreat every UUID-empty row listed in manifest review metadata as unresolved; do not promote a generic, proxy, wrong-property, wrong-compartment, or wrong-product-state candidate.
Processes and inputs/outputs · 4
Process IDProcess nameInput flowsOutput flows
material_preparation_formingMaterial preparation, cutting, and forming32
joining_assemblyWelding, joining, and assembly41
surface_finishingSurface preparation and protective finishing41
inspection_dispatchInspection, testing, draining, and factory release22

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page

1. Scope and Applicability2. Product Category Identity3. Reference Flow4. Measurement and Unit Rules5. System BoundaryBoundary Abstraction6. Process Inventory StructureProcess MapProcess: Material preparation, cutting, and forming (material_preparation_forming)InputsProduct flowsSteel plate input (steel_plate_input)Aluminium plate input (aluminium_plate_input)Forming electricity (forming_electricity)Waste flowsElementary flowsOutputsProduct flowsWaste flowsSegregated steel fabrication scrap (steel_fabrication_scrap)Segregated aluminium fabrication scrap (aluminium_fabrication_scrap)Elementary flowsProcess: Welding, joining, and assembly (joining_assembly)InputsProduct flowsFlux-cored welding wire (flux_cored_wire)Covered welding electrode (covered_welding_electrode)Argon shielding gas (welding_argon)Joining electricity (joining_electricity)Waste flowsElementary flowsOutputsProduct flowsWaste flowsElementary flowsWelding PM10 to air (welding_pm10)Process: Surface preparation and protective finishing (surface_finishing)InputsProduct flowsFinishing electricity (finishing_electricity)Surface-treatment process water (surface_treatment_water)Sodium hydroxide for alkaline cleaning (sodium_hydroxide)Epoxy coating (epoxy_coating)Waste flowsElementary flowsOutputsProduct flowsWaste flowsMetal-surface-treatment wastewater (surface_treatment_wastewater)Elementary flowsProcess: Inspection, testing, draining, and factory release (inspection_dispatch)InputsProduct flowsHydrostatic-test water (hydrotest_water)Inspection electricity (inspection_electricity)Waste flowsElementary flowsOutputsProduct flowsFinished large metal reservoir, tank, vat, or similar container (finished_tank_output)Waste flowsDrained hydrostatic-test wastewater (hydrotest_wastewater)Elementary flows7. Allocation and Co-product Handling8. Foreground Data Collection, Calculation, and Quality RulesData Collection ProtocolsCalculation RulesData Quality Requirements9. Validation Rules10. Published Dataset Profile11. Data Sources