Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:81400 · exact

Source

1. Scope and Applicability

This PCR covers own-account creation of scientific original knowledge intended for sale without a contract or known buyer at production inception: documented ideas, plans, blueprints or formulas for inventions, products and processes (un-cpc3-originals). It encompasses actual laboratory, computational, field, survey and mixed research routes, not just digital document preparation. Identify the novel question, evidence route and original completion gate. A physical prototype may support the original, but the knowledge asset is the reference output. A patent is neither necessary nor proof of scientific validity.

Exclude commissioned research-service outputs, routine testing, design concepts without a research knowledge objective, mineral exploration results, software originals as standalone software products, general-purpose data products, brands/franchises, literary/artistic originals, broadcasts and downloads. Software and data integral to an identified scientific result stay in its package, with no duplicate standalone output. A downstream industrial design original belongs to its own boundary. Resolve mixed research/design classification from the actual deliverable, not its file extension. Count is a declared production unit, not evidence that unrelated originals perform equivalent functions.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.business-and-production-services.research-and-development-services.own-account-research-development-original
classification_refsCPC 3.0 81400
covered_productsOwn-account versioned scientific knowledge originals for inventions, products or processes; intended sale with no contracted or known buyer at inception
excluded_productsCommissioned R&D services; CPC 83920 design originals; software/data/download/broadcast products; exploration, artistic and brand assets
representative_productOwn-account research and development original package
production_routeQuestion and hypothesis → actual investigation and iterations → evidence evaluation → complete versioned original package; specific experiments and supporting infrastructure declared
market_stateCompleted original available for intended sale or licensing of its identified knowledge; actual rights and restrictions declared, no assumed license duration

3. Reference Flow

FieldValue
WhatCreate one identifiable scientific original knowledge package, not perform an unspecified research hour
How muchOne complete original package of one declared version
How wellDocument research objective, originality evidence, investigated uncertainty, methods, datasets/specimens, verification results, limitations, integrity and reuse conditions; no claim of patent, safety or methodology approval
How long or cycleOne actual creation cycle from project inception through documented completion; dates measured, no generic lifetime or later-use duration
reference_flow_linkreference_product_original
FieldValue
Reference amount1
Reference product flowOwn-account research and development original package
Reference flow propertyNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345
Reference unit groupUnits of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159
Reference unititem
Required qualifiersproject and original ID; version/content inventory; own-account inception and intended sale; field and research objective; actual route and scale; completeness acceptance; evidence and reproducibility limits; geography/sites; creation dates; rights/reuse restrictions; storage and completion cutoff; upstream/reuse allocation; device and provider scope

Required qualifiers must accompany the dataset metadata, process notes or reference-flow description. The completed original is not counted once per patent, claim, user, copy or download.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
reference_countreference productNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345itemitem is the unit display alias of public Item(s), with factor 1. Record one complete declared original using cp_original; do not infer knowledge mass, rights quantity or original count from money or bytes.
energy_interfaceall electricity rowsNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJcp_energy records measured kWh; use 1 kWh = 3.6 MJ at the identical energy interface. Preserve the public reference property, geography and voltage. GB, CPU hours and network traffic do not themselves measure electricity.
same_original_basisall inventory rowsOriginal package countitemAll inventory and collection results use per declared reference flow for this one version. Retain raw kg, MJ and device/service item amounts as numerators; no mass conversion of the knowledge output.

Mass property 93a60a56-a3c8-11da-a746-0800200b9a66 references mass unit group 93a60a57-a4c8-11da-a746-0800200c9a66, with reference kg. Net calorific value references energy unit group 93a60a57-a3c8-11da-a746-0800200c9a66, with reference MJ. These units concern specific input/output exchanges, not the intellectual original quantity.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionActual project inception with existing knowledge, specimens and facilities identified; earlier reused original burdens are not assumed zero
starting_condition_roleForeground collection boundary with linked upstream supplies
product_classification_scopeCPC 3.0 81400
recursive_input_ruleTrack reused or purchased research originals once with a matching upstream inventory and an explicit beneficiary ledger; in-house expanded work replaces the corresponding purchased exchange
upstream_dataset_requirementActual supplied state, region/year, device configuration, reagent purity, provider work scope and treatment technology; quantify missing layers before a complete lifecycle claim
disclosureProject start/end, actual methods, failed branches, reused knowledge, make/buy boundaries, materiality and unknown inventories; foreground-only is not complete cradle-to-gate
rule_idApplies toRulesource_ids
boundary_creationall processesInclude hypothesis/planning, investigation including failed trials, evidence evaluation, original documentation and attributable facilities through completion. Travel, heating, cooling, instruments, prototypes and consumables actually used must be screened and instantiated as specific exchanges; salaries are not physical flows.un-cpc3-originals; oecd-frascati-2015; gsf-sci-1-1-0
boundary_routesinvestigationRequire an actual method-to-inventory register for every laboratory, pilot, field, survey and computing route. Expand each material, energy carrier, treatment and supported elementary release individually. Listed conditional rows are concrete route entries, not an exhaustive universal experimental recipe; absent route evidence blocks completeness.oecd-frascati-2015
boundary_research_endprototypes and pilot plantsKeep research trials resolving uncertainty inside the creation cycle. Separate later routine manufacture and commercial operation; subdivide mixed-use pilot operation and physical products rather than assigning all plant burdens to knowledge.oecd-frascati-2015
boundary_distributionoriginal reuse and deliveryKeep reproduction/downloads, later hosting/network delivery, license administration and use of the invention separate from original creation. Declare any initial transfer cutoff explicitly. Reuse must carry the original burden ledger without charging its full creation inventory to every copy.un-cpc3-originals
boundary_providerowned and purchased computingSeparate owned measured utilities and device inventory from complete purchased computing services; record actual provider workload, storage and traffic and its documented inventory. A provider service replaces embedded electricity/hardware; missing provider layers stay unknown.gsf-sci-1-1-0

6. Process Inventory Structure

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
conceptionResearch question, hypothesis and planrequiredAll originalsforeground creationper declared reference flow
investigationActual investigation and iterationsrequiredActual method, including theory, experiments or research data acquisitionforeground creationper declared reference flow
evaluationResearch evidence evaluationrequiredAll originals; no requirement for a successful inventionforeground creationper declared reference flow
consolidationDocumented original completionrequiredAll originalsreference outputper declared reference flow
infrastructureSupporting device embodied inventoriesconditionalActual owned devices not included in purchased servicesupstream allocated inputper declared reference flow

These stages are workload subdivisions, not four additional originals. Internal evidence and draft transfers cancel when consolidating the project. Any unsupported chemistry, site-water discharge, fuel combustion, cooling leakage or prototype route remains a mandatory inventory-expansion question when actually present; do not import generic manufacturing emissions. A theoretical or social-science original need not consume nitrogen or laboratory water.

Process: Research planning (conception)

Inputs

Product flows
Alternating current (conception_electricity)

Meter literature analysis, hypothesis formulation and research planning attributable to this original. This UUID applies only to CN grid-average consumption delivered below 1 kV; other regions or interfaces require their own identity.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Measured attributable amount per declared reference flow; cp_energy.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy
  • Sources: gsf-sci-1-1-0
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Investigation (investigation)

Inputs

Product flows
Alternating current (investigation_electricity)

Record actual experiment, simulation, research data acquisition and failed/repeated run electricity. Apply this UUID only to CN grid-average user supply below 1 kV; do not substitute power-station output.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Measured attributable amount per declared reference flow; cp_energy.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy
  • Sources: gsf-sci-1-1-0
Deionised water (laboratory_water)

Conditional: purchased pure water produced by ion exchange or reverse osmosis actually used in an experimental route. Record measured mass; on-site purification instead requires raw-water, purification and reject inventories and must replace this purchased-water boundary.

  • Selected flow: Deionised water 5b3acbab-2518-4406-8736-d21f222d757a
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable amount per declared reference flow; cp_material.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material
  • Sources: oecd-frascati-2015
Liquid Nitrogen (cryogenic_nitrogen)

Conditional: actual cryogenic experiment or specimen preservation using liquid nitrogen of purity at least 99.9%, from liquid-air fractionation matching the declared supply. Record consumption including attributable storage loss; gaseous nitrogen is a different purchased identity.

  • Selected flow: Liquid Nitrogen dd17be27-229a-4236-ae93-29835cf7e1a8
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable amount per declared reference flow; cp_material.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material
  • Sources: oecd-frascati-2015
Polypropylene centrifuge tube, 15 mL (pp_tube)

Conditional: this exact consumable is actually used. Weigh its polymer mass; volume is the tube capacity, not a conversion to polymer mass. Record cap material separately if different, and instantiate every other actual reagent, specimen, vessel or prototype component as its own atomic exchange.

  • Selected flow: Polypropylene centrifuge tube, 15 mL
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable amount per declared reference flow; cp_material.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_material
  • Sources: oecd-frascati-2015
Tensile-test research report (tensile_report)

Conditional: an external provider delivers one scoped tensile-test report used to resolve a declared research question. Specify test method, specimen identity, run count and report completeness. A complete provider inventory replaces its embedded power and material rows; ordinary factory acceptance testing is not this exchange.

  • Selected flow: Tensile-test research report
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Measured attributable amount per declared reference flow; cp_service.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_service
  • Sources: oecd-frascati-2015
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Used polypropylene centrifuge tube, 15 mL (pp_tube_waste)

Conditional: this actual discarded tube leaves the research site. Record measured mass, contamination, residual chemical identity and receiving treatment. Do not label contaminated laboratory polymer as clean recycling feedstock; retained specimens remain stock, not waste.

  • Selected flow: Used polypropylene centrifuge tube, 15 mL
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable amount per declared reference flow; cp_waste.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_waste
  • Sources: oecd-frascati-2015
Elementary flows
dinitrogen (nitrogen_air)

Conditional: documented molecular nitrogen release to air, unspecified subcompartment, during the represented observation period. Use measured venting or a nitrogen stock balance that separates retained, transferred and released nitrogen. This is neither atmospheric resource extraction nor long-term release nor NO, NO2 or N2O.

  • Selected flow: dinitrogen fe0acd60-3ddc-11dd-aad2-0050c2490048
  • Flow property / unit: Mass 93a60a56-a3c8-11da-a746-0800200b9a66 / kg
  • Amount rule: Measured attributable amount per declared reference flow; cp_emission.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_emission
  • Sources: oecd-frascati-2015

Process: Evaluation (evaluation)

Inputs

Product flows
Alternating current (evaluation_electricity)

Meter reproducibility checks, analysis and validation of the research results. Use this identity only for CN grid-average user supply below 1 kV, and separate this meter pool from investigation.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Measured attributable amount per declared reference flow; cp_energy.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy
  • Sources: gsf-sci-1-1-0
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

Process: Original completion (consolidation)

Inputs

Product flows
Alternating current (consolidation_electricity)

Meter documentation, final integrity checks and storage through the declared original completion gate. CN grid-average user supply below 1 kV only; perpetual hosting and later downloads are separate.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Measured attributable amount per declared reference flow; cp_energy.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_energy
  • Sources: gsf-sci-1-1-0
Waste flows
Elementary flows

Outputs

Product flows
Own-account research and development original package (reference_product_original)

One complete versioned scientific original: its identified knowledge content, supporting evidence and reuse conditions constitute the declared package. Copies, patents, claims, download events and prospective licensees do not create additional originals.

  • Selected flow: Own-account research and development original package
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: 1 item
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_original
  • Sources: un-cpc3-originals
Waste flows
Elementary flows

Process: Supporting hardware (infrastructure)

Inputs

Product flows
Research computing server (server_hardware)

Conditional: this specific owned server supports original creation and its embodied inventory is not already in a purchased service. Bind model, hardware configuration and provider dataset; allocate its device inventory by evidenced time and reserved resource shares. Other workstation, instrument, building or network assets require separate specific rows.

  • Selected flow: Research computing server
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Measured attributable amount per declared reference flow; cp_asset.
  • Value mode: Foreground record (foreground_record)
  • Specificity: Site-specific (site_specific)
  • Normalization basis: per declared reference flow
  • Basis kind: Process output (process_output)
  • Evidence kind: Collected record (collected_record)
  • Collection protocol: cp_asset
  • Sources: gsf-sci-1-1-0
Waste flows
Elementary flows

Outputs

Product flows
Waste flows
Elementary flows

7. Allocation and Co-product Handling

rule_idApplies toRulesource_ids
allocation_subdivideall shared research inputsFirst separate project operations and outputs with actual meters, bookings and material issue records. Do not use revenue, patent counts or hoped-for users as default physical shares. Record causal driver and unassigned residual; unknown shared burdens are not zero.un-cpc3-originals; oecd-frascati-2015; gsf-sci-1-1-0
allocation_computeshared computing facilitiesUse actual measured energy and explainable job/resource/time attribution, including reserved idle capacity and cooling boundary. Energy attribution requires validation against facility meters; storage/traffic metrics are allocation evidence, not universal kWh coefficients.gsf-sci-1-1-0
allocation_deviceserver_hardwareAttribute the specific device inventory using reserved time relative to evidenced installed life and reserved resource share. Collect actual device, life and capacity records; no assumed server lifespan. Apply only outside a provider inventory containing the same asset.gsf-sci-1-1-0
allocation_originalknowledge reuse, failed branches and pilot productsKeep all attributable failed/repeated trials in the bounded original project. Trace reused knowledge and jointly produced originals with a conserved beneficiary ledger; no dilution by unlimited future licenses. Subdivide commercial pilot products and research use using actual physical operation records; unresolved joint attribution needs review.oecd-frascati-2015; un-cpc3-originals

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_originalconsolidationreference outputacceptance_recordproject; original ID; version; content manifest; complete package count; dates; inception buyer/contract facts; intended sale; rights and limitationsInspect original research records and completion checklist, deduplicate content identity and verify own-account inception and package integrityitemAt completionEntire creation cycleAll producing sites and partnersper declared reference flowSigned content manifest and original records, without claiming scientific approval
cp_energyconception; investigation; evaluation; consolidationelectricitymeter_recordstage; meter; timestamps; region; voltage; kWh; attributable workload; idle/cooling boundary; provider inclusionsCalibrated submeters or verified telemetry reconciled to actual facility meter; disclose causal workload allocation and meter coveragekWhEach run and project periodEntire creation cycle, including failed trialsOwned facilities; purchased provider separatelyper declared reference flowCalibration, facility reconciliation, workload ledger and missing-time disclosure
cp_materialinvestigationindividual material inputissue_recordspecific chemical/material; CAS/composition; state/purity; mass; stock changes; method/run; supplier; lossWeigh or use traceable mass issue/return records; measure density for volume-to-mass conversion at recorded conditions; link every actual route reagent and specimenkgEach experiment and stock reconciliationAll trials and storage within gateActual laboratories, field and pilot sitesper declared reference flowBalances, supply certificates, method/BOM and stock reconciliation
cp_serviceinvestigationexternal tensile-test reportprovider_recordprovider; test method; specimens; run count; complete report; utility/material/hardware scope; project assignmentInspect actual order and report; obtain a matching provider inventory with declared report unit and scopeitemEach deliveryProject creation cycleActual providerper declared reference flowProvider report and inventory; embedded-flow exclusion ledger
cp_wasteinvestigationindividual waste outputtransfer_recordwaste identity; polymer mass; contaminant identities; retained stocks; shipment; receiving routeMeasure segregated waste and reconcile manifests; record constituent/residual substances and actual off-site treatment, not assumed clean recoverykgEach transferAll project wastes and final stockActual site and receiving treatmentper declared reference flowWeighing and waste manifests; contamination assessment
cp_emissioninvestigationdinitrogen to airmeasurement_recordnitrogen inlet; stock; recovery; transfer; vent; chemical identity; period; air subcompartmentMeasure actual vent release or reconcile nitrogen mass balance with measured stocks, retained and transferred amounts; disclose uncertainty and verify immediate air compartmentkgEach run and stock periodRepresented observation periodActual experimental siteper declared reference flowVent or stock records; compartment and chemical check
cp_assetinfrastructurespecific server inputasset_recordserver model/configuration; upstream inventory; reserved time; installed life; reserved/total capacity; provider duplication checkInspect asset registers and reservation logs; justify actual installed-life estimate and device dataset match; retain sensitivity for life and capacity assumptionsitemEach asset and project periodCreation cycle and documented asset lifeActual owned serverper declared reference flowAsset evidence, capacity logs, inventory completeness and uncertainty

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
calculate_energyall electricity rowsMultiply attributable recorded kWh by 3.6 to obtain MJ; retain the same interface and declared original basis.cp_energy; kWhMJgsf-sci-1-1-0
calculate_project_amountall inventory rowsSum only nonduplicated exchange amounts attributable to the one declared original; project subdivision and shared shares must be documented first. The reference output is exactly one complete item.cp_original; stage records; beneficiary ledgerper declared reference flowun-cpc3-originals; oecd-frascati-2015; gsf-sci-1-1-0
calculate_nitrogen_releasenitrogen_airReconcile actual nitrogen input and opening stock against closing stock, recovered/transferred nitrogen and measured release. Investigate unexplained balance residual instead of declaring it all emitted.cp_material; cp_emissionkg per declared reference flowoecd-frascati-2015

Data Quality Requirements

requirement_idApplies toRequirementEvidence
quality_identityreference outputBind actual content/version, own-account inception, completeness and reuse restrictions; count alone does not establish comparable knowledge quality.cp_original; un-cpc3-originals
quality_routesinvestigationEvery actual research method maps to complete route-specific atomic inputs, outputs, waste and substantiated releases; distinguish absent from unknown.method logs; cp_material; cp_waste; cp_emission
quality_timeall processesUse the entire declared creation period including failed trials and site/provider changes; quantify missing periods and disclose representativeness.dated project and meter records
quality_upstreamall inputsVerify supplier inventories, physical properties, units, regional/temporal matches and hardware scopes; unresolved identity is a candidate gap, not an available approved dataset.direct identity checks; supplier evidence
quality_uncertaintyallocation and quantitiesReport meter uncertainty, project attribution residuals, device life sensitivity, reused-original provenance and scope exclusions; no generic yield or energy benchmark.measured and allocation evidence

9. Validation Rules

rule_idApplies toRulesource_ids
validate_originalreference_product_originalReject duplicate copies/claims/downloads counted as new originals or a commissioned service relabelled as own-account. Verify required qualifiers and one complete version.un-cpc3-originals
validate_measurementall inventory rowsRequire consistent per declared reference flow in both languages, linked raw records, numerator units and documented energy conversion. No invented knowledge mass or traffic-to-kWh relationship.gsf-sci-1-1-0
validate_routesinvestigationFail dataset completeness when an actual route has unexplained materials, wastes, water fate, direct emissions or trial boundaries. Do not treat conditional absence as a zero without evidence.oecd-frascati-2015
validate_double_countshared assets and providersReconcile provider/owned scope, stage pools and original beneficiary shares; reject the same electricity, device, purchased report or original creation burden counted twice.gsf-sci-1-1-0; un-cpc3-originals
validate_identityUUID-bearing and unresolved rowsVerify public flow substance, supply route, reference property, unit group and elementary subcompartment. Blank identities and missing supplier layers must remain explicit; they prevent complete usable dataset claims until resolved.un-cpc3-originals; oecd-frascati-2015; gsf-sci-1-1-0

10. Published Dataset Profile

FieldValue
dataset_roleOriginal-creation foreground inventory for one complete identified scientific knowledge package
downstream_usesecondary_dataset; background_dataset
allowed_useAfter evidence completion, traceable upstream original input to research, design or product models with explicit reuse attribution
excluded_useGeneric impact per patent, money, user or download; approved scientific or legal status; complete lifecycle claim from foreground alone; comparisons of nonequivalent knowledge assets
required_metadataRequired reference qualifiers; process/route register; actual sites and periods; all exchange units and collection records; upstream/provider versions and scope; reuse and asset allocation ledger
required_quality_disclosureUnknown identities, missing routes/layers, measurement uncertainty, attribution residuals, device life sensitivity and limited knowledge comparability
update_triggerNew original version or knowledge scope; research route change; new provider/device; revised completion cutoff, reuse ledger or measured records

11. Data Sources

Source idTypeReferenceUsed for
un-cpc3-originalsofficial_guidanceUNSD CPC 3.0 explanatory notes, 81400 and 83920: https://unstats.un.org/unsd/classifications/Econ/Structure/Detail/EN/2100/81400 ; https://unstats.un.org/unsd/classifications/Econ/Structure/Detail/EN/2100/83920Economic product boundary, own-account inception and scientific/design distinction; no quantitative LCA factors
oecd-frascati-2015official_guidanceOECD Frascati Manual 2015, DOI 10.1787/9789264239012-en; §§2.5–2.8, 2.32–2.36, 2.49–2.54 and Table 2.3; printed pp.44–45, 51–52, 60–62 (PDF pp.46–47, 53–54, 62–64)Research activity, uncertainty, prototypes and pilot/commercial split; statistical definitions are not LCA allocation factors or measured consumptions
gsf-sci-1-1-0standardGreen Software Foundation, Software Carbon Intensity specification 1.1.0, sections Energy, Embodied emissions, Software boundary, Quantification method: https://sci.greensoftware.foundation/Computing energy and asset attribution only; transfer of measured workload principles, not the SCI carbon score as full original LCA

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 5
Rule IDApplies toRuleSource IDs
boundary_creationall processesInclude hypothesis/planning, investigation including failed trials, evidence evaluation, original documentation and attributable facilities through completion. Travel, heating, cooling, instruments, prototypes and consumables actually used must be screened and instantiated as specific exchanges; salaries are not physical flows.un-cpc3-originals, oecd-frascati-2015, gsf-sci-1-1-0
boundary_routesinvestigationRequire an actual method-to-inventory register for every laboratory, pilot, field, survey and computing route. Expand each material, energy carrier, treatment and supported elementary release individually. Listed conditional rows are concrete route entries, not an exhaustive universal experimental recipe; absent route evidence blocks completeness.oecd-frascati-2015
boundary_research_endprototypes and pilot plantsKeep research trials resolving uncertainty inside the creation cycle. Separate later routine manufacture and commercial operation; subdivide mixed-use pilot operation and physical products rather than assigning all plant burdens to knowledge.oecd-frascati-2015
boundary_distributionoriginal reuse and deliveryKeep reproduction/downloads, later hosting/network delivery, license administration and use of the invention separate from original creation. Declare any initial transfer cutoff explicitly. Reuse must carry the original burden ledger without charging its full creation inventory to every copy.un-cpc3-originals
boundary_providerowned and purchased computingSeparate owned measured utilities and device inventory from complete purchased computing services; record actual provider workload, storage and traffic and its documented inventory. A provider service replaces embedded electricity/hardware; missing provider layers stay unknown.gsf-sci-1-1-0
Allocation rules · 4
Rule IDApplies toRuleSource IDs
allocation_subdivideall shared research inputsFirst separate project operations and outputs with actual meters, bookings and material issue records. Do not use revenue, patent counts or hoped-for users as default physical shares. Record causal driver and unassigned residual; unknown shared burdens are not zero.un-cpc3-originals, oecd-frascati-2015, gsf-sci-1-1-0
allocation_computeshared computing facilitiesUse actual measured energy and explainable job/resource/time attribution, including reserved idle capacity and cooling boundary. Energy attribution requires validation against facility meters; storage/traffic metrics are allocation evidence, not universal kWh coefficients.gsf-sci-1-1-0
allocation_deviceserver_hardwareAttribute the specific device inventory using reserved time relative to evidenced installed life and reserved resource share. Collect actual device, life and capacity records; no assumed server lifespan. Apply only outside a provider inventory containing the same asset.gsf-sci-1-1-0
allocation_originalknowledge reuse, failed branches and pilot productsKeep all attributable failed/repeated trials in the bounded original project. Trace reused knowledge and jointly produced originals with a conserved beneficiary ledger; no dilution by unlimited future licenses. Subdivide commercial pilot products and research use using actual physical operation records; unresolved joint attribution needs review.oecd-frascati-2015, un-cpc3-originals
Validation rules · 5
Rule IDApplies toRuleSource IDs
validate_originalreference_product_originalReject duplicate copies/claims/downloads counted as new originals or a commissioned service relabelled as own-account. Verify required qualifiers and one complete version.un-cpc3-originals
validate_measurementall inventory rowsRequire consistent per declared reference flow in both languages, linked raw records, numerator units and documented energy conversion. No invented knowledge mass or traffic-to-kWh relationship.gsf-sci-1-1-0
validate_routesinvestigationFail dataset completeness when an actual route has unexplained materials, wastes, water fate, direct emissions or trial boundaries. Do not treat conditional absence as a zero without evidence.oecd-frascati-2015
validate_double_countshared assets and providersReconcile provider/owned scope, stage pools and original beneficiary shares; reject the same electricity, device, purchased report or original creation burden counted twice.gsf-sci-1-1-0, un-cpc3-originals
validate_identityUUID-bearing and unresolved rowsVerify public flow substance, supply route, reference property, unit group and elementary subcompartment. Blank identities and missing supplier layers must remain explicit; they prevent complete usable dataset claims until resolved.un-cpc3-originals, oecd-frascati-2015, gsf-sci-1-1-0
Processes and inputs/outputs · 5
Process IDProcess nameInput flowsOutput flows
conceptionResearch question, hypothesis and plan10
investigationActual investigation and iterations52
evaluationResearch evidence evaluation10
consolidationDocumented original completion11
infrastructureSupporting device embodied inventories10

Complete field inspector