TianGong PCR产品类别规则

Printed circuits

Printed circuits: This PCR applies to finished, unpopulated printed circuits supplied as rigid, flexible, or rigid-flex boards or circuits. It covers single-sided…

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
No published version
Readiness
Review required
Last updated

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:47130 · exact

Source

1. Scope and Applicability

This PCR applies to finished, unpopulated printed circuits supplied as rigid, flexible, or rigid-flex boards or circuits. It covers single-sided, double-sided, and multilayer constructions and additive, semi-additive, subtractive, or mixed conductor-formation routes. The product carries a specified conductive pattern on or within an insulating base and is ready for component assembly after the declared solder mask, legend, surface finish, profiling, inspection, and electrical testing steps.

The PCR covers the manufacture of the unpopulated printed circuit from purchased or internally produced base materials, laminates, copper foils, bonding materials, process chemicals, and other declared inputs through saleable printed circuit output at the manufacturing gate. It does not cover mounting or soldering electronic components, printed circuit board assemblies (PCBAs), semiconductor fabrication, separate electronic components, bare laminates without a formed circuit, waste printed circuits, or downstream equipment assembly and use.

Layer count, rigid or flexible construction, substrate and resin system, halogen and flame-retardant status, board thickness, copper weight and conductor density, hole and interconnect technology, surface finish, solder mask, panel format and utilization, quality class, production geography, manufacturing route, and application class can materially change the inventory. Every conforming foreground data package shall declare these facts rather than treating a narrow board design as representative of all printed circuits.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.metal-products-machinery-and-equipment.radio-television-and-communication-equipment-and-apparatus.printed-circuits
classification_refsCPC 3.0: 47130, exact classification context
covered_productsFinished unpopulated rigid, flexible, and rigid-flex printed circuits; single-sided, double-sided, and multilayer printed circuits; boards made by additive, semi-additive, subtractive, or mixed routes
excluded_productsPopulated PCBAs and printed wiring assemblies; mounted electronic components; semiconductors; unprocessed laminates and copper-clad panels without a formed circuit; electronic equipment; waste or scrap printed circuits; treatment services for waste boards
representative_productOne kilogram net mass of saleable, finished, unpopulated printed circuits at the manufacturing gate
production_routeBase-material and panel preparation; lamination when applicable; drilling or other interconnect formation; cleaning and surface preparation; imaging and masking; catalyst and electroless deposition when applicable; electroplating or other conductor build-up; etching and stripping when applicable; solder mask and legend; final surface finishing; profiling, electrical testing, inspection, and packaging
market_stateFinished, tested, unpopulated printed circuit ready for declared component-assembly operations, excluding transport packaging from reference product mass

3. Reference Flow

FieldValue
WhatProvide a finished unpopulated printed circuit that carries the declared conductive pattern and is ready for the declared component-assembly process
How much1 kg net mass of accepted finished printed circuits at the manufacturing gate
How wellMeets the declared drawing, material system, layer stack, conductor and hole specification, surface finish, solder mask, dimensional tolerances, electrical test, acceptance criteria, and quality class
How long or cycleOne declared production lot or reporting period; service life belongs to the downstream assembly or equipment system and is not assumed here
reference_flow_linkThe quantitative reference is exactly 1 kg of accepted finished unpopulated printed circuits; rejects, coupons, break-away rails, tooling areas, and transport packaging are excluded from the reference output and recorded separately
FieldValue
Reference amount1
Reference product flowPrinted circuits b230e7cd-7afd-4398-84bd-71beab1f6626
Reference flow propertyMass 93a60a56-a3c8-11da-a746-0800200b9a66
Reference unit groupUnits of mass 93a60a57-a4c8-11da-a746-0800200b9a66
Reference unitkg
Required qualifiersrigid, flexible, or rigid-flex construction; substrate and resin system; layer count and stack-up; finished board thickness; copper weight or conductor thickness; panel dimensions and utilization; conductor density or declared design family; through-hole, blind-via, buried-via, microvia, or other interconnect technology; additive, semi-additive, subtractive, or mixed route; solder mask and legend system; surface finish; halogen and flame-retardant declaration; acceptance and quality class; production geography; lot and reporting period; included boundary; net-mass convention

When constructing a foreground data package, the items listed in Required qualifiers shall be declared in dataset metadata, process notes, reference-flow comments, product descriptions, or an equivalent data-package field. Missing required qualifiers make the reference-flow definition incomplete for that data package.

The Tiangong reference product flow is generic to CPC 47130 and uses mass as its quantitative reference. Do not substitute a PCBA or electronic-components flow, a layer-count- or application-specific board flow, or an area-referenced bare-board intermediate for this generic reference flow.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_net_massReference productMass 93a60a56-a3c8-11da-a746-0800200b9a66kgReport exactly 1 kg of accepted finished unpopulated printed circuits. Exclude transport packaging, rejected boards, test coupons, break-away rails, tooling strips, and recoverable production scrap from reference product mass.
panel_to_product_conversionPanel-, area-, or item-based production recordsMass and measured area or item countkg; m2; item(s)Convert panel, area, and item records to the mass reference using measured accepted-product mass and the actual panel map for the declared product family and lot. Do not use a generic areal density or board mass when a product-specific measurement is available.
material_mass_separationBase materials and finished productMasskgPreserve separate dry masses for substrate or laminate, copper and other conductors, bonding materials, solder mask, legend ink, surface-finish metals or coatings, and other intentionally incorporated materials.
chemical_solution_basisProcess chemicals and bathsMass, volume, and concentrationkg; m3; kg substance/kg solution or equivalentRecord purchased formulation, make-up, replenishment, bail-out, drag-out, bath life, active constituent concentration, and treatment route without treating solution mass as active-substance mass.
water_source_and_reuseProcess water, rinse water, and cooling waterVolumem3Separate make-up water by source from internally recirculated water, and separate process-contact water from non-contact cooling or utility water to prevent double counting.
energy_carrier_preservationElectricity, heat, and fuelsEnergy and carrier quantitykWh; MJ; carrier-specific unitPreserve carrier, voltage or supply type, heating-value convention, and metered unit. Do not aggregate electricity, supplied heat, and fuels into one undifferentiated energy value.
metal_and_waste_mass_balanceCopper and other metals, rejects, spent baths, sludge, and recovered materialsMasskgReconcile purchased and opening-stock metal, additions, product incorporation, recoveries, closing stock, wastewater or sludge transfer, and other losses over the same reporting period; disclose unresolved imbalance.

5. System Boundary

The default dataset boundary is cradle-to-gate for saleable unpopulated printed circuits. Upstream material, energy, chemical, water-supply, transport, and treatment burdens are represented by linked datasets; the foreground boundary covers the manufacturing operations and on-site management under the producer's control. A gate-to-gate dataset may be produced only when its starting condition and every omitted upstream stage are explicit.

Boundary Abstraction

FieldValue
declared_starting_conditionPurchased or internally produced copper-clad laminate, flexible substrate, ceramic or other declared insulating base, copper foil, prepreg or bonding material, and process chemicals entering the declared printed-circuit manufacturing system
starting_condition_roleUpstream product inputs to the first foreground panel-preparation or lamination operation
product_classification_scopeFinished unpopulated printed circuits conforming to the semantic boundary of CPC 3.0 code 47130; classification is mapping context and does not define the canonical PCR identity
recursive_input_ruleAn input already representing a finished in-scope printed circuit shall be recorded as an upstream product flow and shall not be expanded again inside the receiving foreground process. Intermediate panels made within the same foreground system shall be linked between process stages without duplicating upstream burdens.
upstream_dataset_requirementUse separately documented datasets for substrates, laminates, copper foil and other metals, resins and bonding materials, process chemicals, electricity, heat, fuels, water supply, packaging, inbound transport, and off-site waste or wastewater treatment; disclose proxy use and data quality.
disclosureDeclare product construction, stack-up, material system, manufacturing route, site and geography, reporting period, panel utilization, yield, internal recycling, wastewater and air-emission controls, off-site treatment, allocation, and the exact terminal boundary.
rule_idApplies toRulesource_ids
boundary_product_scopeProduct identityInclude rigid, flexible, and rigid-flex printed circuits and their declared single-, double-, or multilayer routes; exclude component mounting and PCBA operations from the printed-circuit foreground boundary.us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
boundary_required_manufacturingForeground productionInclude applicable base-material preparation, lamination, drilling or other interconnect formation, cleaning, imaging and masking, catalyst and electroless deposition, conductor build-up, electroplating, etching and stripping, solder mask and legend, final surface finish, profiling, testing, inspection, and packaging. Mark non-applicable route steps explicitly.us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
boundary_material_energy_waterAll foreground stagesInclude all purchased and internally transferred materials, process chemicals, bath make-up and replenishment, water by source and use, electricity, heat, fuels, compressed air or other material utilities, and actual internal recycle loops without double counting.us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
boundary_waste_emissionsAll foreground stagesInclude rejects, routing and drilling residues, spent masks and resists, spent baths and etchants, drag-out, rinse wastewater, wastewater-treatment sludge, recovered metals, other hazardous and non-hazardous wastes, and measured or calculated releases to air, water, and soil.us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
boundary_cutoff_disclosureCompletenessDo not omit a known material, chemical, energy, water, transport, waste, or emission flow merely because it lacks a preferred dataset. Record it as unresolved, use a disclosed proxy, or justify its exclusion under the declared study rule.iso-14044-2006
boundary_downstream_exclusionDefault cradle-to-gate datasetExclude component manufacture and mounting, PCBA soldering and cleaning, downstream equipment assembly, distribution of the assembled equipment, use, and end-of-life unless a lifecycle model explicitly adds those stages without double counting.ifc-electronics-ehs-2007; iso-14044-2006

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
material_preparationBase-material preparation and laminationrequiredAlways; lamination-specific inputs apply only when the declared construction uses laminationForeground preparation of the insulating and conductor stackPrepared panel mass needed for 1 kg accepted finished printed circuits
hole_and_surface_preparationDrilling, interconnect formation, and surface preparationrequiredAlways; hole-formation steps are marked not applicable only for a declared route without holes or other formed interconnectsForeground mechanical and chemical preparationPrepared board area and mass entering imaging for 1 kg accepted product
conductor_formationImaging, masking, plating, etching, and strippingrequiredAlways; individual additive, semi-additive, subtractive, catalyst, plating, and etching steps follow the declared routeForeground formation of the conductive patternPatterned board output needed for 1 kg accepted product
finishing_and_releaseSolder mask, legend, surface finish, profiling, testing, inspection, and packagingrequiredAlways; the selected surface-finish sequence follows the declared product specificationForeground completion and release of saleable printed circuits1 kg accepted finished printed circuits
wastewater_and_waste_managementProcess-wastewater, bath, residue, and sludge managementrequiredAlways; model on-site treatment directly and off-site treatment through linked service datasetsForeground segregation, treatment, recovery, and transfer of manufacturing residualsResiduals generated while producing 1 kg accepted product

Process: Base-material preparation and lamination (material_preparation)

Inputs

Product flows
Substrates, copper foils, and copper-clad laminates (base_materials)

Record each insulating base, copper foil, copper-clad laminate, flexible film, ceramic base, metal-core base, and other structural material by supplier specification and lot.

  • Selected flow: Select material- and supplier-specific Tiangong product flows
  • Flow property / unit: Mass / kg; area / m2 retained as supporting activity data
  • Amount rule: Purchase-and-stock reconciliation or measured issue to the declared product family, adjusted for returned stock and normalized by accepted output
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_material_bom_and_stock
  • Sources: us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes
Prepreg, bonding films, resins, and lamination auxiliaries (lamination_materials)

Record prepreg, adhesive or bonding film, coverlay, resin, release film, separator, and other lamination materials when used.

  • Selected flow: Select formulation-specific Tiangong product flows
  • Flow property / unit: Mass / kg; area / m2 where purchased by area
  • Amount rule: Measured batch issue less documented unused return, allocated to the actual panel map and accepted output
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits from routes using lamination
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_material_bom_and_stock
  • Sources: us-epa-pwb-surface-finishes
Electricity and thermal energy for preparation and lamination (material_preparation_energy)

Record electricity, supplied heat, and fuels for cutting, lay-up, pressing, curing, ventilation, and route-specific preparation.

  • Selected flow: Select carrier-, voltage-, technology-, and geography-specific Tiangong product flows
  • Flow property / unit: Energy / kWh or MJ; fuel in metered carrier unit
  • Amount rule: Sub-metered consumption or documented equipment-load calculation allocated under section 7
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_energy_and_utilities
  • Sources: ifc-electronics-ehs-2007
Waste flows

Outputs

Product flows
Prepared or laminated panel (prepared_panel)

Record the dry mass, area, panel count, stack-up, and material composition of prepared panels transferred to the next foreground process.

  • Selected flow: Product-specific prepared printed-circuit panel intermediate
  • Flow property / unit: Mass / kg; area / m2; number of items / item(s)
  • Amount rule: Measured transfer quantity reconciled with material issue, retained stock, trim, and rejects
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: prepared panel needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_batch_route_yield
  • Sources: us-epa-pwb-surface-finishes
Waste flows
Offcuts, separator waste, and lamination rejects (preparation_scrap)

Record each residue by material composition and actual recovery, recycling, or disposal route.

  • Selected flow: Select material- and treatment-specific Tiangong waste flows
  • Flow property / unit: Mass / kg
  • Amount rule: Measured segregated waste and rejected-panel mass, reconciled to issued materials and prepared output
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste_and_recovery
  • Sources: us-epa-pcb-p2-1990
Elementary flows
Lamination and preparation releases to air (preparation_air_releases)

Record measured or permit-calculated releases from cutting, heating, curing, cleaning, and ventilation by substance and compartment.

  • Selected flow: Select substance- and compartment-specific Tiangong elementary flows
  • Flow property / unit: Mass / kg
  • Amount rule: Continuous or periodic measurement, material balance, or documented permit method for the declared reporting period
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_air_emissions
  • Sources: us-epa-pcb-p2-1990; ifc-electronics-ehs-2007

Process: Drilling, interconnect formation, and surface preparation (hole_and_surface_preparation)

Inputs

Product flows
Prepared panels entering hole and surface preparation (prepared_panel_input)

Transfer prepared panels without duplicating their upstream burdens.

  • Selected flow: Product-specific prepared printed-circuit panel intermediate
  • Flow property / unit: Mass / kg; area / m2; number of items / item(s)
  • Amount rule: Measured transfer from material_preparation
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: prepared panels needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_batch_route_yield
  • Sources: us-epa-pwb-surface-finishes
Drill, routing, desmear, cleaning, and conditioning materials (hole_preparation_materials)

Record drill and routing consumables, abrasives, cleaners, desmear and conditioning chemicals, catalysts, and all bath make-up and replenishment used by the declared interconnect route.

  • Selected flow: Select equipment- and formulation-specific Tiangong product flows
  • Flow property / unit: Mass / kg; volume / m3; item count for tools
  • Amount rule: Measured issue, bath make-up and additions, tool-change records, and purchase-and-stock reconciliation
  • Value mode: Calculated value (calculated_value)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per prepared-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_process_chemicals_and_baths
  • Sources: us-epa-pcb-p2-1990; ifc-electronics-ehs-2007
Process and rinse water for hole and surface preparation (hole_preparation_water)

Record make-up water by source and use, separately from recirculated and non-contact water.

  • Selected flow: Select source- and geography-specific Tiangong water product flows
  • Flow property / unit: Volume / m3
  • Amount rule: Metered make-up water or reconciled tank and rinse-line balance
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per prepared-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_water_balance
  • Sources: us-epa-pcb-p2-1990; ifc-electronics-ehs-2007
Electricity and utilities for drilling and surface preparation (hole_preparation_energy)

Record electricity and material utilities for drilling, routing, cleaning, pumping, ventilation, and bath temperature control.

  • Selected flow: Select carrier-, voltage-, and geography-specific Tiangong product flows
  • Flow property / unit: Energy / kWh or MJ; utility in metered unit
  • Amount rule: Sub-metered consumption or documented equipment-load calculation allocated under section 7
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per prepared-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_energy_and_utilities
  • Sources: ifc-electronics-ehs-2007
Waste flows

Outputs

Product flows
Drilled and conditioned panel (conditioned_panel)

Record the transferred panel mass, area, count, hole technology, and accepted quantity.

  • Selected flow: Product-specific drilled and conditioned panel intermediate
  • Flow property / unit: Mass / kg; area / m2; number of items / item(s)
  • Amount rule: Measured accepted transfer to conductor formation
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: conditioned panels needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_batch_route_yield
  • Sources: us-epa-pwb-surface-finishes
Waste flows
Drilling and routing residues and worn tools (mechanical_preparation_waste)

Record collected dust, swarf, backing or entry material, worn tools, filters, and rejected panels by composition and route.

  • Selected flow: Select material- and treatment-specific Tiangong waste flows
  • Flow property / unit: Mass / kg; item(s) for tools with supporting mass
  • Amount rule: Measured waste-container and tool-change records reconciled to production
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per conditioned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_waste_and_recovery
  • Sources: us-epa-pcb-p2-1990
Spent preparation baths and contact wastewater (hole_preparation_wastewater)

Record spent bath solution, drag-out, rinses, filter media, and wastewater transferred to recovery or treatment.

  • Selected flow: Select composition- and treatment-specific Tiangong waste flows
  • Flow property / unit: Volume / m3 and mass / kg of identified constituents
  • Amount rule: Metered transfer and bath-disposal records with measured concentration or defensible composition data
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per conditioned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_wastewater_and_effluent
  • Sources: us-epa-pcb-p2-1990; ifc-electronics-ehs-2007
Elementary flows
Dust, acid mist, and volatile releases (hole_preparation_air_releases)

Record releases from mechanical preparation, cleaning, and ventilation by substance and compartment after controls.

  • Selected flow: Select substance- and compartment-specific Tiangong elementary flows
  • Flow property / unit: Mass / kg
  • Amount rule: Measured or method-calculated controlled release for the reporting period
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per conditioned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_air_emissions
  • Sources: us-epa-pcb-p2-1990; ifc-electronics-ehs-2007

Process: Imaging, masking, plating, etching, and stripping (conductor_formation)

Inputs

Product flows
Conditioned panels entering conductor formation (conditioned_panel_input)

Transfer conditioned panels without duplicating burdens from previous foreground stages.

  • Selected flow: Product-specific drilled and conditioned panel intermediate
  • Flow property / unit: Mass / kg; area / m2; number of items / item(s)
  • Amount rule: Measured transfer from hole_and_surface_preparation
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: conditioned panels needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_batch_route_yield
  • Sources: us-epa-pwb-surface-finishes
Imaging, resist, developer, and stripping materials (imaging_materials)

Record films, photoresists, screen inks, developers, stripping agents, cleaners, and related formulation-specific inputs for the actual route.

  • Selected flow: Select formulation-specific Tiangong product flows
  • Flow property / unit: Mass / kg; volume / m3; area / m2 where supplied as film
  • Amount rule: Measured batch issue, bath make-up and replenishment, and purchase-and-stock reconciliation
  • Value mode: Calculated value (calculated_value)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per patterned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_process_chemicals_and_baths
  • Sources: us-epa-pcb-p2-1990; ifc-electronics-ehs-2007
Copper, catalysts, plating salts, and etchants (conductor_chemicals)

Record catalyst, electroless and electrolytic copper, other conductor or resist metals, etchants, additives, reducers, complexing agents, acids, alkalis, and every bath make-up, addition, bail-out, and replacement.

  • Selected flow: Select substance- and formulation-specific Tiangong product flows
  • Flow property / unit: Mass / kg; volume / m3; concentration retained for each formulation
  • Amount rule: Purchase-and-stock reconciliation plus bath logs, normalized through measured patterned-panel output
  • Value mode: Calculated value (calculated_value)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per patterned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_process_chemicals_and_baths
  • Sources: us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
Process and rinse water for conductor formation (conductor_formation_water)

Record make-up water by process line and source, separately from recirculated water.

  • Selected flow: Select source- and geography-specific Tiangong water product flows
  • Flow property / unit: Volume / m3
  • Amount rule: Metered make-up water or reconciled line balance
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per patterned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_water_balance
  • Sources: us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
Electricity and utilities for conductor formation (conductor_formation_energy)

Record electricity, heat, cooling, ventilation, pumping, compressed air, and other material utilities by line.

  • Selected flow: Select carrier-, voltage-, and geography-specific Tiangong product flows
  • Flow property / unit: Energy / kWh or MJ; utility in metered unit
  • Amount rule: Sub-metered consumption or documented equipment-load calculation allocated under section 7
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per patterned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_energy_and_utilities
  • Sources: ifc-electronics-ehs-2007
Waste flows

Outputs

Product flows
Patterned printed-circuit panel (patterned_panel)

Record accepted patterned-panel mass, area, count, route, conductor build, and transfer to finishing.

  • Selected flow: Product-specific patterned printed-circuit panel intermediate
  • Flow property / unit: Mass / kg; area / m2; number of items / item(s)
  • Amount rule: Measured accepted transfer from the declared conductor-formation route
  • Value mode: Foreground record (foreground_record)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: patterned panels needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_batch_route_yield
  • Sources: us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
Waste flows
Spent resists, masks, films, and contaminated solids (imaging_waste)

Record spent films, masks, resists, filters, wipes, containers, and rejected panels by composition and route.

  • Selected flow: Select material- and treatment-specific Tiangong waste flows
  • Flow property / unit: Mass / kg
  • Amount rule: Measured segregated waste and rejected-panel mass
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per patterned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste_and_recovery
  • Sources: us-epa-pcb-p2-1990
Spent plating baths, etchants, drag-out, and wastewater (conductor_wastewater)

Record each segregated spent bath, etchant, rinse stream, drag-out recovery stream, and wastewater transfer with metal and relevant constituent concentrations.

  • Selected flow: Select composition- and treatment-specific Tiangong waste flows
  • Flow property / unit: Volume / m3; mass / kg of identified constituents
  • Amount rule: Metered transfer, bath logs, and concentration analyses over the reporting period
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per patterned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_wastewater_and_effluent
  • Sources: us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
Elementary flows
Controlled releases from imaging, plating, and etching (conductor_air_releases)

Record acid mist, volatile organic compounds, particulates, and other measured or calculated releases after controls.

  • Selected flow: Select substance- and compartment-specific Tiangong elementary flows
  • Flow property / unit: Mass / kg
  • Amount rule: Stack or workplace exhaust measurement, material balance, or documented permit calculation
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per patterned-panel output needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_air_emissions
  • Sources: us-epa-pcb-p2-1990; ifc-electronics-ehs-2007

Process: Solder mask, surface finish, testing, and release (finishing_and_release)

Inputs

Product flows
Patterned panels entering finishing (patterned_panel_input)

Transfer patterned panels without duplicating upstream burdens.

  • Selected flow: Product-specific patterned printed-circuit panel intermediate
  • Flow property / unit: Mass / kg; area / m2; number of items / item(s)
  • Amount rule: Measured transfer from conductor_formation
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: patterned panels needed for 1 kg accepted finished printed circuits
  • Basis kind: Process output (process_output)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_batch_route_yield
  • Sources: us-epa-pwb-surface-finishes
Solder mask, legend, and final surface-finish materials (finishing_materials)

Record solder mask and legend formulations, cleaners, microetch, catalysts, fluxes, solder or alternative coatings, nickel, gold, palladium, silver, tin, organic preservative, and all route-specific bath materials.

  • Selected flow: Select formulation- and metal-specific Tiangong product flows
  • Flow property / unit: Mass / kg; volume / m3; concentration for each bath or formulation
  • Amount rule: Purchase-and-stock reconciliation plus bath make-up, addition, bail-out, and replacement logs
  • Value mode: Calculated value (calculated_value)
  • Specificity: Technology-specific (technology_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_process_chemicals_and_baths
  • Sources: us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
Finishing water, electricity, and material utilities (finishing_utilities)

Record make-up water, electricity, heat, cooling, ventilation, compressed air, test energy, and other material utilities for finishing, profiling, testing, and packing.

  • Selected flow: Select source-, carrier-, voltage-, technology-, and geography-specific Tiangong product flows
  • Flow property / unit: Volume / m3; energy / kWh or MJ; utility in metered unit
  • Amount rule: Sub-metered consumption or documented allocation from line and facility records
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_energy_water_finishing
  • Sources: us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
Transport packaging materials (transport_packaging)

Record bags, desiccants, separators, labels, cartons, trays, reels, pallets, and reusable packaging separately from product mass.

  • Selected flow: Select material- and supplier-specific Tiangong product flows
  • Flow property / unit: Mass / kg; item(s) with measured mass
  • Amount rule: Measured packaging issued to accepted shipment less documented reusable returns
  • Value mode: Calculated value (calculated_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_product_packaging_and_release
Waste flows

Outputs

Product flows
Accepted finished printed circuits (finished_printed_circuits)

Record accepted net product mass after final profiling, electrical test, dimensional and visual inspection, excluding transport packaging.

  • Selected flow: Printed circuits b230e7cd-7afd-4398-84bd-71beab1f6626
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg (Units of mass 93a60a57-a4c8-11da-a746-0800200c9a66)
  • Amount rule: exactly 1 kg accepted net product output
  • Value mode: Fixed value (fixed_value)
  • Specificity: Product-specific (product_specific)
  • Normalization basis: PCR reference flow
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Identity reference (identity_reference)
Waste flows
Profiling residues, test rejects, and finishing solids (finishing_scrap)

Record routing residues, test coupons, break-away rails, rejected boards, spent filters, contaminated packaging, and other finishing solids by material and route.

  • Selected flow: Select material- and treatment-specific Tiangong waste flows
  • Flow property / unit: Mass / kg
  • Amount rule: Measured segregated waste and reject mass, reconciled to patterned-panel input and accepted product output
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_waste_and_recovery
  • Sources: us-epa-pcb-p2-1990; ifc-electronics-ehs-2007
Spent finishing baths and wastewater (finishing_wastewater)

Record spent surface-finish baths, rinses, drag-out, cleaning solutions, and wastewater transfers by chemistry and destination.

  • Selected flow: Select composition- and treatment-specific Tiangong waste flows
  • Flow property / unit: Volume / m3; mass / kg of identified constituents
  • Amount rule: Metered transfer, bath records, and concentration analyses
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_wastewater_and_effluent
  • Sources: us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
Elementary flows
Controlled finishing releases to air (finishing_air_releases)

Record releases from mask curing, legend printing, surface-finishing baths, hot-air leveling when used, profiling, and ventilation after controls.

  • Selected flow: Select substance- and compartment-specific Tiangong elementary flows
  • Flow property / unit: Mass / kg
  • Amount rule: Measured or documented method-calculated release over the reporting period
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_air_emissions
  • Sources: us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007

Process: Process-wastewater, bath, residue, and sludge management (wastewater_and_waste_management)

Inputs

Product flows
Treatment chemicals, water, energy, and services (treatment_inputs)

Record treatment reagents, filtration media, water, electricity, fuels, and externally supplied recovery or treatment services for the actual contaminant-specific system.

  • Selected flow: Select chemical-, carrier-, and service-specific Tiangong product flows
  • Flow property / unit: Mass / kg; volume / m3; energy / kWh or MJ; service-specific unit
  • Amount rule: Measured treatment-system records and invoices allocated to the reported manufacturing streams
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: residuals generated while producing 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_wastewater_and_effluent
  • Sources: us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
Waste flows
Segregated spent baths, wastewater, and residues entering management (residuals_to_treatment)

Record each internal residual transfer once, preserving source process, chemistry, volume, mass, concentration, and hazardous classification.

  • Selected flow: Select composition- and treatment-specific Tiangong waste flows
  • Flow property / unit: Volume / m3; mass / kg of total stream and identified constituents
  • Amount rule: Sum of verified transfers from foreground production stages after removing documented internal returns to process
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: residuals generated while producing 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_wastewater_and_effluent
  • Sources: us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007

Outputs

Product flows
Recovered copper and other materials (recovered_materials)

Record materials that meet the declared recovery output specification, destination, and allocation treatment; do not classify an unverified waste transfer as recovered product.

  • Selected flow: Select recovered-material-specific Tiangong product flows
  • Flow property / unit: Mass / kg
  • Amount rule: Measured accepted recovery output or verified off-site recovery receipt
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste_and_recovery
  • Sources: us-epa-pcb-p2-1990; ifc-electronics-ehs-2007
Waste flows
Wastewater-treatment sludge and concentrated residues (treatment_sludge)

Record dewatered sludge, filter cake, spent media, concentrated liquids, and other treatment residues by composition and destination.

  • Selected flow: Select composition- and treatment-specific Tiangong waste flows
  • Flow property / unit: Mass / kg; dry matter and wet mass both retained where relevant
  • Amount rule: Measured dispatch mass and moisture or solids content, reconciled with treatment input and effluent
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_waste_and_recovery
  • Sources: us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
Elementary flows
Treated effluent released to water (treated_effluent)

Record effluent volume and each reported pollutant after treatment at the actual receiving compartment.

  • Selected flow: Select water-quantity and pollutant-specific Tiangong elementary flows for the receiving compartment
  • Flow property / unit: Volume / m3 for water; mass / kg for each pollutant
  • Amount rule: Discharge flow multiplied by representative measured concentration, with direct load measurements used when available
  • Value mode: Calculated value (calculated_value)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per 1 kg accepted finished printed circuits
  • Basis kind: Reference flow (reference_flow)
  • Evidence kind: Calculated from collection (calculated_from_collection)
  • Collection protocol: cp_wastewater_and_effluent
  • Sources: us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
allocation_avoidanceMulti-product facilities and shared linesFirst separate processes, lines, meters, batches, and product-family records so direct inputs, outputs, wastes, and emissions remain assigned to the products that caused them.iso-14044-2006
allocation_shared_operationsShared energy, water, ventilation, baths, testing, and utilitiesUse measured causal drivers such as sub-metered consumption, equipment operating time, processed panel area, bath loading, number of test cycles, or contaminant load. Mass-only allocation is permitted only when the shared operation is demonstrated to scale with product mass.iso-14044-2006; us-epa-pwb-surface-finishes
allocation_yield_and_rejectsProduction losses and rejected boardsInclude the burdens of normal scrap, coupons, rails, test failures, and rework in accepted saleable output. Do not remove the burdens of rejected production from the denominator.iso-14044-2006
allocation_wastewater_treatmentCombined wastewater and sludge treatmentAllocate by measured stream volume and pollutant load or other treatment-driving characteristics. Do not allocate chemically dissimilar streams by volume alone when contaminant loading materially differs.us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
allocation_recovered_materialsCopper and other recovered materialsPrefer subdivision and direct mass accounting. If a recovered material is treated as a co-product or receives a recycling credit, declare the method, point of substitution, quality adjustment, and sensitivity; do not combine allocation and substitution credits for the same recovered amount.iso-14044-2006
allocation_internal_recyclingInternal bath, rinse, metal, panel, or material loopsRecord internal returns explicitly, but count only make-up inputs and net releases across the foreground boundary. Internal circulation shall not create an avoided-burden credit.us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_product_identity_and_outputfinishing_and_releaseProduct identity and accepted outputSpecification, route traveller, test record, scale record, release recordproduct code; drawing revision; construction; stack-up; material system; thickness; copper weight; panel map; interconnect technology; surface finish; solder mask; acceptance class; accepted net mass; packaging mass; lotControlled production and release records linked to calibrated weighingkg; m2; item(s)Each lot, aggregated monthlyAt least 12 representative consecutive months or the full campaign for seasonal or campaign productionEvery included site and outsourced operationSum accepted net mass by declared product family; retain lot-level qualifiers and exclude packagingCalibration record; released specification; lot traceability; electrical and dimensional acceptance evidence
cp_material_bom_and_stockmaterial_preparationMaterial inputsBOM, purchase, stores issue, return, and stock recordmaterial id; supplier; lot; composition; issued quantity; returned quantity; opening and closing stock; panel assignmentPurchase-and-stock reconciliation checked against product BOM and actual panel mapkg; m2; item(s)Per issue and monthly reconciliationSame period as accepted outputEvery included siteOpening stock + purchases - closing stock - documented returns, assigned to product family and normalized to accepted outputSupplier specification; stock ledger; BOM revision; material lot traceability
cp_batch_route_yieldall production processesIntermediate transfers, route, and yieldBatch traveller and production execution recordprocess step; route; panel id; input and output count; input and output mass or area; rework; reject code; transfer timeLot-level process tracking with reconciliation between consecutive stageskg; m2; item(s)Each batchSame period as accepted outputEvery included site and outsourced stageSum accepted transfers and losses by route; normalize through accepted outputRoute traveller; production-system audit trail; reject disposition
cp_process_chemicals_and_bathshole_and_surface_preparation; conductor_formation; finishing_and_releaseProcess chemicals and bathsPurchase, stock, bath make-up, replenishment, analysis, bail-out, and disposal recordformulation; constituent concentration; bath volume; additions; sampling; bail-out; drag-out recovery; replacement; destinationBatch and line logs reconciled to purchase and stock recordskg; m3; concentration-specific unitEach addition or disposal; monthly reconciliationSame period as accepted outputEvery wet-process lineOpening inventory + purchases + internal returns - closing inventory - disposal - documented losses, assigned to line and product familySupplier SDS or specification; bath analysis; calibrated dosing record; inventory reconciliation
cp_energy_and_utilitiesmaterial_preparation; hole_and_surface_preparation; conductor_formationElectricity, heat, fuels, and utilitiesMeter, fuel, equipment-runtime, and utility invoice recordcarrier; meter id; start and end reading; runtime; load; heating value; allocation driverSub-metering preferred; otherwise documented equipment calculation reconciled to facility totalskWh; MJ; carrier-specific unitContinuous or per shift; monthly reconciliationSame period as accepted outputEvery included siteSum by carrier and line, subtract unrelated use, allocate under section 7, normalize to accepted outputMeter calibration or invoice; runtime log; reconciliation to site total
cp_water_balancehole_and_surface_preparation; conductor_formationProcess, rinse, and cooling waterMeter, tank, rinse-line, recycle, and discharge recordsource; use; make-up volume; recirculated volume; discharge volume; tank change; concentration where relevantSource and line sub-metering or reconciled water balancem3Continuous or daily; monthly reconciliationSame period as accepted outputEvery included siteCount make-up water once; report recirculation separately; reconcile supply, product retention, evaporation, transfer, and dischargeMeter calibration; water invoice; line log; water-balance closure
cp_energy_water_finishingfinishing_and_releaseFinishing water, energy, and utilitiesMeter, bath, equipment-runtime, and test-system recordsource or carrier; meter; use; runtime; bath or test line; allocation driverSub-metered records or documented line calculationm3; kWh; MJ; utility-specific unitContinuous or per shift; monthly reconciliationSame period as accepted outputEvery finishing and testing lineSum by line and allocate under section 7 to accepted outputMeter or invoice; runtime log; line reconciliation
cp_product_packaging_and_releasefinishing_and_releaseProduct release and packagingPacking list, material issue, shipment, and reusable-return recordpackaging material; issued mass and count; returned reusable units; shipment lot; accepted product massMeasured issue and shipment reconciliationkg; item(s)Each shipment; monthly reconciliationSame period as accepted outputEvery dispatch siteNet packaging issued divided by accepted net product massPacking specification; scale record; reusable packaging ledger
cp_wastewater_and_effluenthole_and_surface_preparation; conductor_formation; finishing_and_release; wastewater_and_waste_managementWastewater, bath transfer, treatment, and effluentFlow meter, batch disposal, laboratory analysis, treatment log, and discharge recordsource line; stream id; volume; pH; constituent concentrations; treatment step; sludge transfer; discharge compartmentMetered flows and representative accredited or qualified laboratory analysesm3; kg constituent; concentration-specific unitContinuous flow where available; sample frequency sufficient for permit and process variabilitySame period as accepted outputEvery included site and receiving treatment systemCalculate loads from matched flow and concentration; preserve segregated streams; reconcile treatment input, effluent, sludge, recovery, and stockSampling plan; chain of custody; laboratory QA; meter calibration; treatment reconciliation
cp_waste_and_recoveryall processesSolid, liquid, hazardous, and recovered residualsContainer weighing, waste manifest, recycler receipt, sludge analysis, and internal transfer recordsource; material; hazardous classification; gross and tare mass; moisture or solids; destination; recovery output; certificateWeighed dispatch and verified destination recordskg; item(s) with supporting massEach transfer; monthly reconciliationSame period as accepted outputEvery included site and contractorSum net mass by composition and destination; distinguish waste transfer from accepted recovered productCalibrated scale; manifest; analysis; recycler or treatment receipt
cp_air_emissionsall production processesAir emissions after controlsStack test, continuous monitor, material balance, operating hours, and permit calculationsource; substance; flow; concentration; control efficiency; operating hours; methodMeasurement preferred; otherwise documented method using foreground activity datakg substance; concentration-specific unitPer regulatory and process-representative scheduleSame period as accepted outputEvery material emission sourceCalculate released mass after controls and allocate by causal operationTest report; monitor QA; method reference; control operating record

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calc_reference_outputAccepted productSum accepted finished printed-circuit net mass after final test and inspection, excluding packaging, coupons, rails, and rejects.Lot release and calibrated scale recordskg accepted net product
calc_material_consumptionEach purchased materialOpening stock + purchases + internal receipts - closing stock - documented return; assign by traced batch or the section 7 allocation rule.Stock, purchase, issue, return, and batch recordskg or m2 material per kg accepted product
calc_chemical_consumptionEach process formulation or constituentReconcile opening bath and stock, make-up, additions, internal recovery, bail-out, closing inventory, transfers, and disposal; convert solution to constituent mass using documented concentration.Bath, dosing, stock, and analysis recordskg formulation and kg constituent per kg accepted productus-epa-pwb-surface-finishes
calc_makeup_waterWater useMake-up water supplied from each source; report recirculated water separately and do not add internal recirculation to net withdrawal.Source meters, line meters, tank and recycle recordsm3 make-up water per kg accepted productifc-electronics-ehs-2007
calc_energyEach energy carrierSum metered carrier use for included operations, subtract documented unrelated use, and apply the section 7 allocation driver.Meter, invoice, runtime, and production recordskWh, MJ, or carrier unit per kg accepted product
calc_stage_yieldEach production stageAccepted output quantity divided by input quantity on a consistent mass, area, or item basis; retain rework and reject disposition.Batch route, transfer, and reject recordsStage yield and loss by declared route
calc_wastewater_loadEach wastewater constituentMatched discharge or transfer volume multiplied by representative measured concentration; sum by stream and reporting period before normalization.Flow and laboratory recordskg constituent per kg accepted productus-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
calc_material_balanceProduct, metals, and treatment systemFor each selected balance domain, inputs + opening stock = accepted product + recoveries + waste + releases + closing stock; report absolute and relative unresolved difference.Material, product, stock, waste, recovery, wastewater, and emission recordsReconciliation and unresolved balance by materialus-epa-pwb-surface-finishes
calc_normalizationAll inventory rowsDivide the allocated reporting-period quantity by accepted net product mass from calc_reference_output.Allocated quantity; accepted net product massInventory quantity per 1 kg accepted finished printed circuits

Data Quality Requirements

requirement_idApplies toRequirementEvidence
dq_product_identityProduct and reference flowPreserve drawing revision, construction, stack-up, substrate, layer count, conductor and interconnect specification, surface finish, acceptance class, and net-mass convention for every represented product family.Released specifications, route travellers, BOMs, and lot traceability
dq_technologicalProcess routeData shall represent the declared additive, semi-additive, subtractive, or mixed route and the actual hole, plating, etching, mask, finish, test, and control technologies.Process map, equipment list, bath list, and production records
dq_temporalForeground activity dataUse at least 12 representative consecutive months when continuous production exists; for campaign or new production, cover the full campaign and disclose its limitations.Dated records and coverage statement
dq_geographicalSite and upstream dataIdentify every production and outsourced site and match electricity, water, transport, treatment, and material datasets to the represented geography where feasible.Site list, supplier and contractor records, dataset metadata
dq_measurementMass, water, energy, concentration, and emission recordsUse calibrated or verified instruments and retain sampling, detection-limit, conversion-factor, and laboratory QA information.Calibration certificates, sampling plan, laboratory QA, meter reconciliation
dq_completenessInventoryCover all required process stages and all known material, chemical, energy, water, transport, waste, recovery, and emission flows; unresolved items shall be disclosed rather than silently omitted.Completeness checklist and material, water, and metal balance
dq_allocationShared operationsDocument the causal allocation driver, coverage, numerator, denominator, and sensitivity for each shared operation or combined treatment system.Allocation workbook and sensitivity record
dq_upstream_proxiesLinked datasetsRecord provider, geography, technology, time, version, representativeness, and proxy rationale for each linked upstream or treatment dataset.Dataset registry and proxy log
dq_outsourced_operationsOutsourced manufacturing or treatmentObtain primary activity records or supplier-specific datasets for material outsourced stages; otherwise disclose the proxy and uncertainty.Supplier data, treatment receipt, audit, or documented proxy

9. Validation Rules

rule_idApplies toRulesource_ids
validate_identity_scopeProduct identityFail unless the product is an unpopulated printed circuit and the required construction, material, layer, route, finish, quality, geography, period, and boundary qualifiers are declared; reject PCBA, component, laminate-only, equipment, and waste-board substitutions.ifc-electronics-ehs-2007; us-epa-pwb-surface-finishes
validate_reference_flowQuantitative referenceRequire exactly 1 kg accepted net output using Printed circuits b230e7cd-7afd-4398-84bd-71beab1f6626, Mass 93a60a56-a3c8-11da-a746-0800200b9a66, Units of mass 93a60a57-a4c8-11da-a746-0800200b9a66, and unit kg; packaging and production residues shall be separate.
validate_route_boundaryProcess map and boundaryRequire every applicable operation in boundary_required_manufacturing, an explicit not-applicable declaration for route steps not used, and separate exclusion of PCBA and downstream equipment stages.us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
validate_intermediate_linksForeground stage transfersRequire prepared, conditioned, and patterned panel transfers to reconcile between adjacent foreground stages without duplicate upstream burdens.
validate_material_and_yieldMaterial balance and outputRequire accepted product mass, stage yields, material inputs, rejects, residues, recoveries, and unresolved mass-balance difference on one reporting period and declared normalization basis.us-epa-pwb-surface-finishes
validate_chemicals_and_metalsWet-process inventoryRequire formulation, concentration, bath make-up, additions, bail-out or disposal, metal incorporation, recovery, and treatment records for every applicable imaging, plating, etching, and finishing line.us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes
validate_water_and_wastewaterWater and effluentRequire source-separated make-up water, internal recirculation disclosure, contact and non-contact separation, wastewater volume, relevant constituent loads, treatment route, effluent, and sludge reconciliation.us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
validate_energyEnergy and utilitiesRequire carrier-separated electricity, heat, fuel, and material utility records and a documented allocation driver for shared systems.ifc-electronics-ehs-2007
validate_waste_recovery_emissionsResiduals and releasesRequire wastes by composition and destination, verified recovered outputs, sludge and spent-bath records, and substance- and compartment-specific air, water, and soil releases where applicable.us-epa-pcb-p2-1990; us-epa-pwb-surface-finishes; ifc-electronics-ehs-2007
validate_allocationMulti-product and shared operationsRequire allocation avoidance where feasible, a causal driver for every shared operation, inclusion of normal reject burdens in accepted output, and no simultaneous allocation and substitution credit for the same recovered amount.iso-14044-2006
validate_data_qualityDataset packageRequire protocol coverage, temporal and site coverage, calibration and laboratory evidence, upstream dataset and proxy disclosure, allocation documentation, and a list of unresolved completeness items.iso-14044-2006

10. Published Dataset Profile

FieldValue
dataset_roleProduct-specific foreground printed-circuit manufacturing dataset normalized to 1 kg accepted net unpopulated printed circuits
downstream_usesecondary_dataset; background_dataset; input to downstream process or lifecyclemodel records for PCB assembly, electronic components, equipment, or other products
allowed_useProduct footprint, LCA, supply-chain inventory, ecodesign, procurement, and hotspot analysis when construction, route, geography, time, quality, and boundary match the intended use
excluded_useGeneric representation of PCBAs, mounted components, semiconductor manufacture, all printed circuits regardless of construction or route, waste treatment, or comparative assertions when reference-flow qualifiers, boundaries, and data quality are not equivalent
required_metadataCanonical PCR id and version; product drawing family; rigid, flexible, or rigid-flex construction; substrate and resin system; stack-up and layer count; thickness; copper weight and conductor density; interconnect technology; surface finish; solder mask; halogen and flame-retardant declaration; acceptance class; site and geography; reporting period; panel utilization and yield; route; included processes; allocation; linked datasets; net-mass convention
required_quality_disclosurePrimary-data share; temporal and site coverage; calibration and laboratory QA; stage yield and material-balance closure; water and wastewater reconciliation; chemical and bath coverage; air-emission method; waste and recovery destinations; allocation drivers; outsourced-stage coverage; proxy and missing-flow list; uncertainty limitations
update_triggerMaterial change in construction, substrate, stack-up, layer count, conductor density, via technology, additive or subtractive route, plating or etching chemistry, surface finish, solder mask, site, electricity or water supply, wastewater or air controls, panel utilization, yield, allocation, supplier dataset, or reporting period; or correction of a referenced Tiangong identity

11. Data Sources

Source idTypeReferenceUsed for
us-epa-pcb-p2-1990Official guidance (official_guidance)U.S. Environmental Protection Agency, Guides to Pollution Prevention: The Printed Circuit Board Manufacturing Industry, EPA/625/7-90/007, June 1990, https://archive.epa.gov/sectors/web/pdf/01050.pdf (retrieved 2026-08-09)Printed-circuit process decomposition; raw materials; cleaning, surface preparation, electroless plating, imaging, electroplating and etching; waste, bath, rinse, air-emission, and recovery inventory coverage
us-epa-pwb-surface-finishesOfficial guidance (official_guidance)U.S. Environmental Protection Agency Design for the Environment, Printed Wiring Board Surface Finishes: Cleaner Technologies Substitutes Assessment, Volume 1, https://www.epa.gov/sites/default/files/2013-12/documents/pwb_surface_finishes_ctsa_vol1_0.pdf (retrieved 2026-08-09)Rigid, flexible and rigid-flex scope; layer types; multilayer production sequence; surface-finish alternatives; process material balance; water, wastewater, spent bath, sludge, solid-waste, and recovery accounting
ifc-electronics-ehs-2007Official guidance (official_guidance)International Finance Corporation / World Bank Group, Environmental, Health, and Safety Guidelines for Semiconductors & Other Electronics Manufacturing, 30 April 2007, https://www.ifc.org/content/dam/ifc/doc/2000/2007-semiconductors-electronic-ehs-guidelines-en.pdf (retrieved 2026-08-09)PCB and PCBA boundary distinction; additive, semi-additive and subtractive routes; board preparation, imaging, plating, finishing and testing; hazardous materials, wastes, air emissions, energy, wastewater segregation, treatment, and recovery
iso-14044-2006Standard (standard)ISO 14044:2006, Environmental management — Life cycle assessment — Requirements and guidelines, including published amendments, https://www.iso.org/standard/38498.html (retrieved 2026-08-09)Goal and scope, life-cycle inventory, allocation, reporting, review, completeness, and data-quality framework

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 7
Rule IDApplies toRuleSource IDs
system_boundary_rule_1foreground_system_boundaryThe default dataset boundary is cradle-to-gate for saleable unpopulated printed circuits. Upstream material, energy, chemical, water-supply, transport, and treatment burdens are represented by linked datasets; the foreground boundary covers the manufacturing operations and on-site management under the producer's control. A gate-to-gate dataset may be produced only when its starting condition and every omitted upstream stage are explicit.
boundary_product_scopeProduct identityInclude rigid, flexible, and rigid-flex printed circuits and their declared single-, double-, or multilayer routes; exclude component mounting and PCBA operations from the printed-circuit foreground boundary.us-epa-pwb-surface-finishes, ifc-electronics-ehs-2007
boundary_required_manufacturingForeground productionInclude applicable base-material preparation, lamination, drilling or other interconnect formation, cleaning, imaging and masking, catalyst and electroless deposition, conductor build-up, electroplating, etching and stripping, solder mask and legend, final surface finish, profiling, testing, inspection, and packaging. Mark non-applicable route steps explicitly.us-epa-pcb-p2-1990, us-epa-pwb-surface-finishes, ifc-electronics-ehs-2007
boundary_material_energy_waterAll foreground stagesInclude all purchased and internally transferred materials, process chemicals, bath make-up and replenishment, water by source and use, electricity, heat, fuels, compressed air or other material utilities, and actual internal recycle loops without double counting.us-epa-pcb-p2-1990, us-epa-pwb-surface-finishes, ifc-electronics-ehs-2007
boundary_waste_emissionsAll foreground stagesInclude rejects, routing and drilling residues, spent masks and resists, spent baths and etchants, drag-out, rinse wastewater, wastewater-treatment sludge, recovered metals, other hazardous and non-hazardous wastes, and measured or calculated releases to air, water, and soil.us-epa-pcb-p2-1990, us-epa-pwb-surface-finishes, ifc-electronics-ehs-2007
boundary_cutoff_disclosureCompletenessDo not omit a known material, chemical, energy, water, transport, waste, or emission flow merely because it lacks a preferred dataset. Record it as unresolved, use a disclosed proxy, or justify its exclusion under the declared study rule.iso-14044-2006
boundary_downstream_exclusionDefault cradle-to-gate datasetExclude component manufacture and mounting, PCBA soldering and cleaning, downstream equipment assembly, distribution of the assembled equipment, use, and end-of-life unless a lifecycle model explicitly adds those stages without double counting.ifc-electronics-ehs-2007, iso-14044-2006
Allocation rules · 6
Rule IDApplies toRuleSource IDs
allocation_avoidanceMulti-product facilities and shared linesFirst separate processes, lines, meters, batches, and product-family records so direct inputs, outputs, wastes, and emissions remain assigned to the products that caused them.iso-14044-2006
allocation_shared_operationsShared energy, water, ventilation, baths, testing, and utilitiesUse measured causal drivers such as sub-metered consumption, equipment operating time, processed panel area, bath loading, number of test cycles, or contaminant load. Mass-only allocation is permitted only when the shared operation is demonstrated to scale with product mass.iso-14044-2006, us-epa-pwb-surface-finishes
allocation_yield_and_rejectsProduction losses and rejected boardsInclude the burdens of normal scrap, coupons, rails, test failures, and rework in accepted saleable output. Do not remove the burdens of rejected production from the denominator.iso-14044-2006
allocation_wastewater_treatmentCombined wastewater and sludge treatmentAllocate by measured stream volume and pollutant load or other treatment-driving characteristics. Do not allocate chemically dissimilar streams by volume alone when contaminant loading materially differs.us-epa-pwb-surface-finishes, ifc-electronics-ehs-2007
allocation_recovered_materialsCopper and other recovered materialsPrefer subdivision and direct mass accounting. If a recovered material is treated as a co-product or receives a recycling credit, declare the method, point of substitution, quality adjustment, and sensitivity; do not combine allocation and substitution credits for the same recovered amount.iso-14044-2006
allocation_internal_recyclingInternal bath, rinse, metal, panel, or material loopsRecord internal returns explicitly, but count only make-up inputs and net releases across the foreground boundary. Internal circulation shall not create an avoided-burden credit.us-epa-pcb-p2-1990, us-epa-pwb-surface-finishes
Validation rules · 11
Rule IDApplies toRuleSource IDs
validate_identity_scopeProduct identityFail unless the product is an unpopulated printed circuit and the required construction, material, layer, route, finish, quality, geography, period, and boundary qualifiers are declared; reject PCBA, component, laminate-only, equipment, and waste-board substitutions.ifc-electronics-ehs-2007, us-epa-pwb-surface-finishes
validate_reference_flowQuantitative referenceRequire exactly 1 kg accepted net output using Printed circuits b230e7cd-7afd-4398-84bd-71beab1f6626, Mass 93a60a56-a3c8-11da-a746-0800200b9a66, Units of mass 93a60a57-a4c8-11da-a746-0800200b9a66, and unit kg; packaging and production residues shall be separate.
validate_route_boundaryProcess map and boundaryRequire every applicable operation in boundary_required_manufacturing, an explicit not-applicable declaration for route steps not used, and separate exclusion of PCBA and downstream equipment stages.us-epa-pcb-p2-1990, us-epa-pwb-surface-finishes, ifc-electronics-ehs-2007
validate_intermediate_linksForeground stage transfersRequire prepared, conditioned, and patterned panel transfers to reconcile between adjacent foreground stages without duplicate upstream burdens.
validate_material_and_yieldMaterial balance and outputRequire accepted product mass, stage yields, material inputs, rejects, residues, recoveries, and unresolved mass-balance difference on one reporting period and declared normalization basis.us-epa-pwb-surface-finishes
validate_chemicals_and_metalsWet-process inventoryRequire formulation, concentration, bath make-up, additions, bail-out or disposal, metal incorporation, recovery, and treatment records for every applicable imaging, plating, etching, and finishing line.us-epa-pcb-p2-1990, us-epa-pwb-surface-finishes
validate_water_and_wastewaterWater and effluentRequire source-separated make-up water, internal recirculation disclosure, contact and non-contact separation, wastewater volume, relevant constituent loads, treatment route, effluent, and sludge reconciliation.us-epa-pwb-surface-finishes, ifc-electronics-ehs-2007
validate_energyEnergy and utilitiesRequire carrier-separated electricity, heat, fuel, and material utility records and a documented allocation driver for shared systems.ifc-electronics-ehs-2007
validate_waste_recovery_emissionsResiduals and releasesRequire wastes by composition and destination, verified recovered outputs, sludge and spent-bath records, and substance- and compartment-specific air, water, and soil releases where applicable.us-epa-pcb-p2-1990, us-epa-pwb-surface-finishes, ifc-electronics-ehs-2007
validate_allocationMulti-product and shared operationsRequire allocation avoidance where feasible, a causal driver for every shared operation, inclusion of normal reject burdens in accepted output, and no simultaneous allocation and substitution credit for the same recovered amount.iso-14044-2006
validate_data_qualityDataset packageRequire protocol coverage, temporal and site coverage, calibration and laboratory evidence, upstream dataset and proxy disclosure, allocation documentation, and a list of unresolved completeness items.iso-14044-2006
Processes and inputs/outputs · 5
Process IDProcess nameInput flowsOutput flows
material_preparationBase-material preparation and lamination33
hole_and_surface_preparationDrilling, interconnect formation, and surface preparation44
conductor_formationImaging, masking, plating, etching, and stripping54
finishing_and_releaseSolder mask, legend, surface finish, profiling, testing, inspection, and packaging44
wastewater_and_waste_managementProcess-wastewater, bath, residue, and sludge management23

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page

1. Scope and Applicability2. Product Category Identity3. Reference Flow4. Measurement and Unit Rules5. System BoundaryBoundary Abstraction6. Process Inventory StructureProcess MapProcess: Base-material preparation and lamination (material_preparation)InputsProduct flowsSubstrates, copper foils, and copper-clad laminates (base_materials)Prepreg, bonding films, resins, and lamination auxiliaries (lamination_materials)Electricity and thermal energy for preparation and lamination (material_preparation_energy)Waste flowsOutputsProduct flowsPrepared or laminated panel (prepared_panel)Waste flowsOffcuts, separator waste, and lamination rejects (preparation_scrap)Elementary flowsLamination and preparation releases to air (preparation_air_releases)Process: Drilling, interconnect formation, and surface preparation (hole_and_surface_preparation)InputsProduct flowsPrepared panels entering hole and surface preparation (prepared_panel_input)Drill, routing, desmear, cleaning, and conditioning materials (hole_preparation_materials)Process and rinse water for hole and surface preparation (hole_preparation_water)Electricity and utilities for drilling and surface preparation (hole_preparation_energy)Waste flowsOutputsProduct flowsDrilled and conditioned panel (conditioned_panel)Waste flowsDrilling and routing residues and worn tools (mechanical_preparation_waste)Spent preparation baths and contact wastewater (hole_preparation_wastewater)Elementary flowsDust, acid mist, and volatile releases (hole_preparation_air_releases)Process: Imaging, masking, plating, etching, and stripping (conductor_formation)InputsProduct flowsConditioned panels entering conductor formation (conditioned_panel_input)Imaging, resist, developer, and stripping materials (imaging_materials)Copper, catalysts, plating salts, and etchants (conductor_chemicals)Process and rinse water for conductor formation (conductor_formation_water)Electricity and utilities for conductor formation (conductor_formation_energy)Waste flowsOutputsProduct flowsPatterned printed-circuit panel (patterned_panel)Waste flowsSpent resists, masks, films, and contaminated solids (imaging_waste)Spent plating baths, etchants, drag-out, and wastewater (conductor_wastewater)Elementary flowsControlled releases from imaging, plating, and etching (conductor_air_releases)Process: Solder mask, surface finish, testing, and release (finishing_and_release)InputsProduct flowsPatterned panels entering finishing (patterned_panel_input)Solder mask, legend, and final surface-finish materials (finishing_materials)Finishing water, electricity, and material utilities (finishing_utilities)Transport packaging materials (transport_packaging)Waste flowsOutputsProduct flowsAccepted finished printed circuits (finished_printed_circuits)Waste flowsProfiling residues, test rejects, and finishing solids (finishing_scrap)Spent finishing baths and wastewater (finishing_wastewater)Elementary flowsControlled finishing releases to air (finishing_air_releases)Process: Process-wastewater, bath, residue, and sludge management (wastewater_and_waste_management)InputsProduct flowsTreatment chemicals, water, energy, and services (treatment_inputs)Waste flowsSegregated spent baths, wastewater, and residues entering management (residuals_to_treatment)OutputsProduct flowsRecovered copper and other materials (recovered_materials)Waste flowsWastewater-treatment sludge and concentrated residues (treatment_sludge)Elementary flowsTreated effluent released to water (treated_effluent)7. Allocation and Co-product Handling8. Foreground Data Collection, Calculation, and Quality RulesData Collection ProtocolsCalculation RulesData Quality Requirements9. Validation Rules10. Published Dataset Profile11. Data Sources