TianGong PCR

Radio programme original production

Lifecycle status
Candidate
Content maturity
Authored methodology
Current version
0.1.0Last updated
Readiness
Review required

Methodology and translation states come from the source record; publishing this website does not change their review status.

Content languages

zh-CN · Aligned
Status, classification and source details

Readiness

  • Warnings methodology_not_reviewed Authored methodology is candidate guidance and still requires methodology review.

Classification mapping

CPC 3.0:84611 · exact

Source

1. Scope and Applicability

Creation of original radio content protectable as intellectual property and produced for over-the-air transmission is covered from a defined production brief and existing inputs through acceptance of the complete original. This includes news features, drama, documentary, music programmes, short-form originals and original scripted live-programme packages when they are complete identifiable assets. Recorded audio is representative; a live-script route declares script/cue embodiment and separates later performance and transmission. A source sound recording alone is not automatically the radio original. [Sources: un-cpc-radio-originals, un-cpc-sound-originals, ebu-radio-production-2023]

Exclude standalone sound-recording originals not commissioned as radio originals, television originals, transmission services, channel scheduling alone, licences alone, physical-media manufacture and consumer downloads. Original creation, copies, distribution and audience use are distinct activities; one item does not imply comparable duration or quality.

2. Product Category Identity

FieldValue
canonical_pcr_idpcr.business-and-production-services.broadcast-content-originals.radio-programme-original-production
classification_refsCPC 3.0 84611
covered_productsComplete protectable radio programme original assets intended for over-the-air transmission
excluded_productsStandalone source sound recordings; television originals; transmission; downloads; licences without production
representative_productAccepted original recorded radio programme with fixed version and declared duration
production_routeBrief/script → create or acquire components → edit/mix or compile original script package → verify and accept
market_stateIdentified reusable original held or transferred under declared rights; no statutory approval inferred

3. Reference Flow

FieldValue
WhatCreate one complete identified radio programme original
How muchOne accepted original; exact duration, components and version declared
How wellDocumented project completeness, editorial and technical acceptance specification; EBU recommendations only where actually adopted
How long or cycleOne creation cycle through acceptance including revisions and failed takes; future reuse period declared without assumed life
reference_flow_linkradio_original
FieldValue
Reference amount1
Reference product flowRadio programme original
Reference flow propertyNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345
Reference unit groupUnits of items 5beb6eed-33a9-47b8-9ede-1dfe8f679159
Reference unititem
Required qualifiersproject/original ID; version; complete programme/series/segment scope; title/genre/language; intended over-the-air use; exact duration; audio or script embodiment; sample rate/bit depth/channels/format when audio; acceptance date/specification/results; component provenance; ownership/permitted reuse; creation period/sites; supply region/voltage

item is the singular-count alias of public Item(s); Chinese 件 denotes the same count, not mass or bytes. Every dataset must declare all required qualifiers. Rights, revenue and audience count are not physical reference quantities.

4. Measurement and Unit Rules

rule_idApplies toRequired propertyRequired unitRule
original_countreference productNumber of items 01846770-4cfe-4a25-8ad9-919d8d378345itemCount one complete accepted original using cp_acceptance; copies and airings do not increase output.
electricity_unitprep_electricity; record_electricity; finish_electricityNet calorific value 93a60a56-a3c8-11da-a746-0800200c9a66MJPreserve public energy property; convert measured kWh to MJ with 1 kWh = 3.6 MJ. No bytes-to-energy conversion.
service_unitrecording_service; hosted_storageTimehHours refer to the specified provider service, not a universal energy coefficient or original duration; fix capacity, crew and coverage.

5. System Boundary

Boundary Abstraction

FieldValue
declared_starting_conditionDefined brief, existing source inputs and installed facilities at project start; inputs are not assumed burden-free
starting_condition_roleforeground_start
product_classification_scopeRadio programme original creation; CPC is a locator, not the identity hierarchy
recursive_input_ruleExisting originals are versioned upstream inputs with declared burden shares; do not re-author recursively or duplicate internal component production
upstream_dataset_requirementVerified electricity, material, source-original, provider, travel and equipment datasets; disclose missing upstream stages
disclosureSites/time; original hierarchy; owned/provider work; support loads; acceptance storage cutoff; exclusions and upstream gaps
rule_idRulesource_ids
boundary_creationInclude actual planning, creation, rework, edit/mix or script compilation, quality checks and acceptance. A live-script route states its real operations rather than inventing recording.un-cpc-radio-originals; ebu-radio-production-2023
boundary_downstreamSeparate later transmission/playout, downloads, long-term archive and audience devices; count creation once, with explicit downstream reuse allocation.ebu-radio-production-2023; un-sna-originals-2008
boundary_actualScreen actual utilities, fuels, consumables, travel, wastes and direct releases at all sites. These cards specify common atomic exchanges, not every project flow. Add separate actual exchanges with verified identities or explicit gaps when present. Do not declare generator fuel or refrigerant loss absent because only electricity is illustrated. A foreground-only dataset cannot claim complete cradle-to-gate coverage.

6. Process Inventory Structure

No elementary flow is presumed for electrical audio/script creation. Retain a direct-release screen; actual releases require species, fossil/biogenic source and receiving compartment evidence and their own rows. Supplier electricity emissions are not local direct releases.

Process Map

process_idprocess_nameinclusioninclusion_conditionrolequantitative_reference
preparePlan and prepare scriptrequiredActual operations; row-specific conditions declaredforeground_productionper declared reference flow
create_contentCreate and acquire programme componentsrequiredActual operations; row-specific conditions declaredforeground_productionper declared reference flow
finishEdit, verify and accept originalrequiredActual operations; row-specific conditions declaredforeground_productionper declared reference flow

Process: Plan and prepare script (prepare)

Inputs

Product flows
Alternating current (prep_electricity)

Meter attributable planning, script and office-support electricity. Only CN grid-average user supply below 1 kV may use this identity; other supply requires a separately verified identity.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_energy.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_energy
  • Sources:
Uncoated woodfree printing paper (script_paper)

Conditional on actual printed scripts; weigh issued and returned paper. Digital-only work needs no paper. Paper bags and coated or recycled paper are separate identities.

  • Selected flow: Uncoated woodfree printing paper
  • Flow property / unit: Mass / kg
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_material.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_material
  • Sources:

Process: Create and acquire programme components (create_content)

Inputs

Product flows
Alternating current (record_electricity)

Meter attributable recording, monitoring and studio support including ventilation. Only CN grid-average user supply below 1 kV may use this identity. Exclude energy already embodied in contracted services.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_energy.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_energy
  • Sources:
Location sound recording service (recording_service)

Conditional on outsourced location recording; specify session, crew, equipment, travel and deliverable coverage; retain provider environmental inventory and actual service hours, not invoice value.

  • Selected flow: Location sound recording service
  • Flow property / unit: Time / h
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_service.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_service
  • Sources:
Condenser microphone (microphone_share)

Conditional on use of an owned condenser microphone. Attribute actual equipment production using utilization and supported service activity, without a default lifetime. Rented devices already covered by services are not counted again.

  • Selected flow: Condenser microphone
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Use the attributable manufacturing fraction of one complete asset from cp_equipment and allocate_equipment as the equipment input per declared reference flow; retain the cumulative cross-project/period ledger and reconcile operation and rental-service coverage separately.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_equipment
  • Sources:
Accepted sound recording original (source_audio)

Conditional on an existing external recording incorporated into the programme. Identify version, permitted use and allocated production burden. Newly produced internal components are not added as external inputs; royalties are metadata.

  • Selected flow: Accepted sound recording original
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_asset_input.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_asset_input
  • Sources:
Passenger transport by petrol passenger car (location_travel)

Conditional on actual location travel by this route; measure passenger distance and project share. Provider-covered travel is not counted again; other vehicle routes require separate specific rows.

  • Selected flow: Passenger transport by petrol passenger car
  • Flow property / unit: Passenger transport / person*km
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_travel.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_travel
  • Sources:

Process: Edit, verify and accept original (finish)

Inputs

Product flows
Alternating current (finish_electricity)

Meter editing, mixing, quality checks, export and operator-owned pre-acceptance storage. Only CN grid-average user supply below 1 kV may use this identity; third-party storage energy embedded in services is not counted again.

  • Selected flow: Alternating current 50657322-939c-4829-a87b-47c093bfa6a7
  • Flow property / unit: Net calorific value 93a60a56-a3c8-11da-a746-0800200c9a66 / MJ
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_energy.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_energy
  • Sources:
Audio production computer workstation (workstation_share)

Attribute actual workstation manufacturing across all three processes once here, using its declared configuration, utilization and supported service denominator; do not convert cost or power to equipment mass.

  • Selected flow: Audio production computer workstation
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: Use the attributable manufacturing fraction of one complete asset from cp_equipment and allocate_equipment as the equipment input per declared reference flow; retain the cumulative cross-project/period ledger and reconcile operation and rental-service coverage separately.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_equipment
  • Sources:
Managed audio-project storage service (hosted_storage)

Conditional on contracted pre-acceptance storage at a fixed declared capacity, redundancy and region. Retain actual capacity-time ledger, attributed service hours and supplier inventory; bytes do not imply kWh. Post-acceptance archival use is downstream.

  • Selected flow: Managed audio-project storage service
  • Flow property / unit: Time / h
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_service.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_service
  • Sources:

Outputs

Product flows
Radio programme original (radio_original)

One complete accepted original at the declared version. A series is one item only if the whole defined series is the complete original. An independently complete segment can be an original. Duplicated files are not additional originals.

  • Selected flow: Radio programme original
  • Flow property / unit: Number of items 01846770-4cfe-4a25-8ad9-919d8d378345 / item
  • Amount rule: 1 item
  • Value mode: fixed_value
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_acceptance
  • Sources: un-cpc-radio-originals; ebu-radio-production-2023
Waste flows
Waste uncoated woodfree printing paper (script_paper_waste)

Conditional on discarded script paper; weigh this segregated stream and document treatment. It is a waste exchange, not an elementary emission or default recycling credit.

  • Selected flow: Waste uncoated woodfree printing paper
  • Flow property / unit: Mass / kg
  • Amount rule: Attributable measured exchange amount per declared reference flow; cp_material.
  • Value mode: foreground_record
  • Specificity: site_specific
  • Normalization basis: per declared reference flow
  • Basis kind: reference_flow
  • Evidence kind: collected_record
  • Collection protocol: cp_material
  • Sources:

7. Allocation and Co-product Handling

rule_idRulesource_ids
allocate_sharedFirst subdivide project work and separate providers. Attribute shared metered totals using measured power profiles and recorded job/equipment occupancy; justify idle/support shares and reconcile assigned totals. Storage uses actual capacity-time and provider inventory, not universal kWh/GB. Do not allocate by sales, royalties or audience counts.
allocate_originalFor jointly created originals prefer subdivision; otherwise document a physically supported shared-work relationship, fractions and sensitivity. Failed takes/revisions remain with the accepted original. Prevent parent/component double accounting; rights transfer is not new original production.ebu-radio-production-2023; un-sna-originals-2008
allocate_equipmentAttribute real equipment manufacturing with a persistent asset ledger across all projects and periods. Measured project use is only the numerator; the denominator must cover supported actual lifetime/cumulative service activity or a justified expected lifetime, with sensitivity and subsequent reconciliation. Cumulative allocated manufacturing fractions across every project and period must not exceed 1, and must never reset at a new project or observation window. An observed-period method distributes only the already attributed manufacturing fraction of that period, not a whole asset inventory in every period. Unknown lifetime, denominator or period share requires explicit review; no default life or mass. Avoid service/rental/equipment duplication and automatic waste credits.

8. Foreground Data Collection, Calculation, and Quality Rules

Data Collection Protocols

protocol_idprocess_idflow_rolerecord_typeraw_fieldscollection_methodunitfrequencytemporal_coveragesite_scopeaggregation_rulequality_evidence
cp_acceptancefinishradio_originalOriginal ledgerID; version; scope; duration; format; acceptance; rights; componentsInspect accepted audio/script package and actual editorial/technical records; distinguish originals from copiesitemeach task and acceptancecomplete creation including reworkall declared operator/provider sitesper declared reference flowtraceable logs; calibrated meters where applicable; supplier inventory; reconciliation
cp_energyprepare; create_content; finishelectricityMeter recordsmeter; kWh; timestamps; task; site; voltage; power profile; support; allocationSubmeter tasks or reconcile interval meters with measured device power and task logs; convert to MJ, separate supplier coverageMJeach task and acceptancecomplete creation including reworkall declared operator/provider sitesper declared reference flowtraceable logs; calibrated meters where applicable; supplier inventory; reconciliation
cp_materialprepare; finishscript_paper; script_paper_wasteWeighing recordspaper grade; issued/returned/waste kg; stock; treatment; projectWeigh actual input/return and segregated waste; reconcile stock and usekgeach task and acceptancecomplete creation including reworkall declared operator/provider sitesper declared reference flowtraceable logs; calibrated meters where applicable; supplier inventory; reconciliation
cp_servicecreate_content; finishrecording_service; hosted_storageProvider recordsprovider; session/storage hours; capacity; crew; redundancy; region; deliverable; covered inputsObtain actual session or capacity-time logs and provider inventory, identify energy/equipment includedheach task and acceptancecomplete creation including reworkall declared operator/provider sitesper declared reference flowtraceable logs; calibrated meters where applicable; supplier inventory; reconciliation
cp_equipmentcreate_content; finishmicrophone_share; workstation_shareUtilization recordspersistent asset ID; model; configuration; production inventory; project task use; supported lifetime/cumulative-service denominator and its coverage; expected-life evidence and sensitivity; manufacturing fraction already attributed to the period; current project fraction; prior and cumulative fractions across all projects and periods; service/rental coverage; subsequent reconciliationLink physical assets and task records to the cross-project/period manufacturing-share ledger; justify the denominator under allocate_equipment. An observation period distributes only its already attributed fraction and cumulative shares must not exceed 1. Unknown denominators or period fractions require review; a new project or period never resets whole-asset manufacture.itemeach task and acceptancecomplete creation including reworkall declared operator/provider sitesper declared reference flowtraceable logs; calibrated meters where applicable; supplier inventory; reconciliation
cp_asset_inputcreate_contentsource_audioAsset provenancesource ID/version; component; rights; production burden; reuse shareVerify supplier original-production inventory and declared consumed share; separate feesitemeach task and acceptancecomplete creation including reworkall declared operator/provider sitesper declared reference flowtraceable logs; calibrated meters where applicable; supplier inventory; reconciliation
cp_travelcreate_contentlocation_travelJourney logsvehicle; petrol route; passengers; km; task; provider coverageRead actual trip records and reconcile passenger distance and project shareperson*kmeach task and acceptancecomplete creation including reworkall declared operator/provider sitesper declared reference flowtraceable logs; calibrated meters where applicable; supplier inventory; reconciliation

Calculation Rules

rule_idApplies toFormula or ruleInputsOutputsource_ids
electricity_conversionprep_electricity; record_electricity; finish_electricityMJ = measured attributable kWh × 3.6; preserve the original denominator.cp_energy; measured kWhMJ per declared reference flow
original_normalizationall inventory rowsFor homogeneous accepted originals with identical declared scope divide each attributable exchange total by actual accepted count. Assign unlike originals by project first and report separately. Output is exactly 1 item per declared reference flow.cp_acceptance; attributable exchange totalsexchange amount per declared reference flow
service_reconciliationrecording_service; hosted_storageReconcile consumed hours for the specified service to supplier activity inventory; time and capacity alone do not establish electrical energy.cp_service; supplier inventoryservice amount per declared reference flow

Data Quality Requirements

requirement_idApplies toRequirementEvidence
quality_identityradio_originalFix original version, complete hierarchy, duration and actual commissioning acceptance specification. Loudness/peak targets follow adopted specification, not universal defaults; no inferred legal or EBU approval.cp_acceptance; ebu-radio-production-2023
quality_activityall inventory rowsCover complete creation/rework and sites; reconcile meters, stocks, provider and equipment allocation. Missing data are disclosed with uncertainty, not set to zero.cp_energy; cp_material; cp_service; cp_equipment
quality_representativeradio_originalDeclare genre, format, recorded/live route and source reuse; count alone cannot compare unlike durations/qualities.cp_acceptance

9. Validation Rules

rule_idRulesource_ids
validate_referenceRequire complete accepted original, all qualifiers and exactly 1 item linked to radio_original. Reject airings, downloads or rights payments as original output.un-cpc-radio-originals; ebu-radio-production-2023
validate_coverageCheck creation/rework and owned/provider separation; reject hidden support, storage, travel, consumable or release omissions. Declare identity/upstream gaps and prohibit complete lifecycle claims while missing.
validate_unitsCheck count and normalization; preserve electricity energy/MJ, equipment count, provider hours and passenger-distance units. Names alone do not establish route, region, property or UUID suitability.
validate_equipment_sharesVerify persistent asset IDs, use numerators, supported lifetime/cumulative-service denominators and already attributed period fractions. Cumulative manufacturing shares across all projects and periods must not exceed 1. Unknown denominators or period fractions require explicit review; one observation window cannot stand for a whole lifetime or reset full manufacture each period.

10. Published Dataset Profile

FieldValue
dataset_roleoriginal_asset_production
downstream_usesecondary_dataset; background_dataset
allowed_useExplicit original-production input to declared broadcast/copy/use scenarios with transparent reuse allocation
excluded_useUnqualified whole-broadcast/listening footprint; count-only comparisons; legal approval
required_metadataReference qualifiers; source hierarchy; sites/period; route; owned/provider coverage; dataset versions; allocations
required_quality_disclosureForeground/upstream coverage; identity gaps; measurement/provider support; equipment uncertainty; exclusions and sensitivity
update_triggerNew original version/scope/route; changed equipment/site/supply; material allocation or acceptance changes

11. Data Sources

Source idTypeReferenceUsed for
un-cpc-radio-originalsofficial_guidanceUNSD CPC 3.0 subclass 84611 explanatory note. https://unstats.un.org/unsd/classifications/Econ/Structure/Detail/EN/2100/84611Original radio content identity and over-the-air intent; no energy factors
un-cpc-sound-originalsofficial_guidanceUNSD CPC 3.0 subclass 96113 explanatory note. https://unstats.un.org/unsd/classifications/Econ/Structure/Detail/EN/2100/96113Sound-recording overlap and source component distinction
ebu-radio-production-2023official_guidanceEBU Tech 3401, November 2023, §1.2 p.6, §2 pp.7–8, §4 pp.8–10. https://tech.ebu.ch/docs/tech/tech3401.pdfProgramme hierarchy and production/distribution distinction; recommendations only if actually adopted; no environmental factors
un-sna-originals-2008official_guidanceUN et al., System of National Accounts 2008, §§10.115–10.116 p.207; §6.208 onwards. https://unstats.un.org/unsd/nationalaccount/docs/SNA2008.pdfHistorical originals/copies distinction only; no monetary allocation or current legal/lifetime claim

Raw downloads

These files are byte-identical to the canonical files for this revision in the repository.

Structured rule index

This index comes from verified structured.yaml and retains the canonical English rule text.

System boundary rules · 3
Rule IDApplies toRuleSource IDs
boundary_creationforeground_system_boundaryInclude actual planning, creation, rework, edit/mix or script compilation, quality checks and acceptance. A live-script route states its real operations rather than inventing recording.un-cpc-radio-originals, ebu-radio-production-2023
boundary_downstreamforeground_system_boundarySeparate later transmission/playout, downloads, long-term archive and audience devices; count creation once, with explicit downstream reuse allocation.ebu-radio-production-2023, un-sna-originals-2008
boundary_actualforeground_system_boundaryScreen actual utilities, fuels, consumables, travel, wastes and direct releases at all sites. These cards specify common atomic exchanges, not every project flow. Add separate actual exchanges with verified identities or explicit gaps when present. Do not declare generator fuel or refrigerant loss absent because only electricity is illustrated. A foreground-only dataset cannot claim complete cradle-to-gate coverage.
Allocation rules · 3
Rule IDApplies toRuleSource IDs
allocate_sharedforeground_burden_allocationFirst subdivide project work and separate providers. Attribute shared metered totals using measured power profiles and recorded job/equipment occupancy; justify idle/support shares and reconcile assigned totals. Storage uses actual capacity-time and provider inventory, not universal kWh/GB. Do not allocate by sales, royalties or audience counts.
allocate_originalforeground_burden_allocationFor jointly created originals prefer subdivision; otherwise document a physically supported shared-work relationship, fractions and sensitivity. Failed takes/revisions remain with the accepted original. Prevent parent/component double accounting; rights transfer is not new original production.ebu-radio-production-2023, un-sna-originals-2008
allocate_equipmentforeground_burden_allocationAttribute real equipment manufacturing with a persistent asset ledger across all projects and periods. Measured project use is only the numerator; the denominator must cover supported actual lifetime/cumulative service activity or a justified expected lifetime, with sensitivity and subsequent reconciliation. Cumulative allocated manufacturing fractions across every project and period must not exceed 1, and must never reset at a new project or observation window. An observed-period method distributes only the already attributed manufacturing fraction of that period, not a whole asset inventory in every period. Unknown lifetime, denominator or period share requires explicit review; no default life or mass. Avoid service/rental/equipment duplication and automatic waste credits.
Validation rules · 4
Rule IDApplies toRuleSource IDs
validate_referenceforeground_dataset_conformanceRequire complete accepted original, all qualifiers and exactly 1 item linked to radio_original. Reject airings, downloads or rights payments as original output.un-cpc-radio-originals, ebu-radio-production-2023
validate_coverageforeground_dataset_conformanceCheck creation/rework and owned/provider separation; reject hidden support, storage, travel, consumable or release omissions. Declare identity/upstream gaps and prohibit complete lifecycle claims while missing.
validate_unitsforeground_dataset_conformanceCheck count and normalization; preserve electricity energy/MJ, equipment count, provider hours and passenger-distance units. Names alone do not establish route, region, property or UUID suitability.
validate_equipment_sharesforeground_dataset_conformanceVerify persistent asset IDs, use numerators, supported lifetime/cumulative-service denominators and already attributed period fractions. Cumulative manufacturing shares across all projects and periods must not exceed 1. Unknown denominators or period fractions require explicit review; one observation window cannot stand for a whole lifetime or reset full manufacture each period.
Processes and inputs/outputs · 3
Process IDProcess nameInput flowsOutput flows
preparePlan and prepare script20
create_contentCreate and acquire programme components50
finishEdit, verify and accept original32

Complete field inspector

Loads this record’s complete manifest and structured projection on demand; values are never truncated. Requires JavaScript.

On this page