TianGong PCR

Sound recording original production

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:96113 · exact

Source

1. Scope and Applicability

Production of original recordings of sounds, words and music in digital or analogue form, from a defined project and existing inputs through acceptance and initial delivery of the complete identified recorded asset. Cover studio, location, speech, musical and environmental-sound recording, including actual editing, mixing, synthesis or mastering when part of the agreed deliverable. Declare whether the original is raw recorded material, an approved mix or a mastered recording; the complete original may be a defined set, not just one file. Neither a universal mastering stage nor a particular sample rate is imposed. [Source: un-cpc-sound-originals]

Exclude a live performance without a recording, a script alone, mere recording labour without an original asset as output, physical-media mass replication, subsequent downloads/streaming, broadcast transmission, standalone software/data assets and rights transactions without production. An original recording commissioned for radio may also be a radio original: use the same production inventory once for the identical asset, with transparent shared/component boundaries. Radio editorial assembly beyond the source recording is additional work; classification or whole-IP sale does not create another production event. [Source: un-cpc-radio-originals]

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.community-social-and-personal-services.audio-original-assets.sound-recording-original-production
classification_refsCPC 3.0 96113
covered_productsIdentified original sound, speech and music recordings in digital or analogue form; all actually used production routes
excluded_productsUnrecorded script/live event; replication/download/broadcast operation; service labour alone; rights resale alone
representative_productAccepted complete digital recorded-sound original with declared production stage, version and component set
production_routeProject preparation → actual capture or recorded-sound creation → actual editing/mixing/mastering as applicable → verify complete asset and initial delivery
market_stateReusable original recording held or transferred with documented rights and technical acceptance, without inferred legal approval

3. Reference Flow

FieldValue
WhatCreate and initially deliver one complete identified recorded-sound original
How muchOne accepted original with exact duration, production stage, channels and component hierarchy declared
How wellActual commissioning specification and verified completeness, playable original embodiment, provenance and permitted reuse; no invented quality grade
How long or cycleComplete creation cycle including retries and acceptance delivery; future reuse period disclosed without assumed asset lifetime
reference_flow_linkaccepted_original
FieldValue
Reference amount1
Reference product flowAccepted complete sound recording original
Reference flow propertyNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345
Reference unit groupUnits of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159
Reference unititem
Required qualifiersoriginal/project ID; version; title and sound/speech/music class; raw/mixed/mastered stage; complete take/song/album/library scope and component hierarchy; exact duration; digital/analogue route; encoding/sample rate/bit depth/channels or analogue tape format/speed/tracks; native versus converted format; actual acceptance specification/result/date; initial delivery and backup scope/cutoff; provenance; permitted reuse/rights; creation sites/period; owned/provider coverage; electricity region/voltage

item is the singular-count alias of public Item(s), and Chinese 件 is the same unit. Declare all qualifiers in the data package. Rights, revenue, listener counts, bytes and carrier mass do not replace the original count. A set's components are identified so that the set and each component are not counted as independent full outputs simultaneously.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
original_countreference productNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345itemCount complete accepted originals with cp_acceptance; internal takes, replicas and subsequent uses do not increase output.
electricity_unitprep_electricity; capture_electricity; finish_electricityNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJPreserve the verified public energy property; measured kWh × 3.6 gives MJ without changing the reference denominator.
carrier_unitblank_tape; discarded_tapeMasskgCollect physical tape separately through cp_carrier; length requires actual supplier linear mass or traceable weighing, not recorded duration.
service_unitrecording_service; mastering_service; hosted_storageTimehMeasure the specified provider activity and reconcile its inventory; session or capacity-time alone is not energy.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionDefined recording project with existing source inputs and installed facilities; neither inputs nor facilities are assumed burden-free
starting_condition_roleforeground_start
product_classification_scopeRecorded-sound original creation and initial acceptance delivery; classification does not establish another original identity
recursive_input_ruleVersioned pre-existing recordings enter with declared upstream production shares; internal capture is foreground; parent and component shares must reconcile
upstream_dataset_requirementVerified electricity, carrier, source-original, service, travel and equipment-production inventories; disclose omissions
disclosureStage/component hierarchy; actual operations/sites/time; owner/provider split; facility support; backup/delivery cutoff; downstream exclusions; upstream gaps
rule_idRulesource_ids
boundary_creationInclude actual preparation, recording/creation, retries, processing, technical checks, pre-acceptance storage and initial agreed delivery. Select operations from the real route; not all recordings require a mixed or mastered version.un-cpc-sound-originals
boundary_stageDeclare the accepted stage and supporting components. For music, tracking, approved mix and mastered mix are distinct handoffs; carry prior burdens forward once rather than repeatedly treating them as new independent creations.academy-delivery-2025
boundary_downstreamRecord actual acceptance and completion of the first agreed delivery separately; creation ends only when both are complete. Retain attributable storage, support, services and equipment activity between those endpoints. Separate ongoing preservation after that boundary, later media replication, downloads, streaming, transmission and listening. Initial delivery network activity, physical carriers and shipping actually used must be recorded; no default network-energy coefficient.
boundary_actualScreen actual facility utilities, fuels, releases, consumables, equipment, travel and wastes. Add one specific row for each present exchange omitted here; no assumed generator/refrigerant emissions. Electricity supplier emissions are upstream. Missing upstream inventories prevent a complete cradle-to-gate claim.

6. Process Inventory Structure

These cards describe common individual exchanges, conditional where stated. No elementary release is presumed from electrical recording. An actual release needs measured species, fossil/biogenic source, receiving compartment and a separately verified elementary identity; retain the screen even when none occurs. Record real additional equipment, physical delivery drives, packaging and routes as separate exchanges in the dataset; the example cards are not a zero-burden exemption.

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
prepareDefine and prepare recording projectrequiredActual project operations; row conditions applyforeground_productionper declared reference flow
captureCapture or create recorded soundsrequiredActual digital/analogue route; existing component provenance retainedforeground_productionper declared reference flow
finishProcess, verify and initially deliver complete originalrequiredActual processing only; mastering conditional on accepted stageforeground_productionper declared reference flow

Process: Define and prepare recording project (prepare)

Inputs

Product flows
Alternating current (prep_electricity)

Meter attributable preparation, audition and project-support electricity. This UUID applies only to CN grid-average user supply below 1 kV. Other supply needs a specific verified flow and the same measured accounting.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_energy.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_energy
  • Sources:

Process: Capture or create recorded sounds (capture)

Inputs

Product flows
Alternating current (capture_electricity)

Meter recording, monitoring, recorder charging and actual studio ventilation/support. Apply the same CN below-1-kV condition; exclude provider-covered energy to avoid duplication.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_energy.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_energy
  • Sources:
Unrecorded analogue magnetic audio tape (blank_tape)

Conditional on actual analogue capture or mix print. Identify tape grade, backing, coating, width and length from supplier records; weigh issued/returned tape. This is the physical carrier, not the intellectual original; no assumed tape formulation.

  • Selected flow: Unrecorded analogue magnetic audio tape
  • Flow property / unit: Mass / kg
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_carrier.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_carrier
  • Sources:
Condenser microphone (microphone_share)

Conditional on actual use of an owned condenser microphone; identify model and manufacturing dataset. Attribute supported production share by recorded utilization. Other microphone types require separate rows; service-included devices are not counted twice.

  • Selected flow: Condenser microphone
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_equipment.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_equipment
  • Sources:
Configured audio recorder (recorder_share)

Conditional on a separate owned recording machine. Declare digital/analogue model, channels, recording medium and configuration. Its manufacturing share is based on actual utilization, not its nameplate power or an invented lifetime.

  • Selected flow: Configured audio recorder
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_equipment.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_equipment
  • Sources:
Location sound recording session service (recording_service)

Conditional on outsourced capture. Specify session, crew, devices, travel and deliverable; obtain supplier inventory and actual session hours. If the provider delivers a pre-existing original instead, use source_original, not both for the same burden.

  • Selected flow: Location sound recording session service
  • Flow property / unit: Time / h
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_service.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_service
  • Sources:
Existing identified sound recording original (source_original)

Conditional on an externally produced existing recording used in the new original. Declare source version, permitted reuse and consumed production share. Newly captured internal takes remain foreground operations, not duplicate upstream inputs; licence payments are metadata.

  • Selected flow: Existing identified sound recording original
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_asset.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_asset
  • Sources:
Passenger transport by petrol passenger car (location_travel)

Conditional on actual production travel by this route. Retain trip distance, passengers and project share; do not double count provider travel. Another mode requires its own specific exchange.

  • Selected flow: Passenger transport by petrol passenger car
  • Flow property / unit: Passenger transport / person*km
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_travel.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_travel
  • Sources:

Process: Process, verify and initially deliver complete original (finish)

Inputs

Product flows
Alternating current (finish_electricity)

Meter editing, mixing, actual mastering, verification, pre-acceptance backups and operator-side delivery. Apply the same CN below-1-kV condition. Record actual processing hours and support; no conversion from track duration or GB to electricity.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_energy.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_energy
  • Sources:
Configured audio production computer workstation (workstation_share)

Attribute workstation manufacturing used across all project stages once here, with actual configuration and supported utilization denominator. DAW processing and synthesis are logged as actual operations; no default workstation or service life.

  • Selected flow: Configured audio production computer workstation
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_equipment.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_equipment
  • Sources:
Sound recording mastering session service (mastering_service)

Conditional on outsourced mastering actually required for the declared accepted stage. Fix deliverable format, channels, version and provider scope; collect real session hours and provider inventory. A raw-recording original does not require invented mastering.

  • Selected flow: Sound recording mastering session service
  • Flow property / unit: Time / h
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_service.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_service
  • Sources:
Managed audio-project storage service (hosted_storage)

Conditional on contracted project storage through acceptance and initial delivery. Fix capacity, region, redundancy and retention, reconcile capacity-time with supplier inventory and its actual service-hours interface. Post-acceptance archival operation is separate; GB is not kWh.

  • Selected flow: Managed audio-project storage service
  • Flow property / unit: Time / h
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_service.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_service
  • Sources:

Outputs

Product flows
Accepted complete sound recording original (accepted_original)

One complete accepted original at the declared stage and version, including its defined components and initial delivery package. A take, song, album or sound library counts as one only when it is the explicitly complete accepted asset. Files, channels, stems and safety copies do not increase the count.

  • Selected flow: Accepted complete sound recording original
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: 1 item
  • Value mode: fixed_value
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_acceptance
  • Sources: un-cpc-sound-originals
Waste flows
Discarded analogue magnetic audio tape (discarded_tape)

Conditional on actual discarded tape from production; weigh this segregated stream and retain composition and treatment evidence. Recorded tape delivered as original embodiment is not waste. Do not claim automatic recycling credits.

  • Selected flow: Discarded analogue magnetic audio tape
  • Flow property / unit: Mass / kg
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_carrier.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_carrier
  • Sources:

7. Allocation and Co-product Handling

rule_idRulesource_ids
allocate_sharedSubdivide jobs first. Attribute shared meters using actual measured device power/occupancy and task logs; explain standby, ventilation and support shares and reconcile all assignments. Supplier storage/network inventory uses actual capacity-time/transfers and service scope, not price or universal kWh/GB.
allocate_originalPrefer subdivision of jointly produced originals; otherwise justify physical shared-work fractions and sensitivity. Failed takes/revisions belong to the accepted asset. Keep component/set, raw/mix/master and radio/sound overlap burdens traceable and counted once; rights or royalty sales are not co-products.
allocate_equipmentAttribute real equipment manufacturing with a persistent asset ledger across all projects and periods. Measured project use is only the numerator; the denominator must cover supported actual lifetime/cumulative service activity or a justified expected lifetime, with sensitivity and subsequent reconciliation. Cumulative allocated manufacturing fractions across every project and period must not exceed 1, and must never reset at a new project or observation window. An observed-period method distributes only the already attributed manufacturing fraction of that period, not a whole asset inventory in every period. Unknown lifetime, denominator or period share requires explicit review; no default life or mass. Avoid service/rental/equipment duplication and automatic waste credits.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_acceptancefinishaccepted_originalOriginal acceptance ledgerID; version; stage; hierarchy; duration; encoding/analogue format; acceptance result; delivery; rightsInspect complete original, components, playback and actual agreed technical/rights records; reconcile replicas and earlier stage IDsitemevery accepted originalfull creation and rework to initial deliveryall operator/provider sitesper declared reference floworiginal checksum or analogue carrier ID; signed acceptance; component ledger
cp_energyprepare; capture; finishelectricityMeter and job recordsmeter; timestamps; kWh; task; site; voltage; power profile; standby/support; provider coverageSubmeter jobs or reconcile interval meters with measured device power and occupancy logs; convert measured kWh to MJMJeach session and processing/delivery intervalall project work including failed takes and backupall included sitesper declared reference flowcalibrated meters; job logs; assigned-total reconciliation
cp_carriercapture; finishblank_tape; discarded_tapeCarrier balancegrade; backing/coating; width; length; kg issued/returned/retained/discarded; treatmentWeigh actual tape or use verified grade-specific measured linear mass; reconcile embodied delivered tape separately from wastekgeach issue/return/discardfull declared analogue workoperator and relevant providersper declared reference flowcalibrated weighing; supplier specifications; stock/treatment ledger
cp_equipmentcapture; finishmicrophone_share; recorder_share; workstation_shareAsset utilizationasset ID; model; configuration; production inventory; actual task hours; supported lifetime/cumulative service activity; justified expected lifetime; period share; prior cumulative fractions; assigned fraction; remaining fraction; sensitivity; subsequent reconciliation; actual acceptance timestamp; actual first-delivery completion timestamp; attributable activity between those endpointsLink real assets to manufacturing inventories and task logs; verify lifetime/service denominator and persistent cross-project/cross-period ledger. Distribute only an already attributed period share in observation-only accounting; reconcile cumulative fractions at most 1. Unknown denominator/share requires review, no default lifespanitemeach project and asset updateFull project activity through both actual acceptance and first agreed delivery completion, ending at the later recorded endpoint; do not assume coincidenceowned equipment at included sitesper declared reference flowpersistent asset ledger; lifetime/period-share evidence; cumulative share conservation; sensitivity; subsequent reconciliation
cp_servicecapture; finishrecording_service; mastering_service; hosted_storageProvider activity ledgerprovider; session/service h; capacity; region; redundancy; delivery; energy/equipment/travel coverage; actual acceptance timestamp; actual first-delivery completion timestamp; attributable activity between those endpointsObtain session/storage activity and supplier inventory; reconcile capacity-time and service-hour definition and avoid owned/provider overlapheach supplier delivery/intervalFull project activity through both actual acceptance and first agreed delivery completion, ending at the later recorded endpoint; do not assume coincidencedeclared providers/sitesper declared reference flowsupplier environmental inventory; activity ledger; scope reconciliation
cp_assetcapturesource_originalSource-asset provenancesource ID/version; stage; components; rights; upstream burden; shareVerify original provenance, allowed reuse and production inventory; document attributable share separately from royaltiesitemeach source componentactual source production represented by upstream inventoryidentified source producersper declared reference flowupstream dataset; rights record; parent/component reconciliation
cp_travelcapturelocation_travelJourney recordscar route; petrol; km; passengers; purpose; provider coverageRead actual journeys and project occupancy share; reconcile passenger-distance and exclude duplicate supplier transportperson*kmeach journeyfull actual production travelproduction locationsper declared reference flowtrip logs; route and passenger records

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
electricity_conversionprep_electricity; capture_electricity; finish_electricityMJ = attributable measured kWh × 3.6; preserve the original denominator.cp_energy; measured kWhMJ per declared reference flow
original_normalizationall inventory rowsFor homogeneous originals of identical declared scope divide each attributable total by actual accepted count. Assign unlike assets by project first and report separately. Reference output is exactly 1 item.cp_acceptance; attributable totalsexchange amount per declared reference flow
provider_reconciliationrecording_service; mastering_service; hosted_storageReconcile actual specified activity with provider inventory; duration/capacity alone cannot determine energy.cp_service; provider inventoryservice amount per declared reference flow

Data Quality Requirements

requirement_idApplies toRequirementEvidence
quality_originalaccepted_originalFix stage, complete hierarchy, version and actual acceptance specification. For music, apply delivery guidance only if adopted; speech/environmental originals use their actual specification.cp_acceptance; academy-delivery-2025
quality_formataccepted_originalRecord native and delivered resolution/format, channel layout and metadata provenance; converted files do not imply newly created content or better source resolution. LOC preferences are preservation guidance, not universal commissioning requirements.cp_acceptance; loc-audio-formats
quality_activityall inventory rowsReconcile complete operations, material stocks, support, equipment and suppliers; disclose missing measurements/upstream inventories with uncertainty, never as zero. Verify equipment cumulative shares across all projects/periods, lifetime/service denominator and subsequent updates; unsubstantiated denominator or period share remains under review.cp_energy; cp_carrier; cp_equipment; cp_service
quality_representativeaccepted_originalDeclare genre, route, duration, stage, component reuse and population represented. One count cannot justify comparison between unlike originals.cp_acceptance

9. Validation Rules

rule_idRulesource_ids
validate_referenceRequire all qualifiers, one complete accepted recorded asset and 1 item linked to accepted_original; reject unrecorded scripts, uses, fees and replicas as original output.un-cpc-sound-originals
validate_overlapVerify stage/set/component and radio/sound relationships. A reused existing original has a traced upstream share; common production cannot be counted anew for another classification or rights sale.un-cpc-radio-originals
validate_coverageCheck each actual route, retry, backup, initial delivery and support activity; screen releases and retain atomic additions. Reconcile operator/provider attribution and disclose missing identities and upstream burdens before any complete lifecycle claim. Reject resetting a whole asset manufacturing inventory per project/period or cumulative asset shares above 1; require review for unsupported lifetime, denominator or period share.
validate_unitsPreserve original count, physical carrier mass, electrical MJ, provider hours and passenger-distance. Inspect public identity route/property/unit, not just names; never map GB directly to kWh or rewrite public properties.

10. Published Dataset Profile

FieldValue
dataset_roleoriginal_asset_production
downstream_usesecondary_dataset; background_dataset
allowed_useTraced recorded-original input to declared radio, audiovisual, replication, download or listening scenarios with explicit reuse allocation
excluded_useComplete listening/broadcast/download footprint without downstream processes; count-only comparison; legal or methodology approval
required_metadataAll reference qualifiers; stage/set/component lineage; actual route; sites/period; operator/provider/upstream coverage; dataset versions; actual allocation basis
required_quality_disclosureMeasurement and identity gaps; upstream completeness; equipment denominator uncertainty; excluded operations; allocation sensitivity and source limits
update_triggerNew original/stage/version/scope; changed recording/processing/delivery route, equipment, supply or acceptance conditions

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-sound-originalsofficial_guidanceUNSD CPC 3.0 subclass 96113 explanatory note. https://unstats.un.org/unsd/classifications/Econ/Structure/Detail/EN/2100/96113Sound/word/music digital or analogue original scope; no environmental factors
un-cpc-radio-originalsofficial_guidanceUNSD CPC 3.0 subclass 84611 explanatory note. https://unstats.un.org/unsd/classifications/Econ/Structure/Detail/EN/2100/84611Recorded-radio overlap; no classification-based duplication
academy-delivery-2025handbookRecording Academy P&E Wing, Delivery Recommendations for Recorded Music Projects, 2025, printed pp.4–8 (PDF pp.6–10). https://naras.a.bigcontent.io/v1/static/PE_Guidebook_241016Music master/component/stage and analogue/digital delivery distinctions, recommendations only where adopted; no default energy or archive life
loc-audio-formatsofficial_guidanceLibrary of Congress Recommended Formats Statement, IV Audio Works, ii A/C, current web statement. https://www.loc.gov/preservation/resources/rfs/audio.htmlMedia-independent native/delivered format and metadata descriptors; preservation preferences only

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 4
Rule IDApplies toRuleSource IDs
boundary_creationforeground_system_boundaryInclude actual preparation, recording/creation, retries, processing, technical checks, pre-acceptance storage and initial agreed delivery. Select operations from the real route; not all recordings require a mixed or mastered version.un-cpc-sound-originals
boundary_stageforeground_system_boundaryDeclare the accepted stage and supporting components. For music, tracking, approved mix and mastered mix are distinct handoffs; carry prior burdens forward once rather than repeatedly treating them as new independent creations.academy-delivery-2025
boundary_downstreamforeground_system_boundaryRecord actual acceptance and completion of the first agreed delivery separately; creation ends only when both are complete. Retain attributable storage, support, services and equipment activity between those endpoints. Separate ongoing preservation after that boundary, later media replication, downloads, streaming, transmission and listening. Initial delivery network activity, physical carriers and shipping actually used must be recorded; no default network-energy coefficient.
boundary_actualforeground_system_boundaryScreen actual facility utilities, fuels, releases, consumables, equipment, travel and wastes. Add one specific row for each present exchange omitted here; no assumed generator/refrigerant emissions. Electricity supplier emissions are upstream. Missing upstream inventories prevent a complete cradle-to-gate claim.
Allocation rules · 3
Rule IDApplies toRuleSource IDs
allocate_sharedforeground_burden_allocationSubdivide jobs first. Attribute shared meters using actual measured device power/occupancy and task logs; explain standby, ventilation and support shares and reconcile all assignments. Supplier storage/network inventory uses actual capacity-time/transfers and service scope, not price or universal kWh/GB.
allocate_originalforeground_burden_allocationPrefer subdivision of jointly produced originals; otherwise justify physical shared-work fractions and sensitivity. Failed takes/revisions belong to the accepted asset. Keep component/set, raw/mix/master and radio/sound overlap burdens traceable and counted once; rights or royalty sales are not co-products.
allocate_equipmentforeground_burden_allocationAttribute real equipment manufacturing with a persistent asset ledger across all projects and periods. Measured project use is only the numerator; the denominator must cover supported actual lifetime/cumulative service activity or a justified expected lifetime, with sensitivity and subsequent reconciliation. Cumulative allocated manufacturing fractions across every project and period must not exceed 1, and must never reset at a new project or observation window. An observed-period method distributes only the already attributed manufacturing fraction of that period, not a whole asset inventory in every period. Unknown lifetime, denominator or period share requires explicit review; no default life or mass. Avoid service/rental/equipment duplication and automatic waste credits.
Validation rules · 4
Rule IDApplies toRuleSource IDs
validate_referenceforeground_dataset_conformanceRequire all qualifiers, one complete accepted recorded asset and 1 item linked to accepted_original; reject unrecorded scripts, uses, fees and replicas as original output.un-cpc-sound-originals
validate_overlapforeground_dataset_conformanceVerify stage/set/component and radio/sound relationships. A reused existing original has a traced upstream share; common production cannot be counted anew for another classification or rights sale.un-cpc-radio-originals
validate_coverageforeground_dataset_conformanceCheck each actual route, retry, backup, initial delivery and support activity; screen releases and retain atomic additions. Reconcile operator/provider attribution and disclose missing identities and upstream burdens before any complete lifecycle claim. Reject resetting a whole asset manufacturing inventory per project/period or cumulative asset shares above 1; require review for unsupported lifetime, denominator or period share.
validate_unitsforeground_dataset_conformancePreserve original count, physical carrier mass, electrical MJ, provider hours and passenger-distance. Inspect public identity route/property/unit, not just names; never map GB directly to kWh or rewrite public properties.
Processes and inputs/outputs · 3
Process IDProcess nameInput flowsOutput flows
prepareDefine and prepare recording project10
captureCapture or create recorded sounds70
finishProcess, verify and initially deliver complete original42

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page