TianGong PCR

Electrically melted Danner-drawn unworked borosilicate glass tubing · 7. Allocation and Co-product Handling

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:37111 · narrower

Source

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
a_scopemethod applicabilityApply these allocation rules only to attributional cases where allocation is required under the declared study framework. First separate dedicated batches, product lines and services; use physical or virtual subdivision to assign exclusive materials and measured services. No free choice between system expansion and allocation is established by this PCR.jrc-ilcd-2010
a_causalityremaining shared exchangesFor every genuinely inseparable shared exchange identify and quantify the determining physical causal relationship to each co-function. A shared meter may use measured actual duty, heat demand or material embodiment only where it causally determines that exchange. Mass, time or value alone is not automatically valid; different exchanges may require different physical relations. Preserve evidence and all non-selected relations.jrc-ilcd-2010
a_residualresidual multifunctional process onlyOnly the residual exchanges left after dedicated assignment/virtual subdivision and determining physical causality may use contemporaneous real co-function market values in the same actual condition and amount at the common process gate. Derive gate values transparently if only downstream conditioned/packed/transported prices exist. State period currency state quantities evidence and sensitivity; do not use one downstream finished price for all functions, an arbitrary physical/economic choice or fixed percentages. Negative-value waste requires the applicable waste framework and cannot be assigned a fictional positive sale.jrc-ilcd-2010
a_returnsinternal returns scrap and packagingInternal glass/dust/water/air/packaging transfers carry their original exchange vectors and cancel at the combined gate; they do not create an avoided-material credit or fresh production. An actual externally sold useful coproduct needs a verified function/status and separate quantity before allocation. Post-consumer waste-glass recycling and substitution credits are outside this virgin-feed manufacturing method and require their own framework.jrc-ilcd-2010; jrc-glass-bref-2013
asset_manufacture_conservationexisting capital/reusable manufacture attributionWithin the applicable allocation decision context, original manufacture burden attributed across uses of actual capital equipment or reusable articles already included in foreground production, packaging or observed services uses one persistent same-asset ledger across all crops, products, cohorts, manufacturing/postrelease services, owners and observation periods. D is its supported whole installed service: all realized historical service plus supported remaining service in the same units as actual beneficiary use u; D must be finite and positive. Period capacity, remaining-only capacity, the physical asset/article mass alone, or current-period product Q alone is not D; supported whole-service throughput in mass units may be used when it demonstrates the causal service and matches u. This does not amortize the manufactured reference product over downstream life or change its declared reference gate/Q. The fractions u/D and all previously assigned manufacture shares together must never exceed 1. Changes of window, custody, provider or repair never restart the original manufacture balance. Replacements have distinct identities and only their real new manufacture vectors; actual repair and treatment increments remain separately accounted. Revised capacity evidence requires transparent reconciliation of prior shares and sensitivity, not a fresh ledger. Keep full physical mass and stock movements independent of burden shares. Unknown D, prior shares or beneficiary coverage requires review and no final manufacture-attributed amount; no assumed lifetime, utilization, zero or arbitrary division is permitted. For each existing collection protocol that attributes manufacture of included production, packaging or observed-service assets across uses in this route (excluding amortization of the manufactured reference product itself), additionally retain a durable asset identity, its measured full physical mass and acquisition/installation/retirement stock history, original manufacture burden vector, all historical and current beneficiaries, matched-unit service readings, the evidenced whole installed-service denominator D, supported remaining-service basis and uncertainty, prior assigned shares and remaining original manufacture balance. Carry the ledger across reporting windows and custody/provider changes. Collect actual repair, replacement, recovery and treatment separately; these records do not normalize physical movements or create an additional asset purchase. These are added fields and conservation obligations for the existing applicable protocols, not a new assumed capital inventory.

8. Foreground Data Collection, Calculation, and Quality Rules

Protocols collect undivided original records only. aggregation_rule labels the final target basis; collection does not execute division. Every card and aggregation reads the same stored normalize_once result. All historical vectors retain each original exchange numerator/unit and ownership.

Data Collection Protocols

For each existing collection protocol that attributes manufacture of included production, packaging or observed-service assets across uses in this route (excluding amortization of the manufactured reference product itself), additionally retain a durable asset identity, its measured full physical mass and acquisition/installation/retirement stock history, original manufacture burden vector, all historical and current beneficiaries, matched-unit service readings, the evidenced whole installed-service denominator D, supported remaining-service basis and uncertainty, prior assigned shares and remaining original manufacture balance. Carry the ledger across reporting windows and custody/provider changes. Collect actual repair, replacement, recovery and treatment separately; these records do not normalize physical movements or create an additional asset purchase. These are added fields and conservation obligations for the existing applicable protocols, not a new assumed capital inventory.

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_materialbatchwhole chemicals and internal transfersweighing receipts charge sheets stock assaylot; supplier; whole supplied mass; assay; free moisture; hydrate/structural water; origin; dry solids; opening closing stocks; inherited vector; transfer counterpartCalibrated scales and representative chemical/moisture tests; reconcile every supplied ingredient separately. Internal assay/water is not a second procurement.kgeach receipt charge stock closure and batchcomplete manufacturing cohort including failure and carryoverreceiving batch and internal donor receiverper 1 kg reference flowcalibration bills assays batch linkage and raw archive
cp_energyallelectricity and each actual fuelmeters bills operating logsmeter and parent; start end integrated reading; true rate timestamp if rate; voltage supplier geography; fuel composition pressure temperature reference volume LHV; stage; campaign; standby cleanup failure; allocation evidence; original cohortRead integrated meters directly; integrate only true rates. Independently test real fuel LHV/composition and state. Reconcile parent/submeters and avoid electricity double count between utility production and consumption.MJ; kWh; m3continuous/log interval plus every start stop and closing readwhole furnace campaign contribution and observed service intervalall stages with original-cohort attributionper 1 kg reference flowmeter calibration invoice reconciliation and causal worksheet
cp_balanceallbatch melt trim and elemental/physical gatesphysical transfer and independent analysisstage source destination; actual gross tare net mass; opening closing WIP/melt; free reaction retained water; Si B Na Al C H O plus actual N S Mo; gas inlet outlet; density state; inherited exchange vectorPair every internal transfer; independently assay materials/product/dust and gas/water destinations. Reconcile physical and element gates separately and report uncertainty and unknown residuals.kg; actual gas m3batch transfer and opening closingsame manufacture FG and combined gate periodsall receiving emitting and retained-stock boundariesper 1 kg reference flowindependent analytical results closure sheets and uncertainty
cp_releasedraw_releaseunique first quality releaseacceptance and calibrated weighingunique release id; originating batch; specification revision; actual OD wall bore length and tests; first-release flag; gross tare net kg; temperature humidity moisture; rejection; original cohortWeigh bare cooled annealed stock tube with calibrated tare; link dimensional/chemical/surface tests to the same lot and de-duplicate release ids. Retest and dispatch are not first release; no item-to-kg assumption.kgevery first-release eventone complete defined manufacturing cohortdeclared first-release gateper 1 kg reference flowtraceable calibration acceptance tests and duplicate-id review
cp_emissionalleach real chemical species and destinationmonitoring speciation and reaction/element recordssource stage; species and CAS if known; phase; compartment; integrated gas volume or rate timestamps; concentration basis; moisture; capture; actual chemical conversion; total B NOx SOx PM COD VOC indicators separately; residual; uncertaintyUse method-matched speciation plus independently assayed reactive inputs and retained products; document actual reactions and separate free reaction structural water. Total physical and element closure cannot fabricate species. Apply actual gas-state conversions; integrated volume is not multiplied by time.kg; m3; actual concentration unitmonitoring interval and every abnormal eventsame cohort and actual abnormal/zero-output coverageall actual vents water outlets and solid capturesper 1 kg reference flowfull laboratory methods raw volumes origin and compartment evidence
cp_utilityutilitieswater air treatment and actual returnmeters chemistry utility supply agreement stockutility; fresh supply; opening closing installed circuit/receiver; pressure temperature humidity independent density; chemical whole formulation and assay; circulation; leakage; evaporation; condensate; external return and enthalpy; blowdown; supplier energy ownership; vectorMeter actual supply/return; independently measure substance/state density; correct real installed stocks once. Internal circulation and reused condensate are paired and cancelled; chemical carrier water is counted inside the formulation once.kg; m3; MJmeter interval each makeup drain return and stock closuremanufacturing campaign and original-cohort servicesreal utility interfaces including external Product returnsper 1 kg reference flowcalibration PVT chemistry enthalpy agreements and vector history
cp_chargeallelectrode refractory lubricant installed stockinstallation maintenance removal and stock historyarticle/fluid identity; new receipt; cold spare; opening closing installed mass; configuration; actual service; topup; removed recovered leaked dissolved amount; same-period stock and inherited exchange vector by vintageMeasure physical stocks and wear with maintenance records; follow each historical vector separately from glass WIP. Use measured service-equivalent consumption only when the same inventory is not corrected again. Add the actual species of every loss.kg; actual service uniteach receipt installation maintenance removal and closurewhole actual remaining and consumed service scopeequipment stocks independently from WIPper 1 kg reference flowweighing maintenance actual lifetime/service and inherited-vector records
cp_wastealleach solid or liquid waste and dust returnweighing analysis handoverorigin cohort; chemistry; moisture; total mass; internal receiver; external destination; legal/physical status; actual function; retained vector; stockWeigh and analyse each real stream separately; pair returned dust and cullet; retain actual physical destination and treatment ownership, never assume coproduct/credit.kgeach generation transfer and closing stockwhole manufacturing and service periods including failureall waste gates and internal receiversper 1 kg reference flowhandover receipts assays inventory and destination proof
cp_serviceservicesFG physical dispatch return and incremental servicecohort-linked stock movement and service logsoriginal Q and release id; opening closing FG; gross dispatch; customer return; original delivery reversal; breakage; actual incremental repair; each actual new material/water and removed glass/moisture; actual waste/emission destination; service interval; prior production vector and current service vectorReconcile lot-level physical FG independently from production Q. Follow returned original goods and repair increments to original cohorts and dispatch reversals, without creating production from deliveries/retests.kg; actual service unitsevery movement and service event plus stock closuredeclared observed post-release interval by original cohortwarehouse dispatch and return gateper 1 kg reference flowunique release shipment and return ids full history and burden-vector reconciliation
cp_packserviceseach whole packaging article each directionpurchase tare movement return repair waste stockone packaging material/configuration; new supply; external return received; opening closing empty attached WIP/FG reusable; gross accompanying dispatch; return to external owner; waste; tare count; new/removed repair components; original cohort vectorWeigh actual packaging separately from bare tubes; count only with measured configuration tare. Reconcile b_pack for each article and destination, cancelling internal reuse and preserving actual repair components/services.kg; counteach purchase dispatch return repair disposal and stocktakesame declared original-cohort service intervalempty attached and reusable packaging physical gatesper 1 kg reference flowtare calibration purchase receipts return notes repair and waste evidence

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
normalize_onceall inventory rowsFor Q_c > 0, result_j_c = A_j_c / Q_c exactly once. First convert original raw numerator units and actual gas/liquid states or integrate genuine rates; then perform evidenced allocation and disjoint raw/WIP/installed-charge historical-vector carryover. For manufacturing burden/consumption numerators, A_j_c is the first-release transfer vector B_j_c^Q: attributable real additions plus opening minus closing unreleased raw/WIP/melt and unassigned installed/spare service vectors, after traced assignment to any other actual function. First-released FG, including held closing FG, is already in B_j_c^Q and is never subtracted from it. Do not correct already measured net consumption again. For each exchange the FG history ledger is opening FG vector + B_j_c^Q + actual return at original dispatch vector + real incremental service additions = closing FG vector + gross dispatch vector + other traced removals/destinations. Service burden A_j_c includes every actually performed original-cohort service increment; opening/closing correction applies only to disjoint unconsumed or unassigned service/charge stocks. Service already performed on that cohort remains included even if the serviced tube stays in closing FG, whose trace vector is retained without subtracting it from A_j_c. Original manufacture is preserved but not added again. Q_c remains the original first-release kg after returns, repair and wet/dry changes. Cancel B_j_c^Q and Q_c as internal transfers in combined history/physical gates, retaining actual external inputs/returns, closing stocks, gross dispatch and other actual exits. For manufacturing material-input cards, A_j_c is attributable whole-supply withdrawal/consumption with the stated disjoint stock correction and its inherited upstream vector; cp_material still preserves gross purchase receipts separately, so unused procurement is not all consumed in this cohort. Explicit packaging-purchase, internal-transfer, gross-dispatch, external-return and waste movement cards use actual physical movement as A_j_c and keep burden-consumption vectors separately. Packaging upstream burdens follow actual consumption/service and the retained vectors, not every repeated returned physical receipt; unused stock does not reduce a recorded gross purchase or gross shipment movement. Internal transfers cancel and no original production burden is added a second time. All cards and aggregation read this stored result; collection never divides raw records. At Q_c = 0 preserve every real load and issue no unit result.A_j_c; Q_c; original_cohort; measurement_state; vector_historyresult_j_cjrc-glass-bref-2013; schott-hot-forming; schott-duran-tubing; jrc-ilcd-2010
asset_manufacture_shareexisting capital/reusable manufacture attributionFor each included original asset manufacture vector B, f_current = u_current / D only after the persistent ledger verifies the supported whole installed-service denominator, all beneficiaries and prior assigned shares. Attribute f_current * B once to the actual beneficiary before the existing single reference normalization. Check prior_shares + all current/new beneficiary shares <= 1; carry the remaining original balance. Capacity revisions reconcile the historical ledger. Full physical asset/packaging mass and actual gross stocks/returns never receive f_current. Unknown D or history leaves the final attributed result unavailable, without suppressing actual repair/replacement/service burdens.asset_id; original_B; u_current; D; historical_beneficiaries; prior_shares; capacity_evidenceconserved attributed manufacture vector

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_primaryall foreground recordsUse real primary records for the declared site period and cohort with calibration raw archive coverage and independent analytical uncertainty. Missing future values are collection obligations; unknown is not zero or a pass.meters scales full lab reports and coverage ledger
dq_identityevery UUID and supplierApply all native card restrictions, exact physical chemistry/form/route/media/type and unit chain before actual linkage; classification or an exit0 receipt alone does not prove applicability. Preserve explicit substitutions and unresolved auxiliary identities; no invented equivalence or density.complete native records supplier assays route and unit references
dq_boundaryphysical manufacturing FG combined and packaging gatesRetain distinct matching-period physical and burden ledgers, every inherited vector, failed/zero-output interval and missing-species uncertainty. No one-residual two-unknown fit; data from another furnace family or proprietary product does not fill the gap.signed balance and history worksheets source limitations
dq_allocationshared and multifunctional operationsDocument subdivision determining physical causality and any genuinely residual same-gate market-value step; report causal evidence coverage uncertainty and sensitivity. No fixed shares or automatic credits.ILCD method context and actual allocation records

9. Validation Rules

rule_idApplies toRulesource_ids
v_identityreference and routeDeclare every Required qualifier and satisfy the complete narrow route and native reference restrictions; waste sorting, quartz, sheet routes and downstream formed articles cannot resolve as this output.unsd-cpc3-2025; jrc-glass-bref-2013; schott-hot-forming; schott-duran-tubing
v_qfirst release and FGThe selected Product output row is finished with 1 kg net bare first-release tube. Q deduplicates release events and retains failures/zero output; FG, gross dispatch, returns and repair increments obey b_release/b_service and never create another Q.jrc-glass-bref-2013; schott-duran-tubing
v_onceevery numeratorUndivided raw records convert states/units/rates and allocate before normalize_once; every card and aggregation reads the same one stored result. Q=0 retains actual loads without a unit value; a failed query or unknown relation cannot become no-hit or pass.jrc-glass-bref-2013; jrc-ilcd-2010
v_mass_speciesfull physical and chemical gatesReconcile independent total mass and each relevant element; distinguish supplied chemical from oxide equivalent and free/reaction/phase/structural water. Retain every actual species/destination and unknown remainder. NOx/COD/VOC/total B are indicators, not arbitrary molecular masses.jrc-glass-bref-2013
v_stockWIP and non-WIP stocksOpening/closing raw glass/melt WIP FG and installed/spare electrode/refractory/fluid/water/air or other actual charge records preserve independent physical stocks and exchange-specific inherited vectors. Manufacture closing excludes first-released FG, whose manufacturing vector remains in B_j_c^Q even when held. FG services retain original-dispatch reversals and actual repair additions/removals against original Q; combined gates cancel internal release transfers. Consumption-equivalent accounting and stock correction may not both consume the same stock.jrc-glass-bref-2013; jrc-ilcd-2010
v_packevery packaging articleAll five physical movement directions and each opening/closing empty attached reusable stock reconcile by b_pack. Gross physical shipments control accompanying packages; internal reuse is not new purchase, tube Q or credit.schott-duran-tubing; jrc-ilcd-2010
v_allocationmethod and source traceabilityEach cited source resolves to its full source record, keeps actual scope/countercontext and supports the stated rule. ILCD allocation remains limited to the declared attributional case and full hierarchy; engineering checks do not establish scientific approval, translation review, mapping or publication.jrc-ilcd-2010; jrc-glass-bref-2013; schott-hot-forming; schott-duran-tubing; unsd-cpc3-2025
validate_asset_manufacture_conservationexisting capital/reusable manufacture attributionFor every included capital/reusable manufacture attribution verify same-asset continuity, whole installed service in matched units, all historical/current beneficiaries, prior assigned manufacture shares and cumulative share <= 1. Reject a reset by period, cohort, provider, owner or repair. Check distinct real replacement and incremental repair/treatment vectors separately and preserve gross physical mass. A missing denominator, unexplained previous allocation or incomplete beneficiary ledger requires explicit review and an unavailable final attributed amount; structural inspection cannot claim empirical completeness.

10. Published Dataset Profile

FieldValue
dataset_rolesecondary_dataset; background_dataset
downstream_useUpstream unworked tube manufacturing input only when actual grade route stock state and boundary match
allowed_useDeclared narrow boric-acid batch electric-melting Danner-drawing manufacture at first release, with separate observed original-cohort service account
excluded_useExclude waste-glass sorting/cleaning without remelting, purchased finished tube repacking, a purchased premelt/redraw-only start, primary quartz/fused-silica tubes, soda-lime tubes, optical blanks, rods/balls/microspheres, float/cast/rolled/drawn sheets, glass fibre, deliberate coloured/lead/fluoride-containing formulations, Vello/down/up-draw routes, normal fossil-fired melting with electric boost, and subsequent end forming, fire-polishing, grinding, drilling, coating, tempering, lamination, ampoule/vial or laboratory-article manufacture. A real different batch ingredient, fuel, package or auxiliary requires an additional specific atomic exchange and reassessment of applicability, never omission or a zero/other bundle.
required_metadataAll section3 qualifiers plus source/PCR identity boundary inventory coverage actual supply/used-state compatibility provider selection allocation and update date
required_quality_disclosureRaw record and speciation coverage; open unknowns; ordinary unresolved auxiliary UUIDs; manufacturing versus service boundary; installed stock/history and packaging closure; source countercontext and actual allocation evidence
update_triggerComposition supply state furnace or drawing route change; material utility/emission-control or package change; actual first-release specification change; boundary/stocks/returns/allocation or representative period change

11. Data Sources

Source idTypeReferenceUsed for
unsd-cpc3-2025official_guidanceUN Statistics Division, CPC Version3.0 Explanatory Notes, 30June2025, PDF p180 and adjacent37112–37115 entries; https://unstats.un.org/unsd/classifications/Econ/Download/In%20Text/CPC_Ver_3.0_Exp_Notes_30Jun2025.pdfClassification scope and tube/sheet/scrap distinctions only; no manufacturing or LCA allocation authority.
jrc-glass-bref-2013official_guidanceEuropean Commission JRC, Best Available Techniques Reference Document for the Manufacture of Glass, EUR25786EN,2013, DOI10.2791/69502; sections2.1,2.3.4–2.3.5,2.8,3.7 and4.2; https://bureau-industrial-transformation.jrc.ec.europa.eu/sites/default/files/2019-11/GLS_Adopted_03_2012_0.pdfComplete raw-material/electric-melting/Danner route and utility/emission/residue context; historical Tables2.8/3.34 are countercontext only, not transferred numerical recipe energy emission or allocation rules.
schott-hot-formingextension_guidanceSCHOTT, Glass Melting and Hot Forming, complete publisher HTML snapshot accessed2026-10-20, Glass Manufacture and Tube drawing sections with adjacent down/up-draw rolled and microfloat alternatives; https://www.schott.com/en-sg/expertise/glass-melting-and-hot-formingManufacturer corroboration of batch melting refining conditioning Danner mandrel-air drawing and annealing; route synthesis only, not a common factory recipe or fuel inventory.
schott-duran-tubinghandbookSCHOTT, DURAN Tubing rods and capillaries made of borosilicate glass3.3, retained publisher brochure accessed2026-10-20, PDF spreads4,5,8 (printed6–9 and14–15); https://www.schott.com/-/media/project/onex/products/d/duran-glass-tubing/downloads/datasheet/schott_duran_brochure_gb_final.pdf?rev=728c283d657c45f49f9d2464097f2b89Real unworked tube quality/traceability and carton/foil/wood packing variants; dimension compatibility and downstream strength test limitations. No density dimensions performance reannealing cycle or certification transferred; same publisher as schott-hot-forming.
jrc-ilcd-2010official_guidanceEuropean Commission JRC, ILCD Handbook General guide for LCA Detailed guidance, first edition March2010, sections7.9.2–7.9.3, PDFpp275–286 including printed255,257–258,264,266 and full context; https://eplca.jrc.ec.europa.eu/uploads/ILCD-Handbook-General-guide-for-LCA-DETAILED-GUIDANCE-12March2010-ISBN-fin-v1.0-EN.pdfOnly declared attributional allocation-required cases: dedicated/virtual subdivision, exchange-specific determining physical causality, genuinely residual same-condition common-gate market values; no free allocation/substitution choice or waste credit.
us-borax-optibor-2026handbookU.S.Borax/RioTinto, Optibor Product Data Sheet Orthoboric Acid, actual publisher footer8/2026, complete four-page original accessed2026-10-20, pp1,3–4; https://www.borax.com/BoraxCorp/media/Borax-Main/Resources/Data-Sheets/optibor-boric-acids.pdf?ext=.pdfH3BO3 glass-feed identity and stepwise thermal dehydration via HBO2 to B2O3; theoretical oxide/water composition versus free moisture and incomplete conversion. No supplier assay fraction bulk density process setpoint or emitted species amount transferred.

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page